PWS Dust Collector Blast Booth Repair-Rebuild.docx

DOCX document 19 KB Posted

Attached to
Blast-it-all Dust Collector repair/rebuild/recondition
Solicitation number
W50S7H24RA003
Issued by

About this file

This document is a Performance Work Statement (PWS) for the rebuild/reconditioning of a dust collector in Building 235 for the 172d Maintenance Squadron (MXS) located in Jackson, MS. The contractor shall furnish all labor, materials, and equipment to rebuild/recondition the existing Blast-it-all dust collector, including work such as rebuilding the interior purge manifold, replacing the timer board, servicing the main motor, installing new filters, replacing slide gates, caulking/sealing the collector, and painting. The contractor must be authorized by Blast-it-all to perform this work.

This PWS is associated with a Request for Quote (RFQ) Solicitation Number W50S7H-24-R-A003, which is a set-aside for Small Businesses under NAICS code 811310. The period of performance is 30 days after award. Quotes are due by July 26, 2024, and will be evaluated based on best value to the government considering price, technical acceptability, and performance history. A site visit is scheduled for July 10, 2024, but attendance is not mandatory. The current applicable Wage Determination is Revision No. 24 dated 04/26/2024 for Rankin County, MS.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description of Requirements Buildings 235 Dust Collector

Dust Collector rebuild/reconditioning bldg. 235.

15 May 2024

1. Requirement Overview: The 172d Maintenance Squadron (MXS), Jackson MS, has a requirement to rebuild/recondition the current dust collector in bldg. 235.

2. Scope of Work: Contractor shall furnish all labor, materials, equipment, and supervision necessary to rebuild/recondition building 235 exterior dust collector.

2.1 Rebuild/Recondition Existing Blast-it-all dust collector: Work to be performed in building 235:

2.1.1 Rebuild Interior Purge manifold (Pulse valves from Customer inventory)

2.1.2 Replace Timer Board and repair pulse operation

2.1.3 Service Main Motor and replace all belts

2.1.4 Install new Filters (From Customer Inventory)

2.1.5 Replace All Slide gates

2.1.6 Caulk all seams and seal Dust Collector

2.1.7 Sand and Paint Collector with Blast-it-all Gray Paint

2.1.8 Inspect and Caulk/seal all Ductwork seams from building to Dust Collector

2.1.9 Clean up and properly dispose of old hardware and other trash created during the rebuild/reconditioning process

2.1.10 The contractor shall be authorized by Blast-It-All to replace equipment

2.1.11 The contractor shall provide adequate personnel to perform the repairs

3. Access and General Protection/Security Policy and Procedures: The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Site POC. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services, or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.