PERFORMANCE WORK STATEMENT
FOR
ANNUAL PREVENTATIVE MAINTENANCE,
SERVICE,
INSPECTION / TESTING, REPAIR,
AND CERTIFICATION OF AIRCRAFT
HANGAR FIRE PROTECTION SYSTEMS
AT
JOINT BASE MCGUIRE-DIX-LAKEHURST
Joint Base McGuire-Dix-Lakehurst 1 April 2020
PERFORMANCE WORK
STATEMENT FOR
ANNUAL PREVENTATIVE MAINTENANCE, SERVICE,
INSPECTION / TESTING, REPAIR, AND CERTIFICATION
OF AIRCRAFT HANGAR FIRE PROTECTION SYSTEMS
AT
JOINT BASE MCGUIRE-DIX-LAKEHURST
1.0. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain continuous and safe operations of aircraft hangar fire protection systems located at Joint Base McGuire-Dix-Lakehurst. The scope of work includes, but is not limited to: the annual preventative maintenance, service, inspection / testing, repair, and certification of fire protection systems located in aircraft hangars, freight terminal, high bay warehouses, and supporting pump houses listed on Appendix A and Appendix B.
1.1. BASIC SERVICES. The contractor shall perform preventative maintenance, inspection / testing, repair, and certification of aircraft hangar fire protection systems, including supporting pump houses on an annual basis located on McGuire. The aircraft hangar fire protection systems include but not limited to: pumps, tanks, risers, sprinkler heads, cannons, monitors, alarm panels, transceivers, enunciator panels, foam releasing panels, modules, sensors, power supplies, horns, strobes, etc. The contractor shall repair mechanical/electrical deficiencies found during the preventative maintenance and inspection/testing cycle per Paragraph 1.1.4. The contractor shall use the following publications for guidance: Unified Facilities Criteria (UFC 3-601-02 dated 8 Sep 2010), National Fire Protection Association (NFPA-25), National Fire Protection Association (NFPA-72), Air Force Occupational and Environmental Safety and Health (AFOSH), American National Standards Institute (ANSI), American Society of Mechanical Engineers (ASME), Occupational Safety and Health Administration (OSHA), and Air Force Guidance Memorandum Establishing Aqueous Film Forming Foam (AFFF) Related Waste Management Implementation Guidance (AFGM2019-32-01 dated 5 September 2019) or any later revisions. The UFC 3-601-02, dated 8 Sep 2010, and any later versions of this UFC take precedence over the NFPA’s. All routine annual preventative maintenance, inspections / testing, repairs, and certifications shall be scheduled in advance, no less than 60 days prior with the Contracting Officer Representative (COR) to minimize disruption to government operations / employees. The government reserves the right to postpone or interrupt scheduled services up to four days per contract year to support emergent mission requirements with no additional cost increases to the government.
1.1.1. PREVENTATIVE MAINTENANCE. The contractor shall perform preventative maintenance on all aircraft hangar fire protection systems and supporting pump houses listed on Appendix A and Appendix B in accordance with paragraph 1.1 for all mechanical and electrical systems concurrent with the annual inspection / testing, repair, and certification cycle. The scope of work includes the entire facilities including common and office areas. Any deficiencies, malfunctions, or discrepancies discovered during the preventative maintenance cycle shall be immediately reported to the COR in a written report for determination of repair procedure. All defects found shall be corrected by the contractor, up to the limits established in Paragraph 1.1.4.
Air Force personnel will be responsible for performing preventative maintenance on mechanical / electrical systems in accordance with the frequencies delineated in paragraph 1.1 during the year.
The contractor shall provide a written report of all preventative maintenance actions performed on each fire protection system.
1.1.2. INSPECTION / TESTING. The contractor shall perform the inspection/testing of all fire protection systems and supporting pump houses listed on Appendix A and Appendix B in accordance with paragraph 1.1 concurrent with the annual preventative maintenance, repair, and certification cycle. The annual inspection/testing schedule shall be provided by the contractor to insure the availability of the fire protection systems due to mission requirements no less than 60 days prior. Inspection/testing shall be witnessed and certified by the government’s authorized representative. Any deficiencies, malfunctions, or discrepancies discovered as a result of these inspections/testing shall be immediately reported to the COR by written report for determination of repair procedure. All defects found shall be corrected by the contractor, up to the limits established in Paragraph 1.1.4. After repairs are made, the failed inspection / testing shall be re-performed. Documentation of inspection/testing shall be maintained by the contractor and as established in Paragraph 1.2.
1.1.3. SERVICE CALLS. In the event that any fire suppression system fails, malfunctions or discharges for any reason, the contractor shall respond to a service call within 24 hours upon notification by the COR. The contractor shall troubleshoot the system and provide a quote to the COR for any repairs necessary as outlined in paragraph 1.1.4. The quote shall include all costs to repair, test and recertify the repaired fire suppression system in accordance with paragraph 1.1 within 2 business days. The contractor shall conduct preventative maintenance of the defective fire protection system in accordance with paragraph 1.1.1 if required. The contractor shall repair the fire protection system at the contractor’s expense if the material cost is less than $100.00 per fire protection system. The contractor shall ensure that all preventative maintenance and repair work is completed within the service call or within one (1) business day unless a repair is discovered greater than $100.00 as denoted in Paragraph 1.1.4. At times, repair work will be identified through in-house fire technicians or as a result of equipment malfunctions. The contractor may be requested to provide quotations for repairs by inspecting the equipment they have identified at no cost to the government. The contractor shall provide a written report of any service calls as established in Paragraph 1.2
1.1.4. REPAIRS. The contractor shall repair all mechanical / electrical / control / safety deficiencies as a result of the preventative maintenance, service calls, inspection / testing, and certification procedures.
1.1.4.1. REPAIRS. The contractor shall repair the fire protection system at the contractor’s expense if the material cost is less than $100.00 per system. If the repair work for a fire protection system is more than $100.00, the contractor shall provide a written repair cost estimate to the COR within two (2) business days of finding the deficiency requesting authorization to proceed. The written repair cost estimate shall include, at a minimum, the following: the estimated cost of material, the labor hours needed to complete repairs, and the projected time the equipment will be out of service. The contractor shall be financially compensated for material and labor costs only if COR authorization is granted. At no time shall work in excess of $100.00 be completed without COR or CO approval. There’s no maximum financial threshold for major repairs under this contract. The contractor shall ensure all major repair work commences within three (3) business days of COR approval. The contractor shall ensure that all repair work is completed within seven
(7) business days of its commencement; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a written report of any completed repairs as established in Paragraph 1.2.
1.1.5. CERTIFICATION. The contractor shall certify each fire protection system and supporting pump houses on an annual basis to insure that all systems have passed the guidance listed in paragraph 1.1. The fire protection systems shall be certified in conjunction with the annual preventative maintenance, inspection / test cycle and repair (if applicable) as outlined in publications listed within Paragraph 1.1. The contractor shall physically attach an annual certification sticker on each fire protection system to include each individual fire pumps. The contractor shall provide a certification document / report for each fire protection system as established in Paragraph 1.2.
1.2. REPORTS / DOCUMENTATION. The contractor shall prepare and submit written reports and documentation for the preventative maintenance, inspection / testing, repair, and certification of each individual fire protection system to include each individual fire pumps. The reports and / or documentation shall be forwarded to the COR within two (5) business days of the completion of any service. The reports and / or documentation shall include but not limited to:
location, type, manufacturer, and model number of each fire protection system to include each individual fire pumps; location, system type, work performed; repairs completed or required (if applicable), mechanical / electrical / control / safety deficiencies, actual parts replaced, parts cost, man hours, preventative maintenance, date of inspection, date of repair, date of certification, name of technician, and overall condition of the equipment.
1.3. MANPOWER REPORTS. The contractor shall make available at the end of each contract year, any contractor reports analyzing labor hours, materials consumption, and equipment usage and general performance data. Reports will itemize such data and provide overall scope summaries. The contractor shall mark any proprietary information. The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each government fiscal year (FY), which runs 1 Oct through 30 Sep. While inputs may be reported any time during the FY, all data shall be reported no later than 31 Oct of each calendar year. The contractor may direct questions to the Contractor Manpower Reporting Application help desk at http://www.ecmra.mil
2.0. SERVICE DELIVERY SUMMARY
Performance Objective PWS Paragraph
Performance
Threshold Method of Assessment
Perform Preventative Maintenance
Performs full preventative maintenance actions and provides required reports on an annual basis.
1.1.1 All preventative
maintenance shall be completed 100% of the time
Periodic surveillance, inspection of reports
Inspections/ Testing Periodic surveillance, inspection of reports
Performs inspections / testing and provides required reports on an annual basis.
1.1.2 All units shall be inspected /
tested 100% of the time.
Service Calls Responds to call from the COR to troubleshoot system and provide quote for repair.
1.1.3 Contractor shall respond to
service calls within 24 hours 98% of the time
Technical inspection, customer complaint
4 Repairs http://www.ecmra.mil/ http://www.ecmra.mil/
Performs repairs found during preventative maintenance and inspection / testing cycle in accordance with timelines.
1.1.4
All repairs shall be completed within the allotted timeframes 95% of the time.
Technical inspection, customer complaint
Certifications.
Conducts the certification process on an annual basis in accordance with all publications / industry standards.
1.1.5 All certifications shall be
completed 100% of the time
Inspection of reports, customer complaint
Reports/ Documentation. Provides accurate reports and documentation within 2 days of inspection
All reports / documentation are current and available 100% of the time.
1.2 Inspection of
reports, technical inspection
7 Manpower Reports. Provides annual labor data documentation
All required documentation
100% of the time.
1.3 Inspection of
reports
3.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES. All reasonable quantities of utilities will be available to the contractor without charge. Any temporary lines and connections that may be required shall be installed, maintained and removed by the contractor at his expense and in a manner satisfactory to the COR.
3.1. SECURITY, FIRE, and MEDICAL SERVICES. The government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available. The Government will provide police and fire protection. McGuire Security Forces / Dix DOD Police Force can be reached at phone numbers
(609) 562-6001/2/3. Lakehurst DOD Police Force can be reached by dialing (732) 323-4000. Base Fire Departments shall provide initial response and fire protection services to the contractor. The Base Fire Alarm Control Centers can be reached at phone number 911 from a base phone. If dialing 911 from a cell phone, the location must be fully identified to ensure that the proper responder is notified. The 87th Medical Treatment Facility may provide urgent health care to any contractor employees or agents for injuries occurring while on duty. Urgent health care is defined as medical care authorized to the extent necessary to save life or limb and prevent undue pain and suffering.
Contractor employees will be transferred to a civilian medical facility as soon as they are appropriately stabilized. The cost of such treatment will be paid for, in full, within a reasonable period of time, by the contractor or the contractor’s employee and will not be borne by the 87th Medical Treatment Facility, the United States Air Force or the government. An AF Form 1127, Hospital Invoice/Receipt / Accounts Receivable Record, will be prepared to ensure collection and/or billing of charges. If a contractor employee or agent cannot pay for the treatment at the time of discharge, a statement of charges and a letter of indebtedness will be completed and billed to such contractor employee for medical services rendered. An accounts receivable record will be established for each contract employee that receives medical care and is unable to pay at the time of discharge. Follow-up on accounts receivable will be conducted in accordance with AFI 41-120, Medical Resource Operations. After an accounts receivable record is established and billing for outpatient medical services has occurred, the SF 558, Medical Record - Emergency Care and Treatment, will be annotated with the date of billing and the voucher number and forwarded to Outpatient Records to be filed in the medical record folder. Contractor employee or agents shall ensure they provide timely notice to their medical insurance company and to the extent an insurance company is to make payment, provide the insurance company with adequate information and documentation necessary to make payment. Any contractor employee or agent treated in a natural disaster is not charged for outpatient care. Lakehurst Specific: Follow-on emergency medical care will be provided to contractor and their employees at Community Medical Center, Toms River. Charges for medical care will be at the contractors or employees’ expense. Emergency Medical Service phone number is 911 from a base phone. If dialing 911 from a cell phone, the location must be fully identified to ensure that the proper responder is notified.
3.2. RESTRICTED AREA BADGES. The government shall furnish an USAF Restricted Area Badge (AF Form 1199A) to all authorized contractor employees with proper security clearances and a validated need for access to flight line areas to perform maintenance services. The contractor shall coordinate the required request for restricted area badges with the COR.
3.3. RESTRICTED AREA ESCORTS. The government shall provide escort services for contractor employees to provide maintenance services within base restricted areas only until the contractor has been provided with the required AF Form 1199A (with escort authorization) to provide their own escorts. The contractor shall coordinate the necessary government escort services with the COR. The contractor is required to obtain restricted area badges for employees.
The contractor shall obtain the appropriate number of employees with badges to escort the workforce.
3.4. PHYSICAL SECURITY. The contractor shall be held fully accountable for any failure to maintain the physical security of all base restricted areas, secured facilities or sites that they are responsible for providing services within. The contractor shall be responsible for the safekeeping and inventorying of all government-furnished keys and combinations issued for the performance of services within secured areas. All losses or damages caused by the contractor, or by the contractor’s failure or negligence in maintaining proper security of these areas will be paid for by the contractor. Upon termination or completion of the contract, the contractor shall secure the previously issued keys and return them to the COR within twenty-four (24) hours.
3.5. FLIGHTLINE DRIVERS TRAINING. All contractor employees must complete Airfield Drivers training prior to operating vehicles on the flight line, initial and annual requirement.
Contractor will contact COR to coordinate training, initial training must be completed within 5 days of start of contract at building 3104 on JB MDL. All contractor employees working on airfield grounds shall be required to have and maintain a valid state driver’s license, must bring valid license to training. All employees working on airfield grounds shall be required to have an AF Form 483, Certificate of Competency (flight line driver’s license) with them at all times. Vehicles must have a valid POV pass issued by Airfield Management prior to operating on the flight line.
No equipment will be left unattended while working in these areas. The contractor shall be responsible for insuring that all foreign objects and debris produced by grounds maintenance is cleared off of all taxiways, runways, and aircraft parking aprons before leaving the work area.
4.0. GENERAL INFORMATION.
4.1. HOURS OF OPERATION. The normal hours of operation for the contractor to perform normal maintenance and repair services required under this contract are 7:00 AM to 4:00 PM, Monday through Friday. The contractor is not required to provide normal service except for emergencies on the following days: New Year’s Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. The COR or CO must approve in advance, excluding legal holidays, any exceptions to work hours and designated workdays. The contractor shall submit their request to COR and CO no later than two (2) working days in advance of the requested change(s).
4.2. CONTRACTOR PERSONNEL. The contractor and their employees shall comply with all base regulations at all times and shall conduct themselves in a professional manner. Uniforms, badges, and good behavioral conduct will be mandatory. The contractor shall provide a complete and current employee roster to the COR and CO within ten (10) working days of the contract award and each subsequent option renewal. The contractor’s employee roster shall identify the primary and alternate site manager or foreman and the Quality Control inspector and their telephone or beeper numbers. As required, the contractor shall provide updated copies of their employee roster to the COR and CO.
4.3. CONTRACTOR EMPLOYEE UNIFORMS AND IDENTIFICATION. All contractor employees shall wear a distinctive company logo on their outer garment at all times. The contractor employee shall be neat and professional in appearance and meet current commercial standards. In addition, the contractor’s employees shall wear a company-issued identification badge with the company’s name, employee’s name and employee’s photo prominently displayed on their outer clothing.
4.4. TOBACCO POLICY. The contractor shall ensure that all contractor employees do not use tobacco products within 50 ft. of any base facility, around fuel tanks and generators, within any clearly marked “No Smoking” areas or within 50 ft. of any flight line aircraft parking areas.
4.5. SAFETY AND ACCIDENT REPORTING. The contractor shall be responsible for providing services under this contract in accordance with (IAW) all base, local, state and Federal occupational safety requirements. The contractor shall ensure that all services are conducted safely at all times. The contractor shall ensure that all contractor employees are issued and properly use all required safety personal protective equipment. The contractor shall use mechanically sound and safe vehicles and equipment in the performance of services under this contract. The contractors shall take necessary corrective actions if the contractor’s employees are conducting operations in an unsafe manner. In the event of an accident, the contractor shall contact the base emergency 911 service and the COR immediately. Additionally, the contractor and contractor’s personnel will be knowledgeable of and comply with all other base incident- reporting procedures.
4.6. INCLEMENT WEATHER SCHEDULE. The contractor shall provide operational service during periods of inclement weather. No exceptions shall be granted.
4.7. HIRING GOVERNMENT PERSONNEL. The contractor is restricted from hiring the COR, inspectors, monitors or any other government employees whose employment could result in conflict of interests in accordance with DOD 5500.7R
4.8. SECURITY REQUIREMENTS / VEHICLES AND PASSES. All contractor or contractor employees’ vehicles used for the performance of this contract shall comply with all local, state and federal regulations. In addition, all vehicles described above must be registered through the Security Police Squadron, Pass and Registration and will comply with JB MDL directives. After award of contract, the contractor shall request through the COR and Security Forces base passes and identification badges for their employees and work vehicles in accordance with the attached McGuire AFB contractor Security Appendix 4 to Annex C to JB MDL JIDP – 10 Jun 2015. Reference Appendix D.
4.9. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE
NATIONAL COMMAND AUTHORITY OR THE LOCAL
INSTALLATION COMMANDER. This service does not meet the criteria for continuation of performance during a crisis.
4.10. EXECUTIVE ORDER (EO) 13423 (Strengthening Federal Environmental, Energy, and
Transportation Management). The contractor shall assist in compliance with this EO through the:
(a) Use of products with post-consumer recycled content
(b) Use of products that are recyclable
(c) Use of low toxicity or non-toxic products
(d) Use and installation of low-maintenance products
5.0. ENVIRONMENTAL COMPLIANCE. The contractor is required to comply with all applicable State and Federal laws, State and Federal regulations, and Air Force instructions in effect at the time of performance of this contract. The laws and regulations include, but are not limited to: environmental and occupational safety and health. The contractor shall be responsible for compliance with construction and operating permits, and also responsible for penalties, fines, or natural resource damage claims that may be required or assessed by the State of New Jersey, Federal or Local Governments resulting from contractor performance, or failure to perform, during the course of this contract. The Government will inspect for environmental compliance at their discretion, and will notify the CO of any discrepancies found. In addition, the contractor may be subject to contractual sanctions including, but not limited to withholding, offset, termination, suspension, and debarment and adverse past performance assessment. Contact numbers McGuire Environmental (609) 754-6166 or Lakehurst Environmental (732) 323-7800.
5.1. SOLID WASTE. The contractor is responsible for the proper handling, disposal and costs of solid and hazardous wastes and hazardous materials generated by or utilized during the course of its activities. Proper handling also includes recycling and material recovery. The terms solid and hazardous wastes, and hazardous materials, include, but are not limited to, those defined in the Federal Water Pollution Control Act, the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, the Solid Waste Disposal Act, the Clean Air Act, the New Jersey Water Pollution Control Act and the regulations promulgated pursuant to those Acts.
The contractor shall also be responsible for any enforcement action that may be taken by the State of New Jersey, other State or the Federal Government related to handling, transportation and the proper disposal of solid and Hazardous waste and hazardous materials. If notification, certifications, documentation, manifests, permits or any other written materials are required by law to be obtained, prepared and / or submitted, the contractor shall prepare same and provide a written copy to the COR, and a copy to the Environmental Flight (787 CES/CEIE) within the timeframes set forth in the law and regulations governing the action. Hazardous waste manifests must be signed by the Environmental Flight McGuire areas (609) 754-6166 and (732) 323-7800 Building #5 Lakehurst. JB MDL is not responsible for any hazardous materials brought on base by the contractor that may become hazardous waste during the course of performance. Contractor shall remove those materials from the base at their own expense and risk.
5.2. Source Separation of Solid Waste: The contractor shall adhere to all base level recycling programs to include disposal of yard / tree waste in specified dumpster collection stations or at the recycling collection center on base. Wastes shall be placed in enclosed metal containers that are emptied on a regular schedule. Solid waste shall be separated and placed in individual containers in a manner that facilitates recycling of various categories of waste. Contractor is responsible for the handling and associated costs of disposal for all solid wastes generated. Cardboard and all types of metal shall be source separated and recycled. Cardboard and metals shall be delivered to the McGuire AFB Recycling Center, building #2321 or building 668 at Lakehurst. The CO or COR shall identify the specific dumpsters for yard/tree waste.
5.3. Recycling: Concrete and asphalt shall be recycled where practicable. Contractor shall deliver these recyclables to a permitted/authorized facility and report all quantities of materials recycled to the COR and to Environmental Flight (787 CES/CEIE). All other waste shall be disposed of in accordance with paragraph 4.28.
5.4. Hazardous Material Handling: Any hazardous material or chemical to be used or stored by the contractor must be approved, in writing, by the COR prior to the contractor bringing it on the Base. The contractor must utilize an AF Form 3000, Material Approval Submittal, listing each container of hazardous material stored, kept, or utilized, to include Safety Data Sheets (SDS).
{Include on Material Approvals Submittal List} SDS sheets must also be displayed on-site for access by contractor employees as well as the Government, per OSHA requirements. Materials will be used for intended purposes and will be stored and utilized in accordance with industry standards. The contractor will submit SDS on all materials to be used fifteen (15) days prior use for approval by the COR.
5.5. NOTIFICATION OF ENVIRONMENTAL SPILLS. In the event that the contractor spills or releases any un-permitted substance, hazardous substance or hazardous waste into the environment, the contractor shall immediately report the incident to the Fire Department, the COR, and the CO. The contractor shall be liable for the costs of clean up and remediation of any spills or the release of such substance into the environment. The government shall provide the contractor reasonable amounts of electricity and water.
5.6. MATERIALS. All materials used in the performance of services on the installation shall be in compliance with industry standards, local, Federal and State laws, and will be used according to manufactures' recommendations. Materials will be used for intended purposes and will be stored and utilized in accordance with industry standards. The contractor will submit Material Safety Data Sheets on all materials to be used fifteen (15) days prior use for approval by the COR.
5.7. CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (EMS):
Pursuant to the Federal Acquisition Regulation (FAR) 52.223-5(c)(7), Pollution Prevention and Right-to-Know Information, the Contractor is required to provide information to show compliance with the JB MDL EMS as described in Executive Order 132423 section 3(b) and 2(j), if the work performed contributes to a prioritized environmental aspect as identified by EMS. When a contract may potentially negatively impact the environment or affect an environmental aspect, the statement of work must reflect the specific requirements, operational controls, monitoring and measurement, reporting requirements and training for which the contractor will be responsible. If the work to be performed is not identified as affection or contributing to a prioritized aspect, this section simply provide notice that there is an existing EMS on JB MDL.
6. APPENDICES:
A. ESTIMATED WORKLOAD DATA
B. ESTIMATED WORKLOAD DATA FOAM SYSTEMS
C. REFERENCES OF APPLICABLE REGULATIONS
D. SECURITY REQUIREMENTS
APPENDIX A
ESTIMATED WORKLOAD DATA
The estimated workload data is predicated on current known requirements and does not reflect a commitment or guarantee of firm work due to the dynamic mission of Joint Base McGuire-Dix-Lakehurst. The quantities listed on the bid schedule reflect the hangar fire protection systems to be serviced which could change due to facility modifications or budgetary constraints.
Facility Number
System Designation
System Type
Valve Size Mfr Model# Alarm
Panel Funds Type
1811 Office Area Wet Pipe 6” Victaulic V27V38 Siemens O&M
1811 North Side Deluge 8" Viking F1 Siemens O&M 1811 South Side Deluge 8" Viking F1 Siemens O&M
1811 Fire Pump #1 Electric 3000GPM Aurora 491BF Siemens O&M
1811 Fire Pump #2 Electric 3000GPM Aurora 491BF Siemens O&M
1811 Foam Pump #1 Electric 150PSI Edwards 150-
3385DF Siemens O&M
1811 Foam Pump #2 Electric 150PSI Edwards 150-
3385DF Siemens O&M
1811 Foam Tank AFFF 1400GAL Poly Pro O&M
1837 Pump Room Wet Pipe 6” Viking J-1 Notifier TWCF
1837 Roof Wet Pipe 6” Viking J-1 Notifier TWCF
1837 AFFF Deluge 6” Viking E-1 Notifier TWCF
1837 A-Bay Monitors 1
Wet Pipe 8" Viking J-1 Notifier TWCF
1837 A-Bay Monitors 2
Wet Pipe 8" Viking J-1 Notifier TWCF
1837 A-Bay Cannon 1 Deluge 6” Viking E-1 Notifier TWCF
1837 A-Bay Cannon 2 Deluge 6” Viking E-1 Notifier TWCF
1837 A-Bay Cannon 3 Deluge 6” Viking E-1 Notifier TWCF
1837 A-Bay Cannon 4 Deluge 6” Viking E-1 Notifier TWCF
1837 A-Bay Cannon 5 Deluge 6” Viking E-1 Notifier TWCF
1837 A-Bay Cannon 6 Deluge 6” Viking E-1 Notifier TWCF
1837 B-Bay Monitors
Wet Pipe 8" Viking J-1 Notifier TWCF
1837 B-Bay Cannon 1 Deluge 6” Viking E-1 Notifier TWCF
1837 B-Bay Cannon 2 Deluge 6” Viking E-1 Notifier TWCF
1837 B-Bay Cannon 3 Deluge 6” Viking E-1 Notifier TWCF
1837 C-Bay Monitors
Wet Pipe 8" Viking J-1 Notifier TWCF
1837 C-Bay Cannon 1 Deluge 6" Viking E-1 Notifier TWCF
1837 C-Bay Cannon 2 Deluge 6" Viking E-1 Notifier TWCF
1837 C-Bay Cannon 3 Deluge 6" Viking E-1 Notifier TWCF
A-Bay
Overhead 1 Roof
Deluge 6" Viking E-1 Notifier TWCF
1837 A-Bay Overhead 2 Deluge 6" Viking E-1 Notifier TWCF
1837 A-Bay Overhead 3 Deluge 6" Viking E-1 Notifier TWCF
1837 A-Bay Overhead 4 Deluge 6" Viking E-1 Notifier TWCF
1837 B-Bay Overhead 1 Deluge 6" Viking E-1 Notifier TWCF
1837 B-Bay Overhead 2 Deluge 6" Viking E-1 Notifier TWCF
1837 B-Bay Overhead 3 Deluge 6" Viking E-1 Notifier TWCF
1837 C-Bay Overhead 1 Deluge 6" Viking E-1 Notifier TWCF
1837 C-Bay Overhead 2 Deluge 6" Viking E-1 Notifier TWCF
1837 C-Bay Overhead 3 Deluge 6" Viking E-1 Notifier TWCF
1837 Fire Pump #1 Diesel 2500GPM Patterson 8X6YS Notifier TWCF
1837 Fire Pump #2 Diesel 2500GPM Patterson 8X6YS Notifier TWCF
1837 Fire Pump #3 Diesel 2500GPM Patterson 8X4YS Notifier TWCF
1837 Fire Pump #4 Diesel 2500GPM Patterson 8X6YS Notifier TWCF
1837 Fire Pump #5 Diesel 2500GPM Patterson 8X6YS Notifier TWCF
1837 Foam Pump #1 Electric 250PSI Edwards Notifier TWCF
1837 Foam Pump #2 Electric 250PSI Edwards Notifier TWCF
1837 Foam Tank AFFF 2600GAL Poly Pro Notifier TWCF
2201 HEF
Generators Deluge 6” Victaulic S/758 Seimens TWCF
2201 West Maint & Roof
Wet Pipe 6” Victaulic 717R Seimens TWCF
2201 East Maint Wet Pipe 8” Victaulic 717R Seimens TWCF
2201 Hangar Bay Wet Pipe 6” Victaulic 717R Seimens TWCF
2201 West Canopy Dry Pipe 4" Victaulic S/756 Siemens TWCF
2201 Foam Tank HEF 700GAL Ansul TWCF
3102 Building Sprinkler
Wet Pipe 4" Viking J-1 Faraday O&M
3102 Fire Pump #1 Electric 2500GPM Peerless 8AEF17Q Faraday O&M
3102 Fire Pump #2 Electric 2500GPM Peerless 8AEF17Q Faraday O&M
3102 Fire Pump #3 Electric 2500GPM Peerless 8AEF17Q Faraday O&M
3102 Fire Pump #4 Electric 2500GPM Peerless 8AEF17Q Faraday O&M
3211 East Hangar Wet Pipe 6” Viking F-1 Faraday TWCF
3211 West Hangar Wet Pipe 6” Viking F-1 Faraday TWCF
3211 Hangar HEF Deluge 6" Viking E-1 Ansul TWCF 3211 Foam Tank HEF 700GAL Ansul TWCF
3333 Office and Shop
Wet Pipe 4" Viking H-2 Simplex ANG
3333 Overhead Sprinkler Deluge 6" Viking E-1 Simplex ANG
3333 Monitor 1 Deluge 4” Viking E-1 Simplex ANG 3333 Monitor 2 Deluge 4” Viking E-1 Simplex ANG 3333 Monitor 3 Deluge 4" Viking E-1 Simplex ANG 3333 Monitor 4 Deluge 4" Viking E-1 Simplex ANG
3333 Foam Tank AFFF 1400GAL Chemguard ANG
3335 Offices and Shop
Wet Pipe 4" Viking J-1 Simplex ANG
3335 Mech & Pump Room
Wet Pipe 2.5” Kennedy Shotgun
Riser Simplex ANG
3335 Fire Pump #1 Diesel 2000GPM Peerless 6AEF140 Simplex ANG
3335 Fire Pump #2 Diesel 2000GPM Peerless 6AEF141 Simplex ANG
3335 Fire Pump #3 Diesel 2000GPM Peerless 6AEF142 Simplex ANG
3336 Paint Shop and Office
Dry Pipe 4" Viking J-1 FCI ANG
3336 Overhead Zone 1 Deluge 6" Viking E-1 FCI ANG
3336 Overhead Zone 2 Deluge 6" Viking E-1 FCI ANG
3336 Bowser Room Deluge 4” Viking E-1 FCI ANG
3336 Monitors Wet
Wet Pipe 6" Viking J-1 FCI ANG
3336 Monitor 1 Deluge 4" Viking E-1 FCI ANG 3336 Monitor 2 Deluge 4" Viking E-1 FCI ANG 3336 Monitor 3 Deluge 4" Viking E-1 FCI ANG
3370 Pump Room Wet Pipe 6" Viking F-1 Siemens O&M
3370 Simulator Deluge 4" Reliable DDX Siemens O&M
3370 A-Bay Floor Nozzles Deluge 6" Viking J-1 Siemens O&M
3370 B-Bay Floor Nozzles Deluge 6" Viking J-1 Siemens O&M
3370 C-Bay Floor Nozzles Deluge 6" Viking J-1 Siemens O&M
3370 D-Bay Floor Nozzles Deluge 6" Viking J-1 Siemens O&M
A&B
Overhead Sprinkler
Deluge 8" Reliable DDX Siemens O&M
C&D
Overhead Sprinkler
Deluge 8" Reliable DDX Siemens O&M
3370 Fire Pump #1 Electric 2500GPM Aurora 8-481- 21A Siemens O&M
3370 Fire Pump #2 Electric 2500GPM Aurora 8-481- 21A Siemens O&M
3370 Fire Pump #3 Diesel 2500GPM Aurora 8-841- 1713 Siemens O&M
3370 Fire Pump #4 Diesel 2500GPM Aurora 8-481- 17B Siemens O&M
3370 Foam Pump #1 Electric 150PSI Edwards Siemens O&M
3370 Foam Pump #2 Electric 150PSI Edwards Siemens O&M
3370 Foam Tank AFFF 3050GAL Assmann Siemens O&M
Table Key
HEF High Expansion Foam AFFF Aqueous Film-Forming Foam
Building 3102 pump house supports Buildings 2201, 3209 & 3211 Buildings 3335 & 3336 pumps are located in Building 3335 All main alarm panels have a built in transmitters
APPENDIX B:
The estimated workload data is predicated on current known requirements and does not reflect a commitment or guarantee of firm work due to the dynamic mission of Joint Base McGuire-Dix-Lakehurst. The quantities listed on the bid schedule reflect the hangar fire protection systems to be serviced which could change due to facility modifications or budgetary constraints.
Facility Number
Bldg.
Designation
System Type Device Fund
Type
1811 Hangar AFFF Overhead Sprinkler O&M
3-Bay Hangar
Maintenance Bay
AFFF 7-Monitors, 6 Generators TWCF
3-Bay
Hangar Fuel Bay
AFFF 3-Monitors, 4 Generators TWCF
3-Bay Hangar
Corrosion Bay
AFFF 3-Monitors, 4 Generators TWCF
2201 Hangar HEF 12 Generators TWCF 3211 Hangar HEF 12 Generators TWCF
3333 ANG
Hangar AFFF 4 Monitors ANG
3336 ANG
Hangar AFFF 3 Monitors ANG
3370 Navy Hangar AFFF 74 Grate Nozzles O&M
APPENDIX C:
REFERENCES OF APPLICABLE REGULATIONS
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only and can be located on the web at the following Uniform Resource Locators (URL)
UFC 3-601-02 - (8 Sep 2010) Unified Facilities Criteria:
Operation and Maintenance: Inspection, Testing and Maintenance of Fire Protection Systems
(https://www.wbdg.org/FFC/DOD/UFC/ufc_3_601_02_2010.pdf)
NFPA-25 - (2017) National Fire Protection Association:
Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems
(https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=25)
NFPA-72 - (2019) National Fire Protection Association:
National Fire Alarm and Signaling Code
(https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=72)
AFOSH - (18 July 2018) Air Force Occupational and Environmental Safety and Health Program covered in Air Force Instruction (AFI) 91-203, Air Force Consolidated Occupational Safety Instruction (http://static.e-publishing.af.mil/production/1/af_se/publication/afi91-203/afi91-203.pdf)
ANSI - American National Standards Institute
(https://www.ansi.org/)
ASME - American Society of Mechanical Engineers https://www.asme.org/
OSHA - Occupational Safety and Health Administration https://www.osha.gov/
APPENDIX D:
87th SECURITY FORCES SQUADRON APPENDIX TO ALL PERFORMANCE WORK
STATEMENTS FOR JOINT BASE MCGUIRE-DIX-LAKEHURST
INSTALLATION ENTRY CONTROL PROCEDURES FOR ALL CONTRACTORS
After award of contract, the Contractor shall request through the COR, CO and Security Forces to be issued base passes and identification badges for their employees and work vehicles in accordance with the attached McGuire AFB contractor Security Appendix 4 to Annex C to JB MDL JIDP – 10 Jun 2015
| Joint Base McGuire-Dix-Lakehurst |
| 2.0. SERVICE DELIVERY SUMMARY |
| 4.0. GENERAL INFORMATION. |
| 6. APPENDICES: |
File details come from the government source that posted it. Updated .