PWS-Final-Utilization Management Imaging Criteria.pdf
PDF 349 KB Posted
- Attached to
- DH10--Notice of Intent to Sole Source - Interqual Review Criteria Addon: Imaging Criteria
- Solicitation number
- 36C24923Q0571
About this file
This performance work statement outlines requirements for a utilization management imaging criteria licensing agreement and related services for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The contractor shall provide 10 users unlimited access to InterQual imaging criteria and tools, including the InterQual Anonymous Cloud, InterRater Reliability Standard Testing Tool, implementation support, and end user training for up to 15 participants. The contractor must meet availability and performance metrics for system uptime and response times. Additional requirements include help desk support, annual evidence-based criteria updates, instructor-led and web-based refresher training for VA staff, training registration and surveys, and an optional task for migrating the solution to the VA Enterprise Cloud. The period of performance is a 12-month base period plus four 12-month option periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24923Q0571-InterqualReviewCriteriaAddon.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF VETERANS AFFAIRS
Veterans Health Administration (VHA)
VISN 9 Quality Management Office
Utilization Management
Utilization Management Review Imaging Criteria
Date: July 11, 2023
PWS Version Number: 1.0
Contents
1.0 BACKGROUND
2.0 APPLICABLE DOCUMENTS
3.0 SCOPE OF WORK
4.0 PERFORMANCE DETAILS
4.1 PERFORMANCE PERIOD
4.2 PLACE OF PERFORMANCE
4.3 TRAVEL
5.0 SPECIFIC TASKS AND DELIVERABLES
5.1 PROJECT MANAGEMENT
CONTRACTOR PROJECT MANAGEMENT PLAN
REPORTING REQUIREMENTS
5.2 VISN 9 LICENSING AGREEMENT
5.3 SYSTEM AVAILABILITY AND PERFORMANCE
5.4 CUSTOMER AND SERVICE DESK SUPPORT
CUSTOMER SUPPORT SURVEY
The Contractor shall survey VISN 9 customers and provide the results (and/or access to the results) to the COR on a quarterly basis. The Contractor shall coordinate the surveys for COR approval prior to conducting the survey; and shall deliver the survey results in accordance with the CPMP (e.g., no later than 10 calendar days after the end of each quarter)
5.5 Annual Evidence-based Criteria Updates
5.6 Training
TRAINING AND CERTIFICATION
INSTRUCTOR-LED, WEB-BASED REFRESHER TRAINING
TRAINING REGISTRATION
TRAINING SURVEY
5.7 OPTIONAL TASK- MIGRATION TO THE PUBLIC CLOUD
6.0 GENERAL REQUIREMENTS
6.1 ENTERPRISE AND IT FRAMEWORK
VA TECHNICAL REFERENCE MODEL
FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT
(FICAM)
INTERNET PROTOCOL VERSION 6 (IPV6)
TRUSTED INTERNET CONNECTION (TIC)
STANDARD COMPUTER CONFIGURATION
VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT
LINE MANAGEMENT (PLM)
PROCESS ASSET LIBRARY (PAL)
AUTHORITATIVE DATA SOURCES
SOCIAL SECURITY NUMBER (SSN) REDUCTION
6.2 PERFORMANCE METRICS
6.3 GOVERNMENT FURNISHED PROPERTY
ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED
ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM
SECURITY/PRIVACY LANGUAGE
1.0 BACKGROUND
Veterans Health Administration (VHA) is committed to a healthcare system that treats its patient population effectively, efficiently, and appropriately. The VHA’s Utilization Management (UM) Program focuses on using resources efficiently and ensuring that every Veteran receives consistent reliable, high-quality care in the optimal setting and at appropriate care delivery intervals. The objective of the UM program is to provide the right care, for the right patient, at the right time and for the right reason using evidence-based practice and continuous measurement and improvement.
VHA users are from all VISN 9 Facilities; and program offices that include the Utilization Management program office, the Chief Business Office, Purchased Care and the Consolidated Patient Account Centers (CPAC).
2.0 APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:
1. 44 U.S.C. § 3541-3549, “Federal Information Security Management Act (FISMA) of 2002”
2. “Federal Information Security Modernization Act of 2014”
3. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements for Cryptographic Modules”
4. FIPS Pub 199. “Standards for Security Categorization of Federal Information and Information Systems,” February 2004
5. FIPS Pub 200, “Minimum Security Requirements for Federal Information and
Information Systems,” March 2006
6. FIPS Pub 201-2, “Personal Identity Verification of Federal Employees and
Contractors,” August 2013
7. 10 U.S.C. § 2224, "Defense Information Assurance Program"
8. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
9. Public Law 109-461, Veterans Benefits, Health Care, and Information
Technology Act of 2006, Title IX, Information Security Matters
10. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”
11. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm
12. VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016, https://www.va.gov/vapubs/index.cfm
13. VA Directive and Handbook 6102, “Internet/Intranet Services,” August 5,
14. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” January 18, 2017
15. Office of Management and Budget (OMB) Circular A-130, “Managing Federal Information as a Strategic Resource,” July 28, 2016
16. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)”
17. NIST SP 800-66 Rev. 1, “An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule,” October 2008
18. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017
19. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
20. VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021
21. VA Handbook 6500, “Risk Management Framework for VA Information
Systems VA Information Security Program,” February 24, 2021
22. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI),” March 12, 2019
23. VA Handbook 6500.5, “Incorporating Security and Privacy into the System Development Lifecycle,” March 22, 2010
24. VA Handbook 6500.6, “Contract Security,” March 12, 2010
25. VA Handbook 6500.8, “Information System Contingency Planning,” April 6,
26. VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018
27. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017
28. OIT Process Asset Library (PAL), https://www.va.gov/process/ . Reference
Process Maps at https://www.va.gov/process/maps.asp and Artifact templates at https://www.va.gov/process/artifacts.asp
29. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)
30. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact Assessment,” October 15, 2014
31. VA Handbook 6508.1, “Procedures for Privacy Threshold Analysis and Privacy Impact Assessment,” July 30, 2015
32. VA Handbook 6510, “VA Identity and Access Management,” January 15,
33. VA Directive and Handbook 6513, “Secure External Connections,” October 12, 2017
34. VA Directive 6300, “Records and Information Management,” September 21,
35. VA Handbook, 6300.1, “Records Management Procedures,“ March 24, 2010
36. NIST SP 800-37 Rev 2, “Risk Management Framework for Information
Systems and Organizations: A System Life Cycle Approach for Security and Privacy,” December 2018
37. NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information Systems and Organizations,” September 23, 2020 (includes updates as of 12/10/2020)
38. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” October 26, 2015
39. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-
12) Program,” March 24, 2014
40. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors,” August 5, 2005
41. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved Identity, Credential, and Access Management,” May 21, 2019
42. OMB Memorandum, “Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation,” May 23, 2008
43. Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011, (NOTE: Part A of the FICAM Roadmap and Implementation Guidance, v2.0, was replaced in 2015 with an updated Architecture (https://arch.idmanagement.gov/#what-is-the-ficam-architecture)
44. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access,“ June 2018
45. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020
46. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014
47. NIST SP 800-164, “Guidelines on Hardware-Rooted Security in Mobile
Devices (Draft),” October 2012
48. Draft National Institute of Standards and Technology Interagency Report
(NISTIR) 7981, “Mobile, PIV, and Authentication,” March 2014
49. VA Memorandum, VAIQ #7100147, “Continued Implementation of Homeland
Security Presidential Directive 12 (HSPD-12),” April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
50. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
51. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896
52. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents
53. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative,” September 12, 2019
54. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name System Infrastructure,” August 22, 2008
55. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public Law 110–140), December 19, 2007
56. Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005
57. Executive Order 13834, “Efficient Federal Operations,” dated May 17, 2018
58. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August
2, 2001
59. VA Directive 0058, “VA Green Purchasing Program,” July 19, 2013
60. VA Handbook 0058, “VA Green Purchasing Program,” July 19, 2013
61. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote
Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
62. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103
63. “Veteran Focused Integration Process (VIP) Guide 4.0,” January 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371
64. VA Memorandum “Proper Use of Email and Other Messaging Services,”
January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
65. “DevSecOps Product Line Management Playbook” version 2.0, May 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946
66. NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020
67. OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol
Version 6 (IPv6),” November 19, 2020
68. Social Security Number (SSN) Fraud Prevention Act of 2017
69. Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23,
70. VA Enterprise Cloud Technical Reference Guide, Version 1.3 July 2018
3.0 SCOPE OF WORK
The Contractor shall provide VISN 9 and VISN 9 facilities software licensing that includes unlimited use, updates, and clinical and technical support for evidence-based criteria and the associated tools identified in this PWS. In addition, the Contractor shall provide training to certify and maintain certification for trainers throughout VISN 9 and helpdesk support.
4.0 PERFORMANCE DETAILS
4.1 PERFORMANCE PERIOD
The period of performance (PoP) shall be a 12-month base period with four (4) 12-month option periods to be exercised by the Government at its sole discretion.
Included is an optional task to migrate the contractor’s solution to the VA Enterprise Cloud (VAEC).
The total PoP shall not exceed 60 months.
4.2 PLACE OF PERFORMANCE
Tasks under this PWS shall be performed at Contractor facilities. The Contractor shall identify the Contractor’s place of performance in their proposal submission.
4.3 TRAVEL
The Government anticipates travel under this effort to perform the training tasks associated with the effort. Include all estimated travel costs in your firm-fixed price line items. These costs will not be directly reimbursed by the Government.
The total estimated number of trips in support of this effort is two (2) per year.
Anticipated locations include the following, estimated at two (2) days in duration:
Nashville TN
5.0 SPECIFIC TASKS AND DELIVERABLES
The Contractor shall perform the following:
5.1 PROJECT MANAGEMENT
CONTRACTOR PROJECT MANAGEMENT PLAN
The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline, and tools to be used in execution of the contract. The CPMP shall take the form of both a narrative and graphic format that displays the schedule, milestones, and risks, including the risk management approach.
The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated in accordance with Section B of the contract. The Contractor shall update and maintain the VA PM approved CPMP throughout the PoP.
Deliverable:
A. Contractor Project Management Plan
REPORTING REQUIREMENTS
The Contractor shall provide the COR with Monthly Progress Reports in electronic form in Microsoft Word and Project formats. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding Month.
The Monthly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The report shall also include an itemized list of all Information and Communication Technology (ICT) deliverables and their current Section 508 conformance status. The Contractor shall monitor availability and performance against the CPMP and report any deviations.
It is expected that the Contractor will keep in communication with VA accordingly so that issues that arise are transparent to both parties to prevent escalation of outstanding issues.
A. Monthly Progress Report
5.2 VISN 9 LICENSING AGREEMENT
The Contractor shall provide 10 users unlimited use, Licensing Agreement to access and use evidence-based clinical appropriateness imaging criteria and associated tools.
The Contractor shall include unlimited Government use of the criteria in electronic format as part of the license agreement. Included in the license agreement, the Contractor shall provide all product support such as application/software updates, patches and upgrades, report generation, and clinical and technical help desk response and resolution. Updates to the electronic version of the criteria or associated applications including clinical revisions, technical enhancements, system patches, and version upgrades shall be included in the license agreement.
The Contractor shall provide access, view, use, and download of the following criteria and associated applications and tools as part of the licensing agreement:
a) InterQual Imaging Criteria
b) InterQual Anonymous Cloud
c) InterRater Reliability Standard Testing Tool
d) Implementation
e) End User Training Services up to 15 Participants
5.3 SYSTEM AVAILABILITY AND PERFORMANCE
Included in the license agreement, the contractor shall meet the following availability and performance metrics:
Metric Metric Description Expected Value
Availability (Asubo)
Percent of time and duration the VA platform and InterQual were up and operational based on available data from
VA OIT
Threshold: 98.5%
Objective: 99.5%
Maintainability
– Mean Time To Repair or Restore (MTTR)
Mean Time to Repair or Restore (MTTR) for software, service components of the InterQual for given reporting period
Threshold: <= 8 hours per incident
Objective: <= 4 hours per incident
Reliability – Mean Time Between Failure
(MTBF)
Mean Time Between Failure (MTBF) for hardware/platform, software, service components of the VA platform and InterQual for given reporting period
Threshold: 10 days
Objective: 30 days
Cybersecurity Incident Response
Time elapsed to address cybersecurity incident based on severity of impact and criticality of system components
Threshold: 48 to 120 hours
Objective: 24, 48, 72 hours (respectively to severity of impact level)
Data Breach Reporting
Time elapsed to report a data breach event
Threshold and Objective:
1 hour
DHA Privacy Office: 24 hours
DoD Privacy & Civil Liberty Division: 48 hours
5.4 CUSTOMER AND SERVICE DESK SUPPORT
The contractor shall provide clinical and technical help desk response and resolution. All VISN 9 user support calls are initially sent to the VA Enterprise Service Desk (ESD), which is responsible for Tier 1 support. The VA ESD uses the Service Now (SNow) tool to track all support calls. The VA ESD will address any issues such as computer hardware, user access, network access, and printing. Any issues that are specifically related to the licensed products described in paragraph 5.2 shall be forwarded to the contractor’s service desk. The Contractor shall provide customer support for the VISN 9 medical centers and program offices during operating hours of 7:00 am to 9:00 pm EST/EDT. The Contractor shall provide both clinical (e.g., the explanation and interpretation of criteria, use of applications, and guidance with complex cases) and technical (e.g., access, account and password help, download, and use of the applications) support. The Contractor shall maintain a 96% customer satisfaction rate based on timely response and resolution. The Contractor shall respond to requests for support within 24 hours of the request, but no later than the next business day. The Contractor shall resolve issues within 15 calendar days of request for support. The Contractor shall provide both an email contact and a phone number for support.
CUSTOMER SUPPORT SURVEY
The Contractor shall survey VISN 9 customers and provide the results (and/or access to the results) to the COR on a quarterly basis. The Contractor shall coordinate the surveys for COR approval prior to conducting the survey; and shall deliver the survey results in accordance with the CPMP (e.g., no later than 10 calendar days after the end of each quarter).
Deliverable:
A: Customer Survey Results
Deliverable:
A. Change Log
5.5 ANNUAL EVIDENCE-BASED CRITERIA UPDATES
The Contractor shall assess the criteria and provide an annual complete updated criteria release that reflects current healthcare best practices. The Contractor shall ensure that all criteria are compliant with the applicable regulations and laws. The Contractor shall notify the COR at least 60 calendar days prior to implementing changes though submission of a change log.
A. Change Log
5.6 TRAINING
The Contractor shall provide educational resources and training to support VISN 9 in the application of the imaging criteria.
The Contractor shall ensure that the training meets certification and accreditation requirements. The Contractor shall provide the training materials to all enrolled learners no later than 10 business days prior to the scheduled training session. The Contractor shall offer both instructor-led, web-based training, and face-to-face training at the Contractor’s facility.
A: Training Materials
TRAINING AND CERTIFICATION
The Contractor shall develop a comprehensive curriculum and agenda for the training, provide faculty, educational material, and continuing education credits approved by the American Nursing Association. The Contractor shall ensure that the training is relative to the development, interpretation, application, and content delivery of the licensed criteria.
INSTRUCTOR-LED, WEB-BASED REFRESHER TRAINING
Contractor shall provide instructor-led, web-based training annually for VISN 9 staff trainers for recertification in all licensed criteria products. The Contractor shall develop a comprehensive curriculum and agenda for the training, provide faculty, educational materials, evaluation of participants and continuing education credits approved by the American Nursing Association. The Contractor shall ensure that the training is relative to the interpretation, application, and content delivery of the annual update of licensed criteria products. The Contractor will ensure competency of all participants at the conclusion of training.
TRAINING REGISTRATION
The Contractor shall establish and coordinate the registration of VISN 9 staff for all training sessions. The Contractor shall accept registrations directly from VISN 9 staff members. The Contractor shall provide information regarding the training to each enrollee to include availability and delivery of training materials, contact information, dates and times of sessions, and other administrative information. The Contractor shall complete the registration for each training session within 30 calendar days prior to conducting the training; and shall provide the COR a list of all VA employees registered to attend the training session no later than 20 calendar days prior to the training start date. The Contractor shall provide the COR a list of the actual attendees for each training session within 10 calendar days of the conclusion of each session.
A: List of Attendees
TRAINING SURVEY
The Contractor shall prepare a student survey/questionnaire for COR approval for all training provided no later than 30 calendar days prior to conducting training sessions.
The Contractor shall provide the completed surveys and results directly to the COR within 10 calendar days of the conclusion of each training session. The Contractor shall maintain a 96% learner satisfaction rate.
A: Training Surveys
5.7 OPTIONAL TASK- MIGRATION TO THE PUBLIC CLOUD
If exercised the criteria and associated applications and tools specified in paragraph 5.2 shall be migrated from the Contractor’s premises and hosted in a public cloud. The Contractor shall be responsible for providing or acquiring cloud capacity or server hosting infrastructure for this contract.
If exercised the contractor shall perform the following:
1. The information system solution selected by the Contractor shall comply with the Federal Information Security Management Act (FISMA).
2. The Contractor shall comply with FedRAMP requirements as mandated by Federal laws and policies, including making available any documentation, physical access, and logical access needed to support this requirement.
3. The Contractor shall, where applicable, assist with the VA ATO Process to help achieve agency authorization of the cloud service or migrated application.
4. The Contractor shall provide an Incident Response Plan (IRP) scenario within 14 days of award and complete Table-Top exercise within 21 days of award unless current VA IRP can be provided.
5. The Contractor shall provide a System Boundary Diagram that demonstrates implementation and any proposed VA interconnections including required ports and protocols at the time award.
6. The Contractor shall complete a FedRAMP System Security Plan (SSP) and supporting documentation at the time of award.
7. The Contractor shall complete a Third-Party Assessment Organization (3PAO) Security Assessment Plan (SAP) at the time of award.
8. The Contractor shall complete a 3PAO Security Assessment Report (SAR) at the time of award.
9. To the extent required to carry out the FedRAMP assessment and authorization process and FedRAMP continuous monitoring, to safeguard against threats and hazards to the security, integrity, and confidentiality of any non-public VA data collected and stored by the Contractor, the Contractor shall provide the VA access to the Contractor’s and Cloud Service Provider’s facilities, installations, technical capabilities, operations, documentation, records, and databases.
10. If new or unanticipated threats or hazards are discovered by either VA or the Contractor, or if existing safeguards have ceased to function, the discoverer shall immediately bring the situation to the attention of the other party in accordance with the security addendum B.
11. The Contractor shall not release any data without the written consent of VA. All requests for release must be submitted in writing to the COR/CO.
12. In order for live VA data to be used in this system, a FedRAMP Authorization and VA ATO will be required.
13. Identified gaps between required FedRAMP Security Control Baselines and Continuous Monitoring controls and the contractor’s implementation as documented in the Security Assessment Report shall be tracked by the Contractor for mitigation in a Plan of Action and Milestones (POA&M) document. Depending on the severity of the gaps, VA may require them to be remediated before a provisional or agency authorization is issued.
14. The Contractor shall maintain a security management continuous monitoring environment based upon the latest edition of the VA Cloud Computing Continuous Monitoring Process, FedRAMP Security Controls Baseline and FedRAMP Continuous Monitoring Strategy Plan.
15. The Contractor shall comply with all VA and FedRAMP privacy requirements.
16. VA may choose to cancel the Contract and terminate any outstanding orders if the contractor has its ATO revoked, and the deficiencies are greater than VA risk tolerance thresholds.
Deliverables:
A. System Boundary Diagram B. FedRAMP System Security Plan (SSP) and supporting documentation C. 3PAO Security Assessment Plan (SAP) D. 3PAO Security Assessment Report (SAR)
6.0 GENERAL REQUIREMENTS
6.1 ENTERPRISE AND IT FRAMEWORK
The Authorization requirements do not apply, and that a Security Accreditation Package is not required.
VA TECHNICAL REFERENCE MODEL
The Contractor shall support the VA enterprise management framework. In association with the framework, the Contractor shall comply with OIT Technical Reference Model (VA TRM). The VA TRM is one component within the overall Enterprise Architecture (EA) that establishes a common vocabulary and structure for describing the information technology used to develop, operate, and maintain enterprise applications. Moreover, the VA TRM, which includes the Standards Profile and Product List, serves as a technology roadmap and tool for supporting OIT. Architecture & Engineering Services (AES) has overall responsibility for the VA TRM.
FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)
The Contractor shall ensure Commercial Off-The-Shelf (COTS) product(s), software configuration and customization, and/or new software are Personal Identity Verification (PIV) card-enabled by accepting HSPD-12 PIV credentials using VA Enterprise Technical Architecture (ETA), https://www.ea.oit.va.gov/EAOIT/VA_EA/Enterprise_Technical_Architecture.asp, and VA Identity and Access Management (IAM) approved enterprise design and integration patterns, https://www.oit.va.gov/library/recurring/edp/index.cfm. The Contractor shall ensure all Contractor delivered applications and systems comply with the VA Identity, Credential, and Access Management policies and guidelines set forth in VA Handbook 6510 VA Identity and Access Management, VA Handbook 0735 Homeland Security Presidential Directive 12 (HSPD-12) Program, and align with the Federal Identity, Credential, and Access Management Roadmap and Implementation Guidance v2.0.
The Contractor shall ensure all Contractor delivered applications and systems provide user authentication services compliant with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-63-3, VA Handbook 6500 Appendix F, “VA System Security Controls”, and VA IAM enterprise requirements for direct, assertion-based authentication, and/or trust-based authentication, as determined by the design and integration patterns. Direct authentication at a minimum must include Public Key Infrastructure (PKI) based authentication supportive of PIV card and/or Common Access Card (CAC), as determined by the business need.
The Contractor shall ensure all Contractor delivered applications and systems conform to the specific Identity and Access Management PIV requirements set forth in the Office of Management and Budget (OMB) Memoranda M-05-24, M-19-17, and NIST Federal Information Processing Standard (FIPS) 201-2. OMB Memoranda M-05-24 and M-19- 17 can be found at:
https://www.whitehouse.gov/sites/whitehouse.gov/files/omb/memoranda/2005/m05- 24.pdf, and https://www.whitehouse.gov/wp-content/uploads/2019/05/M-19-17.pdf respectively. Contractor delivered applications and systems shall be on the FIPS 201-2 Approved Product List (APL). If the Contractor delivered application and system is not on the APL, the Contractor shall be responsible for taking the application and system through the FIPS 201 Evaluation Program.
The Contractor shall ensure all Contractor delivered applications and systems support:
1. Automated provisioning and are able to use enterprise provisioning service.
2. Interfacing with VA’s Master Person Index (MPI) to provision identity attributes, if the solution relies on VA user identities. MPI is the authoritative source for VA user identity data.
3. The VA defined unique identity (Secure Identifier [SEC ID] / Integrated Control Number [ICN]).
4. Multiple authenticators for a given identity and authenticators at every Authenticator Assurance Level (AAL) appropriate for the solution.
5. Identity proofing for each Identity Assurance Level (IAL) appropriate for the solution.
6. Federation for each Federation Assurance Level (FAL) appropriate for the solution, if applicable.
7. Two-factor authentication (2FA) through an applicable design pattern as outlined in VA Enterprise Design Patterns.
8. A Security Assertion Markup Language (SAML) implementation if the solution relies on assertion-based authentication. Additional assertion implementations, besides the required SAML assertion, may be provided as long as they are compliant with NIST SP 800-63-3 guidelines.
9. Authentication/account binding based on trusted Hypertext Transfer Protocol (HTTP) headers if the solution relies on Trust based authentication.
10. Role Based Access Control.
11. Auditing and reporting capabilities.
12. Compliance with VIEWS 00155984, PIV Logical Access Policy Clarification https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896.
The required Assurance Levels for this specific effort are Identity Assurance Level 3, Authenticator Assurance Level 3, and Federation Assurance Level 3.
INTERNET PROTOCOL VERSION 6 (IPV6)
The Contractor solution shall support Internet Protocol Version 6 (IPv6) based upon the memo issued by the Office of Management and Budget (OMB) on November 19, 2020 (https://www.whitehouse.gov/wp-content/uploads/2020/11/M-21-07.pdf). IPv6 technology, in accordance with the USGv6 Program (https://www.nist.gov/programs-projects/usgv6-program/usgv6-revision-1), NIST Special Publication (SP) 500-267B Revision 1 “USGv6 Profile” (https://doi.org/10.6028/NIST.SP.500-267Br1), and NIST SP 800-119 “Guidelines for the Secure Deployment of IPv6”
(https://doi.org/10.6028/NIST.SP.800-119), compliance shall be included in all IT infrastructures, application designs, application development, operational systems and sub-systems, and their integration. In addition to the above requirements, all devices shall support native IPv6 and dual stack (IPv6 / IPv4) connectivity without additional memory or other resources being provided by the Government, so that they can function in a mixed environment. All public/external facing servers and services (e.g., web, email, DNS, ISP services, etc.) shall support native IPv6 and dual stack (IPv6 / IPv4) users and all internal infrastructure and applications shall communicate using native IPv6 and dual stack (IPv6 / IPv4) operations.
TRUSTED INTERNET CONNECTION (TIC)
The Contractor solution shall meet the requirements outlined in Office of Management and Budget Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative“ (https://www.whitehouse.gov/wp-content/uploads/2019/09/M-19-26.pdf), VA Directive 6513 “Secure External Connections”, and shall comply with the TIC 3.0 Core Guidance Documents, including all Volumes and TIC Use Cases, found at the Cybersecurity & Infrastructure Security Agency (CISA) (https://www.cisa.gov/publication/tic-30-core-guidance-documents). Any deviations must be approved by the VA TIC 3.0 Working Group at vaoisesatic30team@va.gov.
STANDARD COMPUTER CONFIGURATION
The Contractor IT end user solution that is developed for use on standard VA computers shall be compatible with and be supported on the standard VA operating system, currently Windows 10 (64bit), Edge (Chromium based), and 365 Apps for enterprise. Applications delivered to VA and intended to be deployed to Windows 10 workstations shall be delivered as a signed .msi package with switches for silent and unattended installation and updates shall be delivered in signed .msp file formats for easy deployment using Microsoft Endpoint Configuration Manager (CM) VA’s current desktop application deployment tool. Signing of the software code shall be through a vendor provided certificate that is trusted by VA using a code signing authority such as Verizon/Cybertrust or Symantec/VeriSign. The Contractor shall also ensure and certify that their solution functions as expected when used from a standard VA computer, with non-admin, standard user rights that have been configured using the United States Government Configuration Baseline (USGCB) and Defense Information Systems Agency (DISA) Secure Technical Implementation Guide (STIG) specific to the particular client operating system being used.
VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT LINE
MANAGEMENT (PLM)
The Contractor shall support VA efforts IAW the updated Veteran Focused Integration Process (VIP) and Product Line Management (PLM). The major focus of the new VIP is on Governance and Reporting and is less prescriptive, with a focus on outcomes and continuous delivery of value. Product Line Management (PLM) is a framework that focuses on delivering functional products that provide the highest priority work to customers while delivering simplified, reliable, and practical solutions to the business, medical staff, and our Veterans. The VIP Guide is a companion guide to the PLM Playbook and can be found at:
https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371 and the PLM Playbook can be found at https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946. The PLM Playbook pivots from project-centric to product-centric delivery and contains descriptive practices that focuses on outcomes. The PLM Playbook contains a set of “plays” that implement Development, Security, and Operations (DevSecOps) principles and processes such as automated development, continuous integration/continuous delivery, and release on demand. The PLM Playbook details how product lines implement Lean-Agile principles, methods, practices, and techniques through levels of maturity. VIP and PLM are the authoritative processes that IT projects must follow to ensure development and delivery of IT products.
PROCESS ASSET LIBRARY (PAL)
The Contractor shall perform their duties consistent with the processes defined in the OIT Process Asset Library (PAL). The PAL scope includes the full spectrum of OIT functions and activities, such as VIP project management, operations, service delivery, communications, acquisition, and resource management. PAL serves as an authoritative and informative repository of searchable processes, activities or tasks, roles, artifacts, tools and applicable standards and guides to assist the OIT workforce, Government and Contractor personnel. The Contractor shall follow the PAL processes to ensure compliance with policies and regulations and to meet VA quality standards. The PAL includes the contractor onboarding process consistent with Section
6.2.2 and can be found at https://www.va.gov/PROCESS/artifacts/maps/process_CONB_ext.pdf. The main PAL can be accessed at www.va.gov/process.
AUTHORITATIVE DATA SOURCES
The VA Enterprise Architecture Repository (VEAR) is one component within the overall EA that establishes the common framework for data taxonomy for describing the data architecture used to develop, operate, and maintain enterprise applications. The Contractor shall comply with the department’s Authoritative Data Source (ADS) requirement that VA systems, services, and processes throughout the enterprise shall access VA data solely through official VA ADSs where applicable, see below. The Information Classes which compose each ADS are located in the VEAR, in the Data & Information domain. The Contractor shall ensure that all delivered applications and system solutions support:
1. Interfacing with VA’s Master Person Index (MPI) (formerly the Master Veteran Index (MVI)) to provision identity attributes, if the solution relies on VA user identities. MPI is the authoritative source for VA user identity data.
2. Interfacing with Capital Asset Inventory (CAI) to conduct real property record management actions if the solution relies on real property records data. CAI is the authoritative source for VA real property record management data.
3. Interfacing with electronic Contract Management System (eCMS) for access to contract, contract line item, purchase requisition, offering vendor and vendor, and solicitation information above the micro-purchase threshold, if the solution relies on procurement data. ECMS is the authoritative source for VA procurement actions data.
4. Interfacing with HRSmart Human Resources Information System to conduct personnel action processing, on-boarding, benefits management, and compensation management, if the solution relies on personnel data. HRSmart is the authoritative source for VA personnel information data.
5. Interfacing with Vet360 to access personal contact information, if the solution relies on VA Veteran personal contact information data. Vet360 is the authoritative source for VA Veteran Personal Contact Data.
6. Interfacing with VA/Department of Defense (DoD) Identity Repository (VADIR) for determining eligibility for VA benefits under Title 38, if the solution relies on qualifying active-duty military service data. VADIR is the authoritative source for Qualifying Active-Duty military service in VA.
SOCIAL SECURITY NUMBER (SSN) REDUCTION
The Contractor solution shall support the Social Security Number (SSN) Fraud Prevention Act (FPA) of 2017 which prohibits the inclusion of SSNs on any document sent by mail. The Contractor support shall also be performed in accordance with Section 240 of the Consolidated Appropriations Act (CAA) 2018, enacted March 23, 2018, which mandates VA to discontinue using SSNs to identify individuals in all VA information systems as the Primary Identifier. The Contractor shall ensure that any new IT solution discontinues the use of SSN as the Primary Identifier to replace the SSN with the ICN in all VA information systems for all individuals. The Contractor shall ensure that all Contractor delivered applications and systems integrate with the VA Master Person Index (MPI) for identity traits to include the use of the ICN as the Primary Identifier. The Contractor solution may only use a Social Security Number to identify an individual in an information system if and only if the use of such number is required to obtain information VA requires from an information system that is not under the jurisdiction of VA.
6.2 PERFORMANCE METRICS
The table below defines the Performance Standards and Acceptable Levels of Performance associated with this effort.
UM Criteria PWS Performance Standards and Methodology Deliverable/ Performance Objective
Performance Standard
Referenc e in PWS
Method of Assessment
Remedy
Clinical and Technical Support
Response to a request for support is no later than one (1) business day.
Resolve issue within 15 calendar days.
Maintain a 96% customer satisfaction rate.
Maintain both an email and phone number for customer support.
5.4 COR
Surveillance (user feedback and surveys)
Document performance in
CPARS.
Clinical and Technical Support
Coordinate survey with COR prior to conducting the surveys.
Conduct quarterly user surveys.
Provide survey results in accordance with the Project Work Plan.
5.4.1 COR
Surveillance (Coordination of survey with COR, and receipt of surveys from contractor)
Document performance in
CPARS.
Product Delivery
Access, use, view, and download of the criteria.
5.2 COR
Surveillance (user feedback and surveys)
Document performance in
CPARS
Annual evidence-based Criteria update
Criteria Updates are provided at least annually 100% of the time.
COR is notified at least 30 calendar days prior to updates.
(PWS section 4.2).
5.6 COR
Surveillance
Document performance in
CPARS
Deliverable/ Performance Objective
Performance Standard
Referenc e in PWS
Method of Assessment
Remedy
Training Training meets certification and accreditation requirements.
Training meets the American Nursing Association approval for continuing education credits.
5.7 / 5.7.1 / 5.7.2
COR
Surveillance
Document performance in
CPARS
Training Training materials are provided to each perspective attendee at least 10 business days prior to start of the training.
5.7 / 5.7.1 /5.7.2
COR
Surveillance
Document
CPARS
Training Registration is completed 30 calendar days prior to conduct of training.
List of registered participants sent to COR within 20 calendar days of the course start date.
5.7.3 COR
Surveillance
Document performance in
CPARS
Training List of actual attendees within 10 calendar days of course conclusion.
5.7.3 COR
Surveillance
Document performance in
CPARS
Training Preview and approval by COR of Survey instrument for students – 30 calendar days prior to the start of training
5.7.4 COR Review
(Survey instrument received by COR; minor or correctable changes if needed; and dates met)
Document performance in
CPARS
Training Completed survey results delivered to COR within 10 calendar days of course conclusion.
5.7.4 COR
Surveillance
Document
Deliverable/ Performance Objective
Performance Standard
Referenc e in PWS
Method of Assessment
Remedy
Training Survey results indicate an overall learner satisfaction rate of at least 96%
5.7.4 COR Review
and Surveillance
Document performance in
CPARS
Contractor Project Manager Plan
Delivered no later than 30 calendar days after contract award and updated monthly thereafter.
100%
4.8 COR
Surveillance
Document
The COR will utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable level of performance. The Government reserves the right to alter or change the surveillance methods in the QASP at its own discretion.
6.3 GOVERNMENT FURNISHED PROPERTY
If the optional task is exercised the Government will furnish the following:
Cloud capacity in and connectivity to the VA Enterprise Cloud (VAEC) environments.
VA Enterprise Cloud Operational Tools (VAECOT) comprised of a suite of COTS cloud management tools as identified in the VAEC Technical Reference Guide Enterprise Development Environment (EDE) and Tools as identified in the VAEC
Technical Reference Guide
ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED
A1.0 Cyber and Information Security Requirements for VA IT Services
The Contractor shall ensure adequate LAN/Internet, data, information, and system security in accordance with VA standard operating procedures and standard PWS language, conditions, laws, and regulations. The Contractor’s firewall and web server shall meet or exceed VA minimum requirements for security. All VA data shall be protected behind an approved firewall. Any security violations or attempted violations shall be reported to the VA Program Manager and VA Information Security Officer as soon as possible. The Contractor shall follow all applicable VA policies and procedures governing information security, especially those that pertain to assessment and authorization and continuous monitoring
Contractor supplied equipment, PCs of all types, equipment with hard drives, etc. for contract services must meet all security requirements that apply to Government Furnished Equipment (GFE) and Government Owned Equipment (GOE). Security Requirements include: a) VA Approved Encryption Software must be installed on all laptops or mobile devices before placed into operation, b) Bluetooth equipped devices are prohibited within VA; Bluetooth must be permanently disabled or removed from the device, unless the connection uses FIPS 140-2 (or its successor) validated encryption,
c) VA approved anti-virus and firewall software, d) Equipment must meet all VA sanitization requirements and procedures before disposal. The COR, CO, the PM, and the Information Security Officer (ISO) must be notified and verify all security requirements have been adhered to.
Each documented initiative under this contract incorporates VA Handbook 6500.6, “Contract Security,” March 12, 2010 by reference as though fully set forth therein. The VA Handbook 6500.6, “Contract Security” shall also be included in every related agreement, contract, or order. The VA Handbook 6500.6, Appendix C, is included in this document as Addendum B.
Training requirements: The Contractor shall complete all mandatory training courses on the current VA training site, the VA Talent Management System (TMS) 2.0, and will be tracked therein. The TMS 2.0 may be accessed at https://www.tms.va.gov/SecureAuth35/ . If you do not have a TMS 2.0 profile, go to https://www.tms.va.gov/SecureAuth35/ and click on the “Create New User” link on the TMS 2.0 to gain access.
Contractor employees shall complete a VA Systems Access Agreement if they are provided access privileges as an authorized user of the computer system of VA.
A2.0 VA Enterprise Architecture Compliance
The applications, supplies, and services furnished under this contract must comply with VA Enterprise Architecture (EA), available at http://www.ea.oit.va.gov/index.asp in force at the time of issuance of this contract, including the Program Management Plan and VA's rules, standards, and guidelines in the Technical Reference Model/Standards Profile (TRMSP). VA reserves the right to assess contract deliverables for EA compliance prior to acceptance.
A2.1. VA Internet and Intranet Standards
The Contractor shall adhere to and comply with VA Directive 6102 and VA Handbook 6102, Internet/Intranet Services, including applicable amendments and changes, if the Contractor’s work includes managing, maintaining, establishing, and presenting information on VA’s Internet/Intranet Service Sites. This pertains, but is not limited to:
creating announcements; collecting information; databases to be accessed, graphics and links to external sites.
Internet/Intranet Services Directive 6102 is posted at (copy and paste the following URL to browser): https://www.va.gov/vapubs/viewPublication.asp?Pub_ID=1056&FType=2
Internet/Intranet Services Handbook 6102 is posted at (copy and paste following URL to browser): https://www.va.gov/vapubs/viewPublication.asp?Pub_ID=1055&FType=2
A3.0 Notice of the Federal Accessibility Law Affecting All Information and Communication Technology (ICT) Procurements (Section 508)
On January 18, 2017, the Architectural and Transportation Barriers Compliance Board (Access Board) revised and updated, in a single rulemaking, standards for electronic and information technology developed, procured, maintained, or used by Federal agencies covered by Section 508 of the Rehabilitation Act of 1973, as well as our guidelines for telecommunications equipment and customer premises equipment covered by Section 255 of the Communications Act of 1934. The revisions and updates to the Section 508-based standards and Section 255-based guidelines are intended to ensure that information and communication technology (ICT) covered by the respective statutes is accessible to and usable by individuals with disabilities.
A3.1. Section 508 – Information and Communication Technology (ICT) Standards
The Section 508 standards established by the Access Board are incorporated into, and made part of all VA orders, solicitations and purchase orders developed to procure ICT.
These standards are found in their entirety at: https://www.access-board.gov/guidelines-and-standards/communications-and-it/about-the-ict-refresh/final-rule/text-of-the-standards-and-guidelines. A printed copy of the standards will be supplied upon request.
Federal agencies must comply with the updated Section 508 Standards beginning on January 18, 2018. The Final Rule as published in the Federal Register is available from the Access Board: https://www.access-board.gov/guidelines-and-standards/communications-and-it/about-the-ict-refresh/final-rule.
The Contractor shall comply with “508 Chapter 2: Scoping Requirements” for all electronic ICT and content delivered under this contract. Specifically, as appropriate for the technology and its functionality, the Contractor shall comply with the technical standards marked here:
E205 Electronic Content – (Accessibility Standard -WCAG 2.0 Level A and AA Guidelines) E204 Functional Performance Criteria E206 Hardware Requirements E207 Software Requirements E208 Support Documentation and Services Requirements
A3.2. Compatibility with Assistive Technology
The standards do not require installation of specific accessibility-related software or attachment of an assistive technology device. Section 508 requires that ICT be compatible with such software and devices so that ICT can be accessible to and usable by individuals using assistive technology, including but not limited to screen readers, screen magnifiers, and speech recognition software.
A3.3. Acceptance and Acceptance Testing
Deliverables resulting from this solicitation will be accepted based in part on satisfaction of the Section 508 Chapter 2: Scoping Requirements standards identified above.
The Government reserves the right to test for Section 508 Compliance before delivery.
The Contractor shall be able to demonstrate Section 508 Compliance upon delivery.
A4.0 Physical Security & Safety Requirements:
The Contractor and their personnel shall follow all VA policies, standard operating procedures, applicable laws and regulations while on VA property. Violations of VA regulations and policies may result in citation and disciplinary measures for persons violating the law.
1. The Contractor and their personnel shall wear visible identification at all times while they…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .