This document is a Performance Work Statement (PWS) for the corrective maintenance and repair of a Reverse Osmosis (RO) Unit on the USNS CARL BRASHEAR (T-AKE 7) ship. The PWS outlines the requirements to provide an authorized Parker Sea Recovery technical representative to troubleshoot and repair the RO unit under Contract No. 24-005, Item No. 24-049. It provides details on the location and description of the RO unit, the required scope of work, including tagging out the unit, reviewing the casualty with the ship's force, troubleshooting and repairing the unit, and conducting an operational test upon completion. The PWS also specifies the need for the contractor to provide a condition report with recommended repairs and parts, and the possibility of obtaining updated software for the RO unit. The related federal contract opportunity is Solicitation No. N4044624Q0011, issued by the Department of the Navy Military Sealift Command, for the troubleshoot and repair of the USNS CARL BRASHEAR's RO unit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4044624Q0011 Amendment 1.pdf | ||
| N4044624Q0011.pdf | ||
| Use of Other than Full and Open for SAT_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS CARL BRASHEAR
(TAKE 7)
0500 CONTRACT NO. 24-005
ITEM NO. 24-049 CATEGORY "A" 09/16/2024
REVERSE OSMOSIS CORRECTIVE MAINT. CASREP 22059 WILLIAM GUNN
24-005 - 1
1.0 ABSTRACT:
1.1 This work item describes the requirements to provide
an Authorized Parker Sea Recovery technical representative to accomplish troubleshoot and repair the Reverse Osmosis Unit.
2.0 REFERENCES:
2.1 Tasman Sea T-2 Operator’s Manual B651730003 (Available
onboard)
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Location/Quantity:
3.1.1 Location: Prop Motor Room (4-76-1)
3.1.2 Quantity: One (1) Each
3.2 Item Description/Manufacturer’s Data:
3.2.1 SRC TASMAN SEA T-2
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless of
tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item.
In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.
5.2 The contractor and all subcontractors regardless of
tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.
5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL
SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS
REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE
AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH
VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.
5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT
FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO
HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE,
BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE
ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL
ELECTICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR
TO WORKING ON THE ITEM.
24-005 - 2
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Tag out and secure RO Unit with the assistance of SF.
7.2 Review casualty with Ship’s Force and troubleshoot RO
unit. Crew reports that unit is inoperative, alarms cannot be cleared, it blows a fuse and has multiple error messages on the PID. Unit has not operated properly since significant downtime during a recent ROH. If available, provide 5 spare fuses for the Diversion valve (FB18) as contractor furnished material.
7.2.1 Additional details: After replacing some
fuses and sensors, the RO started in Auto. It shut itself down due to the Diversion Valve (MV- 1010) not closing. The fuse for the Diversion valve (FB18) blows immediately so there is probably a short in the operator or likely in the connector. We only had one and it blew immediately when it was installed. We have another operator, but we'll need a couple 4A fuses after we sort that out.
7.2.2 We also tried doing an automatic back flush
and the other automatic valves did not shift.
This can be done manually, but we noticed that different operators were installed. We'll source some new fuses. Further, it actually looks operable after we get the Diversion Valve operator squared away. It appears to have some issues with back flushing. I'll also make sure we have spare membranes for it. The unit does not appear to have been placed in a lay-up with the Drew R/O chemical during the ROH. So I'll want new membranes prior to operating it.
7.2.3 If we get the OEM here, would recommend
operators for the various valves and some new fuses although, I'm sure I can dig up fuses here.
7.3 Provide a condition report with recommended repairs
and parts.
7.3.1 Any additional parts or repairs that are
required with be the subject of a CCO.
7.4 If new or updated software is available, technician
shall upload and operate with new software.
24-005 - 3
7.5 At the completion of repairs, perform an operational
test in the presence of Ship’s Force and the MSCREP.
7.6 Provide documentation certifying completion of work
performed as described above.
7.7 Manufacturer's Representative:
7.7.1 Provide an authorized/certified Sea Recovery
Technical Representative to perform all work stated in this work item. Technical Representative shall provide certification letter to the MSCREP prior to commencing work.
www.searecovery.com.
7.7.2 Parts Source/Service:
A. Steve Theus Parker Hannifin Corporation Technical Services Manager Filtration Group / Water Purification Division 2630 E. El Presidio Street Carson, CA 90810 Direct: 310 894.4161 Mobile: 619.888.6151 Fax: 310.608-5693 Email: steven.theus@parker.com www.parker.com
Parker Hannifin Robert A. Rangel robert.rangel@parker.com 619-204-9248
8.0 GENERAL REQUIREMENTS: None Additional.