PWS - Garbage Collection RFI DRAFT.docx

DOCX document 62 KB Posted

Attached to
Collection & Waste Disposal
Solicitation number
W51AA1GARBAGE
Issued by

About this file

This is a Performance Work Statement (PWS) for garbage collection and solid waste disposal services at Tobyhanna Army Depot (TYAD) in Tobyhanna, Pennsylvania. The contractor must furnish all labor, tools, materials, equipment, transportation, and supervision to manage collection and off-post disposal of solid waste generated at the facility. Collection services include twice-weekly refuse pickup from 86 collection sites with 8 cubic yard containers, weekly recyclable pickups (glass, plastics, cardboard, paper) during first shift between 8:00 a.m. and 2:00 p.m. on weekdays, and specialized collections for coatings/paint waste (15 times per year), garnet sludge (6 times per year), sewage sludge (20 pickups April-October), and infectious waste (minimum 13 pickups per year). Additional services include bulky item collection using contractor-furnished roll-off containers (10-40 cubic yards) and on-call maintenance within 48 hours of request. The contractor must establish approved collection routes and schedules within seven days of award and report vehicle weights at designated weigh stations, with monthly tabulation of disposed waste required.

The contractor is responsible for providing all collection vehicles compliant with federal, state, and local safety requirements including 40 CFR 243 and ANSI Z245.1, equipped with enclosed bodies, backup warning devices, and noise-limiting equipment. All waste must be disposed at Pennsylvania Department of Environmental Protection (PADEP)-approved and Monroe County-authorized landfills; transfer facilities are not permitted. The contractor must comply with Pennsylvania Act 101, Act 90, and applicable OSHA standards (29 CFR 1910 and 1926), obtain all necessary permits and licenses at no cost to the government, and establish a comprehensive Quality Control Plan. Disposal of hazardous materials and military equipment is prohibited. Payment is on a firm fixed-price monthly basis via Wide Area Work Flow (WAWF) electronic invoicing within Net 30 days of invoice acceptance by the Contracting Officer's Representative (COR). The contractor must also comply with installation-specific safety standards including the Red Card Program, use of electric or alternatively-fueled vehicles where feasible, and immediate reporting of all incidents and accidents to the COR.

View the file

Other files

File Type Posted
Waste RFI.docx DOCX document
Waste Disposal RFI.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE OF WORK STATEMENT DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Scope of Work (SOW). The contractor shall furnish all labor, tools, materials, equipment, transportation and supervision, except as specified hereinafter as government-furnished, to manage and perform all operations for the collection and off-post disposal of solid waste generated at Tobyhanna Army Depot (TYAD), Tobyhanna, Pennsylvania. Performance shall be according to the terms, conditions, specifications and standards contained herein and the contractor shall comply with all laws, ordinances, statutes and regulations pertaining to the collection, transportation and disposal of refuse and shall obtain such permits, licenses or other authorizations as may be required. The contractor shall be bound by any and all laws which bind TYAD.

The contractor is also to provide weekly recyclable pickups from several collection points. Weekly collection shall occur during first shift, between 8:00 a.m. and 2:00 p.m., on weekdays when TYAD is open. Should on-call maintenance or collection be needed, it shall occur during the same hours of first shift, and it shall occur within 48 hours of the request. Materials that needs to be collected for recycling includes: glass, plastics, cardboard, and paper. The contractor is to provide six (6) containers for this collection process, a single stream collection method is preferred.

No government personnel will be furnished to perform work determined to be the contractor's responsibility or to operate equipment or facilities provided under this contract. All fuel and lubricants shall be furnished by the contractor. The contractor has the sole responsibility for providing personnel and equipment necessary for the performance of this contract. The contractor has the sole responsibility for assuring all operators and other personnel employed by him are competent and qualified to perform the services required hereunder.

Quality Assurance (QA). The government will monitor the contractor's performance under this contract using a Quality Assurance Surveillance Plan (QASP).

Quality Control. The contractor shall establish a complete Quality Control Plan to assure the requirements of the contract are met.

Damages Caused by the Contractor. The contractor shall be held accountable and liable to the government for any damages to government facilities, fixtures, furnishings, equipment or grounds caused by the contractor or his employee.

CONTRACTOR-FURNISHED ITEMS.

It is the responsibility of the contractor to furnish all parts, materials, supplies, tools, equipment and safety clothing necessary to meet the requirements of this contract, except for the front load containers already on-site.

Contractor's Collection Equipment.

All refuse collection vehicles shall be specifically designed for the purpose and must be compatible with the government containers on site. Vehicles shall be painted to present a neat appearance and have the contractor's name affixed on both sides of the vehicle.

All vehicles shall be in fully operable condition and meet all federal, state and local safety requirements, as applicable and 40 CFR 243. Vehicles shall be equipped with enclosed type bodies sufficiently tight to prevent spillage and must be maintained to prevent dripping or leaking of oil and hydraulic fluids. The contractor shall carry sufficient materials on vehicles that enter TYAD to contain and clean up any spilled petroleum products, oil, hydraulic fluid or other toxic material.

The contractor shall notify the Fire Department and the COR immediately if any oil, hydraulic fluid or other toxic material is spilled onto the pavement or ground. Clean up of spilled materials from contractors vehicles shall be at the contractor’s expense.

Contractor vehicles which become inoperative or break down shall be moved off-post within four hours. The contractor will be allowed to perform only minor repairs to vehicles on-post.

Vehicles shall be operated in a safe manner in compliance with the federal, state and TYAD regulations. (TYAD Regulation 190-5.)

Vehicles for the collection, storage and transportation of solid waste shall be in compliance with ANSI Z245.1.

APPLICABLE DOCUMENTS.

Documents applicable to the Statement of Work/Specification under the contract are listed below, all documents are mandatory unless otherwise stated. The contractor is only obligated to follow those coded as mandatory and only to the extent stated in the specification/Statement of Work when a specific part of the document is referenced herein. The contractor is responsible to obtain copies of all referenced documents at his own expense except for those mentioned in 5.3 these regulations will be provided upon award. Supplements and amendments to mandatory publications shall be considered to be in full force and effective immediately upon receipt by the contractor. It is the contractor's responsibility to ensure that the current copies of all mandatory publications are complied with, as applicable.

Advisory Documents.

AR 58-1 Management, Acquisition and Use of Motor Vehicles TM 5-634 Solid Waste Management Code of Federal Regulations.

40 Code of Federal Regulations (CFR) Subchapter I - Solid Wastes Parts 240 through 258

29 Code of Federal Regulations (CFR) 1910

Pennsylvania Department of Environmental Protection (PA DEP) Regulations.

Pennsylvania Act 101: Municipal Waste Planning, Recycling and Waste Reduction Act of 1988

Pennsylvania Solid Waste Management Act Title 25, Chapter 273, Infectious and Chemotherapeutic Waste Disposal 1988*

Title 25, Pennsylvania Code, Chapters 271 through 285 Municipal Waste Title 25, Pennsylvania Code, Chapters 287 through 299 Residual Waste Monroe County Solid Waste Management Plan of 1990 Waste Transportation Safety Act (Act 90) Commercial.

Mandatory Document.

American National Standard Institute (ANSI) Z245.1 Safety Standards for Refuse Collection Equipment

SPECIFIC TASKS.

Personnel and Collection Methods. The contractor shall have sufficient manpower to carry out all the terms of this contract.

Collection Requirements.

Containers. All containers shall be emptied in accordance with specifications listed, except as outlined in Special Collections described hereinafter. Definite routes shall be assigned each collection vehicle, and those vehicles will traverse those routes each day and empty all containers scheduled for disposal that day.

NOTE: The contractor must be able to adapt to TYADs ever changing workload. The COR will occasionally request that front-loading cans be moved from one location to another depending on request from shops for shifts in workloads, construction projects, special events, etc. The contractor will have 48 hours to meet the COR requests.

Schedule and Points of Collection. The contractor shall provide necessary services for refuse collection and disposal as described herein.

Route and Collection Schedules.

Upon award, the contractor will have seven days to establish vehicle routes and collection schedules and submit these routes and schedules to the COR for approval. Once the routes and collection schedules have been approved, the contractor shall be required to follow these approved routes and schedules unless otherwise directed by the COR. In the event that the contractor wants to change the approved vehicle routes and/or collection schedules, such changes must be approved in writing by the COR prior to any changes.

For daily refuse collection the contractor shall establish the routes so the vehicle operator reports initially to the guard station located at Squire Street and Hap Arnold Boulevard. The vehicle operator will then go to the weigh station adjacent to Bldg. 42 on First Street. Upon arrival at the weigh station the contractor will notify the COR so the initial vehicle weight can be recorded, the contractor will then begin the daily collection service. Once the contractor is done with that day’s pickups they will then notify the COR and will report to the weigh station for a weight total. An Environmental Management Division (EMD) representative will then record the weight and fill out TYAD form 1231. The contractor is required to provide a monthly tabulation of all solid waste disposed of broken down per day for daily refuse removal and for each roll off emptied at the end of each month. The COR can provide a spreadsheet template for this record keeping.

The collection schedule shall be established so that operations will not start earlier than 5:30 AM but not later than 10:30 AM. The contractor must be done will all the necessary collections no later than 3:00 PM, Monday through Friday. Collection operations outside these hours will require prior approval of the COR. Where pickup is required twice a week, containers shall be picked up either Mondays and Thursdays or Tuesdays and Fridays. Where pickup is required three times a week, containers shall be picked up Mondays, Wednesdays and Fridays. Where pickup is once a week, containers shall be picked up on Wednesdays.

The frequency of collections will be as indicated on Tabulation of Solid Waste Collection Sites as listed in this statement of work.

The contractor shall execute the collection and disposal operations to result in minimum delay or divergence from the schedule.

Points of Collection. Points of collection are as indicated and numbered on the attached Solid Waste Collection Site listed.

NOTE: Points of collection may be changed from time to time as required by the needs of the government. The COR reserves the right to direct the contractor to relocate any or all refuse collection points, residual waste collection points and/or all roll offs.

Bulky Item Collection Requirements. The contractor shall furnish an adequate number of roll- off containers at the start of performance of this contract as requested by the COR for use in bulky item collections. Prior to the start of the contract, the COR will coordinate with the contractor on locations. These containers are usually open-top and approximately 10- 40 cubic yards in size.

Coatings/Paint Waste Collections. Coatings/paint waste shall be collected by using contractor- furnished containers and contractor-owned collection trucks. A leak-proof 40 cubic yard roll-off must be provided for the collection of this waste or the contractor must place a liner in the container before use. The current location of the coatings/paint waste collection site is Bldg. 9. Collection of paint waste will be required fifteen (15) times per year.

Garnet Sludge. Garnet sludge collection shall be collected using contractor-furnished containers and contractor-owned collection trucks. A leak-proof 10 cubic yard roll-off for the collection of this waste must be provided for the collection of this waste or the contractor must place a liner in the container before use. The current location of the garnet sludge collection site is warehouse 4 bay 6. Garnet sludge will be picked up 6 times per year.

Sewage Sludge. Sewage sludge collection shall be collected using contractor-furnished containers and contractor-owned collection trucks. A leak-proof 20 cubic yard roll-off for the collection of this waste must be provided for the collection of this waste or the contractor must place a liner in the container before use. The current location of the sewage sludge collection site is Bldg. 241. Collection will required between April – October and 20 pickups will be required.

Infectious Waste. The contractor shall provide properly labeled containers and requisite disposable red bags on an as required basis. Upon award, the contractor must provide a pickup schedule within seven days. The contractor shall arrange a pickup schedule that leaves pick up a minimum of 13 pickups per year or within twenty-four (24) hours after notification by the COR. The contractor shall be responsible for the proper completion and disposition of waste manifest(s) in accordance with all applicable federal, state and municipal laws, codes and regulations including changes thereto. The contractor shall be responsible for obtaining all necessary licenses and permits and shall furnish copies of such to the KO as they become available. Removal, transportation and disposal of the waste shall be the responsibility of the contractor. The contractor shall dispose of the waste at a disposal facility which has all the valid and current licenses/permits required by federal, state or local agencies. The contractor must be able to provide validation of disposal upon the CORs request.

NOTE: The contractor shall furnish an empty replacement roll-off container each time a filled container is removed from TYAD unless otherwise requested. The COR will notify the contractor when a container needs to be switched out. The contractor then has 24 hours to replace the filled container with an empty one.

Positioning of Containers. The contractor shall position all containers at collection stations to best aid the use in disposing of solid wastes. The contractor shall also position containers so as to minimize interference with adjacent parking areas, sidewalks, roadways, etc. The positioning of the containers must meet the approval of the COR. The contractor shall not combine or relocate collection stations, revise or in any way modify route diagrams without prior approval of the COR.

When more than one container is positioned at one collection station, containers shall be placed as close together as feasible for user convenience and organized appearance, subject to the approval of the COR.

The contractor shall return non-disposable containers to their proper station in an upright position with the lids securely in place and the doors closed.

Unconfined Excess Refuse. The contractor must collect any refuse within five feet of each collection site. Refuse placed at the collection site in sacks, cartons, bags, cans, etc. or loose shall be removed by the contractor in the same manner and at the same time as if it were placed in the regularly provided containers.

The contractor shall not pick up any empty 55-gallon drums that may be placed in the vicinity of any of the collection sites. Such drums may or may not have contained hazardous materials. If the contractor sees a 55-gallon drum in any of the collection containers they are to notify the COR immediately.

Blocked Containers. Any container that needs to be emptied that is blocked by vehicles, equipment, snow, etc. shall be reported to the COR immediately. The COR will attempt to get the car, equipment, etc. moved. The contractor shall return to check the blocked container for pickup at least one more time that day.

Expedited Removal of Non-Hazardous Sludge – Annually: The purpose of this annual expedited removal is to accommodate collection of dewatered sludge as it is processed by a sludge dewatering unit. The contractor must have the ability to send up to two roll offs into the sewage treatment plant per day for up to five consecutive days as demanded by the treatment plant.

Regulations. The site of the contract work is on federal property and all rules and regulations issued by the Commander of TYAD covering topics such as, but not limited to, fire, safety, sanitation, admission to the installation and conduct of operations shall be observed by the contractor and his employees.

In order to provide safety controls for protection to the life and health of employees and other persons; for the prevention of damage to property, materials, supplies, and equipment; and to avoid work interruptions in the performance of this contract, the contractor shall conform to all rules and requirements prescribed in all applicable Occupational Safety and Health Administration (OSHA) regulations.

The contractor shall take all steps and precautions to prevent accidents and to preserve the life and health of contractor and government personnel performing or in any way associated with or resulting from the performance of this contract.

Noise Prevention. All of the contractor's equipment shall be equipped with properly maintained noise limiting devices.

Backup Warning Devices. All contractor vehicles used in the performance of this contract shall be equipped with audible and flashing backup warning devices.

SAFETY PROVISION FOR SERVICE CONTRACTS PERFORMED AT TYAD.

Safety: Incidents or Accidents on the installation: Any incident or accident resulting in any (minor or major) damage or injury, whether or not it involves the contractor’s policy or employees, or it involves government property or employees, shall immediately be reported to the COR. The contractor and any other persons involved shall remain at the site of the incident until the COR arrives to assess and to notify the proper authorities. Failure to report any incident or accident resulting in any damage or injury is not acceptable.

DoD, DA, OSHA and local TYAD rules and regulations shall govern contractors, sub- contractors, suppliers and their employees. Contractors and subcontractors shall comply with

TYAD Safety Regulation 385 as applicable. The TYAD Safety Regulation 385 Safety Manual may be made available by contacting the TYAD Safety Division (570) 615-7027.

Contractors shall comply with Title 29 Code of Federal Regulations-1910 (OSHA General Industry Standards), Title 29 Code of Federal Regulations-1926 (Construction Industry Standards) and National Fire Protection Association Codes as applicable.

All contractor and subcontractor employees on site at TYAD shall be required to view a 15- minute Safety film upon TYAD entry and prior to performance of any on-site work. Contractors shall also comply with any and all Safety requirements as stated in the specific statement of work or technical specifications applicable to the contract/order.

DISPOSAL.

The contractor shall comply with PA Act 101, PA Act 90, and the Monroe County Solid Waste Management Plan. The contractor shall be licensed as required by PA Act 90 and the Monroe County Solid Waste Management Ordinance and shall submit semi-annual and annual reports (on the proper forms) to the Monroe County Municipal Waste Management Authority.

The municipal solid waste and generic residual waste generated at TYAD shall be collected on the same front loading refuse truck and treated as both municipal solid waste and generic residual waste. The contractor shall dispose of all municipal solid waste and generic residual waste under this contract at a Pennsylvania Department of Environmental Protection (PADEP) approved and Monroe County Municipal Waste Management Authority authorized landfill.

Disposal of all solid waste collected under this contract shall be in strict accordance with federal, state, county and local regulations as applicable. The contractor shall obtain such permits, licenses or other authorization as may be required at no additional cost to the government. The disposal site (sanitary landfill) must have valid permits issued by the appropriate government agency for each type of waste being disposed.

All coatings/paint waste, garnet sludge, and sewage sludge shall be disposed of at a PADEP approved and Monroe County Municipal Waste Management Authority authorized landfill. The Keystone Sanitary Landfill has approved form U’s for these waste streams and currently receives this waste.

The contractor shall be solely responsible for using an approved disposal facility. In the event of revocation of the landfill permit or landfill enclosure, the contractor remains responsible for the removal and approved disposal of solid waste from TYAD without deviations from the provisions contained herein, unless prior written approval is granted by the KO. The contractor may identify a secondary disposal facility if so desired. However, the secondary disposal facility must be a Monroe County Municipal Waste Management Plan approved site. Also, the contractor must give adequate notice and also coordinate this with the COR so the proper forms can be filled out and approved with the landfill.

The contractor shall provide trucks or similar hauling equipment designed to prevent blowing, spilling and otherwise scattering refuse, solid waste, trash, garbage, etc., on government property, on and along roads, on streets and on any surrounding and adjacent areas en route to the disposal site. All roll-offs that are taken off post are required to be covered before leaving TYAD.

NOTE: TYAD has cradle-to-grave responsibility for the disposal of all solid waste generated on-site. Generic residual waste must be disposed of at a PADEP approved landfill. Transfer facilities generally do not send solid waste received to the same facility each day. Therefore, TYAD will not approve a proposal to send municipal solid waste and/or generic residual waste to a transfer facility, even if the transfer facility is a Monroe County Municipal Waste Management Plan approved site.

Salvageable Materials. The contractor shall not salvage any material unless specifically designated and approved by the COR. If the contractor discovers a questionable item or material which they believe has a salvageable value or for which there is doubt as to whether the item(s) were intended for refuse pickup or disposal, the COR shall be notified immediately.

Hazardous Materials. The contractor shall not collect or dispose of any hazardous materials. If the contractor or his employees discover material, which they believe may be hazardous, the COR shall be notified immediately. In the event the COR is not available, the contractor shall notify the TYAD EMD, who will then contact the appropriate personnel to provide guidance.

Military Materials. The contractor shall not collect or dispose of any military equipment. Should a load include military equipment (e.g., army-green or desert-beige painted items), the contractor shall immediately notify the COR. Per the decision of the COR, either TYAD personnel shall immediately retrieve the item(s) from the contractor’s facility, or the contractor shall return the material during their next trip to TYAD. In the event the COR is not available, the contractor shall notify the TYAD Security Office (phone number to be provided at time of award), who will then contact the appropriate personnel to provide guidance.

Retention of Discarded Items. Any type of refuse collected by the contractor under this contract may be retained by the contractor for disposition off-post if approved by the KO and provided the requirements of this contract are fulfilled. If any item(s) is requested to be returned, the contractor shall do so while the items(s) is in his possession. The government reserves the right to inspect the landfill site, recycling center or other sites that might contain the refuse collected at TYAD, and recover any material originating from TYAD. If the landfill or recycling center is not owned and/or operated by the contractor, the contractor shall make provisions with the landfill or recycling center owner and/or operator for government inspection and recovery privileges.

Solid Waste Collection Sites

ContainerType ofFrequency of
Site#Size (cu.yd.)Solid WastePickup
1
8
Refuse
2W
2
8
Refuse
2W
3
8
Refuse
2W
4
8
Refuse
2W
5
8
Refuse
2W
6
8
Refuse
2W
7
8
Refuse
2W
8
8
Refuse
2W
9
8
Refuse
2W
10
8
Refuse
2W
11
8
Refuse
2W
12
8
Refuse
2W
13
8
Refuse
2W
14
8
Refuse
2W
15
8
Refuse
2W
16
8
Refuse
2W
17
8
Refuse
2W
18
8
Refuse
2W
19
8
Refuse
2W
20
8
Refuse
2W
21
8
Refuse
2W
22
8
Refuse
2W
23
8
Refuse
2W
24
8
Refuse
2W
25
40
Coatings Paint Waste
AS
26
8
Refuse
2W
27
8
Saw Dust
1W
28
8
Refuse
2W
29
40
Bulky items
AS
30
40
Bulky Items
AS
32
8
Refuse
2W
33
8
Refuse
2W
34
20
Garnet Sludge
AS
35
8
Refuse
2W
36
8
Refuse
2W
37
8
Refuse
2W
38
3
Sawdust
1W
39
3
Sawdust
1W
40
8
Refuse
2W
41
8
Refuse
2W
42
8
Refuse
2W
43
8
Refuse
2W
44
8
Refuse
2W
45
8
Refuse
2W
46
8
Refuse
2W
47
8
Refuse
2W
48
8
Refuse
2W
49
8
Refuse
2W
50
NA
Infectious Waste
AS
51
8
Refuse
2W
52
8
Refuse
2W
53
8
Refuse
2W
54
8
Refuse
2W
55
8
Refuse
2W
56
8
Refuse
2W
57
8
Refuse
2W
58
8
Refuse
2W
59
8
Refuse
2W
60
8
Refuse
2W
61
3
Refuse
2W
62
8
Refuse
2W
63
8
Refuse
2W
64
8
Refuse
2W
65
8
Refuse
2W
66
8
Refuse
2W
67
8
Refuse
2W
68
8
Refuse
2W
69
8
Refuse
2W
70
8
Refuse
2W
71
8
Refuse
2W
72
8
Refuse
2W
73
8
Refuse
2W
74
8
Refuse
2W
75
8
Refuse
2W
76
8
Refuse
2W
77
8
Refuse
2W
78
8
Refuse
2W
79
8
Refuse
2W
80
8
Refuse
2W
81
8
Refuse
2W
82
8
Refuse
2W
83
8
Refuse
2W
84
8
Refuse
2W
85
8
Refuse
2W
86
20
Sewage Sludge
AS

ABBREVIATIONS:

AS - As Scheduled 1W- Wednesday 2W - Twice Weekly (either Mondays and Thursdays or Tuesdays and Fridays)

Inclement Weather Schedule. The contractor shall collect refuse during periods of inclement weather unless otherwise approved by the COR in the case of extreme weather conditions. The COR will approve the delay in collection during periods of extreme weather conditions on a day- by-day basis. When exceptions are granted, the contractor shall accomplish all collections for each day missed in order to "make up" all missed collections within 24 hours after re- commencement of services. In the event the following day is Saturday, such make up will be performed on Monday. If all "make up" collections cannot be made in 24 hours, the Contractor shall submit a revised schedule to the COR for approval. Rescheduling to provide "make up" collections shall not be the basis for a claim by the contractor for additional compensation.

Holidays. If the daily collection schedule falls on a legal holiday, the contractor shall plan additional pickup time for the next work day. Upon award, the contractor shall notify the COR of their holiday schedule if it differs from the government’s schedule. Any holiday rescheduling shall be at no additional cost to the government and under no circumstances will the collection interval exceed the three-day requirement. Refuse collection will not be made on the following holidays due to TYAD being closed:

New Year’s DayJanuary 1
Martin Luther King Day3rd Monday in January
Presidents Day3rd Monday in February
Memorial DayLast Monday in May
JuneteenthJune 19
Independence DayJuly 4
Labor Day1st Monday in September
Columbus Day2nd Monday in October
Veterans DayNovember 11
Thanksgiving Day4th Thursday in November
Christmas DayDecember 25

CONTRACTOR QUALITY CONTROL.

The contractor shall provide and maintain an effective Quality Control Program to ensure that all specified contract requirements are met. The contractor has full responsibility for compliance with all provisions of the contract. The burden of proof of contract compliance is placed on the contractor and not assumed by the government. The contractor's quality control may not be accepted without question and the government reserves the right to inspect or verify at any time.

If deficiencies indicate that the contractor's Quality Control System is not adequate or does not produce the desired results, corrective actions in both the Quality Control System and the work shall be taken by the contractor. If the above does not obtain effective improvement in the contractor's Quality Control System, the KO may direct additional changes be made in the Quality Control System or organization. Corrective action directed by the KO shall be taken by the contractor.

The contractor shall notify the KO in writing of any proposed change to the contractor's Quality Control System. No such change shall be implemented prior to approval in writing by the KO or his/her authorized representative.

An inspection system covering all the services stated in the PRS of the Performance Work

Statement. It must specify areas to be inspected on both a scheduled or unscheduled basis and the individuals who will do the inspections.

Methods of quality control including that for his/her subcontractor's work. (To include items to be inspected, types of inspection, duties of personnel and methods the contractor proposes to use to ensure quality work.

Methods of documenting quality control operations and inspection, including samples of proposed forms.

Safety inspection procedures. (To include employees responsible for overall supervision of accident prevention activities, including applicable safety requirements in work methods and for inspecting the work to ensure that safety measures and instructions are actually applied.)

A digital copy of the complete plan shall be submitted for approval.

Until the approval of the Quality Control Plan by the government, the contractor shall utilize the best industry methods, standards and procedures, for the type of services described herein, to assure compliance with all terms and conditions of the contract.

INSPECTION AND ACCEPTANCE.

The government will inspect the contractor's performance under the contract in accordance with the terms of the contract clauses and the standards and procedures specified in the QASP. Final inspection and acceptance will be performed at the site of performance at Tobyhanna Army Depot by the COR.

The KO will conduct such inspection and surveillance of the contractor's performance under the contract as he determines appropriate and necessary. The government will monitor the contractor's performance by physical inspection, review of reports/documentation and customer complaints.

PAYMENT FOR ACCEPTED SERVICE.

The contractor will be paid a firm fixed price on a monthly basis. All payments will be made electronically within Net 30 Days of acceptance of invoice in WAWF by the COR.

Submittals: The contractor shall provide the following submittals to the COR via the Wide Area Work Flow (WAWF) electronic invoicing system: monthly invoice for services performed under this contract.

ACCESS TO RECORDS, DATA AND FACILITIES.

The contractor shall permit the KO or his authorized representatives to have access at any reasonable time to all records, data and facilities used in contract performance.

End Work Statement

SERVICE or EQUIPMENT INSTALLATION CONTRACTOR SAFETY STANDARDS FOR TYAD Below are some “installation specific” safety standards which contractors are required to adhere to while performing any work on Tobyhanna Army Depot. It is the contractor’s responsibility to always incorporate these particular requirements into their daily operations while under contract and to institute these specifics into their overall site safety controls. These do not substitute or deflect in any way the requirement to institute and adhere to all OSHA 29 CFR 1910 & 1926 and USACE EM385-1 safety standards, as well as all applicable contractual Federal Acquisition Regulations while performing the work under this contract on Tobyhanna Army Depot.

It is the responsibility of the contractor to enforce the below requirements as well as all current revisions of the above referenced standards. Failure to enforce safety requirements on the depot can result in immediate stop works, safety stand down orders and even complete termination of the contract.

Important Phone Numbers:

Fire or Emergency: 911 Fire Department – (Non-Emergency): 570-615-7300 Security: 570-615-7550 Safety Office - 570-615-7027

S1.0 THE CONTRACTOR IS SOLELY RESPONSIBLE AND LIABLE FOR JOB- SITE SAFETY

1. Review of the project plans and other documents by any government appointed official does not constitute an acceptance of Federal responsibility or liability for the adequacy of the safety measures identified for the job or for the Contractor's compliance with all applicable safety rules and regulations.

2. The Contractor remains solely responsible and liable for job-site safety at all times during the term of the contract. No outside personnel (other than ET, COR, TYAD Safety, or other government appointed contract personnel) are allowed onto the job site at any time during contract without prior permissions and/or escort by the ET, COR or KO.

3. Tobyhanna Army depot has restrictions on the use of fossil fuels in all buildings. When it is determined that electric or other alternatively fueled vehicles are insufficient or unavailable for movement of material within the buildings on the installation, fossil-fueled vehicles can be used only when all alternatives of accepted electric material movement equipment have been considered, and the last option is use of a fossil fuel vehicle or project failure. This includes any situations where safety of employees and equipment may be jeopardized. Convenience will never be an acceptable justification to utilize fossil-fueled vehicles. The Government Designated Representative (GDR) will notify the appropriate supervisor(s) or leader(s) in the area where the need to utilize a fossil fuel vehicle is required. The supervisor / leader will take the necessary steps to notify the employees in the work area of the option to leave the area during the material movement process. The GDR and Contractor will also document all actions the Contractor took to utilize electric or other alternatively fueled vehicles. The documentation will specifically state why electric or alternatively fueled vehicles are insufficient and all mitigation efforts used to minimize the effects of fossil-fueled vehicles to include information as to any appropriate scrubbers that can be utilized along with any ventilation or exhaust systems that can be used to externally vented to the outside of the facility. The documentation must be submitted to the TYAD Safety office for approval prior to any equipment being used. A final copy of the Approved documentation will be provided to the TYAD Safety Division.

4. All direct construction supervision, including subcontractors, must as a minimum, complete an OSHA 30-hour safety course for construction. These certificates must be submitted as part of the site safety plan BEFORE construction activities start.

5. RED CARD PROGRAM - Tobyhanna Army Depot utilizes a program to allow employees to stop an action which is considered unsafe. Employees carry small red cards that can be thrown down when employee sees any action they consider unsafe. Work ceases until TYAD management can decide if it is safe or not. Contractors are required to comply with this program. If a TYAD employee presents the red card to the contractor, the contractor must stop working until the COR and Safety Office can determine if there is a safety hazard or not.

6. All contractor personnel, to include subcontractors, vendors, suppliers, or visitors, when performing any type of work activity, or gaining access through an occupied area or shop - must have all applicable PPE that is required for the area to include, but not limited to, hardhats, safety glasses, hearing protection, and respirator protection. Notify both COR & Area Supervision, for access approval and prior to any work activities being performed.

S13.0 IF AN INCIDENT HAPPENS

1. Any serious injury or medical emergency:

· Immediately call emergency responders

· Dial 911 and give accurate location and nature of emergency. Make sure to tell the operator that you are calling from Tobyhanna Army Depot.

· Send someone to the nearest exit to assist responders.

· Treat victims to the best of your ability.

· Notify COR / call work order desk at 570-615-7805 if there is any blood or body fluids that must be cleaned up.

2. In the event of the smell of natural gas:

· Call dial 911and give accurate location and nature of emergency. Make sure to tell the operator that you are calling from Tobyhanna Army Depot.

· Have all personnel evacuate the area if the smell is significant.

· Upon arrival of fire personnel, provide information as to specific equipment and exact location of potential leak.

3. In the case of a fire:

· If the fire is small, use a fire extinguisher and call 911.

· Otherwise, dial 911 and pull the fire alarm.

· Evacuate the building.

IN ANY CONFLICT BETWEEN STANDARDS, THE STRICTER OF THE TWO SHALL APPLY. IF UNSURE CONTACT THE COR / ET VIA PROPER RFI PROTOCOLS FOR VERIFICATION THROUGH THE TYAD SAFETY OFFICE.

File details come from the government source that posted it. Updated .