This performance work statement outlines requirements for the renewal of 143 hydraulic hoses on the marine travel lift at the Industrial Production Facility in Galveston, Texas. The contractor shall remove existing hoses and ultraviolet guards, fabricate and install new hoses and UV covers meeting specifications for material, length, diameter, pressure rating, and fire/UV resistance. Hoses must be pressure tested and tagged, and the contractor must be present for operational testing and repair any issues found. The contractor is required to provide all labor, materials, and equipment to complete the work. The related federal contract opportunity is solicitation number 70Z02923QNEW020 for the hose renewal work at the Galveston facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) IPF Galveston Travel Lift Hose Renewal

1. BACKGROUND

IPF Galveston’s marine travel lift, Model 150CII hydraulic hoses have passed expected service life and require renewal.

2. REFERENCE

USCG SFLC Technical Standard 505-2 Hoses and Expansion Joints

3. REQUIREMENTS

Contractor shall perform the following:

• Conduct site visit prior to bid and assess travel lift hose renewal of 143 hydraulic hoses, fittings, UV guards, and tags. Some hoses are in excess of 35 feet above ground. Aerial platforms recommend to complete task. Aerial platform NOT provided by the government for assessment or execution of contract requirements.

• Remove existing hydraulic hoses and UV guards.

• Fabricate and install hydraulic hoses IAW with references with the same criteria, length, inside diameter, materials, ratings, fire and UV rating, and end fittings as the original hose section.

• Fabricate and install hydraulic hoses that meet or exceed the maximum working pressure of marine travel lift, Model 150CII.

• Complete pressure test of all fabricated hoses prior to installation.

• Fabricate and install hose tags for each individual hose fabricated.

• Fabricate and install new UV hose covers IAW with references with materials that equal or exceed currently installed UV cover capacity, materials, fitting, and length.

• Be present for operational testing and repair any leaks, cracks, or damaged hoses found during operational test.

NOTE: Awarded vendor must provide all labor, materials and equipment to complete PWS

4.0 ADMINISTRATION.

4.1 CONTRACTOR PERSONNEL

4.1.1 Qualified Personnel.

The Contractor shall provide qualified personnel and subject matter experts to perform all required tasks specified in this PWS.

4.1.2 Employee Conduct.

Contractor employees shall present a professional appearance and their conduct shall not reflect discredit upon the U.S. Government, and any involved Departments or Agencies.

4.1.3 Conflict of Interest.

The Contractor shall not employ any person who is an employee of the U.S. Government if that employment would, or would appear to cause, a conflict of interest. The Contractor shall take appropriate precautions as delineated in the Federal Acquisition Regulation (FAR) to preclude actual or apparent conflicts of interest.

4.2 PERIOD OF PERFORMANCE.

TBD

4.3 PLACE OF PERFORMANCE.

Base Galveston, Industrial Production Facility

3000 Ft Point Rd

Galveston, TX 77550

POCs: LT Francisco Fano Vance Shaylor

Desk: (409) 766-4834 Desk: (409) 766-5683

Cell: (702) 358-9975 Vance.E.Shaylor@uscg.mil

Francisco.M.Fano@uscg.mil

*THIS STATEMENT OF WORK IS SOLELY FOR MARKET RESEARCH*