View the file

Other files

File Type Posted
CDRLs.pdf PDF
Pack.pdf PDF
TRNS.pdf PDF
FA8517-20-Q-0014.pdf PDF
WAGEDET.pdf PDF
QASP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-20-00601 PWS 1

Distribution Statement: D

Performance Work Statement (PWS) for

LANTRIN Signal Generator

NSN 6625-01-585-4346KV

Purchase Request: FD2060-20-00601

23 April 2020

Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only: Administrative or Operational Use, 09 January 2020. Other requests for this document shall be referred to 410 SCMS/GULA, 235 Byron Street, Suite 19A, Robins Air force Base, GA 31098-1813.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751 et seq.) or the Export Administration Act 1979, as amended (Title 50, U.S.C., App. 2401 et seq.). Violators of these export laws are subject to severe criminal penalties.

PR: FD2060-20-00601 PWS 2

1.0 Description of Services

1.1 Objective(s): This Performance Work Statement (PWS) describes the services required to repair National Stock Number (NSN) 6625-01-585-4346KV, P/N 2572-OPT2M-S-RACK.

NSN 6625-01-585-4346KV is the Dual-Channel Arbitrary Waveform Generator Assembly which can be used as an arbitrary waveform generator, as well as function and pulse generator.

This item is used in Electronic Electrical System Test Set AN/AAM-104, which is part of the Low Altitude Navigation and Targeting Infrared for Night (LANTIRN) Automatic Test Equipment (ATE) components. The Contactor shall provide quality repair to ensure a serviceable “A” condition item that efficiently serves its intended purpose, by the required disassembly, test, bench check, inspection and repair. The Contractor shall provide timely and accurate reporting in Commercial Asset Visibility AF (CAVAF), meet Turnaround Time (TAT) for delivery of requirement per PWS instructions, and reduce frequency of Product Quality deficiency Reports (PQDRs). The Contractor is responsible for ensuring that all Line Replaceable Units (LRUs) and Test Replaceable Units (TRUs) are returned to service or delivered in compliance with Original Equipment Manufacturer (OEM) performance standards/specifications. The Contractor shall repair submitted hardware, utilizing repair components that are equal to, or superior to, OEM components, which meet applicable drawings, handbooks, manuals, and/or specification established by OEM and which will perform in next higher assemblies.

1.2 Benefit to United States Air Force (USAF): This repair will benefit the United States Air Force (USAF) by reducing Mission Capability (MICAP), surge Requisitions and backorders, ensuring proper operation of ATE components.

1.3 Background: The LANTIRN and Depot ATE test stations are designed to check/test, diagnose, and repair LANTIRN and Depot ATE LRUs and Shop Replaceable Units (SRUs).

They operate under computer control to provide power, generate stimuli, monitor/switch/process, and measure test signals. These check and test capabilities are essential for sustaining the LANTIRN and Depot ATE LRUs & SRUs. The LANTRIN Test Equipment was originally designed/developed and integrated by Lockheed Martin. Initially the Source of Supply was Tabor Electronics LTD (CAGE code SU309), P/N 2572-OPT2M-S- RACK. CAGE SU309 is obsolete and replaced by 9WD0A. However, the item is no longer available from Tabor Electronics. Based on Market Research, this component can be repaired from Artisan Scientific Corporation (CAGE 33QA2) and P.S.I. Repair Services, Inc. (CAGE 5N884). This effort is a repair requirement for the LANTIRN Automated Test Equipment

(ATE).

2.0 Services Summary

Performance Objective PWS

Reference Performance Threshold

Quality system shall be established and maintained for repair

4.4.2 Assets shall be repaired in accordance with T.O.

00-25-234.

PR: FD2060-20-00601 PWS 3

Repaired assets shall pass inspection with no failures per repair.

100% of repaired assets shall pass initial test.

There shall be no more than one PQDRs QDRs per contract.

Delivery of repair

4.4.5 Repaired assets shall be delivered in accordance with

the schedule defined by the contract/order.

There shall be no more than 1 late delivery (ies) per contract year.

The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date.

The late asset shall be delivered by the revised delivery date acceptable to the Government.

3.0 Government Property and Services:

3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.

3.2 Government Property to be Provided: Government property will be provided. See Appendix B.

3.3 Reporting of Government Property: The Contractor shall create and maintain records of all Government property accountable to the contract/order. The Contractor shall record receipt and return of Government-Furnished Property (GFP) in the Item Unique Identification (IUID) Registry.

3.4 Loss of Government Property

3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property using Defense Contract Management Agency (DCMA) / Access To eTools.

PR: FD2060-20-00601 PWS 4

3.5 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.

4.0 Technical Requirements:

4.1 Period and Place of Performance:

4.1.1 Contract Period of Performance: The period of performance for the contract/order will extend 24 months (Basic Year: 12 months and Ordering Period Year: 12 months).

4.1.2 Place of Performance: These services will be performed at Contractor’s facility.

4.2 Contract Data Requirements List(s) (CDRL)

Document Identifier

DID Title PWS Reference(s)

A001 DI-MGMT-81803 Item Unique Identification (IUID) Marking Plan

4.3.1.1

A002 DI-MGMT-81804A Item Unique Identification (IUID) Marking Activity Validation and Verification Report

4.3.1.2

A003 DI-MISC-81832 Counterfeit Prevention Plan 4.3.4

A004 DI-MGMT 81838/ Commercial Asset Visibility Air Force (CAV) Reporting

4.3.3

A005 DI-PSSS-81995/ Contract Depot Maintenance (CDM) Production Report

A006 DI-MGMT 80441C/

Annual Government Property Physical Inventory Report

4.2.1 Quality of CDRL Deliverable: There shall be no more than one (1) rejection of any deliverable. There shall be no more than one (1) total rejection(s) of deliverables per Quarter.

The Government will reject a deliverable if two (2) or more technical errors or 10 or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with

PR: FD2060-20-00601 PWS 5

the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within 15 business days of notification of Government rejection.

4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Wide Area WorkFlow (WAWF) and submitted directly to the MFT member identified on the CDRL. There shall be no more than two (2) late submission(s) of deliverables per Quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.3 Repair

4.3.1 Item Unique Identification: Item Identification and Valuation, unique item identification is a method of marking items with unique item identifiers which have machine-readable data elements. Unique item identification is required for all items to be delivered to the DoD that meet the criteria established in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract.

4.3.1.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR.

The Contractor shall mark items in accordance with contract clauses, and Military Standard (MIL-STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S.

Military Property. [CDRL A001, DI-MGMT-81803, Item Unique Identification (IUID) Marking Plan]

4.3.1.2 Reporting in IUID Registry: In accordance with the Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, the Government agent or Contractor representative responsible for causing “life cycle events” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update applicable item record(s) in the IUID Registry. [CDRL A002, DI-MGMT- 81804A, Item Unique Identification (IUID) Marking Activity Validation and Verification Report]

4.3.2 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations. The Contractor shall ensure that classified material is packaged, marked and delivered in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM).

4.3.3 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor shall report production using CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report daily or as actions occur. The following metrics will be

PR: FD2060-20-00601 PWS 6

monitored: GFM In-Transit, Repairable GFM Accountability and Assets Not on Contract. If CAV-AF training is required, Contractor personnel may send an email to:

406scms.cav.af.ar@us.af.mil.

• A004, Commercial Asset Visibility Air Force (CAV) Reporting DI-MGMT 81838/T

• A005, Contract Depot Maintenance (CDM) Production Report DI-PSSS-81995/T

• A006, Annual Government Property Physical Inventory Report DI-MGMT

80441C/T

4.3.4 Counterfeit Prevention Plan: The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end items or otherwise entering the USAF/DoD inventory. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI- MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI- MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE AS 5553A, Fraudulent/Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. [CDRL A003, DI-MISC-81832, Counterfeit Prevention Plan]

4.4 Specific Technical Requirements

4.4.1 The information contained in this section is not intended to be all inclusive or to detract from procedures outlined in the specifications, technical orders, and other directives listed in this work statement, except where specifically noted herein.

4.4.2 Workmanship shall be in accordance with T.O. 00-25-234, General Shop Practice requirements for repair, MIL-PRF-23377J (2), Primer Coating Epoxy, High Solids and MIL-PRF-19500N, General Specification for Semi-Conductor Devices.

4.4.3 Contractor furnished material or parts used for replacement shall equal or exceed those specified by the Original Equipment Manufacturer (OEM). The material or parts shall be entirely suitable for restoration of the reparable item for its intended purposes, and shall be completely interchangeable without alteration of either the parts or the end item. If there is a need to use parts other than the OEM specified parts or the latest government furnished baseline, the standard parts approval procedures through the Defense Electronic Supply Center (DESC) or the Defense Industrial Supply Center (DISC) shall be followed. If a part is disapproved by DESC or DISC, the Procuring Contracting Officer (PCO) has approval authority with engineering concurrence.

4.4.4 Original design of the reparable item and parts thereof, or the design functional capabilities of the item, shall not be changed, modified or altered unless such changes are documented, reported and approved by the Government. The contractor will certify that these items are tested

PR: FD2060-20-00601 PWS 7

and inspected to the Original Equipment Manufacturer (OEM) or equivalent commercial standards.

4.4.5 The Contractor shall complete production and ship serviceable assets IAW the delivery turnaround time (TAT) established in the contract schedule, after receipt of asset, for routine, SURGE, and MICAP requirements. The desired TAT for SURGE requirements is 15 calendar days, and MICAP requirements 30 calendar days. Any order issued for SURGE or MICAPs requirements will specify the routine delivery TAT with the expectation that the Contractor will attempt to meet the accelerated delivery as specified above.

The contractor shall forward any production problems (including delays in delivery) to AFSC/PZAAC PCO and the 410th SCMS/GULA Production Management Specialist (PMS) and Logistics Manager (LM). Delivery Performance: There shall be no more than one late delivery per quarter. If the delivery date of any asset will not meet the required delivery date the contractor shall notify the Government of the cause and propose a delivery date. Any extension of the required date will be concurred on by the Program Office and negotiated with the PCO.

4.4.6 Contractor shall ensure early Contractor identification and reporting of Government repairable items which are misidentified, misdirected, or missing recoverable modules/subassemblies.

4.4.7 NFF (No Fault Found): Any item found to be serviceable on initial test and evaluation and deemed by the Contractor as a serviceable item shall be reported to the PCO immediately for disposition. Billing for assets determined as No Fault Found/RETOK will only incur fees for

TT&E."

4.4.8 Over and Above CLIN: Non-repair related discrepancies discovered that are not caused as a result of Contractor actions shall be reported to 410 SCMS/GULA immediately for disposition and/or engineering evaluation. Routine discrepancies shall be reported via email to the Program Manager, 410 SCMS/GULA, Robins AFB, GA 31098, commercial phone (478) 222-2267, with a detailed description of the issue, photos if necessary, recommended course of action or options, and estimated hours to complete repair. Repair of an item that is beyond normal repair issues and requires additional funding will be placed on an “Over & Above” contract line item

4.4.9 BER (Beyond Economical Repair): Requests for condemnations shall be submitted in writing to the Government PCO within five workdays of the intent to condemn. Condemnation authority shall be requested when the cost to Repair the asset exceeds 75 percent of the unit’s repair cost. The contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated BERs CLIN. The PCO retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number. The results of any electrical testing

PR: FD2060-20-00601 PWS 8

performed on the end item shall also be submitted for review. The contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions.

4.4.10 Beyond Physical Repair (BPR) and Condemnation: Upon receipt of an item for repair the contractor shall first determine if the item shall be inducted for repair. Request for condemnation shall be submitted to the PCO for approval/disapproval if the unit falls into one of the criteria specified below:

a. Physical damage destroys 75% of the physical and/or electrical integrity of the unit (i.e.

crushed).

b. Overheating and subsequent destructions of 80% of the internal electrical components and electrical connections.

If an item is initially determined to be Beyond Physical Repair (BPR), in accordance with A and/or B above, the contractor shall utilize the BPR form, attached hereto as Appendix B, for the purpose of requesting direction from the Government. The contractor’s determination of BPR shall be verified by the Government Multifunctional Team (MFT) and ACO. Once determination that the item(s) are BPR and to be destroyed (scrapped), the contractor shall demilitarize the item in accordance with (IAW) DoD 4160.21-M-1, Defense Demilitarization Manual, Appendix 3, DEMIL Code B, USML Item - mutilation to the point of scrap required worldwide. All items condemned that contain precious metals, silver, gold, platinum, rhodium, iridium, and ruthenium, scrap bearing such metals, and items containing recoverable quantities thereof shall be reported via Inventory Schedule to the DCMA Plant Clearance Office for disposition instructions.

4.4.11 When requested, the Contractor shall assist the Contract Administration Office in evaluating product quality deficiency reports and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies IAW T.O. 00-35D-54, USAF Material Deficiency Reporting and Investigation System. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies in workmanship shall be an integral part of the Contractor’s Quality Program at no additional cost to the government.

4.4.12 Cannibalization: Prior to the destruction of items determined BPR/BER, the contractor may retain any components that may be utilized for future repair efforts under this contract. The contractor may cannibalize from the LRU/SRU to accomplish timely repair of SURGE and MICAP requirements. All cannibalized components will be returned to pre-cannibalized condition. Parts removed for this reason shall not be cause for condemnation of assets.

5.0 General Information:

PR: FD2060-20-00601 PWS 9

5.1.1 Definition of Mission-Essential Services: In accordance with DFARS 252.237- 7023(a)(1), Continuation of Essential Contractor Services, “ ‘Essential contractor service’ means a service provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, … associated support activities, … and similar services provided to foreign military sales customers under the Security Assistance Program.

Services are essential if the effectiveness of defense systems or operations has the potential to be seriously impaired by the interruption of these services, as determined by the appropriate functional commander or civilian equivalent.”

5.1.2 Designation of Services as Mission-Essential: In accordance with DFARS 237.7602(a), The Continuation of Essential Contractor Services / Policy, DFARS 252.237-7023(a)(2), and Air Force Instruction (AFI) 10-403, Deployment Planning and Execution, paragraph 1.9.1.33.2, the Functional Commander (FC) or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.

5.2 Security Requirements: Actual knowledge and/or generation of classified information and/or Controlled Unclassified Information (CUI) are not expected to be necessary for performance of the contract/order. Contractor personnel are required to comply with security requirements to preclude potential security incidents or violations. If a change in the security classification of the contract/order becomes necessary after contract/order award, the Contractor shall make a reasonable effort to continue performance of tasks under the contract/order in compliance with the change in security classification in accordance with FAR 52.204-2, Security Requirements.

5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and security requirements are met. The Contractor shall comply with Government security regulations including, but not limited to, Department of Defense (DoD) 5200.2-R, Personnel Security Program; DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM); DoD Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual; and Robins Air Force Base Integrated Defense Plan (RAFB IDP) 31-101.

5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E and DoD Manual 5205.02-M to protect United States (U.S.)

Government interests. The Contractor shall ensure Contractor personnel who perform work on a Government facility comply with the OPSEC procedures of the facility.

5.2.3 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or Controlled Unclassified Information (CUI) in accordance with DoD 5220.22- M. Applicable equipment shall be safeguarded, maintained and operated in accordance with DoD 5220.22-M.

PR: FD2060-20-00601 PWS 10

5.2.4 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements.

Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.

5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified information and/or CUI.

5.2.6 Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.

5.2.7 Access to Government Facility or Military Installation: The Contractor shall ensure contractor/subcontractor personnel who require access to a Government facility or military installation comply with the security requirements of the facility or installation.

5.3 Environmental Management System (EMS): These services shall not be performed at a Government facility; therefore, the EMS requirement does not apply.

5.4 Agency Affirmative Procurement Programs: In accordance with FAR 23.404, Agency Affirmative Procurement Programs, 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [http://www.epa.gov/cpg/products.htm] and/or United States Department of Agriculture (USDA)-designated products included in the bio-based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio-based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

5.5 Safety Requirements

5.5.1 Contractor Compliance: The Contractor shall comply with Government Safety and Health regulations including, Public Law 91-596 as amended by Public Law 101-552 [Occupational Safety and Health Act of 1970 (OSHA)] and DoDD 4715.1E, Environment, Safety, and Occupational Health (ESOH).

PR: FD2060-20-00601 PWS 11

5.5.2 Mishap Notification/Investigation: The Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations. The Contractor shall ensure the Safety Office and the PCO are notified of mishaps.

The Contractor shall contact the MFT (COR, if available, or another MFT member) by telephone within four business hours. The Contractor shall cooperate with Government safety investigations.

5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

5.7 Contractor Manpower Reporting: In accordance with 10 United States Code 2330a, the Contractor shall provide an annual count of contractor/subcontractor personnel performing work for each fiscal year if the DoD is the requiring activity and if the acquisition is in excess of $3,000,000.00. The Contractor shall report all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract in the Enterprise-wide Contractor Manpower Reporting Application (eCMRA). Reporting shall be conducted for each fiscal year, which extends October 1 through September 30. While inputs may be made any time during the fiscal year, all data shall be reported no later than October 31 of the following fiscal year. The Contractor shall establish a record for the contract/order in eCMRA no later than 30 calendar days after contract/order award. The Contractor shall enter Order Data, Contact Data and Location Data. Data for Air Force service requirements must be input at the Air Force CMRA link. Additional information and user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

5.8 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.

5.9 Quality Control Plan/Quality Management System (QMS): The Contractor shall ensure the quality of services through a quality and/or inspection system. The Contractor’s quality program shall meet the requirements of ISO 9001:2015 or equivalent addressing detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur. 100% compliance with the QMS is required.

5.10 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

6.0 Plan for Corrective Action

PR: FD2060-20-00601 PWS 12

6.1 Unsatisfactory Contractor performance will result in the issuance of a negative PAR. The program office will set a suspense date and forward the PAR to the Procuring Contracting Officer (PCO) for submission to the Contractor. The PCO will submit the PAR to the Contractor for corrective action. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence. The Contractor shall sign and return a negative PAR to the PCO by the suspense date.

6.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the program office will initiate the corrective action report (CAR) process. However, the Multi-Functional Team (MFT) reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance.

The PCO will set a suspense date and submit the CAR to the Contractor for corrective action.

The Contractor shall sign and return the CAR, with a corrective action plan, to the PCO for acceptance by the Multi-functional team (MFT) by the suspense date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT.

The CAR will become part of the PCO contract file. If the CAR process fails to resolve the deficiency, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

7.0 Contractor Responsibilities

7.1 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on DCMA’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.

7.2 Maintains an inspection process acceptable to the Government and records of inspections, which shall be made available to the Government as long as the contract requires in accordance with the Inspection of Supply/Services clause(s) identified in the contract/order.

7.3 Responsible for ensuring personnel, information, system, property, facility and, if applicable, international security requirements are met in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification, and applicable Government regulations.

7.4 Signs and returns a positive PAR within five business days. Signs and returns a negative PAR with corrective action identified by the suspense date. Signs and returns a CAR with a

PR: FD2060-20-00601 PWS 13

corrective action plan by the suspense date.

8.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract does not exceeds $1,000,000.00; therefore, CPARS reporting is not required.

8.1 The MFT will evaluate Contractor performance. The program office will, at a minimum, review the PARs and other relevant information to prepare and substantiate the CPAR.

CPARS will be updated, at a minimum annually, documenting Contractor performance for the contract/order. More frequent updates may be made, as required, to document a significant improvement or decline in the level of Contractor performance.

8.2 The Contractor shall have input into the CPAR prior to it being finalized. For each reporting period, the Program Manager will provide the Contractor a draft CPAR with no ratings, only justifications, to examine for seven calendar days. After MFT review of the Contractor’s response, the CPAR will be coordinated through management up to the Division level. Once approved, the CPAR will be sent to the Contractor via CPARS for the official 60 calendar day review. The Contractor shall have the option to concur or non-concur, with comments, via CPARS.

8.3 In evaluating the quality of contractor’s performance, the following performance ratings are used in documenting past performance. The areas rated may include: Quality of Service, Business Relations, Management, Cost Control (if applicable), and Schedule.

PR: FD2060-20-00601 PWS 14

Performance Rating

Criteria

Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

PR: FD2060-20-00601 PWS 15

9.0 Appendices

9.1 Appendix A: Reference(s)

Publication Number Publication Title Publication Date Specific Paragraph Reference

AFI 10-403 Deployment Planning and Execution 20 Sep 12 1.9.1.33

DFARS 252.237-

Continuation of Essential Contractor Services Oct 2010 Entire

SAF/AQ Memo 11 Jun 13 and SAF/AQ Memo, 13 Nov 12

Implementation of FY11 NDAA 8108, Contractor Inventory

11 Jun 13 and 13 Nov 12 Entire

MIL-STD-130N(1),

With Change 1

DoD Standard Practice Identification Marking of US Military Property

16 Nov 12 Entire

DFARS 252.211–7003 Item Identification and Valuation Jun 2013 Entire

MIL-STD-2073-1d Standard Practice for Military Packaging 10 May 02 Entire

MIL-STD-129P With Change 4

Military Marking for Shipment and Storage Sep 2007 Entire

FAR 52.246-4 Inspection of Services- Fixed Price August 1996 Entire

DoD 4100.39-M Federal Logistics Information System

May 2010 and Change Letter Oct

Entire

SAF/AQ Memo Contractor Inventory Requirements 13 Nov 12 Entire

DoD 5220.22-M National Industrial Security Program Operating Manual

(NISPOM)

28 Mar 13 Entire

AFI 31-101 Integrated Defense 2 Aug 04 Entire

RAFBI 31-101 Robins Integrated Defense Plan 31-101 Jan 2012 Para

8.8.2.1

IAW AFI 91-204 Safety Investigations and Reports

9 Aug 12 http://www.e-publishing.af.mil

Paragraph 2.12

Public Law 91-596 Occupational Safety and Health Act (OSHA) 1 Jan 04 Sec 5-6

DODD 4715.1E Environmental, Safety, and Occupational Health (ESOH)

19 Mar 05 http://www.dtic.mil/ whs/directives/corres/ pub1.html

Entire

PR: FD2060-20-00601 PWS 16

Publication Number Publication Title Publication Date Specific Paragraph Reference

DoDD 5205.02E DoD Operations Security 20 Jun 12 Entire

DoD Manual 5205.02-M

DoD Operations Security (OPSEC) Program Manual 3 Nov 08 Entire

DoD 5200.2-R Personnel Security Program 23 Feb 96 Entire RAFB 01560 Environmental Requirements Feb 2013 See Part 1 T.O. 00-35D-54 Product Quality Deficiency Report (PQDRs)

USAF Deficiency Reporting, Investigation, and Resolution 1 Nov 11 Entire

T.O. 00-25-234

General Shop Practice Requirement for the Repair Maintenance and Test of Electrical Equipment

Aug 1998; Chg 39, 21 Jul 11 Entire

ISO 9001:2015 Quality Management Systems

– Requirements 23 Sep 2015 Entire

FAR 23.404 Agency Affirmative Procurement Program

Oct-10 Entire

9.2 Appendix B:

NSN P/N Description

6625-01-585-4346KV

2572-OPT2M-S-RACK Signal Generator

File details come from the government source that posted it. Updated .