PWS.pdf
PDF 146 KB Posted
- Attached to
- MLB-Forklift Maintenance and Repair Federal contract opportunity
- Solicitation number
- 52000QU260026407
About this file
This is a Performance Work Statement (PWS) for maintenance services on various material handling equipment operated by the United States Coast Guard (USCG) Surface Forces Logistics Center (SFLC) Inventory Control Point (ICP) in Baltimore, Maryland.
The contractor shall maintain operational capability for four forklifts of varying ages and models at the facility, which supports over $800 million in inventory for more than 2,000 USCG fleet assets. The primary objective is to ensure no more than one piece of equipment is down for maintenance at any given time, with a maximum downtime of one week. Key service requirements include: quarterly preventative maintenance (PM) services per manufacturer specifications, including oil changes, filter replacements, and brake/light/safety device inspections; annual PM services including hydraulic hose repairs, tire and bearing inspections, and major component replacements; performance of unscheduled minor repairs with COR approval; and submission of PM checklists with COR approval signature within two business days of inspection. The contractor must furnish all personnel, equipment, supplies, facilities, tools, and materials necessary to perform these services. The contract period runs for one year from September 30, 2026 through September 29, 2027, with work performed primarily at 2401 Hawkins Point Road, Baltimore, MD 21226 (Buildings 88A and 5A) during standard business hours of 0700-1600 EST, Monday-Friday, except federal holidays. Contractor employees must contact the Contracting Officer's Representative (COR) 24 hours prior to arrival, wear proper identification displaying contractor name and photo, comply with all government security and conduct regulations, and submit monthly progress reports by the last day of each month detailing all work performed, outstanding repairs, and recommendations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Equipment List.pdf | ||
| wage determination.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECUITY (DHS)
PERFORMANCE WORK STATEMENT
FOR
Various Material Handling Equipment
1.0 GENERAL
1.1 BACKGROUND
The United States Coast Guard (USCG) Surface Forces Logistics Center (SFLC) Inventory Control Point (ICP) warehouse located in Baltimore Maryland provides support for over $800M in inventory for the US Coast Guard fleet, servicing over 2000 assets. The material handling equipment referenced in the statement is an integral part of the warehouse’s ability to service the fleet. There are four (4) forklifts of varying ages, manufacture and model numbers that require consistent upkeep and maintenance (see equipment list for additional information).
1.2 SCOPE
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items for non-personal services necessary to perform maintenance services as defined in this Performance Work Statement.
1.3 OBJECTIVE
The Contractor shall be responsible for maintaining operational capability for all material handling equipment listed on the material handling equipment list at the USCG SFLC ICP in Baltimore Maryland. The objective of this responsibility is to ensure that no more than one (1) piece of equipment being down for no more than 1 (one) week at any given time. The objective is supported by the tasks listed in this PWS, which have been designed to achieve and sustain operational capability.
1.4 GENERAL INFORMATION
Quality control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is how they assure themselves that their work complies with the requirement of the contract.
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE: PREVENTATIVE MAINTENANCE (PM)
2.1.1. Perform quarterly PM services on all equipment listed on the material handling equipment list in accordance with the manufacturer’s specifications. This includes changing oil, filters, fluids, as well as adjusting and checking brakes, lights, and safety devices. Additionally, any other minor maintenance tasks specified by the manufacturer should be completed.
2.1.2. Perform annual PM services in accordance with manufacturer specifications. This includes but is not limited to repairing/replacing hydraulic hoses and leaks, inspecting, repairing/replacing tires, brakes, bearings, filters, hoses, fluids, safety lights and equipment. These tasks are considered major or mandatory maintenance replacements and should be conducted as required by the manufacturer.
2.2 TASK TWO: PM CHECKLISTS
2.2.1. Contractor shall document and record details of each preventative maintenance inspection.
2.2.2. COR approval signature is required at the time of inspection on all PM checklists.
2.3 TASK THREE: UNSCHEDULED REPAIRS
2.3.1. A quote must be submitted to the COR and approved by the Contracting Officer for any repairs or services not covered under preventative maintenance before proceeding.
2.3.2. Contractor shall perform minor repairs not previously identified during inspections in timely manner. They shall provide troubleshooting advice and, if necessary, schedule a visit to perform the required minor repairs. For the purpose of this contract, minor repairs are defined as any request for service that is not covered under normal preventative maintenance.
3.0 CONTRACTOR PERSONNEL
Contractor personnel assigned to the maintenance and repair tasks shall possess the necessary qualifications and expertise in accordance with the level of maintenance and repair required for the stated equipment.
3.1 Employee Access
Contractor employees shall contact COR via email or telephone 24 hours prior to arrival on base. If prior notice is not possible, contractor employees must coordinate same day arrivals with COR for escort on base. All contractor vehicles must have proof of state registration and current proof of insurance.
3.2 Employee Identification
Contractor employees visiting Government facilities shall wear clothing or other items (ex. badge) that, at minimum, displays the Contractor name and employee’s photo. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view, above the waist at all times.
3.3 Employee Conduct
Contractor employees shall comply with all applicable Government regulations, policies, and procedures (ex. fire, safety, sanitation, environmental protection, security, off limit areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the USCG or DHS. The COR shall ensure Contractor employees understand and abide by DHS Security established rules, regulations, and policies concerning safety and security.
3.4 Removing Employees for Misconduct or Security Reasons
The Government Facility Commander may remove any Contractor employee from USCG facilities and bar that employee’s re-entry for misconduct or security reasons. The Contracting Officer may recommend that the Contractor remove any Contractor Employee for performance reasons, when a Contractor Employee is not performing to the requirements of this contract. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee for performance reasons.
4.0 SECURITY
Contractor access to classified information is not required under this PWS.
4.1 PERIOD OF PERFORMANCE
The period of performance for this contract is a one-year base period from September 30, 2026 and will expire September 29, 2027.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be the SFLC ICP SFLC and MLB, located on the USCG Yard
Base at the following address: 2401 Hawkins Point Road, Baltimore, MD 21226; BLDG 88A (ICP) and BLDG 5A (MLB).
4.3 HOURS OF OPERATIONS
The Contractor Employees shall generally perform all work between the hours of 0700 and 1600
EST, Monday through Friday (except Federal Holidays). However, there may be occasions when contractor employees may need to work other than normal business hours to repair equipment in a timely manner. The COR shall approve any deviation from the hours listed in this PWS.
4.4 PROGRESS REPORTS
The contractor shall submit a monthly progress report to the COR via electronic mail. This report is due on the last day of each month and shall include a summary of all contractor work performed, any outstanding repairs, and contractor concerns or recommendations for the previous reporting period.
5.0 GOVERNMENT TERMS AND DEFINITIONS
COR: Contracting Officer’s Representative
DHS: Department of Homeland Security USCG: United States Coast Guard SFLC: Surface forces Logistics Center MLB: Mobile Logistics Branch
6.0 GOVERNMENT FURNISHED RESOURCES
The Government will not furnish any resources to the Contractor in support of this contract.
7.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.
8.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an email that includes documented reasons for non-acceptance, If acceptable. If the deliverable is deemed acceptable, the COR will send an email to the Contractor notifying that the deliverable has been accepted.
8.1. The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reason(s) for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
8.2. The COR will have two (2) business days to review deliverables and make comments. The
Contractor shall have two (2) business days to make corrections and redeliver.
8.3. All other review times and schedules for deliverables shall be agreed upon by the parties based on the final approved Project Plan. The Contractor shall be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor shall work with personnel reviewing the deliverables to assure that the established schedule is maintained.
9.0 DELIVERABLES
The Contractor shall consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to the next deliverable ort event in this PWS.
ITEM PWS
REFERENCE
DELIVERABLE/EVENT DUE BY DISTRIBUTION
1 2.2.2 COR Approved PM Checklist
2 business days after inspection
COR, Contracting Officer
2 4.5 Progress Report Last day of month
COR, Contracting Officer
File details come from the government source that posted it. Updated .