This Performance Work Statement (PWS) details chemical delivery requirements for the Marine Corps Air Station (MCAS) Cherry Point in North Carolina. The contract involves furnishing, delivering, monitoring, and maintaining chemical stock levels for two primary treatment facilities: a Water Treatment Plant (Building 4977) and an Industrial Wastewater Treatment Plant (Building 4380). Specific chemicals to be delivered include Sodium Hydroxide (50%), Sodium Hypochlorite (12.5-15%), Aluminum Sulfate Liquid, Sodium Bisulfite Liquid (38-40%), Sulfuric Acid (33-39% and 93%), and Unlime (20-35%). Delivery requirements specify quantities ranging from 1,166 to 4,166 gallons/month "as needed" to Building 4380 and Building 4977, with deliveries permitted between 7:00 AM and 4:00 PM, Monday through Friday. The contractor must also provide Safety Data Sheets (SDS) for each chemical delivered to the respective sites, with only Utility Department personnel authorized to receipt for deliveries.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCAS CHERRY POINT

1.0 SPECIFIC TASKS

1. DUTIES AND TASKS. The Contractor shall furnish all labor, transportation, materials, equipment and supervision necessary for the provision, delivery, monitoring and maintaining of stock levels of the specified chemicals at various locations al the Marine Corps Air Station (MCAS) Cherry Point, NC.

2. WATER TREATMENT, STEAM, AND WASTEWATER TREATMENT PLANTS.

2.1. Water Treatment Plant Locations. There is one (I) water treatment plant, at the following location: Bldg. 4977.

Chemicals to be delivered to the Water Treatment Plant: Sodium Hypochlorite, Calcium Hydroxide, and Sulfuric Acid, - bulk.

2.2. Industrial Wastewater Treatment Plant. There is one (I) Industrial Wastewater Plant: Bldg. 4380.

Chemicals to be delivered to this plant are Sodium Hypochlorite, Sodium Mela-Bisulfite, Sulfuric Acid, Sodium Hydroxide, Aluminum Sulfate (Alum).

2.3. Delivery Hours. Deliveries for the Water Treatment, Wastewater Treatment Plant, and Industrial Wastewater Plant, shall be made between 7:00 AM and 4:00 PM, Monday through Friday. Deliveries for Water Treatment and Wastewater Treatment Plants shall be coordinated with the Plant Supervisors. The contract specialist will provide the POC names and telephone numbers at contract award. Only Utility Department personnel are designated to receipt for deliveries.

3. MATERIAL SAFETY DATA SHEETS (SDS). Contractor shall provide Safety Data Sheets (SDS) for each chemical to each site delivered.

4. DELIVERY AND FREQUENCY

CLIN000l

SODIUM HYDROXIDE 50%

Deliver to: Estimated Frequency & Amount

4380 9.3 TONS/MONTH - DELIVERED AS

NEEDED

CLIN0002

SODIUM HYPROCHLORITE 12.5-15%

4380 1,333 GALLONS/MONTH – DELIVERED

AS NEEDED

CLIN0003

ALUMINUM SULFATE LIQUID

4380 4,166 GALLONS/MONTH – DELIVERED

CLIN0004

SODIUM BISULITE LIQUID 38-40%

4380 1,333 GALLONS/MONTH – DELIVERED

CLIN0005

SULFURIC ACID 33-39%

4380 4,166 GALLONS/MONTH – DELIVERED

CLIN0006

SULFURIC ACID 93%

4977 1,166 GALLONS/MONTH – DELIVERED

CLIN0007

UNLIME 20-35%

4977 2,500 GALLONS/MONTH – DELIVERED

CLIN0008

SODIUM HYPROCHLORITE 12.5-15%

4977 1,333 GALLONS/MONTH – DELIVERED

1.0 SPECIFIC TASKS
2. WATER TREATMENT, STEAM, AND WASTEWATER TREATMENT PLANTS.
4. DELIVERY AND FREQUENCY