PWS IET Musician.pdf

PDF 511 KB Posted

Attached to
Initial Entry Trainee Musician Services
Solicitation number
W911S725RA002
Issued by

About this file

This Performance Work Statement (PWS) details a non-personnel services contract for Initial Entry Trainee Musician Services at Fort Leonard Wood, Missouri. The contractor will provide a pianist/musician to support four chapel services (Gospel, Crossroads, Traditional, and Catholic) held on Sundays, performing 2-4 songs per service in contemporary, Gospel, traditional, and liturgical styles. The musician must have an advanced skill level (SMP Level 9) and will be responsible for leading congregational singing, including preludes, postludes, offertory, hymns, and background music for meditation, prayers, and communion.

The contract is structured for one base year with four 12-month option years and a potential six-month extension. Key requirements include attending coordination meetings, maintaining a monthly work log, submitting monthly invoices, and completing annual anti-terrorism training. The contractor will perform at Main Post Chapel and Soldier Memorial Chapel, with the government providing musical instruments, facilities, and utilities. Background checks, security training, and compliance with copyright laws are mandatory. The government will provide chapel access, standard operating procedures, and sheet music reproduction capabilities, while the contractor is responsible for providing sheet music for each service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Initial Entry Trainee Musician Services

Part 1

General Information

1. GENERAL: This is a non-personnel services contract to provide Initial Entry Trainee Musician Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the

Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Musician Services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this

PWS.

1.2 Background: The Government requires Musician Services in support of worship activities. The Contractor shall provide support to the Religious Education program at Fort Leonard Wood Religious Support Office (RSO). The location(s) and time(s) will be specified in the PWS or modified in the contract by the Contracting Officer.

1.3 Objectives: The contractor shall provide music support for public worship to enhance the assembly or congregation.

1.4 Scope:

1.4.1 This is a Non-Personal Services Contract between the Fort Leonard Wood Religious Support Office (RSO) and the contractor to perform tasks and provide deliverables identified herein. This PWS defines the requirements and deliverables of the contractor that support the individual Free Exercise of Religion for military personnel, family members, and authorized personnel.

1.4.2. This contract does not create an employer-employee relationship between the Government and Contractor, as well as any corporation, partnership, business association, other party, or legal entity with which the Contractor may be associated. The Government assumes no responsibility for costs incurred for services performed by the contractor that are not included in this contract. There are no provisions for lodging, employee benefits, medical care, retirement, or Workmen's Compensation Insurance.

1.4.3. The Contractor shall only provide services for which no Unit Ministry Team (UMT) members (Chaplains and Religious Affairs Specialists), RSO Department of the

Army (DA) Civilians, or volunteers are able to perform. The contract cannot duplicate duties required or provided by these entities as contracted services are an exception to policy.

1.4.4. This contract does not require a traditional fulltime Monday through Friday 9:00 to 5:00 type work environment. Workdays and hours will vary according to the approved Calendar of Events, tasks outlined in the CLINs and the time of meetings. Many of the tasks will require holiday, evening, and weekend hours.

1.4.5. No UMT member, military member, DA Civilian, fellow contractor, or volunteer can supervise or direct the Contractor or control the method by which he/she performs the required tasks. Under no circumstances shall a work schedule be prepared for the Contractor, or the impression be given that the Contractor is an employee of the Government. It is the responsibility of the Contractor to guard against any actions that are of the nature of personal services, give the impression of personal services or portray his/her position as that of an employee.

1.4.6. Under no circumstances shall a Contractor provide direction to a Chaplain, Religious Affairs Specialist (RAS), general military member, a DA Civilian, fellow contractor, or volunteer, nor shall he/she represent in an official capacity of the Federal Government, U.S. Army, or the local congregation that the contract supports.

1.4.7. The services of a musician fall under the Fort Leonard Wood Chaplain’s approved, annual Command Master Religious Program (CMRP). The mission of the CMRP is to provide military religious support activities that meet the religious requirements of Soldiers, Families, and authorized civilians. The primary goal of the CMRP is to ensure the free exercise of religious preference which is a statutory requirement under USC Title 10 USC 1789 and 7217. As a non-personal services Contractor, the Musician is not a member of the Commander’s Staff or Command Chaplain’s Staff.

1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years with an optional six-month extension. The Period of Performance reads as follows:

Base Year Option Year I Option Year II Option Year III Option Year IV 6 Month Extension

1.6 General Information

1.6.1 Quality Control: The Contractor shall develop and maintain a Quality Control Plan (QCP) to ensure services are performed in accordance with (IAW) this PWS. The

Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) workdays after date of contract award (Deliverable A.001). After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP) and the Performance Requirements Summary (PRS). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays:

New Year’s Day 1 January Martin Luther King Day 3rd Monday in January President’s Day 3rd Monday in February Memorial Day last Monday in May Juneteenth 3rd Monday in June Independence Day 4 July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day 11 November Thanksgiving Day 4th Thursday in November Christmas Day 25 December

1.6.4 Government Hours of Operation: Government business hours are between 0900- 1630 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Religious Support Office programming may be conducted outside of normal government business hours. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of services are essential.

1.6.5 Place of Performance: The services to be performed under this contract shall be performed at Main Post Chapel and Soldier Memorial Chapel, Fort Leonard Wood, Missouri.

1.6.6 Type of Contract: The government will award a firm fixed contract.

1.6.7 Security Requirements: Contractor personnel performing work under this contract shall have at time of the proposal submission and maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254 (The unit security monitor or COR is responsible for initiating this form).

1.6.7.1. All contractor and sub-contractor employees requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training. IAW AR 525-13, 3 DEC 19, AT Level I Awareness training will be conducted by a certified Level II trained ATO. For contracts that cross fiscal years, or for contracts with option years, all contractor personnel shall complete annual AT Level I awareness training. The Installation AT Office or a certified Level II trained ATO on the installation will provide the training. Contact information for this Government employee will be provided at the kick-off meeting.

The Installation AT Office or a certified Level II trained ATO will provide a one-hour training session conducted on FLW for Contractor personnel working on this installation. The COR will coordinate this training at the time of task order modification or award. Contractor personnel working at installations other than FLW shall coordinate with the COR and local AT Offices to obtain training applicable to that installation.

Contractor shall provide a list of personnel trained to the COR within five (5) business days of completion of training.

1.6.7.2. FLW Automated Installation Entry (AIE) Pass Transition. The included instructions/form for requesting a Ft. Leonard Wood AIE pass supersede those previously communicated. The AIE pass form (see attached) has been revised for applicants to provide citizenship status, Foreign Nationals Alien Registration/Passport number and Country of Birth information. An electronic copy of the spreadsheet will be sent via email for your use. As with the previous version, all information must be typed;

handwritten and incomplete requests will not be processed. Once completed, submit the form to your sponsor via email or US mail.

Your sponsor will add the FPCON level, days, and times for entry and will forward it to the Visitor Control Center (VCC) for background screening and pass processing. The sponsor will send it via encrypted email to this address: usarmy.leonardwood.usag.list.des-physec-vcc@army.mil. VCC personnel will notify sponsors when background screenings are completed, and passes are ready for pickup. Sponsors will then notify you that your pass is ready for pick up at the VCC. You will need bring a valid picture ID and turn in Mobilisa passes, as they will no longer be authorized.

As a reminder, the Mobilisa pass application portal is no longer used. Regardless of the expiration date of an existing Mobilisa pass, ALL pass holders are required to get the new AIE pass. Person(s) that do not submit for the new AIE pass may experience delays entering FLW.

If a retiree, or DOD ID card holder, wishes to gain employment on the installation as a contractor, then that person’s “status” will change to a contract employee, which triggers the requirement for an employment background check and an NCIC-III check for access to the installation.

Beginning 1 June 2023, Ft. Leonard Wood will no longer accept, for access purposes, the state issued driver licenses (DL), or state issued IDs that do not meet the Real ID Act of 2005 standards. Person(s) requesting access with a non-compliant state DL or ID will need to present along with the non-compliant DL/ID one of the documents below to prove identity to be issued a pass or given access to Ft. Leonard Wood.

• US passport or passport card

• Certified birth certificate (not a photocopy)

• Social Security Card (not a photocopy)

• School identification card with photograph (high school and college age students)

• US military or draft record (DD Form 214)

• US Coast Guard Merchant Mariner Card

• Transportation Worker Identification Card (TWIC)

• US Native American tribal document

• NEW VA health card

1.6.7.3. iWatch Training. Within 10 calendar days of contract award and within 10 calendar days of new Contractor employees commencing work on this contract, all Contractor and sub-contractor employees shall review the FLW Directorate of Emergency Services (DES) web link for iWatch training located at http://www.wood.army.mil/LEC/iWatch/iWatch.htm. This locally developed training will inform employees of the types of behavior to watch for and how to report suspicious activity. Suspicious activity shall be reported to the COR or KO.

1.6.7.4. OPSEC Training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. OPSEC Awareness for Military Members, DoD Employees and Contractors is available at the following website:

https://securityawareness.usalearning.gov/opsec/index.htm

The OPSEC Plan and User Agreement: The OPSEC Plan and User Agreement will be available for Contractors to review through the Installation OPSEC Officer. The Contracting Officer’s Representative (COR) will ensure the Contractor is aware of the Installation's OPSEC Plan and is in compliance with the Installation's OPSEC Plan during contract performance.

For contracts that require an OPSEC Standard Operating Procedure/Plan:

Contractor shall develop and submit an OPSEC SOP that is in compliance with AR 530-1 within 90 calendar days of contract award to be reviewed and approved by the responsible Government OPSEC Officer. This SOP/Plan will include Government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, Contractor shall identify an individual who will be an OPSEC Coordinator and is OPSEC Level II certified.

OPSEC Training: Pursuant to AR 530-1, all Contractor personnel must complete initial Level I OPSEC training within 30 calendar days of beginning performance on this contract. For contracts that cross fiscal years, or for contracts with option years, all contractor personnel shall complete annual OPSEC awareness training, to be provided by the Installation OPSEC Office or a certified Level II trained OPSEC Officer. Contact information for this Government employee will be provided at the kick-off meeting.

The Installation OPSEC Office, or a certified Level II trained OPSEC Officer, will provide Level I OPSEC training on Fort Leonard Wood for Contractor personnel working on this installation. The COR will coordinate this training at the time of task order modification or award.

Contractor shall provide a list of personnel trained to the COR within five (5) business days of completion of training.

Contractor personnel working at installations other than FLW shall coordinate with the COR and local OPSEC Office to obtain training applicable to that installation.

1.6.8 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.8.1. Key Control. The Contractor will not receive keys to the chapel facilities. The Religious Support Office will ensure that each chapel is unlocked 1 hour prior to the start of each service.

1.6.9 Special Qualifications:

1.6.9.1. The Contractor shall provide a resume to the Contracting Officer and documentation to substantiate personal qualifications and spiritual understanding of church music, determined by a history of working specifically in development of musical worship plans. The Contractor shall perform contemporary, Gospel, traditional, and liturgical style music in keeping with the style of the chapel service supported. Although a specific degree is not mandatory, any credentials pertaining to this PWS, training and experience is considered in the award.

1.6.9.2. The Contractor Musician shall possess experience as a musician in religious worship settings, with sufficient [2+ years] experience playing piano in appropriate music style (contemporary, Gospel, traditional, and liturgical style music) at public worship services. This requirement is waiver able by the COR upon senior installation Chaplain’s review and approval of key personnel resumes of primary or sub-contractor. Waiver request must address how knowledge, skills, education, or training have prepared the employee to perform the tasks satisfactorily absent extensive [2+ years] experience.

1.6.9.3. Background Checks and Investigations: Contract personnel shall submit to and pass a thorough Criminal History Background Check per Public Law 101-647, Section 231, Crime Control Act of 1990; DoD 1402.5, Criminal History background Checks on Individuals in Child Care Services, AFI 31-501 Background Checks/Investigations and

36 WG/HC OI 31-3.

1.6.9.4. Background Investigation. The background check will be coordinated by the RSO and includes an Installation Records Check and a Childcare National Agency Check and Inquires

1.6.9.5. Competency of Contractor Personnel. All services under this contract are to be performed by an adult. Applicants must be willing to undergo a background check. The Contractor shall be fully qualified to perform the required services without any supervision or direction by Government Personnel.

1.6.9.6. The Contractor shall comply with all U.S. copyright law 100% of the time.

1.6.9.7 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5.

The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.9.8 Contracting Officer Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. The Government will provide a COR who will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration.

The COR is not authorized to change any of the terms and conditions of this contract. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work.

The COR is authorized to perform the following functions:

Assure that the Contractor performs the technical requirements of the contract Perform inspections necessary in connection with contract performance Maintain written and oral communications with the Contractor concerning technical aspects of the contract Issue written interpretations of technical requirements, including Government drawings, designs, specifications Monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies Coordinate availability of Government property Coordinate site entry of Contractor personnel.

Examples of COR Duties and responsibilities may be found in Table 1 of the DoDI 5000.72.

1.6.9.9. Key Personnel: The following personnel are considered key personnel by the government: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 9:00 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:

Function Name Qualifications

1.6.10 Identification of Contractor Employees: All contract personnel shall identify themselves as contractors/contractor employees to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.11 Contractor Travel: RESERVED

1.6.12 Other Direct Costs: RESERVED

1.6.13 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer.

All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.14 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the

OCI.

1.6.15 COMBAT TRAFFICKING IN PERSON.

IAW FAR 52-222-50. Contractor Requirements.

The Contractor shall –

(1) Notify its employees of

(i) The U.S. Government's zero tolerance policy.

(ii) Actions that will be taken against employees for violations of this policy.

(2) Take appropriate action.

Part II, Trafficking in Persons (TIP)

1. The Contractor has a procedure for notifying employees of TIP and proof of such notification on file via:

i. Training records or

ii. Employee signature

2. Has documented actions on file citing appropriate action to TIP violations.

3. Record of documented violations to date (if any).

4. The Contractor has a procedure for notifying the Contracting Officer if information is received or actions related to TIP are observed.

1.6.16 PHASE IN /PHASE OUT PERIOD: RESERVED

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.

This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor.

The Government does not have privity of contract with the subcontractor.

2.1.12. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services. Performance is at a Government Facility. Therefore, FAR Part 45.000(b)(5) applies. Specifically, Government property that is incidental to the place of performance, when the contract requires contractor personnel to be located on a Government site or installation, and when the property used by the contractor within the location remains accountable to the Government. Items considered to be incidental to the place of performance include, for example, office space, desks, chairs, telephones, computers, and fax machines. The Government will provide musical instruments although not specifically meeting the definition of GFP/GFE under the above cited FAR reference.

The Government will provide Contractor access to chapel or other congregational spaces in order to perform the requirements.

3.2 Facilities: The Government will provide a piano and sound equipment at both Main Post Chapel and Soldier Memorial Chapel for the contractor staff to provide the support outlined in the PWS.

3.3 Utilities: The Government will provide all required utilities for the contractor in performance of tasks outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.6. The Government will provide Contractor access to chapel or other congregational spaces in order to perform the requirements.

3.7. Materials: The Government will provide the contractor with both of the chapel’s Standard Operating Procedures and Policies and copy capabilities to reproduce sheet music as necessary.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section, 3 of this

PWS.

4.2 Materials. The Contractor shall provide the sheet music for songs requested for each service. Duplication devices are located at both chapels if multiple copies are needed.

4.3 Equipment. The Contractor will not be required to provide any equipment.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. The Contractor shall attend planning and coordination meetings and provide necessary actionable input for services as prescribed by the Contracting Officer’s (KO) scheduling. 52 units (1 unit equals 1.5 hours).

STD: Attend planning and coordination meetings IAW KO scheduling

AQL: 100%

5.2 The Contractor shall maintain a log of the work performed and shall provide a copy of the log to the COR on a monthly basis NLT the 10th day of the month following the month of performance. 12 units (1 unit equals 2 hour) (Deliverable A.002).

STD: provide a copy of the log to the COR on a monthly basis NLT the 10th day of the month

AQL: 100%

5.3. Task Heading.

5.3.1. Pianist Musician Services- The Contractor shall provide Piano/Keyboard Music Support while leading congregations in the singing of preludes, postludes, offertory, singing of hymns/choruses/spiritual songs, background music for meditation, prayers, and communion. Skill level shall be at or above the SMP Level 9 (Advanced) and be demonstrated to and accepted by the COR.

Contractor shall perform contemporary, Gospel, traditional, and liturgical music for 4 Initial Entry Training chapel services. Contractor will be expected to play 2 to 4 songs per service depending on the service. Song selections will be provided by the COR to the contractor 2 weeks in advance for each service. (52 units, 1 unit equals 1.5 hours, for 4 chapel services = 208 units)

STD: Provide Piano/Keyboard Music Support while leading congregational singing.

5.3.2. Contractor shall perform music in accordance with the following schedule:

Service Location Frequency/Times Quantity Gospel IET Main Post Chapel 0800 Sunday 50 Crossroads IET Main Post Chapel 0930 Sunday 50 Traditional IET Soldier Memorial Chapel 1300 Sunday 50 Catholic IET Main Post Chapel 1300 Sunday 50

The Contractor shall perform at all scheduled services and miss no more than 2 per year.

STD: Perform music IAW this schedule

AQL: 98%

5.4. The Contractor shall submit an invoice to the COR and into WAWF by Close of Business (COB) on the 5th of every month. 12 Units (1 unit equals .5 hours). The invoice shall include:

Vendor’s name Contract number CLINs provided and quantity of each Quantities of Occurrences Used & Occurrences Remaining Explanation of CLINs service provided such as the nature of the service; contractor shall comply with PII protection protocols.

Date of invoice Dates of service Total cost per service type Total of invoice

STD: Submit an invoice to the COR and into WAWF(COB) on the

5th of every month

5.4. Service Contract Reporting: RESERVED

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

7.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule

7.3 Attachment 3/Technical Exhibit 3 – Estimated Workload Data

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard Performance Threshold

Method of Surveillance

Incentive/ Disincentive

Attended Meetings (PWS para. 5.1.)

Contractor attended meetings as necessary to ensure that tasks were coordinated.

100% 100% Inspection

Performance will be documented in Monthly COR Reports to the

KO

The Contractor shall maintain a log of the work performed (PWS para. 5.2)

Provide a copy of the log to the COR on a monthly basis NLT the 10th day of the month following the month of performance

100%

100% Inspection

Performance will be documented in Monthly COR

The Contractor shall perform at all scheduled services (PWS para.

5.3.2)

Arrive 15 minutes prior

98% Periodic sampling

Performance will be documented in Monthly COR Reports to the

KO

Contractor shall submit an invoice to the COR and into WAWF by the close of business on the 5th of every month.

(PWS para 5.4)

Submit invoice to the COR and WAWF on the 5th of every month

100% 100% Inspection

Performance will be documented in Monthly COR Reports to the

KO

The Contractor shall complete annual AT Level I awareness training. IAW AR 525-

13, 3 DEC 19

Submit AT Level 1 certificate of completion to the COR with 5 days after the training

100% 100% Inspection

Performance will be documented in Monthly COR

The contractor shall provide a contract manager who shall be responsible for the performance of the work.

Submit the name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer within 30 days.

100% 100% Inspection

Performance will be documented in Monthly COR

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To (Deliverable A.001). submit Contractor’s Proposed QCP (PWS para.

1.6.1) within ten (10) workdays after date of contract award

1 .pdf KO VIA THE COR

(Deliverable A.002) maintain a log of the work performed (PWS para. 5.2) provide a copy of the log to the COR on a monthly basis NLT the 10th day of the month following the month of performance

1 As required COR

(Deliverable A.003) submit an invoice to the COR and into

WAWF (PWS

para. 5.6) by Close of Business (COB) on the 5th of every month

1 As required COR

TECHNICAL EXHIBIT 3

ESTIMATED WORKLOAD DATA

ITEM

NAME

ESTIMATED

QUANTITY

File details come from the government source that posted it. Updated .