This is a Performance Work Statement (PWS) for an Indefinite-Delivery, Indefinite Quantity (IDIQ) contract with Military Sealift Command (MSC) to provide engineering drawing services for approximately 125 MSC fleet vessels. The contract supports the MSC N7 Engineering Directorate with an 18-month ordering period, under which individual firm-fixed-price task orders (TOs) will be issued for specific work. No work may be performed until directed by a TO; task orders may be issued via email with formal written confirmation within 3-7 business days.

The contractor shall develop new engineering drawings, revise existing drawings, perform drawing conversions (hard copy to AutoCAD/PDF format, raster to vector, and other document format conversions), conduct ship check surveys, and provide calculations for drawings requiring technical analysis. All drawings must be submitted in AutoCAD 2017 and PDF (Version 6 or newer) formats. Services encompass multiple engineering disciplines including marine, mechanical, electrical, electronics, structural, and naval architecture. The contractor must maintain capability to conduct at least three simultaneous ship check surveys across different technical disciplines. Fault current analysis, protective device coordination, and arc flash analysis shall be performed in SKM Power Tools for Microsoft. Ship checks require Government Furnished Information (GFI) standards including MSC Standard Drawings 803-7079667 and 803-7081122, plus MSC QMS requirements. The contractor must obtain ISO 9001:2015 certification or equivalent audit verification. Key personnel include one Program Manager (15+ years marine engineering experience, licensed PE, 10+ years MSC vessel experience), one Senior Engineer (15+ years marine engineering, 6 years naval/commercial ship systems experience, 4 years oceangoing vessel maintenance experience), and three Discipline Engineers—one Marine Engineer, one Naval Architect, and one Electrical Engineer (each requiring 12 years marine engineering experience, 6 years ship systems operations/maintenance, and 4 years oceangoing vessel maintenance). All personnel must be U.S. citizens capable of maintaining SECRET security clearance and obtaining Common Access Cards (CAC). The contractor must provide all necessary computers, accessories, and WiFi capability for on-site work at MSC facilities in Norfolk, Virginia. Travel costs must be submitted as firm-fixed-price and comply with DOD Joint Travel Regulations per diem limits, with contractor responsible for all travel arrangements including medical exams, immunizations, passports, visas, and security clearances. Performance requirement standards address personnel manning, trafficking in persons compliance, timeliness and accuracy of quotes, whistleblower clause compliance, and fair and reasonable pricing, tracked through the Defense Contractor Performance Appraisal Reporting System (CPARS). Deliverables include meeting minutes, ship check data, electronic drawings with regulatory approvals (USCG/ABS as required), Microsoft Excel files, biweekly task tracking spreadsheets, and key personnel resumes. The contractor must report labor hours via the Enterprise-wide Contractor Manpower Reporting Application (ECMRA) on SAM.gov by October 31 annually, excluding certain PSC categories. Typical places of performance include CONUS and OCONUS locations: Boston, Philadelphia, Norfolk, Charleston, Seattle, Portland, San Francisco, San Diego, Honolulu, Guam, Subic Bay (Philippines), Singapore, Yokosuka, Sasebo, Bahrain, Jebel-Ali, Duqm, Naples, and Rejika. The contract requires a non-disclosure agreement signed by all key personnel and subcontractors, and the contractor is solely responsible for safety compliance, including accident reporting within 24 hours of occurrence.

View the file

Other files

File Type Posted
SOURCES SOUGHT NOTICE - MSC Engineering Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

1.0 Background

1.1 Military Sealift Command

Military Sealift Command (MSC) owns and operates approximately 125 ships, including steam turbine, gas turbine, and diesel engine propelled vessels. These vessels fulfill such varied missions as underway replenishment, oceanographic research, cable repair, and dry and refrigerated cargo support. The MSC N7 Division is responsible for aspects of ship maintenance, repair, alteration and material readiness for the MSC fleet. Throughout the period of performance of this contract, new ships will be introduced into the MSC fleet, ships will undergo life extensions, and ships will be retired from service life.

1.2 Contract

The purpose of this Indefinite-Delivery, Indefinite Quantity (IDIQ) contract is to develop a vehicle for procurement to provide new and revised engineering drawings for ships of the fleet. MSC requires contracted expert survey, drafting, and production drawing support to fulfill its commitments in a timely manner. These new and revised drawings, diagrams, and sketches are required to be drawn in an electronic format and plotted in full size and color. Drawing reproduction and conversion services are also required.

This contract will provide non-personal services to Military Sealift Command N7 Engineering Directorate to provide engineering analysis/calculations, ship checks, engineering system design, and professional AutoCAD drafting in order to develop and revise engineering drawings. The Contractor shall accurately prepare AutoCAD drawings for designated systems in accordance with the standard drawings provided as Government Furnished Information (GFI) and listed in Section 3.2 of this PWS. The Contractor may be required to perform surveys, ship checks, and analyze as built drawings, red line mark ups, work packages and other correspondence in order to develop or revise drawings for various engineering disciplines, including, but not limited to, marine engineering, mechanical engineering, electrical engineering, electronics engineering, and naval architecture.

MSC manuals predominantly composed of drawings such as Engineering Operating Manuals and Damage Control Books shall be updated under this contract. The Government will not provide neither the tablets and associated software nor AutoCAD software for performance under task orders issued against the contract.

1.3 List of Acronyms and Abbreviations

ABS – American Bureau of Shipping ADDA – American Design Drafting Association CAC – Common Access Card CAD – Computer Aided Design CD/DVD – Compact Disc/ Digital Versatile Disc CFR – Code of Federal Regulations COR – Contracting Officer Representative CLIN – Contract Line Item Number DOD – Department of Defense FAR – Federal Acquisition Regulations GFI – Government Furnished Information GTR – General Technical Requirements HVAC – Heating, Ventilation and Air Conditioning MSC – Military Sealift Command ODC – Other Direct Cost PDF – Portable Document File PWS – Performance Work Statement QASP – Quality Assurance Surveillance Plan SOLAS – Safety of Life at Sea SRD – Selected Record Drawing TO – Task Order TPOC – Technical Point of Contact USCG – United States Coast Guard USNS – United States Naval Ship

2.0 Specific Tasks:

The Contractor shall create or revise engineering drawings to accurately reflect the ship’s system/equipment. All drawings shall be accurately prepared and submitted in accordance with the Government Furnished Information (GFI) references outlined in Paragraph 3.0 of the PWS.

Specific task descriptions, sufficient in detail to allow for contractor performance, shall be provided with each Task Order (TO) Performance Work Statement (PWS) under this contract. Some work may be quick turnaround emergent work. Some services may require short notice travel; other work may require a quick study or analysis.

2.1 Create New Engineering Drawings. The Contractor shall develop new engineering drawings as described in the Task Order (TO). The Contractor may be required to perform a ship check survey to develop sketches and notes for the new drawing as well as consult existing engineering drawings, technical data, work packages, technical manuals and other correspondence as required. The Contractor shall provide the Technical Point of Contact (TPOC) a complete copy of all ship check notes, sketches, photos, and draft drawings for quality assurance comparison of the final drawing. Ship check notes, sketches and draft drawings shall be made using tablet technology where applicable. Tablets should have the ability to electronically transfer these notes, sketches and draft drawings to the Government QA representative throughout the ship check allowing the opportunity for oversight.

2.2 Revise Existing Engineering Drawings. The Contractor shall revise engineering drawings as described in the TO. The TPOC will provide access to PDF, AutoCAD, or paper copy of the drawings to be revised as available. The Contractor may be required to perform a ship check survey to develop a mark-up of the original drawing, sketches, and notes as well as consult existing engineering drawings, technical data, work packages, technical manuals, and other correspondence as required. The Contractor shall provide the TPOC a complete copy of all ship check notes, sketches, mark-up drawings, photos, and draft drawings for quality assurance comparison of the final drawing.

2.2.1 Fault Current Analysis, Protective Device Coordination Study and Arc Flash Analysis, when tasked, shall be performed/developed in SKM Power Tools for Microsoft in accordance with G.F.I.

2.3 Drawing Conversions. The Contractor shall provide services for conversion of drawings from hard copy to electronic AutoCAD format and/or PDF format as required by the TO. Drawing conversion shall also include conversion from raster drawings to vector drawings as well as other document formats (for example PDF to Excel, PDF to Word). Specifically, the Contractor shall have the capability to electronically convert PDF drawings to AutoCAD or a hybrid of the two formats as required by the TO.

The Contractor shall accurately produce, reproduce, or modify for production the drawings to scale.

2.4 Other Requirements:

2.4.1 Calculations. The contractor shall provide calculations for drawings requiring specific calculations.

Calculations include but are not limited to: pressure drop, heat transfer, HVAC, structural, weight and moment, electrical load, voltage drop, and any other calculations determined by the TPOC and specified in the TO.

2.4.1.2 Calculations shall be in an editable format with all formulas depicted. Assumptions in calculations shall be explained and provided with details to the TPOC.

2.4.2 Ship Check Survey. The Contractor shall have the manpower capability to perform at least three (3) separate ship check surveys simultaneously, covering all the necessary technical areas of expertise. The Contractor shall ensure each discipline required by the TPOC or TO be available for ship checks. A different engineering discipline shall not conduct a ship check for the required engineering discipline (i.e.

an electrical engineer shall not conduct piping system ship check for a mechanical engineer). Contractor travel for ship checks must be approved by Military Sealift Command’s TPOC. Approved Contractor travel will be paid in accordance with Paragraph 4.0 below.

2.4.2.1 Certain TO’s will require the contractor to work at MSC facilities and work in conjunction with the TPOC. The Contractor shall provide all necessary computers, accessories, and WIFI capability to perform in accordance with the PWS under each TO.

2.4.2.2 The Contractor shall be responsible for pick-up and delivery of documentation and technical references at MSC N7 office at Naval Station Norfolk, VA at the Contractor’s expense.

2.4.2.3 Meetings shall be held in the Hampton Roads area at the Government’s facility located at Naval Station Norfolk, VA. Meetings may be held virtually at the discretion of the COR. The location and type of meeting are at the discretion of the MSC TPOC. Travel to and from meetings is at the Contractor’s expense. MSC estimates 8-10 meetings of this type will occur per Contract year without guarantee.

2.4.2.4 Regulatory Body Approvals. Drawings may require submission to the US Coast Guard (USCG) and American Bureau of Shipping (ABS) for acceptance and approval, as indicated by the TO. The TPOC will alert ABS that drawings will be submitted for approval, and the Contractor will submit the drawings directly to ABS. The Contractor is responsible for all corrections and revisions required to meet USCG and ABS final approval. The Contractor will not be responsible for the cost of the ABS review and approval process.

2.4.2.4.1 The Contractor shall maintain contact with ABS throughout the review process, and notify the TPOC of any potential delays. The Contractor shall make every effort to provide ABS approved final deliverables to the TPOC no later than the deliverable schedule indicated in the task order; however, the Contractor will not be held responsible for delays directly attributable to the ABS review and approval process.

2.4.2.4.2 The Contractor shall request and gain O2E access through the TPOC and utilize this for ABS submittals under MSC’s account.

2.4.2.5 The Contractor shall have an established Quality Control System (ISO 9001:2015 or newer) or demonstrate that they have had an independent audit that certified the Quality Control System is compliant with the ISO standard.

3.0 Government Furnished Information (GFI):

3.1.1 The MSC N7 TPOC or COR will provide drawings and technical manuals when available and as requested.

3.1.2 The MSC Technical Library will provide the following standard references after award in electronic format:

3.1.3 MSC Standard Drawing 803-7079667 (or latest revision); Preparation of Selected Record Drawings (SRDs) for USNS Ships.

3.1.4 MSC Standard Drawing 803-7081122 (or latest revision); Military Sealift Command General Technical Requirements (GTRs)

3.1.5 MSC QMS N7.72.9085.010-WP (or latest revision); Drawing Development and Revision

4.0 Travel

Contractor(s) shall submit a firm-fixed-price for travel for the reasonable, allowable, and allocable total cost of transportation, lodging, meals and incidental expenses only to the extent that they do not exceed on a daily basis the maximum per diem rate in effect at the time of travel as set forth in the DOD Joint Travel Regulations located at https://secureapp2.hqda.pentagon.mil/perdiem/. The cost may not include handling charges, general and administrative cost, overhead, profit or any other indirect cost.

Each task order that requires travel will require the Contractor to submit with their quote, a firm-fixed-price for travel costs associated with that task order.

The Contractor is responsible for making all needed arrangements for its personnel. This includes, but is not limited to, the following:

• Medical Examinations

• Immunizations

• Passports, Visas, etc.

• Security Clearances https://secureapp2.hqda.pentagon.mil/perdiem/

• Country Clearances

Note: Travel to the Philippines will require a “9A Special” visa.

5.0 Deliverables

5.1 Kick-Off Meeting

A contract kick-off meeting will be held shortly after award unless otherwise specified by the COR. The Contractor and the COR shall arrange a mutually agreeable time and place to meet for the purpose of discussing the requirements and details of the work.

The Contractor shall create a set of meeting minutes, to be signed by both the COR and the Contractor, reflecting all matters discussed during the kick-off meeting. Meeting minutes shall be provided to the COR within three (3) days after conclusion of the kick-off meeting.

Monthly Sync Meeting: A synchronization meeting will be held at a mutually agreed time reoccurring monthly via teleconference. An agenda shall be provided prior and meeting minutes shall be provide to the COR within three (3) days of the meeting.

5.2 Task Deliverables

A kick-off meeting may be required for certain TO/DOs as stated in the TO/DO or otherwise requested by the KO. The meeting may be held within three (3) business days after TO/DO award.

The Contractor shall contact the PPE, CHENG, COR, and KO and arrange a mutually agreeable time and place to meet (teleconference is acceptable) for the purpose of discussing the requirements and details of the work.

The Contractor shall create a set of meeting minutes, to be signed by both MSC and the contractor, reflecting all matters discussed during the kick-off meeting. Meeting minutes shall be provided to the PPE, CHENG, and KO within three (3) business days after conclusion of the kick-off meeting.

Deliverables and delivery schedules will be defined in each individual TO. Examples of deliverables include, but are not limited to, the following:

Ship Check Data: Hard copy (when applicable) and electronic copies of ship check survey notes, drawing mark-ups, draft drawings, photos, and sketches. All CD/DVD(s) shall be labeled, at a minimum, with the date of each TO, title of task, name of the N7 POC issuing the task, and list of documents on CD/DVD (include drawing numbers and technical manual numbers).

Drawings: Drawings shall be submitted in electronic format. Contractor shall provide one (1) copy in AutoCAD 2017 and one (1) copy in PDF (Version 6 or newer) on CD/DVD(s) at the end of each TO and via DoD SAFE as the individual drawing is completed. The drawing shall be submitted electronic format prior to USCG/ABS submission, if required. All CD/DVD(s) shall be labeled, at a minimum, with the date of each TO, title of task, name of the N7 POC issuing the task, and list of documents on CD/DVD (include drawing numbers and technical manual numbers).

Microsoft Excel: When required, Contractor shall develop and submit the Microsoft Excel file to the TPOC according to the delivery schedule indicated on the TO. The drawing shall be submitted electronic format prior to USCG/ABS submission, if required. Contractor shall provide one (1) copy in Microsoft Excel and one (1) in PDF (Version 6 or newer) on CD/DVD(s) at the end of each TO and via DoD SAFE as the individual drawing is completed. All CD/DVD(s) shall be labeled (at a minimum) with the date of each Task Order, Title of Task, name of the N7 person issuing the task, and list of documents on CD/DVD (include drawing numbers and technical manual numbers).

Regulatory Body Approval: The Contractor shall provide Regulatory body review and approval, as required. The Contractor shall provide one (1) AutoCAD copy, and one (1) PDF copy of each deliverable, including USCG and ABS stamp, as appropriate, or a letter certifying approval, if required, on CD/DVD. All CD/DVD(s) shall be labeled, at a minimum, with the date of each TO, title of task, name of the N7 POC issuing the task, and list of documents on CD/DVD (include drawing numbers and technical manual numbers).

5.3 Tasking Spreadsheet

The Contractor shall provide a task tracking spreadsheet in Microsoft Office 365 Excel format listing each TO and the associated deliverables. The spreadsheet shall be updated every two weeks and sent to the MSC COR and designated TPOC via e-mail. The task tracking spreadsheet shall also be updated upon completion of each task.

5.4 Key Personnel Submission

No later than two weeks prior to the start of the base contract, the Contractor must provide the Contracting Officer with individual resumes of the designated key personnel for review and approval in accordance with the personnel qualifications stated below. If a proposed individual is not an employee of the Contractor then a signed letter of intent is required to be submitted with the individual’s resume. Failure to provide qualified personnel may result in contract termination and a negative performance evaluation.

All deliverables shall be in accordance with the base contract PWS standards and individual Task Order standards. Factors that may determine a deliverables acceptability are, but not limited to, technical errors and clerical errors. Any standards that are not met may result in corrective action in accordance with FAR 52.212-4.

6.0 Personnel Qualifications

6.1 Personnel Labor Categories

Personnel qualifications for each relevant labor category are set forth below. The Contractor agrees to assign to this contract the persons whose qualifications meet the required standards below. The Government reserves the right to confirm qualifications of service representatives on a TO/DO basis.

Program Manager (PM) (1)

• A minimum of 15 years of marine engineering experience

• Six years of experience in maritime project management or program planning

• Licensed Professional Engineer (PE).

• A minimum of 10 years’ experience working with MSC vessels.

• Experience updating shipboard ABS approved Fire Control Plans and Damage Control

Plans.

• An understanding of MSC’s organizational structure (GOGO and GOCO).

Senior Engineer (1)

• At least 15 years of marine engineering experience

• Six years of experience in the operation, maintenance, test and evaluation of naval or commercial ship systems or equipment, shore-based systems, or equipment within a particular trade area (e.g., electrical, electronics, mechanical, structural weapons)

• Four years of specialized experience in the maintenance and repair of oceangoing vessels that demonstrates an ability to survey and inspect such vessels for the purpose of classification, appraisal, determination of equipment installed, and system engineering design

• A minimum of 8 years’ experience working with marine government experience.

• An understanding of MSC’s organizational structure (GOGO and GOCO).

• Experience updating shipboard ABS approved Fire Control Plans and Damage Control

Plans.

Discipline Engineers (3)

• Marine Engineer (1)

• Naval Architecture (1)

• Electrical Engineer (1)

• 12 years of marine engineering experience

• Six years of experience in the operation, maintenance, test and evaluation of naval or commercial ship systems or equipment, shore-based systems, or equipment within a particular trade area (e.g., electrical, electronics, mechanical, structural weapons)

• Four years of specialized experience in the maintenance and repair of oceangoing vessels that demonstrates an ability to survey and inspect such vessels for the purposes of classification, appraisal, determination of equipment installed and system engineering design. Electrical Engineer shall demonstrate a working knowledge of SKM Power Tools.

6.2 Program Management Personnel

The contractor(s) shall designate an individual as the Program Manager (PM) with complete authority to decide all technical matters connected with this contract. The contractor shall advise the KO, in writing, which specific persons have the decision-making authority described herein.

6.3 Key Personnel

The positions identified below are key personnel positions under this Contract. The numbers of key personnel required to support the contract are to be determined by the Offerors to support the requirements of the contract and the task orders. The numbers noted below in parentheses (5) are the minimum number of key personnel that must be provided under the contract. No substitutions shall be made except in accordance with paragraphs below.

• Program Manager (1)

• Senior Engineer (1)

• Discipline Engineers (3)

Key personnel shall be employed by the contractor and not be a subcontractor. In the event that key personnel are not performing IAW the PWS, the TPOC will notify the COR who, in turn, will notify the Contracting Officer. The Contracting Officer will coordinate directly with the Contractor.

6.4 Guidance on Substitutions

The Contractor(s) agrees that during the first ninety (90) days of the contract performance period for any task order, no key personnel substitutions will be permitted unless such substitutions are necessitated by an individual’s illness, death, or termination of employment. In any of these events, the contractor(s) shall promptly notify the KO and provide the information required below. After the initial ninety (90) day period, all substitution proposals must be submitted, in writing, at least fifteen (15) days in advance of the proposed substitution to the KO, and provide information required below.

6.5 Requests for Substitution

All requests for substitutions must provide detailed explanations of the circumstances necessitating the proposed substitutions, a complete resume for the proposed substitute and all additional documentation, and any other information requested by the KO needed to approve or disapprove the proposed substitution. All proposed substitutes must have qualifications that are at least the equivalent of the qualifications of the person to be replaced. The KO or authorized representative will evaluate such requests and promptly notify the contractor of approval or disapproval.

6.6 Personnel in Training Status

The Contractor is not to use apprentices to perform any of the required services unless the apprentice performs all work under the close supervision of a qualified service representative. Any work performed by an apprentice is to be minimized as the purpose of their presence onboard is for training. The contractor is responsible for all work performed by an apprentice. The full cost associated with trainee efforts shall be borne by the contractor and shall not be charged to this contract or TO/DO.

6.7 Other Personnel

The minimum qualifications for non-key personnel labor categories are as follows:

Designer. Minimum of ten years’ experience as designer in the preparation of construction and as built drawings. Certified AutoCAD 2004 Drafter III, equivalent or greater.

CAD Operator and Drafter and Jr. Designer. Four years’ experience as a technical drafter involved in the preparation of construction and as built drawings. Certified AutoCAD 2004 Drafter III, equivalent or greater. Drafter III qualifications require either AutoCAD or American Design Drafting Association (ADDA) Drafter certification.

Technical Editor. No specific requirements.

Administrative Support: No specific requirements.

7. 0 Contract Information

7.1 Contract Type

This will be an IDIQ contract with firm-fixed-price TO/DOs. Under this type of contract, no work may be performed until directed by a TO/DO. Electronic mail and facsimile are acceptable forms of transmission for all TO/DOs, modifications, and correspondence issued under this contract. TO/DOs may be issued via written authorization through email; however, these orders will be followed up with a formal TO/DO within seven (7) business days under normal circumstances.

7.2 Place of Performance

Contractor is required to perform at the contractor’s facility, various locations worldwide as specified by the TO and onboard MSC vessels unless shop work is authorized, necessary, and/or required. Vessels will be either moored at a Government Facility, located in a Commercial Repair Facility, or underway. In most cases, the contractor will have to perform work aboard the vessel while the vessel is in a commercial repair facility. The work will be required to be performed in various CONUS and OCONUS locations. Typical places of performance include, but are not limited to the following: Boston MA; Philadelphia, PA; Norfolk, Virginia; Charleston, South Carolina; Seattle, Washington; Portland, Oregon; San Francisco, California;

San Diego, California; Honolulu, Hawaii; Guam; Subic Bay, Philippines; Singapore; Yokosuka, Japan;

Sasebo, Japan; Bahrain; Jebel-Ali, United Arab Emirates; Duqm, Oman; Naples, Italy; and Rejika, Croatia.

7.3 Period of Performance

The period of performance is an eighteen (18) month ordering period.

7.4 Performance Requirement Standards (PRS)

Performance Objective Performance Standard Performance

Threshold Surveillance Method Incentive (Negative) Incentive (Positive)

Personnel Manning

Each Task Order shall be assigned qualified key personnel in accordance with Section 6 of the base contract

PWS.

100% of the task orders are required to have qualified personnel.

COR Inspection/ Customer Complaints /Customer Feedback /COR Reports and Assessments. COR Inspection/ Customer Complaints / Customer Feedback/COR Reports and Assessments.

Unsatisfactory/Poor Performance will be documented in CPARS. Corrective action to be implemented.

Positive

CPARS

FAR Clause 52.222-50, Trafficking in Persons and FAR 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan

IAW FAR 52.222-50 and FAR 52.222-56

100% compliance required due to U.

S. Zero Tolerance policy.

COR/KO Inspection

Non-conformance will be documented in CPARS.

Corrective action to be implemented.

Positive

CPARS

Contractor Requirements: The Contractor shall-

(1) Notify its employees of

(i) The U.S. Government’s Zero Tolerance policy.

(ii) Actions that will be taken against employees for violations of this policy.

(2) Take appropriate actions.

(3) Annually after receiving an award, the Contractor shall submit a certification to the Contracting Officer via email that-

(i) It has implemented a compliance plan to prevent any prohibited activities identified at paragraph (b) of this clause and to monitor, detect, and terminate any agent, subcontract or subcontractor employee engaging in prohibited activities; and

(ii) After having conducted due diligence, either-

(A) To the best of the Contractor’s knowledge and belief, neither it nor any of its agents, subcontractors, or their agents is engaged in any such activities; or

(B) If abuses relating to any of the prohibited activities identified in paragraph (b) of this clause have been found, the Contractor or subcontractor has taken the appropriate remedial and referral actions.

The Contractor shall submit a Trafficking in Persons Compliance Plan and the associated certification required by FAR 52.222-56 as part of their initial proposal and prior to contract award.

This requirement shall be documented and tracked as a formal deliverable in accordance with the CDRL’s.

Timeliness and Accuracy of Quotes

Quoting process shall follow timeline in the RFQ in accordance with Section 8.3 of the base contract PWS.

100% compliance;

no late quotes are acceptable, and any revisions to extend an RFQ will be at the contracting officer’s discretion.

Contractors are expected to reply in a timely manner to all quote inquiries and discussions.

The contracting officer shall be updated within 3 business days on any inquiry regarding negotiations, pricing concerns, quote revisions, etc.

CS/KO monitoring Non-conformance will be documented in CPARS.

Positive

CPARS

Compliance with Whistleblower Clause DFARS 252.203-7002

Contractor shall comply with all requirements listed in the Whistleblower clauses

100% of the time inform employees in writing of contractor employee whistleblower rights and protections under 10 USC 2409.

100% of the time the contractor shall include the substance of the clause in all subcontracts.

COR Verification Nonconformance will be documented in CPARS

Positive

CPARS

Fair and Reasonable Pricing

Prices for labor, materials, and services remain fair and reasonable throughout the contract period.

100% compliance required;

Contractors submitting quotes must be cognizant and compliant with the Government’s obligation under FAR 15.402(a), which requires contracting officers to purchase supplies and services from responsible sources at fair and reasonable prices.

Additionally, proposed prices for these supplies and services must withstand evaluation under

FAR 15.404-1,

which prescribes proposal analysis techniques to determine price fairness and reasonableness.

COR/KO will utilize historical invoice reviews, required cost/price data, price catalog and/or redacted invoicing of similar services or supplies, Non-conformance will be documented in CPARS.

Positive

CPARS

7.5 Authorized Changes Only by the Contracting Officer

Except as specified in paragraph below, no order, statement, or conduct of Government personnel who visit the Contractor’s facilities or in any other manner communicates with contractor(s) personnel during the performance of this contract shall constitute a change under the changes clause of this contract.

The contractor(s) shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the KO, or is pursuant to specific authority otherwise included as a part of this Contract.

The KO is the only person authorized to approve changes in any of the requirements of this Contract and notwithstanding provisions contained elsewhere in this Contract, said authority remains solely the KO’s. In the event the contractor(s) effects any change at the direction of any person other than the KO, the change will be considered to have been made without authority and no adjustment will be made in the Contract price to cover any increase incurred as a result thereof.

7.6 Subcontracting Arrangements - Contractor(s) shall identify any subcontracting arrangements in each Task Order quote. MSC reserves the right to approve or disapprove any potential subcontractor(s).

7.7 Designation of Contracting Officer’s Representative

The following individual is appointed as Contract Officer’s Representative under this Contract:

TBD

The COR will represent the KO in the administration of technical details within the scope of this contract and will perform inspection and acceptance of all deliverables. The COR is not otherwise authorized to make any representations or commitments of any kind on behalf of the KO or the Government. The COR does not have the authority to alter the contractor's obligations or change the specifications in the contract or issue Task Orders. If, as a result of technical discussions, it is desirable to alter contract obligations or performance work statements, a modification must be issued in writing and signed by the KO. The COR is responsible for reviewing the invoices submitted by the contractor(s) and informing the KO of areas where exceptions are to be taken. The COR authority is non-delegable. The COR may be personally liable for unauthorized acts.

The TPOC is not a representative of the Contracting Officer nor the COR. He/She is the technical expert for that individual task order. The TPOC will provide input and guidance to the contractor, COR and Contracting Officer on technical issues on an as needed basis. The TPOC may also be the COR.

7.8 Contractor Performance Appraisal Reporting System

Past performance information will be collected and maintained under this contract using the Department of Defense Contractor Performance Appraisal Reporting System (CPARS). CPARS is a web-enabled application that collects and manages the Contractor’s performance information on a given contract during a specific period of time. Additional information is available at http://www.cpars.navy.mil/.

The contractor will receive notification via email when a CPARS evaluation has been completed and is available for review and comment on any element of the proposed rating before that rating becomes final.

Within 30 days after contract award, the contractor shall provide the name, title, e-mail address and telephone number of the company individual or individuals who will have the responsibility of reviewing and approving any CPARS evaluation developed under the contract to the CPARS focal point via e-mail (Valerie.watkins@navy.mil). If, during the life of this contract the company individual(s) are replaced, the substituted individual’s information (contractor, the name, title, e-mail address and telephone number) will be provided to the CPARS focal point within 30 days of the replacement.

Performance will be evaluated in the CPARS basis on an annual basis. This annual evaluation will take into account performance of all TO/DOs awarded under during the evaluation time period.

http://www.cpars.navy.mil/ mailto:(Valerie.watkins@navy.mil

8. 0 General Information

8.1 Holidays

The holidays applicable to this contract are as follows:

New Year’s Day 01 January Martin Luther King Day Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth 19 June* Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

*If a holiday falls on a Saturday, for most Federal employees, the preceding Friday will be treated as a holiday

8.2 Standards of Workmanship

Unless otherwise specifically required for within this contract, the quality of all services provided shall conform to the highest standards in the relevant profession trade by fully qualified individuals in their field of endeavor including, but not limited to, ABS, IEEE, ASTM, ANSI, NFPA, National Electrical Safety Code (NESC), Occupational Safety Hazards (OSHA), UNITED STATES COAST GUARD (USCG) Navigation and Vessel Inspection Circulars (NVICs), as applicable. All services shall be rendered by individuals fully qualified in the relevant profession, trade, or field. The required obtainment and maintenance of any license required by law are also required by the terms of this contract. ONLY Qualified personnel, as defined in 29 CFR 1910.331(a), shall accomplish all services. The required obtainment and maintenance of any licenses required by law are also required by the terms of this contract.

8.3 Ordering Procedures

After contract award, individual task orders will be issued in accordance with FAR 16.505 as necessary to support Contract requirements. Contractors shall be sent a Request for Quote (RFQ) for services to be performed or parts to be delivered. Each RFQ will include a PWS and instructions for submitting quotes, and if applicable, a wage determination instructions for submitting quotes, and the Government’s evaluation procedures. At the Contracting Officer discretion, past performance could be evaluated at the order level. At the discretion of the Contracting Officer, an offeror's past performance may be evaluated at the individual order level. In response to the RFQ, the Contractors shall provide a firm-fixed-price to complete the requirements and any information required by the RFQ instructions. This firm-fixed-price shall include all labor. Travel and materials shall be priced separately under each order. Prices shall be broken down as follows:

Specific instructions shall be given to all contractors at the task order and delivery order level. In order for a contractor’s quote/proposal to be accepted, contractors must follow all instructions given to them which will be explained in the RFQ.

RFQ Response – The Contractors shall respond to each RFQ within the time established by the Government for response (will vary on an Order-by-Order bases but is typically five (5) to ten (10) business days after receipt of the RFQ). Urgent requirements may require less time for contractor to provide a quote. The Government reserves the right to exclude quotes received after the closing date and time. In response to the RFQ, contractor shall provide a firm-fixed-price quote to complete the requirements and provide any additional information as required by the RFQ instructions or respond with a statement regarding their decision not to quote.

RFQ Questions – During the RFQ time period, contractor(s) are encouraged to ask question in effort to clarify the requirement as needed. Reponses to questions will be sent to all contractors. The Government will respond to questions received prior to the closing date and time or extend the RFQ response time.

Electronic mail is an acceptable form of transmission for all Orders, Modifications, and correspondence issued under this contract. Orders may be issued orally by the KO; however, orally issued orders will be followed up with a written order within three to five business days.

Fair & Reasonable Price Determination - For each task order or delivery order issued under this IDIQ contract, the Contractor’s quoted prices will be evaluated for fairness and reasonableness in accordance with FAR 15.404-1 Proposal Analysis Techniques. The Contracting Officer will assess the proposed pricing using one or more of the applicable price analysis techniques, including, but not limited to, comparison to historical prices, comparison to other competitive offers, market research, or any other method deemed appropriate to ensure that the Government receives fair and reasonable pricing. The Contractor may be required to provide additional supporting documentation or data to substantiate price reasonableness when requested. The final determination of price reasonableness will be made by the Contracting Officer prior to order award.

Award and Notice – The successful contractor will be directed to commence work via a signed TO sent from the Contracting Officer. The contractor shall provide notice of acceptance of the TO by either commencing work or signing the SF 1449 and returning it to the KO. The KO will notify all contractors on the contract of the award, the award price, and the successful Contractor.

8.4 Data Rights

All work performed by the contractor(s) under the Contract shall become the exclusive property of MSC in which the Government shall have unlimited rights. The contractor(s) shall not deliver or otherwise provide to the Government technical data or computer software, to include the deliverables under the Contract, with restrictions, including those as to use, modification, reproduction, and transfer, or with restrictive markings.

At any and all times, the contractor(s) agrees to promptly provide to the Government at no additional cost such documents, codes or other materials and information that are necessary to permit the Government's full enjoyment of its rights in the deliverables as described above.

8.5 Facility and Vessel Access

• Facility Access The contractor(s) are hereby advised that some MSC ship overhauls may take place at facilities where a visitor security clearance may be required. Therefore, the Government reserves the right to request any appropriate information concerning contractor personnel as necessary to provide security check and/or clearances to enter such facilities. All costs associated with facility access shall be for the contractor’s account.

8.6 Licenses, Permits, and Precautions

The Contractor shall, at the Contractor’s expense, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable laws, codes, and regulations, in connection with the performance of work. Further, the Contractor is responsible to ensure that proper safety and health precautions are taken to protect the work, the workers, the public, and the property of others.

8.7 MSC Ombudsman

The MSC Ombudsman is available to assist in the resolution of contractor complaints arising with respect to the issuance of any Task Order under this contract. Ombudsman assistance is optional. However, in the case of orders valued at $10 million or less, FAR 16.505(a)(9)(i)(A) prohibits protest under FAR Subpart 33.1, including protest of KO decisions regarding fair opportunity, except protests asserted that a task or delivery order increase the scope or maximum value of the contract.

The contractor is encouraged to first seek resolution of its complaint with the KO. If that effort fails or if the contractor elects to forgo that approach, the contractor must submit its complaint to the Ombudsman no later than 10 days after the task order award decision has been issued by the KO. Complaints submitted after that cate are untimely and considered waived.

The MSC Ombudsman for this contract is:

Deputy Assistant Secretary of the Navy (Procurement) Mr. Michael L. Brown 1000 Navy Pentagon Washington, DC 20350

Phone: (703) 614-9595

Email: NCAG@navy.mil

By submission of a complaint, the contractor authorized the Ombudsman to disclose any information submitted to the Ombudsman, that, in the judgement of the Ombudsman, must be disclosed within the Government to the extent deemed necessary by the Ombudsman to facilitate understanding of the issue or issues. The contractor understands the Ombudsman, shall disclose any information submitted to the Ombudsman that, in the judgment of the Ombudsman, must be disclosed to prevent or investigate fraud, waste, abuse, criminal activity or imminent physical harm.

In accordance with FAR 16.505(a)(10)(ii), protest of task or delivery orders valued in excess of $25 million must be filed with the Government Accountability Office (GAO) in accordance with the procedures at FAR

33.104. Seeking Ombudsman assistance does not extend the time for filing a timely protest with the GAO.

8.8 Other Pertinent Information, Guidelines, and Assumptions:

Identification of Non-Disclosure Requirements: The Contractor shall work with business sensitive information in the performance of this PWS. No sensitive or proprietary information of, or in the possession of the Military Sealift Command or any of its operating units, will be disclosed without the written consent of the Contracting Officer. A non-disclosure agreement concerning information gained or used during the performance of this contract must be signed prior to the start of performance under this contract. The agreement must be signed by all key personnel and any other personnel who may have access to sensitive business information. This also includes any subcontractor personnel who may have access to sensitive information. The required non-disclosure agreement is included as an attachment to this solicitation.

8.8 Security Requirements:

8.8.1 The Contractor shall comply with all applicable public laws, government regulations, and command procedures regarding privacy.

8.8.2 All personnel performing work under this Contract shall be United States citizens and able to maintain a SECRET clearance. See section 8.14 for more details.

8.8.3 All personnel working on any TO shall maintain and have a Common Access Card (CAC).

8.9 Contractor Identification:

8.9.1 Contractor employees must be clearly identifiable while on Government property by wearing appropriate badges.

8.9.2 Contractor personnel and their subcontractors must identify themselves as Contractors or subcontractors during meetings, telephone conversations, in electronic messages, or correspondence related to this Contract.

8.9.3 Contractor-occupied facilities (on Department of the Navy or other Government installations) such as offices, separate rooms, or cubicles must be clearly identified with Contractor supplied signs, name plates or other identification, showing that these are work areas for Contractor or subcontractor personnel.

8.10 Business Systems Access:

8.10.1 All key personnel shall obtain and maintain access to SAMM in order to access the VTL.

This is a CAC-enabled system. Contractor shall obtain a CAC reader. The Government will not provide the CAC reader.

mailto:NCAG@navy.mil

8.11 Safety:

The contractor is solely responsible for compliance of all safety regulations of employees while working on government owned facilities. All accidents which may arise out of, or in connection with, performance of services required hereunder which result in injury, death, or property damage, shall be reported in writing to the Contracting Officer and cognizant Contracting Officer Representative (COR) within twenty-four hours of such occurrence. Reports shall provide full details of the accident, including statements from witnesses. The foregoing procedures shall also apply to any claim made by a third party against the contractor as a result of any accident that occurs in connection with performance under this contract.

8.12 Non-Personal Service Statement: Contractor employees performing services under this order shall be supervised at all times by management personnel of the contractor. Contractor management shall ensure that employees properly comply with the performance work standards outlined in the statement of work.

Contractor employees will perform their duties independent of, and without the supervision of, any Government official or other Defense Contractor. The tasks, duties, and responsibilities set forth in the contract may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation.

The Government shall control access to the facility and shall perform the inspection and acceptance of the completed work.

8.13 Government Management Oversight: Government management shall provide general instructions on limitations and deadlines. Additional instructions will be provided for any unusual assignments or those that vary from established procedures. The contractor’s employees will independently carry out the assignments. Completed work will spot-checked by Government management for adherence to procedures, accuracy, completeness.

8.14 SECURITY CLEARANCE:

The Contractor is hereby advised that some contract requirements may take place at facilities where a visitor security clearance may be required. Therefore, the Government reserves the right to request any appropriate information concerning Contractor personnel as necessary to provide security check and/or clearances to enter such facilities. The Contractor must comply with COMSCINST 5521.1 Series. The level of facility security clearance (FCL) required will be identified at the task order level. If an active FCL is deemed to be needed, a DD 254 will be required. If a Confidential or higher security clearance level is required, the Contractor and their key personnel shall be able to possess the necessary security clearance through the Defense Security Service (DSS). The task order will identify the specific classified material needed to complete the work and the level of classification. If classified information is required, FAR clause FAR 52.204-2 (Security Requirements) will be unilaterally implemented at the task order level. Before performing any work under this Contract that is classified as Confidential or higher, the Contractor must have the proper Government approved FCL.

8.15 Common Access Cards (CAC). To support access to the government computers and systems, authorized personnel shall obtain a CAC. CACs are to be issued only through the auspices of the Trusted Agent to U.S. Citizens, U.S. Permanent Resident Aliens or such other individuals as may be authorized by Commander Military Sealift Command (COMSC). To be eligible for a CAC, contractor personnel shall comply with Homeland Security Presidential Directive 12 (HSPD-12) requiring the completion of an FBI fingerprint check with favorable results and the initiation of a National Agency Check with Written Inquiries (NACI). An individual who maintains a current equivalent or higher investigation shall not require an additional NACI. As required for access to the government computers and systems, the NACLC suffices. The Contractor shall ensure that all its personnel performing under the contract obtain a CAC. The CAC shall not be used for any unauthorized purpose. Fees associated with obtaining CACs are for the Contractor's account.

TRACKING AND DISPOSITION. The Contractor shall immediately inform the Contracting Officer in writing if a contractor employee is given an adjudication of "Access Suspended", "Interim Declination", "Loss of Jurisdiction", "No Determination Made", or has their clearance eligibility otherwise withdrawn, denied, or revoked. The Contractor shall be responsible for the control of CACs issued to its personnel under MSC contract. In order to ensure positive control of CACs, the Contractor shall surrender to the Trusted Agent all CACs issued in the performance of this contract upon: 1) Termination of the contract; 2) if a contractor employee will no longer be performing work under this contract, or 3) as directed by the issuing authority, the Trusted Agent, or the Contracting Officer.

CAC REPORTING. A report shall be made to the Contracting Officer within 24 hours of discovering any CAC is lost, stolen, or destroyed. The Contracting Officer will then generate a report to 1) the Trusted Agent for cancellation of the card, 2) to the local U.S. Military Security Office, and 3) to the appropriate MSC Squadron Commander.

8.16 Enterprise-wide Contractor Manpower Reporting Application (ECMRA) The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Military Sealift Command via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs).

The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications Transmission (D304) and Internet (D322) ONLY;

(5) S, Utilities ONLY;

(6) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address: https://www.sam.gov/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.sam.gov/ https://www.sam.gov/ https://www.sam.gov/

1.0 Background
1.2 Contract
1.3 List of Acronyms and Abbreviations
2.0 Specific Tasks:
2.4 Other Requirements:
3.0 Government Furnished Information (GFI):
4.0 Travel
5.0 Deliverables
5.2 Task Deliverables
5.3 Tasking Spreadsheet
5.4 Key Personnel Submission
6.0 Personnel Qualifications