PWS FD2030-19-00621___30 April 2020.docx

DOCX document 51 KB Posted

Attached to
3rd Stage Turbine Air Sealing Ring Segment
Solicitation number
PZAAA-01
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

For F100-PW-229 3rd Stage Turbine Air Sealing Ring Segment Overhaul

FILE NUMBER: PR # FD2030-19-00621

REV. 1

DATE: 30 April 2020

PREPARING ORGANIZATION:

AFLCMC/LPSAAA

TINKER AFB, OK 73145-3030

Warning –this document contains technical data whose export is restricted by the arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25.

TABLE OF CONTENTS Page

SECTION I

1.1DATA .......................................................................................................................................... 3
1.2SECURITY .................................................................................................................................... 5
1.3QUALITY ..................................................................................................................................... 5
1.4DELIVERY SCHEDULES ................................................................................................................ 5
1.5CONDEMNATION AND OVERHAUL............................................................................................. 6
1.6HANDLING .................................................................................................................................. 6
1.7INVENTORY .................................................................................................................................6
1.8PRESERVATION........................................................................................................................... 7
1.9RECEIPT/HANDLING OF PQDR EXHIBITS ..................................................................................... 7
1.10SAFETY AND HEALTH…………………............................................................................................... 7
1.11GENERAL WORK REQUIREMENTS............................................................................................... 8
1.12SPECIFIC WORK REQUIREMENTS.................................................................................................9
1.13APPLICABLE TECHNICAL ORDERS............................................................................................... 12
1.14APPLICABLE DIRECTIVES............................................................................................................13
1.15APPLICABLE DOCUMENTS.........................................................................................................13
1.16MISSION ESSENTIAL SERVICES ………..…………………………………………………………………………….……13

SECTION II

2.1SERVICE SUMMARY REQUIREMENTS........................................................................................ 15
2.2CONTRACTOR PERFORMANCE EVALUATION............................................................................ 15

SECTION III

3.1 GOVERNMENT PROPERTY

APPENDIX 1

A1.1 ACRONYMS

APPENDIX 2

A2.1 NOTES

APPENDIX 3

A3.1PRODUCT VERIFICATION AUDIT PROCEDURES ......................................................................... 20
A3.2TERMS EXPLAINED ................................................................................................................... 20
A3.3RESPONSIBILITIES ..................................................................................................................... 20
A3.4AUDIT PROCEDURES................................................................................................................. 21
A3.5AUDIT RESULTS ........................................................................................................................... 24

APPENDIX 4 ………………………………………………………………………………………………………………………………………26

SECTION I

DESCRIPTION OF SERVICES

This PWS establishes the minimum work requirements to return F100-PW-229 3rd Stage Turbine Air Sealing Ring Segments listed below by National Stock Number (NSN) and Part Number (P/N) to a serviceable, like new condition. F100-PW-229 3rd Stage Turbine Air Sealing Ring Segment received by the contractor, as set forth in this contract shall be overhauled, modified, tested, prepared for storage and shipped in accordance with (IAW) the requirements in this PWS and the contract.

NOUN
PART NUMBER
NSN
APPLICABLE T.O.
3rd Stage Turbine Air Sealing Ring Segment
input

4064232 4083239-01

Output 4083239-01 input 2840-01-318-4803 2840-01-450-9977

Output 2840-01-450-9977 2J-F100-53-9 Or

2J-F100229(III)-530

1.1 DATA

1.1.1 Reporting Requirements

1.1.1.1 Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

1.1.1.2 Product Quality Deficiency Report (PQDR – SF 368): The contractor shall prepare a PQDR on all design and quality control (material) deficiencies found IAW the procedures of TO 00-35D-54. Applicable portions of TO 00-35D-54 relative to quality defects will apply. The contractor shall hold exhibits of reported deficient items pending disposition from the ACO representative. Report preparation, distribution, holding and tagging of exhibits shall be IAW TO 00-35D-54. The contractor shall furnish an information copy of the SF 368 to USAF F100 Engineering Source Authority listed in TO 2J-F100-53-1, WP 600 00.

1.1.1.3 TO System Publication Improvement Report (AFTO Form 22): The contractor shall prepare a PIR when an error or improvement changes the meaning of the instructions or information contained in technical directives and will prevent the adequate performance intended. The contractor shall accomplish a PIR IAW TO 00-5-1 and submit one copy to AFSC/ENR. Minor discrepancies of non-technical nature such as improper sequence of pages, typographical errors, transportation errors, misspelled words, etc, shall not be reported. The contractor shall report omissions of pertinent technical data, correction of overhaul procedures in TOs, or desired changes to TO data shall likewise use the AFTO Form 22.

1.1.1.4 Teardown Deficiency Report (TDR): A TDR shall be accomplished on any PQDR exhibit received for investigation. The report shall be completed IAW the procedures established on DD Form 1423 as set forth in the contract.

1.1.2 Other Records, Forms and Reports

1.1.2.1 The contractor shall make available to the appropriate ACO representative the required information to enable him to review and/or verify monthly production status reports on end items and to enable him to complete his records or to complete such other reports as may be required.

1.1.2.2 CAV AF End Item Production Report (End Item Activity Report): The report shall be completed IAW the procedures established on DD Form 1423, as set forth in the contract and the CAV AF Statement of Work.

1.1.2.3 CEMS Reporting: The status of all serialized life limited parts must be known at all times. This status is to be reported to CEMS IAW T.O. 00-25-254-1 as required by DD Form 1423. Any questions regarding the reporting requirements are to be directed through the ACO. N/A - Note: The F100-PW-229 3rd Stage Turbine Air Sealing Ring Segment is not serialized tracked part, and therefore, CEMS reporting is not required in this contract.

1.1.2.4 Completed DD Form 1574 Serviceable Tags are required IAW MIL-STD-129P, paragraph 5.2.21.a.

1.1.2.5 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

1.1.2.5.1 Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar. Contractors may direct questions to the CMRA help desk.

1.1.3 Technical Data

1.1.3.1 TOs listed in this specification are the basic directives to be used in accomplishing the overhaul requirements of the contract.

1.1.3.2 TO illustrated parts breakdowns (IPBs) listed in this PWS shall be used in the part replacement requirements of the contract. Replacement parts shall conform to the configurations stipulated in the applicable TO IPB as supplemented by other applicable directives and instructions in this PWS. Part replacement shall be confined to those parts determined to be required to produce a serviceable end item.

1.1.3.3 Directives listed in paragraphs 1.11, 1.12, 1.13 and 1.14 and instructions provided throughout this PWS shall be adhered to. Thus obtaining the highest possible quality of workmanship and to maintain acceptable quality standards.

1.1.3.4 Instructions listed in this PWS as “Changes” or “Revisions” to a TO represent publication changes to the Technical Order System and shall be complied with. The sub-paragraphs contain the location of changes as designated and the deletion, change or addition of technical information to be accomplished.

1.1.3.5 In the event of a conflict between the instructions in this PWS and the applicable technical directive, the following order of override precedence applies (descending order): 1) this PWS, 2) the end item TO, 3) other technical directives.

1.2 SECURITY

1.2.1 Contractor’s Security Controls: Equipment and materials covered by this PWS are not classified.

1.3 QUALITY

1.3.1 The contractor shall provide and utilize an inspection/quality system IAW ISO - 9001.

1.3.2 The contractor shall investigate, take corrective action if necessary, and reply to user initiated PQDR forwarded to them by the ACO. This applies to all PQDRs submitted against products repaired or overhauled by the contractor and/or their subcontractor or vendors. Sufficient priority shall be given to PQDR investigation to allow timely corrective action and to meet requirements of TO 00-35D-54.

1.3.3 The Contractor’s accepted Quality Management System (QMS) plan effectively controls quality, meets the PWS quality requirements, and does not deviate from the Contractor’s accepted QMS. To receive a satisfactory rating, the Defect Correction Rate, which identifies if COR/contractor identified non-conformities should be corrected within the contractor’s self-imposed “get-well” dates.

1.3.4 The Contractor shall support a quality acceptance review by the DCMA representative at the site of work as specified in this PWS for each end item worked under the terms of this contract.

1.3.5 Quality acceptance of each end item shall be performed prior to packaging and transportation. Quality acceptance shall be performed by DCMA at the overhaul site. Quality acceptance documentation for each end item shall be maintained by the Contractor as part of the item document package.

1.3.6 Each end item identified as serviceable shall be delivered to the Government defect free.

1.3.7 Following quality acceptance by DCMA, the Contractor shall notify the Production Management Specialist (PMS) in writing of the completion of overhaul process. The PMS will provide shipping instructions to the Contractor in writing for each end item produced. Within one (1) business day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report to the PMS. The Receiving Report shall include the carrier and tracking number.

1.4 DELIVERY SCHEDULES

1.4.1 The delivery schedules shall be IAW the contract delivery schedules.

1.4.2 DoD FEDMall is prohibited for use by non DoD entities. The contractor will need to ensure they have viable sources of supply to enable them to meet the government’s delivery schedules.

1.5 CONDEMNATION, REPAIR, OR OVERHAUL

1.5.1 Contractor’s Scrap Procedures: The contractor shall prepare and submit to the Government Property Administrator (GPA) for approval, a written plan that sets forth procedures for handling scrap materials. These procedures shall include the requirements stipulated in the Federal Acquisition Regulation (FAR) 45.1, titled “General”. Disposition of condemned parts containing critical alloys and/or precious metals shall be IAW TO 00-25-113, 00-25-153-F100-ENG and FAR 45.6 titled “Reporting, Reutilization, and Disposal”.

1.5.2 Condemnation: The contractor shall not condemn End Items without written approval of the ACO or his/her representative.

1.5.2.1 End Items determined by the contractor and verified by the ACO to be beyond economical overhaul shall be disposed of as directed by the ACO in writing.

1.5.2.2 Parts, which have been condemned as a result of NDI methods, other inspection methods, or for other reasons, shall be mutilated to the extent necessary to ensure that purchasers of scrap are unable to repair or overhaul the item for possible resale or reuse. All documents and tags pertinent to such condemned parts authorized for transfer to disposal shall bear a certificate to the effect that all required mutilation has been accomplished.

1.5.2.3 The serial number and part number of any life-limited item, which is condemned, must be transmitted to F100 Engineering Source Authority listed in TO 2J-F100-53-1, WP 600 00.

1.5.3 Overhaul: End Items determined to be beyond economical repair shall not be repaired or overhauled by the contractor unless authorized in writing by the ACO.

1.6 HANDLING

1.6.1 The contractor shall have physical custody of end items and parts received at their facility and shall be responsible for their constant care during such custody.

1.6.1.1 The receipt and status of all serialized components or accessories, which are tracked in CEMS, must be reported IAW Para 1.1.2 of the PWS. N/A - Note: The F100-PW-229 3rd Stage Turbine Air Sealing Ring Segment is not serialized tracked part, and therefore, CEMS reporting is not required in this contract.

1.7 INVENTORY

1.7.1 Each end item shall be inspected by the contractor upon receipt to determine its condition and to ensure that its item identification corresponds to that shown on the contract schedule. Non-conforming end items shall be reported to the appropriate ACO representative.

1.8 PRESERVATION

1.8.1 Preservation inspection of end items is not required upon receipt. Adequacy of preservation will be determined when the item is placed in work and if found deficient shall be reported to the appropriate ACO representative.

1.8.2 All Government assets shall be stored in an enclosed and covered area and shall be adequately protected against loss by fire, theft, and physical damage by the elements. Government-owned items and parts shall not be co-mingled with non-Government owned property.

1.9 RECEIPT/HANDLING OF PQDR EXHIBITS

1.9.1 Any exhibit received for the purpose of an investigation into the cause of a material or a quality deficiency shall be kept separated from normal overhaul assets until the investigation is completed. The contractor shall provide the exhibit receipt date through the ACO with the F100 Engineering Source Authority listed in TO 2J-F100-53-1, WP 600 00.

1.10 SAFETY AND HEALTH

1.10.1 While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Government Representative (GR), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.

1.10.1.1 Mishap notifications shall contain, as a minimum, the following information:

1.10.1.1.1 Contract, Contract Number, Name and Title of Person(s) Reporting

1.10.1.1.2 Date, Time and exact location of accident/incident

1.10.1.1.3 Brief Narrative of accident/incident (Events leading to accident/incident)

1.10.1.1.4 Cause of accident/incident, if known

1.10.1.1.5 Estimated cost of accident/incident (material and labor to repair/replace)

1.10.1.1.6 Nomenclature of equipment and personnel involved in accident/incident

1.10.1.1.7 Corrective actions (taken or proposed)

1.10.1.1.8 Other pertinent information

1.10.2 If requested by the designated GR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

1.11 GENERAL WORK REQUIREMENTS

1.11.1 The instructions for the overhaul of items stipulated in this PWS shall be performed IAW the applicable TOs and the below exceptions.

1.11.1.1 The contractor is authorized to inspect per part drawing and part QAD (Quality Assurance Document).

1.11.2 The contractor shall use protective equipment to protect items from damage as they are processed through the plant. Special protection shall be placed over the machined surfaces of end items.

1.11.3 The contractor shall inspect the various disassembled components or part of the end item to determine if further overhaul is needed. Subsequent overhaul shall be accomplished IAW the applicable portion of the applicable overhaul technical order and supplementary instructions specified herein.

1.11.4 The contractor shall rework all reparable parts so that they are capable of meeting the serviceable requirements of this PWS.

1.11.5 The contractor shall continue to use all parts and assemblies determined serviceable and appropriate as a result of inspections and checks, except as specified in this PWS.

1.11.6 The contractor shall replace condemned parts of the end item with like serviceable parts listed in the applicable technical order IPB unless otherwise specified in or within this PWS.

1.11.7 When overhaul kits are available for the overhaul of an end item, such kits shall be used IAW the applicable technical order and changes thereto or the specific instructions contained in this PWS.

1.11.8 Where the contractor is directed to hold an item for AFLCMC disposition by any cited publication herein or be any statement made within this PWS, such items shall be reported to the ACO through the GPA for disposition.

1.11.9 Overhaul, to the maximum extent, is desired when such overhaul is economically feasible. The contractor is encouraged to submit new or improved overhaul procedures to the Government whenever practical. Procedures may be submitted on an AFTO Form 22 as specified in this PWS or by any other means authorized under this contract. This does not preclude the contractor’s submission of overhaul procedures, which are not economically feasible, when such overhauls are advantageous to the Government.

1.11.10 All of the contractor’s operators of special processes, such as X-ray, radiography machines, Fluorescent Penetrate and Magnetic Particle Inspection Equipment, as well as welders and moralizers, shall be qualified and certified for operation IAW applicable military specifications when listed in the PWS.

1.11.11 Fit and tolerance limits shall be IAW applicable overhaul TO/contractor’s processes and procedures unless otherwise specified.

1.11.12 Fluids, oil, greases and compounds shall conform to and be used as directed in the overhaul TO and instructions contained in this PWS.

1.12 ITEM UNIQUE IDENTIFICATION (IUID)

1.12.1 Overhaul contracts that result in the delivery of tangible personal property to the Government shall follow the latest DoD instructions to install IUID compliant marks in accordance with policy as stated in DFARS 211.274. IUID requirements for the J85 MISTR components have not been identified at this time. When directed by the PCO, the contractor shall follow the latest DoD instructions to install IUID compliant marks. TOs and drawings will be complied with for any component where direction is currently called out in the TO or drawings

1.13 SPECIFIC WORK REQUIREMENTS

1.13.1 Removal

1.13.1.1 Not Applicable.

1.13.2 Disassembly

1.13.2.1 Not Applicable.

1.13.3 Cleaning

1.13.3.1 F100-PW-229 3rd Stage Turbine Air Sealing Ring Segment shall be cleaned IAW TO 2J-F100-53-9 WP 200.

1.13.3.2 The contractor shall ensure that cleaning and preserving materials meet the requirements specified in TO 2J-F100-53-1, TO 2J-F100-53-2 WP 005 00, or TO 2-1-111 and that such materials are properly used during application.

1.13.4 Inspection

1.13.4.1 Inspection of F100-PW-229 3rd Stage Turbine Air Sealing Ring Segment shall be accomplished IAW 2J-F100-53-9 WP 300.

1.13.5 Corrosion Control

1.13.5.1 The corrosion control of F100-PW-229 3rd Stage Turbine Air Sealing Ring Segment during overhaul and storage shall be accomplished IAW TO 2-1-111.

1.13.6 Overhaul

1.13.6.1 Overhaul of F100-PW-229 3rd Stage Turbine Air Sealing Ring Segment shall be accomplished IAW 2J-F100-53-9 WP 400.

1.13.6.2 The contractor shall identify all overhauled F100-PW-229 3rd Stage Turbine Air Sealing Ring Segment with the contractor’s CAGE IAW MIL-STD-130.

1.13.7 Installation

1.13.7.1 Not applicable.

1.13.8 Test And Government Acceptance

1.13.8.1 Inspect, test and check each overhauled item IAW TO 2-1-111.

1.13.8.2 The Government shall accomplish acceptance.

1.13.9 Product Verification Audit (PVA)

1.13.9.1 Overhauled items shall be subject to PVA if requested by the government.

1.13.9.2 To perform PVA, the government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials.

1.13.9.3 After notification by the ACO that a PVA is required, the contractor will follow the procedures of Appendix 3 - Product Verification Audit Procedures.

1.13.10 Technical Publication Compliance

1.13.10.1 Compliance with all TOs, Directives, Government Specifications, Drawings, etc., listed herein is mandatory, unless otherwise specified in this PWS, when:

1.13.10.1.1 They have not been previously accomplished.

1.13.10.1.2 They are pertinent to the end item.

1.13.10.1.3 They prescribe Air Force Policies, use of materials and procedures for overhaul.

1.13.10.2 For solicitation purposes, the contractor may contact USAF F100 Engineering Source Authority for instructions for viewing or purchasing technical data required for maintenance of this contract. Upon contract award, the contractor shall establish and maintain a TO distribution account IAW TO 00-5-1; and be placed on initial distribution for one copy each of the TOs and TCTOs listed in this SOW. The contractor shall contact the TOMA office at AFLCMC.LPSAA.TOMA@us.af.mil within five (5) working days after contract award for guidance in obtaining a TODO account. Once the contractor’s TODO account is in operation, the contractor shall maintain all TOs and TCTOs and other technical directives listed in the PWS in an updated and current status IAW TO 00-5-1. The contractor is required to comply with the latest dated TO; TCTO and other technical directives issued and will be contractually covered during the time the work is accomplished. For example, an item already in work will continue to be worked under the existing contractual scope of work until such time that the latest TO revisions can be negotiated as to price and scheduled incorporation. The contractor shall submit a monthly review of changes to TOs, TCTOs, and other applicable directives received during that period. However, if a change is received that has a cost impact greater than 10% and/or is critical to safety of flight, the contractor shall notify the ACO within ten (10) days of receipt of that change and also shall provide the cost impact with his backup data. The contractor shall not begin working with new publication until authorization has been granted by the ACO/PCO.

1.13.10.3 Copies of other Air Force publications required in the performance of work outlined in this PWS will be requisitioned through the ACO. Submit requests to appropriate ACO representative for review. TO 00-5-1 provides an explanation of the Technical Order System and for pertinent distribution, requisition and storage information.

1.13.10.4 In the event a follow-on to this contract is awarded, the “Package File” at the contract facility as of the end of the previous contract will be applicable to the follow-on contract and will be updated through amendments to the new PWS of the new contract. This procedure will ensure continuity of the publication data from one contract to another.

1.14 APPICABLE TECHNICAL ORDERS

This is a preliminary list of Technical Orders. The contractor is responsible for ensuring they are using the latest edition.

TECH ORDER
BASIC
CG
CHANGE
NUMBER
DATE
NO
DATE
SHORT TITLE
00-5-1
15 JAN 13
24

AF TECH ORDER SYSTEM

00-5-15
01 JAN 10
9

TIME COMPLIANCE TECH ORDER SYSTEM

00-20-1

5
15 JUN 13
PREV MAINT PROG

00-20-2

28
01 NOV 12
MAINT DATA COLLECTION SYS
00-20-3
01 JAN 09
11

MAINT PROC OF REPARABLE PROP

00-25-113-F100-ENG
01 AUG 88
49
01 DEC 13
CRITICAL ALLOY AND PRECIOUS METAL

00-25-254-1

14
15 FEB 14
SYS MANUAL COMPREHENSIVE ENGINE MGT. SYS. (CEMS)

00-35D-54

12
01 NOV 11
MATERIAL DEF REPORT & INVEST SYSTEM
2-1-111
15 FEB 90
60
15 FEB 14
STAND MAINT PROCEDURES

33B-1-1

10
15 FEB 14
NONDESTRUCTIVE INSP METHODS
2J-F100-9
01 NOV 95
54
15 FEB 14
NONDESTRUCTIVE INSPECTION
2J-F100-53-1
01 FEB 07
9
01 DEC 12
MAINT INSTR – DEPOT GENERAL INFO
2J-F100-53-2
15 FEB 07
9
01 DEC 12
ON CONDITION MAINT
2J-F100-53-2
15 FEB 07
0
01 APR 20
MAINTENANCE INSTRUCTIONS
2J-F100-94
01 MAY 92
55
15 FEB 14
SUPPORT EQUIP IPB

1.15 APPLICABLE DIRECTIVES

AIR FORCE INSTRUCTION
CHANGE DATE
TITLE
AFI21-101
26 JUL 10
MAINT MGMT OF AIRCRAFT
AFI21-118
2 OCT 03
IMP AERO EQUIP RELIABILITY & MAINTAINABILITY
MILITARY STANDARDS
CHANGE DATE
TITLE

MIL-STD-129P

19 SEP 07
U.S. MILITARY MARKING FOR SHIPMENT AND STORAGE
MIL-STD-130N
17 DEC 07
ID MARKING OF U.S. MILITARY PROP.

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ISO - 9001
15 NOV 08
QUALITY MANAGEMENT SYSTEMS – REQUIREMENTS – THIRD EDITION

1.16 APPLICABLE DOCUMENTS

1.16.1 Propulsion –QPR-1 Rev Basic

1.17 MISSION ESSENTIAL SERVICES N/A- Note: Not required in this contract.

1.17.1 The contractor shall prepare for the continuation of essential DoD services during crisis IAW Defense Federal Acquisition Regulation (DFAR) 252.237-7023. In a state of emergency, if the Government deems necessary, the contractor shall provide all services necessary to ensure mission accomplishment. On occasion, services may be required to support an activation, or exercise of contingency plans outside normal duty hours. IAW DFARS 252.237-7023, the contractor shall develop a contingency plan and furnish a copy to the PCO for those tasks identified as essential to provide reasonable assurance of continuation during crisis conditions.

SECTION II

SERVICE SUMMARY

The contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. The contractor shall be aware that the absence contract requirement from the service summary does not detract from its enforceability nor limit the rights or remedies of the government under any other provision of the contract. The government will use the surveillance methods contained in the Surveillance plan to evaluate the Contractor’s performance for the performance objectives listed below. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.

NOTE: For those requirements listed in Section II, Service Summary, the Surveillance plan will follow the methods of surveillance specified in the Surveillance plan. The Surveillance plan is authorization for the Government’s PCO to participate in the administration of this contract.

2.1 SERVICE SUMMARY REQUIREMENTS

2.1.1 The contractor shall ensure the performance objectives and performance thresholds identified in table 2-1 of this PWS are achieved as follows:

Table 2-1

Performance Objective
Reference Paragraph

Performance Threshold

SS-1
Quality:
PWS #s 1.3
No defective parts shall be delivered to the Government.
SS-2
Delivery Performance:
PWS # 1.4
The contractor shall meet the delivery schedule.

2.2 CONTRACTOR PERFORMANCE EVALUATION

2.2.1 The contractor shall be aware that the evaluation of performance will occur when the Program Manager evaluates the services of the contractor to determine whether or not it meets the performance measures of the contract.

2.2.1.1 SS-1: The contractor’s failure to meet the requirements for this item shall result in the possibility of a poor rating under the Contractor Performance Assessment Review (CPAR) and remedies as allowed under Federal Acquisition Regulation (FAR) 52.246-4 Inspection of Services-Fixed Price.

2.2.1.2 SS-2: The contractor’s failure to meet this requirement shall result in a negative CPAR rating and remedies as allowed under FAR 52.246-4 Inspection of Services-Fixed Price.

SECTION III

GOVERNMENT PROPERTY

3.1 GOVERNMENT PROPERTY

3.1.1 Contractor shall furnish all material, support equipment, tools, test equipment and services. Government Furnish Material shall not be provided.

APPENDIX 1

1.1 ACRONYMS

ACO
Administrative Contracting Officer
AFMC
Air Force Material Command
ALC
Air Logistics Center
CAGE
Contractor and Government Entity
CAO
Contract Administration Office
CEMS
Comprehensive Engine Management System
DOD
Department of Defense
EC
Engineering Change
ESA
Engineering Source Authority
FAR
Federal Acquisition Regulation
GFM
Government Furnished Material
GFP
Government Furnished Property
GPA
Government Property Administrator
IAW
In Accordance With
IPB
Illustrated Parts Breakdown
MRB
Material Review Board
NDI
Nondestructive Inspection
AFLCMC
Oklahoma City Air Logistics Center
OEM
Original Equipment Manufacturer
PCO
Procurement Contracting Officer
PIR
Publication Improvement Report
PQDR
Product Quality Deficiency Report
PVA
Product Verification Audit
QAD
Quality Assurance Document
QAR
Quality Assurance Representative
QCD
Quality Control Deficiency
SL:
Salvage Layout
SR
Service Remanufacture
TO
Technical Order
USAF
United States Air Force
WP
Work Package

FD2030-19-00621 Page 18 of 18

File details come from the government source that posted it. Updated .