PWS Dumptruck Corrosion Control 9 Jul 2020.pdf

PDF 195 KB Posted

Attached to
Dump Truck Corrosion Control
Solicitation number
FA449720Q0033
Issued by

View the file

Other files

File Type Posted
RFQ Dump Truck Corrosion Control Amendment 2.pdf PDF
Dump Truck 2.jpg JPG image
RFQ Dump Truck Corrosion Control Amendment 1.pdf PDF
Dump Truck 4.jpg JPG image
Dump Truck 3.jpg JPG image
Dump Truck 5.jpg JPG image
Dump Truck 1.jpg JPG image
Dump truck.jpg JPG image
Clauses - FA449720Q0033.pdf PDF
RFQ Dump Truck Corrosion Control.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Sand Blast, Prime, and Paint wheels, dump bed exterior, vehicle cab, underneath body, and frame 08D00914/International Dump Truck

Dover AFB, Logistics Readiness Squadron

The Scope of work for this project is as follows

1. Vehicle is to be driven by the Government from Building 781 on Dover AFB, Dover, Delaware 19902 to an auto body and sandblasting location within two hours of Dover AFB.

2. Remove bed cover assembly for dump bed.

3. Remove Spare Tire located in between truck cab and dump bed

4. Remove Mud Flaps

5. Remove reflective tape, reflective markers and light assemblies from dump bed.

6. Remove all removable hardware from back of truck such as lights, glad hands, and electrical outlet, license plate. (Pintle hook may be left installed and sandblasted and painted with the rest of the truck

7. Cover up data plates so they are not damaged during sand blasting or painted.

8. Remove Stickers (Try to salvage so new ones can be ordered if possible.

Place salvaged stickers in plastic bag to be given back to DOVER AFB)

9. Cover up any exposed electrical connectors for lights that were removed so they won’t be damaged.

10. Cover all glass, mirrors, lights, and surfaces on cab not being painted to prevent damage during sandblasting process

11. Cover sight gauge for hydraulic tank.

12. Remove Exhaust stack on P/S of cab.

13. Remove all 6 tires on vehicle

14. Sand blast, Prime, and Paint Cab, frame, dump bed exterior and wheels as discussed. (If during sandblasting you discover any cracked welds or structural damage please document and send an e-mail to cory.grodi@us.af.mil to discuss what needs to be done to move forward.)

15. Install all 6 tires

16. Reinstall Exhaust stack on P/S of cab

17. Remove all coverings that were applied to prevent damage during sand blasting/painting process.

18. Reinstall removable hardware on back of the truck, Glad hands, electrical outlets, lights etc.

19. Reinstall the remaining lights onto the dump bed

20. If able install reflectors where they were previously mounted. If you are not able to remount plate them in a bag to be returned to customer when vehicle is picked up.

21. Reinstall Mud flaps

22. Remount spare tire

23. Install dump bed cover and wrap pull rope around hooks towards front of dump bed on drivers’ side.

24. Check lights and components that were removed and ensure proper operation mailto:cory.grodi@us.af.mil

25. Provide Dover AFB with any necessary information, paperwork, as well as any stickers that were salvaged during removal (excluding reflective tape.)

26. Inspection of vehicle will be completed on-site by the Government before pickup and payment.

NOTES:

Call SSgt Grodi if any mechanical malfunctions outside the scope of this contract occur during Sandblasting, Priming or Painting process. Call SSgt Grodi at 302 677 5218 or send an e-mail to cory.grodi@us.af.mil if, at any time, there will be a potential change in the quoted price due to unforeseen circumstances. Prior approval must be obtained to conduct any work outside the scope of this contract.

File details come from the government source that posted it. Updated .