PWS_IR_Brazil_I200668_Redacted.pdf

PDF 546 KB Posted

Attached to
Standard Recovery - Brazil (Follow-on)
Solicitation number
83310126Q0024
Issued by

About this file

This is a Performance Work Statement (PWS) dated March 2, 2026, for loan recovery assistance services related to EXIM Bank Claim No. I200668, located in Brazil. The contractor is Varella & Advogados Asociados, a law firm in Rio de Janeiro, Brazil, responsible for collecting a defaulted debt on behalf of the Export-Import Bank of the United States (EXIM Bank).

The PWS outlines three primary tasks: (1) Case Analysis/Due Diligence, requiring the contractor to analyze case specifics, develop recovery strategies, conduct asset searches, and perform credit analysis; (2) Recovery of Defaulted Debt on a contingency fee basis, requiring extrajudicial collection attempts within ten business days of authorization and quarterly written briefs to EXIM Bank's Contracting Officer Representative (COR), with compensation limited to a negotiated contingency fee percentage with no expense reimbursement unless COR-approved; and (3) Litigation, requiring written approval from EXIM Bank's Recoveries Group and Office of General Counsel prior to filing legal proceedings, with compensation consisting of a contingency fee on actual cash recoveries plus approved non-administrative legal expenses. The contractor must ensure no conflicts of interest exist, maintain compliance with Brazilian law, be registered/licensed in Brazil, and provide experience handling collection matters for foreign government entities. Deliverables include a Project Task Log (monthly), conflict of interest notifications (within five business days), quarterly written briefs for active cases, collected funds reports (within 15 calendar days of notification), and litigation request forms with cost breakdowns as required. EXIM Bank reserves the right to cease work if contractor performance is unsatisfactory, the contractor requests release, or it determines cessation is in the government's best interest.

View the file

Other files

File Type Posted
JOFOC_IR_BRAZIL_I200668_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

DATE: 3/2/2026

1.0 INTRODUCTION

This contract is for loan recovery assistance from Varella & Advogados Asociados law firm located in Rio de Janeiro, Brazil, to collect a debt of – EXIM Bank Claim No.

I200668, located in Brazil.

The Contractor shall provide all personnel, equipment, supplies, postage, facilities, transportation, tools, materials, travel, supervision, and other items and non-personal services necessary to perform loan recovery Services as defined in this Performance Work Statement except for those items specified as Government furnished property and services.

2.0 BACKGROUND

(a) The Export-Import Bank of the United States (“EXIM Bank”) supports the financing of U.S.

goods and services. It assumes credit and country risks the private sector is unable or unwilling to accept. In covering these risks, EXIM Bank paid on the claim related to Claim I200668. Upon payment of the claim, it becomes the responsibility of the Asset Recovery Group (“ARG”) within the Asset Management Division of EXIM Bank (“AMD”) to seek repayment from the debtor and/or guarantors.

(b) Throughout this document, the term “recovery officer(s)” will be used. For the purposes of this document, recovery officer(s) refers to the International Recovery Officers, and Managing

Director – Recoveries, within ARG.

(c) ARG collects on accounts in three ways:

1. Direct Collection – EXIM Bank officers personally work the collection cases,

2. Local Attorneys – EXIM Bank signs a contract with a local attorney to work on the collection within certain guidelines from EXIM Bank, and

3. Collection Contractor – EXIM Bank contracts with a collection firm to handle collections within certain guidelines from EXIM Bank.

**The second collection method is the subject of this Performance Work Statement.

***Collection type for each case is at the discretion of the Asset Management Recovery

Office.

3.0 SCOPE

The Contractor shall provide collection services and servicing of above-mentioned defaulted loan which may include borrower negotiations, restructuring, and workout agreements. The

Contractor is already providing loan recovery services, institute legal proceedings, provide credit restructuring services and take such other actions required to effect recovery for EXIM Bank.

4.0 OBJECTIVES (NATURE OF WORK)

To recover this a s s e t , it has instituted legal proceedings and/or provide a credit restructuring related to the claim, involving the d e b t o r and guarantor(s), located in

Brazil.

Desired Outcome: To recover as much of the debt as possible given the debtor’s financial circumstance.

Constraints: If the Contractor (i.e., Law Firm) is “debarred” (prohibited from performing legal work) based on local jurisdiction directives, the Contractor shall inform EXIM Bank. EXIM

Bank will then take appropriate action which may include termination of the contract.

5.0 APPLICABLE DIRECTIVES

1. EXIM Bank’s AMD procedures

2. Industry practices as observed by peer institutions including Federal

Agencies, foreign ECAs, and multilateral development banks

6.0 GOVERNMENT FURNISHED INFORMATION OR PROPERTY

EXIM Bank will notify Contractor by email from the COR as to the specifics of each case to be recovered. The email will include the name of the debtor, the claim number, the buyer debt, the claim amount, and the date the claim was paid.

7.0 SPECIFIC REQUIREMENTS/TASKS

Task Introduction:

This contract will cover EXIM Bank Claim No. I200668, assigned to Varella & Advogados

Associados law firm for recovery.

Contractor shall analyze the specifics of the case, consider recovery strategies, and implement actions based on the potential recoveries and risks with the aim of maximizing collections on behalf of the EXIM Bank.

There will be one contingency fee of on actual cash applicable for this assigned case and it remains the same throughout the life of that case.

Contractor will instruct debtor to remit recovered funds directly to EXIM designated accounts. In the event the Contractor receives directly recovered funds, the Contractor shall remit the funds in their entirety (without deduction of expenses or collection fee) promptly to EXIM’s designated account.

EXIM Bank reserves the right to cease work on any particular case in the event that:

1. EXIM Bank determines the Contractor’s work is unsatisfactory.

2. The Contractor requests release from the Case

3. It is determined to be in the best interest of the Government.

Task 1 – The Contractor shall provide Case Analysis/Due Diligence in Brazil:

a. The Government will send a copy of the claim collection file via email.

b. The Contractor shall perform due diligence and analyze the specifics of the case, consider recovery strategies, and recommend actions based on the potential recoveries and risks with the aim of maximizing collections on behalf of EXIM Bank.

c. The Contractor has ensured there is no conflict of interest between the firm and the debtor. No work shall be completed by vendors in the event a conflict of interest arises.

d. The Contractor will conduct preliminary research /evaluation of the case, including, but not limited to, asset search, credit analysis and legal actions registered against the obligor.

Task 2 – The Contractor shall recover Defaulted Debt per Contingency Fee Basis of .

a. The Contractor shall attempt extrajudicial collection of the debt within ten business days of the Recovery Officer’s authorization to proceed and report the results of such attempts to the Recoveries Group, Asset Management Division.

b. The Contractor shall provide a written brief (preferably in English) via email to EXIM

Bank’s COR on a frequent basis, at a minimum on a quarterly basis for active cases. The reports should discuss the life cycle of the cases and enable the COR to understand the particular situations surrounding the progress of the case. The COR will also monitor the work of the Contractor through periodic site trips.

c. The Contractor shall provide a Collected Funds report not later than fifteen (15) calendar days after notifying COR notification of incoming funds and identify fee to be received based on percentage of all monies actually collected in accordance with the Assignment email.

d. Contractor understands compensation for Task 2 services is limited to the negotiated contingency fee percentage of . No expenses will be reimbursed unless approved by

COR. These expenses are to be determined on a case-by-case basis.

Task 3 – The Contractor shall conduct Litigation

a. Prior to legal action and incurring related costs, the Contractor must request and obtain in writing the approval from the Recoveries Group, Asset Management Division and EXIM

Bank’s Office of the General Counsel through the Litigation Request Form (See

Attachment A). Duly authorized, the Contractor can then file legal proceedings against the Debtor [and the Guarantors].

b. The Contractor shall provide a break-down of anticipated work/cost on a Litigation

Request Form (See Attachment A). The Government will review the Form to determine the acceptability of request/cost. Once the Contractor is authorized by EXIM Bank to pursue litigation against a debtor, the Contractor can complete work of this nature.

c. Contractor understands compensation for Task 3 services is divided into two sections: 1.

Financing Funds - Contingency fee of on actual cash recoveries. 2) Legal expenses

– Non-Administrative Exp.

d. Negotiated contingency fee percentage of applied to the total amount collected –

Maximum US (Calculated at of principal amount of debt of

). (See Task 2 paragraph d.) and Non-Admin – Legal fees -and specified in the approved

Schedule of

Deliverables the Event occurs.

Very Good (between 98% and 96%).

Satisfactory (between 93% and 95%)

Marginal (between 91% and 93%

Unsatisfactory (less than

90%).

Task 2:

Recovery of

Defaulted

Principal/

Contingency

Timeliness, complete and thorough record keeping, effective communicati on.

100%

Compliance with

Brazilian

Law, thoroughness

, and accuracy.

Regular and ad-hoc meetings between contractor and

Government as needed

Surveillance by EXIM

Bank COR will be performed as the Event occurs.

Exceptional

Very Good

Satisfactory Marginal

Unsatisfactory

Exceptional (greater than

99%)

Positive or negative

CPARS rating

Written Brief for active

Cases

Complete, accurate and timely

All cases accounted for

100% accuracy.

All deliverables as described in the PWS and specified in the approved

Schedule of

Deliverables

Surveillance by EXIM

Bank COR will be performed as the Event occurs.

Exceptional

Very Good

CPARS rating

Collected

Funds report

Complete, Accurate accounting of expenses.

100%

All deliverables as described in the PWS and specified in the approved

Schedule of

Deliverables

Surveillance by EXIM

Bank COR via portfolio monitoring of existing outstanding claims as well as site visits.

Exceptional

Very Good

Unrecovered cases might be recalled back to EXIM

Bank’s portfolio and

Contractor instructed to

“Cease and

Desist” from any further recovery efforts.

Task 3:

Provide

Litigation

Timeliness, complete and thorough record keeping, effective communicati on.

100%

Compliance with

Brazilian

Law, thoroughness

, and meetings between contractor and

Government as needed

Surveillance by EXIM

Bank COR will be performed as the Event occurs.

Exceptional

Very Good

CPARS rating

Litigation

Request Form with break-down of anticipated work/cost

Complete, Clear breakdown of projected expenses.

100%

All deliverables as described in the PWS and specified in the approved

Schedule of

Deliverables

Surveillance by EXIM

Bank COR will be performed as the Event occurs.

Exceptional

Very Good

Positive or

Business

Relations

Professional and respectful of all parties

Regular and ad-hoc meetings between contractor and

Government

Semi-Annual

Performance

Evaluation

Exceptional

Very Good

CPARS rating

Management of Key

Personnel

Appropriate credentials for the work involved.

Attend scheduled meetings if needed.

Available for meetings as necessary for contractual concerns meetings between contractor and

Government as needed

Semi-Annual

Performance

Evaluation

Exceptional

Very Good

File details come from the government source that posted it. Updated .