PWS for Portable restroom renewal 2.pdf

PDF 166 KB Posted

Attached to
PATTON PORTABLE LATRINES
Solicitation number
W911SD-24-R-0000
Issued by

About this file

This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide and install a 10-station restroom trailer with separate men's and women's sides at West Point, NY. The contractor shall deliver the trailer from September 15, 2024, through September 14, 2026, with a 12-month base year and one 12-month option year. Key requirements include:

The men's side shall have 3 urinals, 2 toilet stalls, and 2 sinks, while the women's side shall have 5 toilet stalls and 2 sinks. The trailer shall have central air and heat, mirrors, and be aesthetically pleasing. The contractor shall provide keys to West Point, empty the waste tank every other day, and provide twice-weekly cleaning and restocking. The contract opportunity is anticipated to be set aside for small businesses, with the NAICS code 562991 - Septic Tank and Related Services. Interested small businesses are instructed to provide details on their capabilities, experience, and pricing to support the set-aside.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

The Contractor shall deliver a 10 station restroom trailer with separate men’s and women’s sides.

No handicap access is needed.

Men’s side shall have 3 urinals, 2 toilet stalls and 2 sinks. Women’s side shall have 5 toilet stalls and 2 sinks.

The trailer shall have central air and heat and mirrors and shall be aesthetically pleasing.

The contractor shall provide keys to West Point so that we are able to lock the unit when not in use.

The trailer shall be delivered in place on West Point from 15 September 2024 – 14 September 2026 for a minimum of 12 month base year with one (1) 12 month option year to extend up to an additional 6 mos.

The contractor shall use the existing hookup to existing water and electricity.

The contractor shall empty of the waste tank every other day (Mon, Wed,Fri or Tues, Thurs, Sat) The contractor shall provide twice per week cleaning of the trailer interior and restocking of soap and paper supplies. This service may be preformed when the contractor comes to empty the unit.

The contractor shall report manpower in the Army Contractor Manpower Reporting Application https://cmra.army.mil/. (See attached for complete details.)

https://cmra.army.mil/

File details come from the government source that posted it. Updated .