PWS EDM FY26 20260126_(RFI DRAFT).pdf

PDF 233 KB Posted

Attached to
RFI: Executive Decision Model
Solicitation number
EDM-RFI-001
Issued by

About this file

This is a Performance Work Statement (PWS) for maintenance and sustainment of the Executive Decision Model (EDM), an existing analytical capability supporting the Air Education and Training Command (AETC). The contractor must provide a fully operational integrated system from contract day one, including EDM Online, Platform Utilization Logistics Status Enterprise (PULSE), and Lifecycle Enhanced Asset Decision Software (LEADS). The system provides high-fidelity representation of AETC's Undergraduate Pilot Training (UPT), Pilot Instructor Training (PIT), Euro-NATO Joint Jet Pilot Training (ENJJPT), Fighter Bomber Fundamentals (FBF), Combat Systems Operator (CSO), and Formal Training Unit (FTU) operations to forecast impacts of resourcing and requirement decisions across the flying training enterprise.

Key contractor responsibilities include modifying system architecture within ten business days of requests; conducting study scenario analyses within one business day; incorporating government-provided data within two business days; providing user training within one business day; delivering monthly analysis reports by the first working Monday of each month; sustaining the ENJJPT Management Database; and supporting annual Programmed Flying Training (PFT) and Program Objective Memorandum (POM) processes. The contractor must access the Department of the Air Force Data Fabric and Envision platform to automatically pull pilot training and maintenance data and push analytical results back into Envision. The period of performance is one twelve-month base period plus four twelve-month option periods. The primary place of performance is the contractor's facility in Addison, Texas, with estimated travel to multiple Air Force bases (JBSA Randolph, Laughlin AFB, Sheppard AFB, Vance AFB, Columbus AFB, and Kirtland AFB). The contractor must respond to customer support inquiries within four business hours during normal business hours (Monday–Friday, 8:00 AM–5:00 PM CST), with fixes to system outages implemented within three business days. The government will provide training syllabi, sortie attrition rates, current inventories, and workspace if onsite personnel are required. All work is unclassified; contractor personnel must comply with DFARS Clause 252.204-7012 regarding NIST SP 800-171 security controls for Covered Defense Information and must report direct labor hours and dollars to the System for Award Management (SAM) by October 31 of each fiscal year.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Executive Decision Model (EDM)

28 Jan 2026

1. DESCRIPTION OF SERVICES.

This Performance Work Statement (PWS) defines the requirement for the maintenance and sustainment of an existing, contractor-provided, fully operational analytical capability, known as the Executive Decision Model (EDM), to support the Air Education and Training Command (AETC). This is a non-developmental requirement; the Government is not seeking a contractor to build or create this capability, but to provide maintenance and sustainment of an existing capability as a ready service.

The Air Education and Training Command A9 Division (AETC/A9) is responsible for providing Headquarters (HQ) Air Education and Training Command (AETC) and 19th Air Force (19 AF) with aircrew training program analyses. 19 AF is responsible for executing operational-level command and control of all formal aircrew flying training missions within AETC and providing Airmen with a 5th generation, cross-domain, warrior mindset to sustain the United States Air Forces combat capability. HQ AETC and 19AF have a requirement to utilize the AETC Executive Decision Model (EDM) to forecast the impact of resourcing and requirement decisions across AETC’s Flying Training enterprise. EDM is a probabilistic model accounting for process variance within AETC’s Undergraduate Pilot Training (UPT), Pilot Instructor Training (PIT), Euro-NATO Joint Jet Pilot Training (ENJJPT), Fighter Bomber Fundamentals (FBF), Combat Systems Operator (CSO), and Formal Training Unit (FTU) operations. EDM is tailorable to both Undergraduate and Graduate user levels and requirements. EDM Online allows EDM to be accessed from a secure cloud via CAC authentication, providing users the capability to perform pilot training analyses from an internet browser. EDM Online also includes a dashboard that displays the results of EDM analyses in a variety of charts, providing the user with the ability to quickly visualize and understand the results. EDM uses common architecture and data, ensuring users across AETC can access and utilize planning and execution factors for all required analyses.

EDM will allow process owners the ability to integrate potential ranges of all factors that influence the Flying Training pipeline capacity. In addition to the AETC requirement, the Office of the Under Secretary of the Air Force for Installations, Environment, and Operational Energy (SAF- IE) has the need to continue evaluating flying training fuel consumption metrics and energy savings plans and programs. SAF-IE will use the EDM capability to determine and evaluate fuel consumption data for FTU missions under operational control by AETC and 19AF.

2. SCOPE.

The scope of this PWS is to maintain and sustain the existing EDM, to include EDM Online, and provide pilot training pipeline studies and analyses using these tools. The Contractor shall possess and provide this capability, including the integrated Platform Utilization Logistics Status Enterprise (PULSE) and the Lifecycle Enhanced Asset Decision Software (LEADS). The Contractor shall provide all maintenance, sustainment, configuration, user training, documentation, and helpdesk support for the EDM system. EDM must provide AETC with a high-fidelity representation of AETC’s UPT, PIT, ENJJPT, FBF, CSO, and government- selected FTU operations at each of their respective training locations, and each respective pilot training syllabi, operating current Mission Design Series (MDS) aircraft training systems. The EDM system shall be used to conduct “what-if” analyses across multiple dimensions (aircraft availability, instructor manning, simulator inventories, syllabus composition, etc.) and forecast the outcomes of specific study scenarios, such as the number of sorties and/or graduates realized, before resources are expended. Specific study scenarios can include, but are not limited to, the effects of grounding an aircraft fleet, a comparison of legacy and future UPT constructs, or an examination of strategic basing decisions plans. In addition to maintaining and performing analyses with the existing EDM, the contractor shall work with the 19AF and AETC staffs to support and sustain the generation of Programmed Flying Training (PFT) and the Command’s Program Objective Memorandum (POM) input to the USAF budget using the model's capabilities. The Contractor shall provide maintenance and sustainment for the integrated EDM, which includes PULSE and LEADS, to support analysis of T-6A, T-38C, and T-7A maintenance data.

3. REQUIRED SUPPORT CAPABILITIES.

The Contractor shall provide a fully operational and integrated EDM system from day one of the contract, which includes EDM Online, PULSE and LEADS.

The existing analytic capability must be sustained and provided as a ready service.

This integrated system provides a holistic view of aircraft maintenance data, availability, and its impact on training production forecasts. To ensure the system accurately represents real-world AETC flying training operations, the Contractor shall provide all necessary support to maintain, sustain, and configure the integrated EDM, LEADS, and PULSE system architecture as required by AETC and 19AF. This includes collecting data, modeling and analyzing study scenarios, reporting results, supporting the analysis of T-38C subcomponent availability, and tracking T-6A fleet health to provide accurate Aircraft Availability (AA) estimates.

The Contractor is required to be able to access the Department of the Air Force (DAF) Data Fabric, to include the Envision platform. At a minimum, the Contractor will be required to automatically pull pilot training and maintenance data from Envision for the creation of EDM baseline inputs, and be required to push EDM analytical results into Envision, including tables, charts, and dashboards. If the Government requests the capability, the Contractor will be required to port EDM into Envision.

3.1. The Contractor shall:

a. Modify the integrated system architecture as required by AETC. Make modifications within ten (10) business days after a request is made and deliver all related files and documentation to AETC/A9 and 19 AF via e-mail or compact disk (CD) within ten (10) business days after completion.

b. Conduct study scenario analysis using the integrated system within one (1) business day after AETC’s request. Provide all input and result files to AETC/A9 and 19 AF via e-mail within one (1) business day upon completion of a study.

c. Incorporate Government-provided data (sortie attrition rates, instructor/aircraft/simulator/student inventories) into the integrated system baseline scenarios and provide them to the Contracting Officer’s Representative (COR) within two (2) business days after receipt.

d. Provide training to Government personnel for the operation of the integrated system as required, responding to requests via telephone or e-mail within one (1) business day.

e. Provide the Government with updated Users’ Manuals for the operation of the integrated system within ten (10) business days after a model modification release.

f. Review the status of analyses and system modifications with AETC via telecom weekly or as pre-coordinated with AETC/A9 and 19 AF.

g. Maintain the ability of the system to provide full undergraduate flying training resourcing and programming capability. Begin modification of any related modules within one (1) business day after AETC’s request.

h. Provide a monthly report summarizing all analyses performed in the prior month to AETC/A9 on the first working Monday of every month.

i. Provide analyses of capacity factors affecting pilot training production by the ENJJPT program at Sheppard AFB, TX, beginning analysis within one (1) business day of a request.

j. Sustain the ENJJPT Management Database (EMD), providing support as needed within one

(1) business day.

k. Analyze capacity factors impacting Special Operations Forces (SOF)/Personal Recovery (PR) training production and other FTUs as required, beginning analysis within one (1) business day of a request.

l. Work with wing Operations Analysts at the FTUs to align aircrew instructor requirements and capabilities to support programmed student training flow and required training events.

m. Work with 19AF and AETC staffs to fully support AETC’s mission and annual PFT and POM processes, updating the integrated system accordingly.

n. Provide feedback to AETC/A9 and 19 AF on written reports and presentations to ensure a study’s assumptions were accurately represented within the integrated system, within one (1) business day after receipt.

o. Provide support to, or design and develop new analytical models for, SAF-IE to evaluate productivity related to fuel consumption.

p. Provide seats for EDM On-line access and software licenses required to operate the stand-alone systems, as directed.

q. Be available to answer Government inquiries during normal business hours (8:00 AM - 5:00 PM CST), responding via telephone or e-mail within four (4) business hours

3.2. General Requirements

3.2.1 Period of Performance. The period of performance shall be for one (1) base period of 12 months and four (4) 12-month option periods.

3.2.2 Kickoff Meeting. The Contractor shall schedule, coordinate, and host a program kickoff meeting NLT five (5) business days after contract award. The meeting shall provide an introduction between Contractor and Government stakeholders, and will allow for discussion of technical, management, security requirements, and reporting procedures. At a minimum, the attendees shall include the key contractor personnel, contracting officer (CO), contracting officer representative (COR), and AFAC Medical Office Clerk Services program manager (PM). The Contractor shall provide a meeting agenda for review and approval by the CO, COR, and PM NLT two (2) business days before scheduled meeting.

3.3.3 Transition/Phase-In and Phase-Out. The contractor shall provide a transition plan within the PMP that outlines the designated time period and strategy to transition into the duties as the contractor and to transition out of the contract at the end of the period of performance. The Phase In transition period shall not exceed fourteen (14) calendar days and the Phase Out transition period shall not exceed fourteen (14) calendar days. If there is a change in contractor, the incumbent contractor shall provide familiarization and allow the follow-on contractor and/or government personnel to observe operations, facilities, work, equipment locations, and reporting procedures on a non-interference basis. During the phase-out familiarization period, the incumbent

4. GOVERNMENT PROVIDED RESOURCES

4.1. The Government will provide the Contractor with data for the EDM baselines and specific “what-if” scenarios. This data includes, but is not limited to:

a. AETC training syllabi via e-mail as changes occur.

b. The previous month’s sortie attrition rates via e-mail by the 15th calendar day of the month.

c. Current instructor, aircraft, simulator, and student inventories (provided by various HQ

AETC organizations).

d. Current AETC processes and staff coordination procedures used to develop annual PFT and POM programs of record.

4.2. If onsite personnel are required, the government shall provide contractor personnel with workspace, office furniture and supplies, computer resources, and telephones necessary to perform the task, commensurate with those provided government employees. DoD Common Access Card (CAC), (AFI 36-3026), used for contracts for more than six months and requirement exists for access to the government computer systems and software. CAC applications are accomplished by Trusted Agents via the Contractor Verification System (CVS). CACs shall be returned within seven business days of the end of the contract or separation of a Contractor employee.

4.3. The contractor shall have access to government regulations, specifications, standards, technical manuals, design documentation, and task documentation.

5. CONTRACTUAL REQUIREMENTS

5.1. Customer Support.

The Contractor shall provide the technical support as listed below via telephone and/or e-mail:

If EDM Online is not accessible or not functioning properly, the Contractor shall respond within four (4) hours after notification during normal work hours, which for the purpose of this contract shall be Monday – Friday (M-F) 8:00 A.M. – 5:00 P.M. CST. AETC does not expect the vendor to respond after normal duty hours. A fix shall be implemented within 3 business days after notification.

5.2. Non-Personal Services.

The Government shall neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

5.3. Place of Performance.

The primary place of performance shall be at the Contractor’s facility (Addison TX). Should the contractor approve telework for its employees, the telework shall be consistent with meeting mission needs. There shall be no additional cost to the Government. The contractor shall determine if an employee is eligible to participate in telework on either a regular or a situational basis.

Contractor employees who are eligible to telework must be fully trained on telework procedures including information technology and data security, and safety requirements consistent with DoWI 8500.01.

If a contractor employee requires access to Government furnished equipment (GFE), the GFE shall be used for official use and authorized purposes only. Family members and friends of employees are not authorized to use GFE and materials. GFE must be returned to the Government at the conclusion of the employee’s need for the equipment to perform his or duties on the contract, or at the Government’s request.

For elevated privileges, each contractor employee must fill out a DD Form 2875.

5.4. Normal Hours of Operation.

Normal hours of operation are Monday through Friday between 8:00 AM and 5:00 PM CST with the exception of Federal Holidays.

5.5. Travel

Travel to government facilities may be required. All travel requirements (including plans, agenda, itinerary, or dates) shall be pre-approved by the government (subject to local policy procedures) and conducted IAW the JTR. Travel shall be cost- reimbursable to the contractor. No profit shall be paid on travel. The table below contains estimates for the travel required for each year of the contract:

Estimated Travel Destination No. of Trips No. of Travelers Days per Trip JBSA Randolph 5 2 3 Laughlin AFB 1 2 3 Sheppard AFB 1 2 3 Vance AFB 1 2 3 Columbus AFB 1 2 3 Kirtland AFB 2 2 3

5.6. Security

This effort shall be unclassified, and the Contractor personnel shall NOT have access to classified documents. No classified work shall be accomplished under this PWS and security clearances are not required. Performance under this PWS may generate USG proprietary data categorized as "Controlled Unclassified Information" (CUI) or protected under the Privacy Act of 1974.

Contractor personnel, although recognized as Contractor employees and under the complete control of the Contractor, shall be required to comply with the directives and requirements of the base commander or authorized representative as to security standards and regulations applicable to the work site. Contractor personnel involved in civil crimes and/or other incidents of misconduct may be barred from the site. The Contractor shall inform the CO of any information they have relating to crimes. The Contractor shall comply with DFARS Clause 252.204-7012, 'Safeguarding Covered Defense Information and Cyber Incident Reporting,' which requires the implementation of NIST SP 800-171 security controls for all Covered Defense Information (CDI) processed, stored, or transmitted in the performance of this contract.

5.7. Safety

Contractor Compliance: The Contractor and its subcontractors shall comply with Public Law 91- 596 (Occupational Safety and Health Act (OSHA)) and the Environmental, Safety, and Occupational Health (ESOH) (DODD 4715.1E). These requirements shall be incorporated into the Contractor's safety and health program. The Department of Defense (DoD) participates in the OSHA Voluntary Protection Program (VPP). Contractor personnel performing services on a DoD installation shall participate in the local VPP. Information on the VPP is available at http://www.osha.gov/dcsp/vpp/index.html.

5.8. Mishap Notification and Investigation. The Contractor shall notify (via telephone) the cognizant contracting officer, the COR, and/or other applicable members within four (4) hours after all mishaps or incidents. The Government person notified by the Contractor shall in-turn notify the Safety office. Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the cognizant contracting officer, the COR, and/or the cognizant program manager, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government investigates the mishap, the Contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.

5.9. Data and Intellectual Property Rights. The Government’s rights in all deliverables, including but not limited to, software applications, source code, databases, software documentation, training materials, forms, modules, user guides, reports, meeting minutes and other materials and technical data shall be IAW the rights described in DFARS 252.227-7015 and DFARS 252.227-7020 which shall be incorporated by reference to this contract. The contractor shall seek review and approval from the contracting officer prior to using any proprietary solutions in any of the deliverables delivered under this contract.

6. QUALITY

http://www.osha.gov/dcsp/vpp/index.html

This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort. Only the COR or the designated alternate COR has the authority to inspect, accept, or reject performance objectives.

6.1. The Contractor shall develop a Quality Control Plan (QCP) and maintain an effective quality control program to ensure services are performed in accordance with the contract and this PWS.

The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which to it ensures work complies with the requirement of the contract. Contractor's attention is directed to the contract’s clause entitled “Inspection of Services”. Contractor shall submit a Quality Control Plan (QCP) to the CO, for acceptance, prior to contract award. The QCP shall be submitted as part of the technical proposal for evaluation. Changes to the QCP during contract performance shall be submitted to the CO for acceptance no later than ten (10) calendar days prior to any changes being affected by the Contractor.

6.2. The Contractor's quality inspection documentation (i.e., metrics, reports, etc.) shall be made available to the COR monthly. The reports should provide information on the methods of inspection, what was inspected, discrepancies found, and actions taken to correct and preclude recurrence.

7. SERVICES SUMMARY.

Performance Objective PWS Paragraph Performance Threshold

1. Modify the integrated system architecture as required by

AETC

3.1.a The Contractor shall make modifications to the model’s architecture within ten (10) business days after request is made, with no more than two (2) discrepancies allowed per quarter.

2. Maintain full undergraduate flying training resourcing and programming capability, making any modifications as required, including support to the annual PFT and POM processes.

3.1.g The Contractor shall begin modifications within one (1) business day after AETC’s request and provide support within one (1) business day as needed, with no more than two (2) discrepancies allowed per quarter.

3. Model and analyze AETC study scenarios, including UPT, ENJJPT, SOF/PR, and other FTUs.

3,1,b The Contractor shall begin conducting the study scenario analysis within one (1) business day after AETC’s request. No more than two (2) discrepancies allowed per quarter..

4. Provide all model input and result files related to AETC study scenarios..

3 The Contractor shall provide all model input and result files to AETC/A9 and 19 AF via e-mail within one (1) business day after completing the study. No more than two (2) discrepancies allowed per quarter.

5. Sustain the ENJJPT Management Database

(EMD).

3.1.k The Contractor shall provide support within one (1) business day as needed. No more than two (2) discrepancies allowed per quarter.

6. Update integrated system baseline inputs

3.1.c The Contractor shall incorporate data and provide updated baselines to the COR within two (2) business days after receipt. No more than two (2) discrepancies allowed per quarter.

7. Provide training on the operation of the integrated system

3.1.d The Contractor shall respond to users' request for training via telephone or e-mail within one

(1) business day after receipt of inquiry. No more than two (2) discrepancies allowed per quarter.

8. Provide a monthly report on all analyses performed.

3.1.i The Contractor shall provide the report to AETC/A9 on the first working Monday of every month. No more than two (2) discrepancies allowed per quarter

9. Provide updates of User’s Manuals.

3.1.e. The Contractor shall provide the manuals to AETC/A9 and 19 AF within ten (10) business days after model modification release. No more than two (2) discrepancies allowed per quarter

10. Provide system status reviews.

3.1.f The Contractor shall review the status of analyses and modifications with AETC via telecom every Tuesday or as pre-coordinated

11. Advise on written reports

3.1.o The Contractor shall provide feedback on AETC's written reports within one (1) business day after receipt. No more than two (2) discrepancies allowed per quarter.

12. Provide customer support to users during normal business hours

3.1.r The Contractor shall respond to users via telephone or e-mail within four (4) business hours after receiving inquiries. No more than two (2) discrepancies allowed per quarter.

8. PERFORMANCE OF SERVICES DURING CRISIS

IAW DoDI 1100.22, Policy and Procedures for determining Workforce Mix and DFARS 237.76, Continuation of Essential Contractor Services, unless otherwise directed by an authorized government representative, it is determined that services as identified in this PWS are NOT essential for performance during a crisis. In the event of an unforeseen natural or military crisis, i.e., hurricane, insurrection, etc., the contractor’s primary responsibility is to safeguard it personnel and secure any equipment.

9. CONTRACTOR MANPOWER REPORTING

The Contractor shall report all un-loaded direct labor hours and unburdened direct labor dollars required for performance of services provided under this contract. After the prime contractor has reported its data, subcontractors are required to report their information. The prime contractor has overall responsibility for ensuring subcontractors enter their respective data. The Contractor must completely fill in all required data fields.

The System for Award Management (SAM) secure data website (https://www.sam.gov) is the collection point for this information. Data for Air Force service requirements must be input at the SAM link at https://www.sam.gov.

9.1. Reporting inputs shall be for the direct labor executed during each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data for the FY shall be reported no later than 31 October of each calendar year. Notify the contracting officer via e-mail when all prime contractor and subcontractor input is complete.

9.2. Information from the secure web site is proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time shall any data be released to the public with the contractor name and contract number associated with the data.

http://www.sam.gov/ http://www.sam.gov/

1. DESCRIPTION OF SERVICES.
2. SCOPE.
3. REQUIRED SUPPORT CAPABILITIES.
4. GOVERNMENT PROVIDED RESOURCES
5. CONTRACTUAL REQUIREMENTS
5.1. Customer Support.
5.2. Non-Personal Services.
5.3. Place of Performance.
5.4. Normal Hours of Operation.
5.5. Travel
5.6. Security
5.7. Safety
6. QUALITY
7. SERVICES SUMMARY.
9. CONTRACTOR MANPOWER REPORTING

File details come from the government source that posted it. Updated .