This performance work statement outlines development support services required for the CalSim 3 hydrological model. The contractor shall perform tasks including model review and updates, improving input data processes, developing upper watershed modules, calculating San Joaquin River salinity, integrating the Tulare Basin, accommodating sustainable groundwater management requirements, and updating groundwater modeling. The contractor must provide documentation, code, training, and ensure all work products can be accessed indefinitely. The period of performance is the task order term. This document relates to the pre-solicitation notice for the CalSim 3 Development contract to be awarded by the Bureau of Reclamation to provide the services described in the performance work statement.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
CalSim 3 Development
1.0 SCOPE
CalSim3 is the platform upon which the Long-Term Operations consultation will depend for analysis of CVP/SWP operations. Other planning studies are expected to migrate from CalSim2 to CalSim3 as well. The larger footprint of this tool requires a team effort for support, maintenance, and development.
1.2 BACKGROUND
CalSim3 uses land-use-based demands and other hydrology elements defined by physical models, including ET, evaporation, deep percolation, local loss factors, and groundwater. The high resolution of CalSim3 enables more control over local operations representation, but simultaneously requires a significant effort to prepare input data and verify that its implementation in CalSim3 is functioning as intended. Upper watershed models have been developed for multiple sub-basins – ongoing work to full buildout of these invaluable tools is needed.
2.0 REFERENCES - The following list of documents are required in the performance of this contract:
Number
Title and Edition
Date
Source
01 Latest CalSim Model Most Recent 800 Division, Bay Delta Office, Bureau of Reclamation or Denver Technical Service Center, Bureau of Reclamation
02 Latest CalSim Hydro Most Recent 800 Division, Bay Delta Office, Bureau of Reclamation or Denver Technical Service Center, Bureau of Reclamation
3.0 TASKS - The contractor shall perform the following tasks:
1. Project Management, Meetings, and Coordination
2. CalSim 3 Development Support – Model Review
3. CalSim 3 Development Support – Model Inputs
4. CalSim 3 Development Support – Upper Watersheds
5. CalSim 3 Development Support – San Joaquin Salinity
6. CalSim 3 Development Support – Tulare Basin Integration
7. CalSim 3 Development Support – SGMA Approach
8. CalSim 3 Development Support – Groundwater Update
9. Data Management and Documentation
3.1 Project Management, Meetings, and Coordination
The Contractor shall liaise with Reclamation technical staff on an as needed basis, within a week of requested update during the course of the task order to coordinate tasks, resources and activities, and review progress and schedule. Additional communications shall be required to exchange information for billing and invoicing as needed.
3.1.1 Deliverables and Due Dates
• Deliverables: Summaries of requested progress meetings. Invoices and progress reports on an agreed upon schedule, no less than quarterly.
• Due Date: Performance period of the task order.
3.2 CalSim 3 Development Support – Model Review
The Contractor shall provide CalSim 3 Development Support as directed by Reclamation, which may include but are not limited to:
• QAQC of Operations and Hydrology-The Contractor shall provide a review of the CalSim 3 model to verify that demand unit deliveries, efficiencies, and returns are a reasonable depiction of current irrigation district and urban water management practices. Contractor to provide a technical memorandum of findings and recommended improvements.
• CalSim 3 Updates Based on the 2023 Benchmark Review-The 2023 Benchmark review identified multiple areas of CalSim 3 that need further attention. The Contractor shall review these issues, summarize them, provide suggested approaches, and implement them in coordination with Reclamation.
Tasks shall be prioritized and assigned at the discretion of Reclamation. Scope, and level of effort will be coordinated between Reclamation and the Contractor, but expected to include: WRESL code development, comments in the code to explain logic, quality assurance checks, groundwater review and recommendations, documentation of code developed, recommendations, and reviews, and Reclamation staff walk-through of work products.
3.2.1 Deliverables and Due Dates
• Deliverables: Contractor shall provide training to Reclamation on the processes developed under this contract. Contractor shall provide documentation on code, reviews, and recommendations done under this contract. Contractor shall provide all documentation, information, and tools needed for Reclamation staff to run the products developed under this contract. Interim code to be shared within 5 business days of Reclamation request for review.
Interim and final products shall be made available to Reclamation via secure online platform (like SharePoint).
• Due Date: Performance period of the task order.
3.3 CalSim 3 Development Support – Model Inputs
The Contractor shall provide CalSim 3 Development Support as directed by Reclamation, which may include but are not limited to:
• Improve processes for Updating CalSim 3 Input Data Set-The Contractor shall develop innovative approaches for facilitating the CalSim 3 input update process. Upon development of this process, the Contractor shall provide training and documentation to Reclamation such that Reclamation staff can update inputs without Contractor assistance. Documentation should also include validation of approach. As a part of the development and review of CalSim3 inputs, Contractor shall examine the role closure terms play in CalSim 3.
• CalSim Hydro Support-The Contractor shall provide assistance with assessing and incorporating land use, evapotranspiration, and hydrology in an innovative approach for facilitating the input update process to develop demands and local hydrology. The update should make demands consistent and leverage the capabilities of updated Integrated Water Flow Model (IWFM). Work to be done in coordination with Reclamation and Reclamation’s consultant DRI.
• Multiple Land-Use Projections-The Contractor shall develop the ability to run multiple land-use projections within a CalSim 3 study. This work to be coordinated with existing development being led by the California Department of Water Resources. WRESL code shall include comments. Contractor to provide code walk-through and answer Reclamation question upon Reclamation request.
Tasks shall be prioritized and assigned at the discretion of Reclamation. Scope, and level of effort will be coordinated between Reclamation and the Contractor, but expected to include: code development, comments in the code to explain logic, quality assurance checks, recommendations, documentation of code developed, recommendations, and reviews, and Reclamation staff walk-through of work products.
3.3.1 Deliverables and Due Dates
• Deliverables: Contractor shall provide training to Reclamation on the processes developed under this contract. Contractor shall provide documentation on code, reviews, and recommendations done under this contract. Contractor shall provide all documentation, information, and tools needed for Reclamation staff to run the products developed under this contract. Interim code to be shared within 5 business days of Reclamation request for review.
Interim and final products shall be made available to Reclamation via secure online platform (like SharePoint).
• Due Date: Performance period of the task order.
3.4 CalSim 3 Development Support – Upper Watersheds
The Contractor shall provide CalSim 3 Development Support as directed by Reclamation, which may include but are not limited to:
• Logic Development for San Joaquin River Upstream of Friant Dam-The Contractor shall implement development of logic for the San Joaquin River upstream of Friant Dam.
Implement, test, and validate the CalSim 3 WRESL code.
• Refine Upper Basin Watershed Modules-The Contractor shall improve robustness of the stand-alone and on/off capabilities of all upper basin watershed modules in CalSim3. Code shall include processes to turn the upper watershed modules on/off.
Tasks shall be prioritized and assigned at the discretion of Reclamation. Scope, and level of effort will development, comments in the code to explain logic, quality assurance checks, recommendations, documentation of code developed, recommendations, and reviews, and Reclamation staff walk-through of work products.
3.4.1 Deliverables and Due Dates
• Deliverables: Contractor shall provide training to Reclamation on the processes developed under this contract. Contractor shall provide documentation on code, reviews, and recommendations done under this contract. Contractor shall provide all documentation, information, and tools needed for Reclamation staff to run the products developed under this contract. Interim code to be shared within 5 business days of Reclamation request for review.
Interim and final products shall be made available to Reclamation via secure online platform (like SharePoint).
• Due Date: Performance period of the task order.
3.5 CalSim 3 Development Support – San Joaquin Salinity
The Contractor shall provide CalSim 3 Development Support as directed by Reclamation, which may include but are not limited to:
• Develop/Improve Calculation of San Joaquin Salinity-The Contractor shall investigate methods to develop/improve the calculation of San Joaquin salinity in CalSim 3. Contractor shall work with Reclamation to choose, develop, and implement a method. Contractor shall implement, test, and validate the chosen method.
Tasks shall be prioritized and assigned at the discretion of Reclamation. Scope, and level of effort will development, comments in the code to explain logic, quality assurance checks, recommendations, documentation of code developed, recommendations, and reviews, and Reclamation staff walk-through of work products.
3.5.1 Deliverables and Due Dates
• Deliverables: Contractor shall provide training to Reclamation on the processes developed under this contract. Contractor shall provide documentation on code, reviews, and recommendations done under this contract. Contractor shall provide all documentation, information, and tools needed for Reclamation staff to run the products developed under this contract. Interim code to be shared within 5 business days of Reclamation request for review.
Interim and final products shall be made available to Reclamation via secure online platform (like SharePoint).
• Due Date: Performance period of the task order.
3.6 CalSim 3 Development Support – Tulare Basin Integration
The Contractor shall provide CalSim 3 Development Support as directed by Reclamation, which may include but are not limited to:
• Tulare Basin Integration-The Contractor shall implement complex and dynamic decisions throughout the Friant Kern service area and in the Tulare lakebed in the Tulare Basin, leveraging development of CVSOM in coordination with Reclamation’s existing project work.
Implement, test, and validate the CalSim 3 WRESL code.
Tasks shall be prioritized and assigned at the discretion of Reclamation. Scope, and level of effort will development, comments in the code to explain logic, quality assurance checks, recommendations, documentation of code developed, recommendations, and reviews, and Reclamation staff walk-through of work products.
3.6.1 Deliverables and Due Dates
• Deliverables: Contractor shall provide training to Reclamation on the processes developed under this contract. Contractor shall provide documentation on code, reviews, and recommendations done under this contract. Contractor shall provide all documentation, information, and tools needed for Reclamation staff to run the products developed under this contract. Interim code to be shared within 5 business days of Reclamation request for review.
Interim and final products shall be made available to Reclamation via secure online platform (like SharePoint).
• Due Date: Performance period of the task order.
3.7 CalSim 3 Development Support – SGMA Approach
The Contractor shall provide CalSim 3 Development Support as directed by Reclamation, which may include but are not limited to:
• SGMA Approach-The Contractor shall initiate a template for CalSim3 logic to accommodate decisions and limits encountered by demand units as they adapt to program requirements.
Implement, test, and validate the CalSim 3 WRESL code.
Tasks shall be prioritized and assigned at the discretion of Reclamation. Scope, and level of effort will development, comments in the code to explain logic, quality assurance checks, recommendations, documentation of code developed, recommendations, and reviews, and Reclamation staff walk-through of work products.
3.7.1 Deliverables and Due Dates
• Deliverables: Contractor shall provide training to Reclamation on the processes developed under this contract. Contractor shall provide documentation on code, reviews, and recommendations done under this contract. Contractor shall provide all documentation, information, and tools needed for Reclamation staff to run the products developed under this contract. Interim code to be shared within 5 business days of Reclamation request for review.
Interim and final products shall be made available to Reclamation via secure online platform (like SharePoint).
• Due Date: Performance period of the task order.
3.8 CalSim 3 Development Support – Groundwater Update
The Contractor shall provide CalSim 3 Development Support as directed by Reclamation, which may include but are not limited to:
• Groundwater Update-The Contractor shall review initialization, pumping, groundwater levels, and accretions/depletions in the CalSim 3 model and provide insight and updates as needed.
This review shall include a review of land use and urban water demands and how they contribute to the groundwater model performance. Contribute to the California Department of Water Resources lead review of using the continuous C2VSim compared to CalSim’s fixed level. Recommend updates to the groundwater DLL and contribute to enhancements in coordination with DWR.
Tasks shall be prioritized and assigned at the discretion of Reclamation. Scope, and level of effort will development, comments in the code to explain logic, quality assurance checks, groundwater model review and recommendations, documentation of code developed, recommendations, and reviews, and Reclamation staff walk-through of work products.
3.8.1 Deliverables and Due Dates
• Deliverables: Contractor shall provide training to Reclamation on the processes developed under this contract. Contractor shall provide documentation on code, reviews, and recommendations done under this contract. Contractor shall provide all documentation, information, and tools needed for Reclamation staff to run the products developed under this contract. Interim code to be shared within 5 business days of Reclamation request for review.
Interim and final products shall be made available to Reclamation via secure online platform (like SharePoint).
• Due Date: Performance period of the task order.
3.9 Data Management and Documentation
The Contractor shall provide final models, tools, and documentation on all products developed under this contract. Documentation shall include comments within the developed code to explain the logic and requested memorandums. The Contractor agrees that any and all models, scripts, tools, and documentation developed under this contract shall remain the property of Reclamation.
The Contractor shall provide a secure online platform for Reclamation to access the final models. Final models shall be available on the shared drive through the end of the contract period.
3.9.1 Deliverables and Due Dates
• Deliverables: Contractor will provide final copies of the WRESL code developed for the requested refinements on or before the termination of this contract. Final WRESL code shall include comments and output DSS files. Requested memorandums to be made available to Reclamation via secure online platform (like SharePoint).
• Due Date: Performance period of the task order.
4.0 PERFORMANCE REQUIREMENTS SUMMARY
Task No.
Task Description
Performance
Indicator
Performance
Standard
Minimum Acceptable Quality
Level 01 Project
Management, Meetings, and Coordination
Coordination with Reclamation staff
Meetings within a week of request.
Regular (no less than quarterly) invoices and progress reports.
95% meeting requested meetings, invoices, and progress reports.
02-08 CalSim 3 Development Support -
CalSim 3 developments implemented and provided to Reclamation.
Additional development, Product should be free from technical errors and contain accurate data.
Logical interpretation of the data from the resulting product must be possible.
Training provided during contract period.
review, support, and documentation provided.
Training provided to Reclamation.
Data Management and Documentation
Models and documentation made available to Reclamation
Product should be free from technical errors and contain accurate data.
Models and documentation accessible to Reclamation.
Logical interpretation of the data from the resulting product must be possible.
Models and documentation accessible to Reclamation.
5.0 DATA AND REPORTS - The contractor shall provide the following data and reports as follows:
Item No.
Description
Content
Format
Medium
Delivery
01 Summaries of progress meetings
See Task 1 Digital Email, MS Word, or
Email or upload to secure online platform
02 Invoices and Progress Reports
See Task 1 Digital Email, MS Word, or
Email or upload to secure online platform
03 Model Updates, Code Developed, Updated Input/Output Files, Tools Developed under this Contract
See Task 2-8 Digital To be determined
(TBD)
Upload to secure online platform
04 Trainings See Tasks 2-8 Meeting TBD Virtual (Teams or Zoom) or in-person in Sacramento area
05 Meetings on implementation
See Tasks 2-8 Meeting TBD Virtual (Teams or Zoom) or in-person in
Sacramento area
06 Memorandums/ Documentation