PWS - Intl Rec - Brazil_TAF - FINAL_Redacted.pdf
PDF 333 KB Posted
- Attached to
- Standard Recovery - Brazil (Follow-on)
- Solicitation number
- 83310125Q0023
- Issued by
-
Export Import Bank of the US
About this file
This Performance Work Statement (PWS) details a loan recovery assistance contract for the Export-Import Bank of the United States (EXIM Bank) with Varella & Advogados Associados, a law firm located in Rio de Janeiro, Brazil. The contract focuses on collecting a defaulted debt associated with EXIM Bank Claim No. G083384, with the primary objective of recovering as much of the debt as possible given the debtor's financial circumstances.
The contractor will provide comprehensive collection services including case analysis, due diligence, extrajudicial collection efforts, potential legal proceedings, and credit restructuring. Key requirements include conducting asset searches, negotiating with the debtor and guarantors, and potentially initiating litigation within Brazilian legal guidelines. The contract operates on a contingency fee basis, with the contractor required to remit all recovered funds directly to EXIM Bank's designated account. The performance will be evaluated through surveillance by EXIM Bank's Contracting Officer Representative (COR), with performance ratings ranging from Exceptional to Unsatisfactory and potential positive or negative Contractor Performance Assessment Reporting System (CPARS) ratings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JOFOC - Intl Rec - Brazil_TAF - FINAL_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
DATE: February 19, 2025
1.0 INTRODUCTION
This contract is for loan recovery assistance from Varella & Advogados Associados located in
Rio de Janeiro, Brazil to collect a debt of – EXIM Bank Claim No. G083384
The Contractor shall provide all personnel, equipment, supplies, postage, facilities, transportation, tools, materials, travel, supervision, and other items and non-personal services necessary to perform loan recovery Services as defined in this Performance Work Statement except for those items specified as Government furnished property and services.
2.0 BACKGROUND
(a) The Export-Import Bank of the United States (“EXIM Bank”) supports the financing of U.S.
goods and services. It assumes credit and country risks the private sector is unable or unwilling to accept. In covering these risks EXIM Bank paid on this claim related to Claim No. G083384.
Upon payment of the claim, it becomes the responsibility of the Asset Recovery Group (“ARG”) within the Asset Management Division of EXIM Bank (“AMD”) to seek repayment from the debtor and/or guarantors.
(b) Throughout this document the term “recovery officer(s)” will be used. For the purposes of this document, recovery officer(s) refers to the International Recovery Officers, and Managing
Director – Recoveries, within ARG.
(c) ARG collects on accounts in three ways:
1. Direct Collection – EXIM Bank officers personally work the collection cases,
2. Local Attorneys – EXIM Bank signs a contract with a local attorney to work on the collection within certain guidelines from EXIM Bank, and
3. Collection Contractor – EXIM Bank contracts with a collection firm to handle collections within certain guidelines from EXIM Bank.
**The second collection method is the subject of this Performance Work Statement.
***Collection type for each case is at the discretion of the Asset Management Recovery
Office.
3.0 SCOPE
The Contractor shall provide collection services and servicing of above-mentioned defaulted loan which may include borrower negotiations, restructuring, and workout agreements. The Contractor is already providing loan recovery services, institute legal proceedings, provide credit restructuring services and take such other actions required to effect recovery for EXIM Bank.
4.0 OBJECTIVES (NATURE OF WORK)
To recover this a s s e t , it could institute legal proceedings and/or provide a credit restructuring related to the claim, involving the d e b t o r and guarantor(s), located in
Brazil.
Desired Outcome: To recover as much of the debt as possible given the debtor’s financial circumstance.
Constraints: If the Contractor (i.e. Law Firm) is “debarred” (prohibited from performing legal work) based on local jurisdiction directives, the Contractor shall inform EXIM Bank. EXIM Bank will then take appropriate action which may include termination of the contract.
5.0 APPLICABLE DIRECTIVES
1. EXIM Bank’s AMD procedures
2. Industry practices as observed by peer institutions including Federal
Agencies, foreign ECAs, and multilateral development banks
6.0 GOVERNMENT FURNISHED INFORMATION OR PROPERTY
EXIM Bank will notify Contractor by email from the COR as to the specifics of each case to be recovered. The email will include the name of the debtor, the claim number, the buyer debt, the claim amount and the date the claim was paid.
7.0 SPECIFIC REQUIREMENTS/TASKS
Task Introduction:
This contract will cover EXIM Bank Claim No. G083384 assigned to the Varella & Advogados
Associados law firm for recovery.
Contractor shall analyze the specifics of the case, consider recovery strategies and implement actions based on the potential recoveries and risks with the aim of maximizing collections on behalf of the EXIM Bank.
There will be one contingency fee of on actual cash applicable for this assigned case and it remains the same throughout the life of that case.
Contractor will instruct debtor to remit recovered funds directly to EXIM designated accounts. In the event the Contractor receives directly recovered funds, the Contractor shall remit the funds in their entirety (without deduction of expenses or collection fee) promptly to EXIM’s designated account.
EXIM Bank reserves the right to cease work on any particular case in the event that:
1. EXIM Bank determines the Contractor’s work is unsatisfactory
2. The Contractor requests release from the Case
3. It is determined to be in the best interest of the Government
Task 1 – The Contractor shall provide Case Analysis/Due Diligence in Brazil:
a. The Government will send a copy of the collection claim file via email.
b. The Contractor shall perform due diligence and analyze the specifics of the case, consider recovery strategies and recommend actions based on the potential recoveries and risks with the aim of maximizing collections on behalf of EXIM Bank.
c. The Contractor has ensured there is no conflict of interest between the firm and the debtor. No work shall be completed by vendors in the event a conflict of interest arises.
d. The Contractor will conduct a preliminary research /evaluation of the case, including, but not limited to, asset search, credit analysis and legal actions registered against the obligor.
Task 2 – The Contractor shall recover Defaulted Debt per Contingency Fee Basis of .
a. The Contractor shall attempt extrajudicial collection of the debt within ten (10) business days of the Recovery Officer’s authorization to proceed and report the results of such attempts to the Recoveries Group, Asset Management Division.
b. The Contractor shall provide a written brief (preferably in English) via email to EXIM
Bank’s COR on a frequent basis, at a minimum on a quarterly basis for active cases. The reports should discuss the life cycle of the cases and enable the COR to understand the particular situations surrounding the progress of the case. The COR will also monitor the work of the Contractor through periodic site trips.
c. The Contractor shall provide a Collected Funds report not later than fifteen (15) calendar days after notifying COR notification of incoming funds and identify fee to be received based on percentage of all monies actually collected in accordance with the Assignment email.
d. Contractor understands compensation for Task 2 services is limited to the negotiated contingency fee percentage of . No expenses will be reimbursed unless approved by
COR. These expenses are to be determined on a case-by-case basis.
Task 3 – The Contractor shall conduct Litigation
a. Prior to legal action and incurring related costs, the Contractor must request and obtain in writing the approval from the Recoveries Group, Asset Management Division and EXIM
Bank’s Office of the General Counsel through the Litigation Request Form (See
Attachment A). Duly authorized, the Contractor can then file legal proceedings against the
Debtor [and the Guarantors].
b. The Contractor shall provide a break-down of anticipated work/cost on a Litigation
Request Form (See Attachment A). The Government will review the Form to determine the acceptability of request/cost. Once the Contractor is authorized by EXIM Bank to pursue litigation against a debtor, work of this nature can be completed by the Contractor.
c. Contractor understands compensation for Task 3 services is divided in two sections: 1.
Legal expenses, approved in advance for . Negotiated contingency fee percentage of applied to the total amount collected – .
(Calculated at of principal amount of debt of ). (See Task 2 paragraph d.)
d. Contractor understands EXIM Bank directed that litigation be commenced since it deemed to be in the best interest of the Government.
8.0 CONTRACTOR QUALIFICATIONS
a. Work is to be completed in Brazil and Contractor shall have experience in the following:
locating assets, in particular hidden assets if any, and embargoing (placing liens) and executing upon such assets; drafting / negotiating restructuring agreements appropriate for debtors of the type in this matter; and litigating the collection matter at all levels of courts through the debtor’s country.
b. The Contractor shall be a law firm registered/licensed in the Brazilian Bar Association to practice law in Brazil. Any subcontracted effort must also be registered / licensed in the
Brazilian Bar Association.
c. The Contractor shall have experience handling collection matters of this sort on behalf of foreign entities, and especially foreign government entities such as EXIM Bank
(Contractor shall provide documentation noting relevant experience with foreign government entities). This requirement is to ensure Contractor is able to understand legal risks that may be raised during representation of the foreign government entity. These risks include the risk of countersuits, referrals for criminal prosecution, withholding tax questions, and the ability to communicate in the local language.
9.0 DELIVERABLES
Deliverable Item PWS Section Due Date Format/
Quantities
Project Task Log
Project Task
Log, Para a.
Once every other month
Electronic, (In
English)
Conflict of
Interest notification
Task 1 Para b.
Within 5 business days of identifying conflict
Written Brief for active Cases Task 2 Para b.
Quarterly on active cases Email
Collected Funds report Task 2 Para c.
Fifteen days from
COR notification in terms of incoming funds
Written report
Litigation
Request Form with break-down of anticipated work/cost
Task 3 Para b.
Upon determined litigation is required
Written
Document and specified in the approved
Schedule of
Deliverables occurs. Exceptional (greater than 99%)
Very Good (between
98% and 96%);
Satisfactory (between
93% and 95%)
Marginal (between
91% and 93%
Unsatisfactory (less than 90%).
Task 2:
Recovery of
Defaulted
Principal/Con tingency
Timeliness, complete and thorough record keeping, good communication.
100%
Compliance with
Brazilian
Law, thoroughness and accuracy.
Regular and ad-hoc meetings between contractor and
Government as needed
Surveillance by EXIM
Bank COR will be performed as the Event occurs.
Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
Exceptional (greater
Positive or negative
CPARS rating
Written Brief for active
Cases
Complete, accurate and timely
All cases accounted for
100% accuracy.
All deliverables as described in the PWS and specified in the approved
Schedule of
Deliverables
Surveillance by EXIM
Bank COR will be performed as the Event occurs.
Exceptional
Very Good
Satisfactory
Positive or negative
CPARS rating
Collected
Funds report
Complete, Accurate accounting of expenses.
100%
All deliverables as described in the PWS and specified in the approved
Schedule of
Deliverables
Surveillance by EXIM
Bank COR via portfolio monitoring of existing outstanding claims as well as site visits.
Exceptional
Very Good
Satisfactory
Positive or
Unrecovered cases might be recalled back to EXIM
Bank’s portfolio and
Contractor instructed to
“Cease and
Desist” from any further recovery efforts.
Task 3:
Provide
Litigation
Timeliness, complete and thorough record keeping, good communication.
100%
Compliance with
Brazilian
Law, thoroughness and meetings between contractor and
Government as needed
Surveillance by EXIM
Bank COR will be performed as the Event occurs.
Exceptional
Very Good
Satisfactory
Positive or negative
CPARS rating
Litigation
Request Form with break-down of anticipated work/cost
Complete, Clear breakdown of projected expenses.
100%
All deliverables as described in the PWS and specified in the approved
Schedule of
Deliverables
Surveillance by EXIM
Bank COR will be performed as the Event occurs.
Exceptional
Very Good
Satisfactory
Positive or
Business
Relations
Professional and respectful of all parties
Regular and ad-hoc meetings between contractor and
Government
Semi-Annual
Performance
Evaluation
Exceptional
Very Good
Satisfactory
Positive or negative
CPARS rating
Management of Key
Personnel
Appropriate credentials for the work involved
Attends scheduled meetings if needed
Available for ad-hoc meetings as necessary for contractual concerns meetings between contractor and
Government as needed
Semi-Annual
Performance
Evaluation
Exceptional
Very Good
Satisfactory
Positive or
File details come from the government source that posted it. Updated .