PWS.pdf
PDF 319 KB Posted
- Attached to
- Repair of the F-15 Tactical Electronic Warfare System Intermediate Support System Components
- Solicitation number
- FA851723Q0018
About this file
This performance work statement outlines requirements for the repair of F-15 Tactical Electronic Warfare System Intermediate Support System components. The Air Force Materiel Command Air Force Sustainment Center seeks these repair services through solicitation FA851723Q0018. The work statement establishes quality standards for repairs, turnaround times for routine and expedited repairs, item tracking and reporting requirements. Repairs must be completed at the contractor's facility in accordance with original equipment manufacturer specifications. The contractor will also manage government property involved, implement item unique identification, and report asset status and inventory through various data deliverables and Air Force systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA851723Q0018.pdf | ||
| Wage Determination.pdf | ||
| Transportation Data.pdf | ||
| Packaging Data.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR: FD2060-24-00008
Performance Work Statement
For
F-15 Tactical Electronic Warfare System (TEWS) Intermediate Support System (TISS) Repair/Sustainment
Purchase Request: FD2060-24-00008
15 June 2023
1.0 Description of Services
1.1 Objective(s): This PWS establishes the minimum depot level repair requirements of F-15 Tactical Electronic Warfare System (TEWS) Intermediate Support System (TISS) Components.
The contractor shall provide quality repair to ensure a serviceable “A” condition item that efficiently serves its intended purpose, by the required disassembly, test, bench check, inspection, and repair. The contractor shall provide timely and accurate reporting in Commercial Asset Visibility AF (CAVAF), meet Turnaround Time for delivery of MICAPs requisitions per PWS instructions, and reduce frequency of Product Quality deficiency Reports (PQDRs). The contractor is responsible for ensuring that all Line Replaceable Units (LRUs) and Test Replaceable Units (TRUs) are returned to service or delivered in compliance with OEM performance standards/specifications. The Contractor shall repair submitted hardware, utilizing repair components that are equal to, or superior to, Original Equipment Manufacturer (OEM) components, which meet applicable drawings, handbooks, manuals, and/or specification established by OEM and which will perform in next higher assemblies.
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by sustaining the F-15 TISS which will enable the warfighter to continue to test and fault isolate deficiencies in F-15 TEWS Line Replaceable Units (LRUs). These actions shall ensure proper operation of TISS components, resulting in less MICAP requisitions.
1.3 Background: TISS is the standard intermediate level tester for the F-15 Electronic Warfare Suite TEWS. TEWS suite uses its Built-In-Test (BIT) capability to detect malfunctions and isolate failures to Line Replaceable Units (LRUs). Failed LRUs are removed from the aircraft and sent to the intermediate level of maintenance for test, repair, and re-test. Test and repair of a LRU is accomplished by fault isolation to a Shop Replaceable Unit (SRU). At the intermediate level of maintenance, extensive use will be made of the F-15 TEWS Intermediate Support System (TISS). TISS consists of Automatic Test Equipment (ATE), a Test Program Set (TPS) for each unit under test (UUT) and a Storage Equipment Set (SES).
2.0 Services Summary:
Performance Objective PWS Reference
Performance Threshold
Quality system shall be established and maintained for repair
4.4.2 Repaired assets shall pass DCMA inspection
with no more than one failure per contract year.
At a minimum, 95% of repaired assets shall pass initial inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt.
This metric will be calculated per contract year.
There shall be no more than one PQDRs and/or QDRs per contract year.
3.0 Government Property:
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.
3.2 Government Property to be provided: Government property to be provided includes the NSN listed in Appendix B. The contractor shall furnish all material and parts necessary for repair of these items.
3.3 Reporting of Government Property: The Contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) Government property in its possession in accordance with FAR 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil, as stipulated by DFARS 252.245-7002. This reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract. GFP training and guidance is located at the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/.
3.4 Loss of Government Property
3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.
3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.
3.5 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.
4.0 Technical Requirements:
https://piee.eb.mil/ https://dodprocurementtoolbox.com/ https://piee.eb.mil/piee-landing/
4.1 Period and Place of Performance:
4.1.1 Contract Period of Performance: The period of performance for this contract will be from May 2024 to May 2025 with the option of a 6-month extension.
4.1.2 Place of Performance: These services will be performed at the Contractor’s facility.
4.2 Contract Data Requirements List(s) (CDRL):
Document Identifier
DID Title PWS Reference(s)
A001 DI-MGMT-81803 Item Unique Identification (IUID) Marking Plan
4.3.1.1
A002 DI-MGMT-81804A
NOT 1
Item Unique Identification (IUID) Marking Activity Validation and Verification Report
4.3.1.2.1
A003 DI-MISC-81832 Counterfeit Prevention Plan 4.3.4
A004 DI-MGMT-81838
NOT 1
Commercial Asset Visibility Air Force (CAV) Reporting
4.3.3
A005 DI-PSSS-81995A Contract Depot Maintenance (CDM) Monthly Production Report
4.3.3
A006 DI-MGMT-80441D
Government Property Annual Inventory Report 4.3.3.1
4.2.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any deliverable. There shall be no more than 1 total rejection(s) of deliverables per contract year.
The Government will reject a deliverable if 2 or more technical errors or 10 or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within 10 business days of notification of Government rejection.
4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Wide Area Workflow (WAWF) and submitted directly to the MFT member identified on the CDRL. There shall be no more than 2 late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
4.3 Repair
4.3.1 Item Unique Identification (IUID): Item Identification and Valuation, unique item identification is a method of marking items with unique item identifiers which have machine-readable data elements.
4.3.1.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR. The contractor can submit a copy of the government approved IUID Marking Plan from previous contract as it is sufficient for this requirement. [CDRL A001, DI-MGMT-81803, Item Unique Identification (IUID) Marking Plan]
4.3.1.2 Reporting in IUID Registry
4.3.1.2.1 Transmission of Government property must be recorded in the IUID Registry. The Government is required to record the transfer of GFP to the Contractor. The Contractor is required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government. [CDRL A002, DI-MGMT-81804A NOT 1, Item Unique Identification (IUID) Marking Activity Validation and Verification Report]
4.3.1.2.2 The Government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.
4.3.2 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations. The Contractor shall ensure that classified material is packaged, marked and delivered in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM).
4.3.3 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract and shall report production in CAV-AF. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250). The Contractor shall provide data on the actions conducted for each unit and report as actions occur.
[CDRL A004, DI-MGMT-81838 NOT 1, Commercial Asset Visibility Air Force (CAVAF) Reporting] [CDRL A005, DI-PSSS-81995A, Contract Depot Maintenance (CDM) Monthly Production Report]
4.3.3.1 Government Property Annual Inventory Report: The contractor shall perform an annual 100% physical inventory. The annual period of performance for the contractor to accomplish the required action shall be one year starting from the date of award. All results, findings and corrective actions of any annual physical inventories shall be provided to the Government 21 working days after the one year mark.
[CDRL A006, DI-MGMT-80441D, Government Property Annual Inventory Report]
4.3.4 Counterfeit Prevention Plan (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the United States Air Force (USAF)/Department of Defense (DoD) supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. The contractor can submit a copy of the government approved CPP from previous contract as it is sufficient for this requirement. [CDRL A003, DI-MISC-81832, Counterfeit Prevention Plan]
4.4.4 Counterfeit Electronic Parts: The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end items or otherwise entering the USAF/DoD inventory.
4.4 Specific Technical Requirements
4.4.1 The information contained in this section is not intended to be all inclusive or to detract from procedures outlined in the specifications, technical orders, and other directives listed in this work statement, except where specifically noted herein.
4.4.2 Quality system shall be established and maintained for repair: Workmanship shall be in accordance with T.O. 00-25-234, General Shop Practice requirements for repair, MIL-PRF- 23377J(2), Primer Coating Epoxy, High Solids and MIL-PRF-19500N, General Specification for Semi-Conductor Devices. Repaired assets shall pass inspection with no more than one failure per Contract year. At a minimum, 95% of repaired assets shall pass initial screening/test/inspection.
Remaining 5% (or less) of failed assets shall pass on the second attempt. This metric will be calculated per contract year. There shall be no more than one PQDRs and/or QDRs per contract year.
4.4.3 Contractor furnished material or parts used for replacement shall equal or exceed those specified by the Original Equipment Manufacturer (OEM). The material or parts shall be entirely suitable for restoration of the reparable item for its intended purposes, and shall be completely interchangeable without alteration of either the parts or the end item. If there is a need to use parts other than the OEM specified parts or the latest government furnished baseline, the standard parts approval procedures through the Defense Electronic Supply Center (DESC) or the
Defense Industrial Supply Center (DISC) shall be followed. If a part is disapproved by DESC or DISC, the Procuring Contracting Officer (PCO) has approval authority with engineering concurrence.
4.4.4 Original design of the reparable item and parts thereof, or the design functional capabilities of the item, shall not be changed, modified or altered unless such changes are documented, reported and approved by the Government. The contractor will certify that these items are tested and inspected to the Original Equipment Manufacturer (OEM) or equivalent commercial standards.
4.4.5 The Contractor shall complete production and ship serviceable assets IAW the delivery turnaround time (TAT) established in the contract schedule, after receipt of asset, for routine, SURGE, and MICAP requirements. The desired TAT for SURGE requirements is 15 calendar days, and MICAP requirements 30 calendar days. Any order issued for SURGE or MICAPs requirements will specify the routine delivery TAT with the expectation that the Contractor will attempt to meet the accelerated delivery as specified above.
The contractor shall forward any production problems (including delays in delivery) to AFSC/PZAAC PCO and the 410th SCMS/GULA Supply Planner (SP) and Logistics Manager (LM). Delivery Performance: There shall be no more than one late delivery per contract year.
The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date (TAT) and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government. Any extension of the required date will be concurred on by the Program Office and negotiated with the PCO.
4.4.6 Contractor shall ensure early Contractor identification and reporting of Government repairable items which are misidentified, misdirected, or missing recoverable modules/subassemblies.
4.4.7 NFF (No Fault Found): Any item found to be serviceable on initial test and evaluation and deemed by the Contractor as a serviceable item shall be reported to the PCO immediately for disposition. Billing for assets determined as No Fault Found/RETOK will only incur fees for
TT&E.
4.4.8 Over and Above CLIN: Non-repair related discrepancies discovered that are not caused as a result of Contractor actions shall be reported to 410 SCMS/GULA immediately for disposition and/or engineering evaluation. Routine discrepancies shall be reported via email to the Logistics Manager, 410 SCMS/GULA, Robins AFB, GA 31098, with a detailed description of the issue, photos if necessary, recommended course of action or options, and estimated hours to complete repair. Repair of an item that is beyond normal repair issues and requires additional funding will be placed on an “Over & Above” contract line item
4.4.9 BER (Beyond Economical Repair): Requests for condemnations shall be submitted in writing to the Government PCO within five workdays of the intent to condemn. Condemnation authority shall be requested when the cost to Repair the asset exceeds 75 percent of the unit’s repair cost. The contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated BERs CLIN. The PCO retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number. The results of any electrical testing performed on the end item shall also be submitted for review. The contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions.
4.4.10 Beyond Physical Repair (BPR) and Condemnation: Upon receipt of an item for repair the contractor shall first determine if the item shall be inducted for repair. Request for condemnation shall be submitted to the PCO for approval/disapproval if the unit falls into one of the criteria specified below:
a. Physical damage destroys 75% of the physical and/or electrical integrity of the unit (i.e.
crushed).
b. Overheating and subsequent destructions of 80% of the internal electrical components and electrical connections.
If an item is initially determined to be Beyond Physical Repair (BPR), in accordance with A and/or B above, the contractor shall utilize the BPR form, attached hereto as Appendix C, for the purpose of requesting direction from the Government. The contractor’s determination of BPR shall be verified by the Government Multifunctional Team (MFT) and ACO. Once determination that the item(s) are BPR and to be destroyed (scrapped), the contractor shall demilitarize the item in accordance with (IAW) DoD 4160.21-M-1, Defense Demilitarization Manual, Appendix 3, DEMIL Code B, USML Item - mutilation to the point of scrap required worldwide. All items condemned that contain precious metals, silver, gold, platinum, rhodium, iridium, and ruthenium, scrap bearing such metals, and items containing recoverable quantities thereof shall be reported via Inventory Schedule to the DCMA Plant Clearance Office for disposition instructions.
4.4.11 When requested, the Contractor shall assist the Contract Administration Office in evaluating product quality deficiency reports and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies IAW T.O. 00-35D-54, USAF Material Deficiency Reporting and Investigation System. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies in workmanship shall be an integral part of the Contractor’s Quality Program at no additional cost to the government.
4.4.12 Cannibalization: Prior to the destruction of items determined BPR/BER the contractor may retain any components that may be utilized for future repair efforts under this contract. The contractor may cannibalize from the LRU/SRU to accomplish timely repair of SURGE and MICAP requirements. All cannibalized components will be returned to pre-cannibalized condition. Parts removed for this reason shall not be cause for condemnation of assets.
5.0 General Information:
5.1 Continuation of Mission-Essential Services during a Crisis: The Functional Service Manager (FSM) has determined these services are not mission-essential and will not continue in the event of a crisis.
5.2 Security Requirements
5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility. The Contractor shall comply with the following security regulations: Government Security regulations including, DoD 5200.2-R, Personnel Security Program; DoDD 5205.02E, DoD Operations Security (OPSEC) Program;
DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual; and AFI 31-101, Integrated Defense.
5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and DoD Manual 5205.02-M require contractors supporting DoD activities use OPSEC to protect critical information for specified contracts, sub contracts, and information used in the performance of duties in support of Air Force requirements/missions. The Contractor shall ensure Contractor personnel who perform work on (or in) a Government facility comply with the OPSEC procedures and training requirements of the facility as specified in AFI 10-701.
5.2.3 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or Controlled Unclassified Information (CUI) in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), § 117.7(a).
Applicable equipment shall be safeguarded, maintained and operated in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), § 117.7(a).
5.2.4 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements.
Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.
5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation.
5.2.6 Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.
5.3 Environmental Management System (EMS): These services shall not be performed at a Government facility; therefore, the EMS requirement does not apply.
5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of Environmental Protection Agency (EPA)-designated products or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.
5.5 Safety Requirements
5.5.1 Contractor Environmental, Safety, and Occupational Health Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive 4715.01E, Environmental, Safety, and Occupational Health (ESOH). The Contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan (SHP). The Contractor shall require all subcontractors to comply with required safety, health and fire standards.
5.5.2 Mishap Notification/Investigation: In accordance with DAFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to USAF assets/interests. The Contractor shall ensure the USAF is notified of mishaps. The Contractor shall contact the Contracting Officer (CO) or the Contracting Officer’s Representative (COR), if available, or another MFT member by telephone within eight (8) hours of any damage to government property where the dollar value exceeds $600,000.00, and within two workdays for any damage to government property less than $600,000.00 during the execution of the contract.
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, contract number, name and title of person(s) reporting
b. Date, time and exact location of accident/incident
c. Brief narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
5.7 Service Contract Reporting (SCR): The contract does not meet the DoD Contract Reporting criteria or reporting dollar threshold; therefore, SCR does not apply.
5.8 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.
5.9 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip
6.0 Appendices
6.1 Appendix A: Reference(s)
Publication Number Publication Title Publication Date Specific Paragraph Reference
AFI 10-403
Deployment Planning and Execution 20 Sep 12 1.9.1.33
DFARS 252.237-
Continuation of Essential Contractor Services and Oct 2010 Entire
SAF/AQ Memo 11 Jun 13 and SAF/AQ Memo, 13 Nov 12
Implementation of FY11 NDAA 8108, Contractor Inventory
11 Jun 13 and 13 Nov 12 Entire
MIL-STD-130N(1),
With Change 1
DoD Standard Practice Identification Marking of US Military Property
16 Nov 12 Entire
DFARS 252.211–7003 Item Identification and Valuation
Jun 2013 Entire
MIL-STD-2073-1d Standard Practice for Military Packaging
10 May 02 Entire http://www.state.gov/j/tip https://www.my.af.mil/gcss-af/USAF/AFP40/d/sA4057E1F39D499180139F925AC8404A0/Files/editorial/Revised%20Implementation%20of%20FY11%20NDAA%20Section%208108%20-%20AQX.pdf?channelPageId=sA4057E1F39D499180139F925AC8404A0&programId=tA4057E1F3B4D0604013B51C0645700FA https://www.my.af.mil/gcss-af/USAF/AFP40/d/sA4057E1F39D499180139F925AC8404A0/Files/editorial/Revised%20Implementation%20of%20FY11%20NDAA%20Section%208108%20-%20AQX.pdf?channelPageId=sA4057E1F39D499180139F925AC8404A0&programId=tA4057E1F3B4D0604013B51C0645700FA https://cs.eis.af.mil/airforcecontracting/knowledge_center/Documents/AFFARS_Library/5337/2012-11-13_saf-aq-memo.pdf https://cs.eis.af.mil/airforcecontracting/knowledge_center/Documents/AFFARS_Library/5337/2012-11-13_saf-aq-memo.pdf
Paragraph Reference
MIL-STD-129P With Change 4
Military Marking for Shipment and Storage Sep 2007 Entire
FAR 52.246-4 Inspection of Services- Fixed Price August 1996 Entire
DoD 4100.39-M Federal Logistics Information System
May 2010 and Change Letter Oct
Entire
SAF/AQ Memo Contractor Inventory Requirements
13 Nov 12 Entire
DoD 5220.22-M National Industrial Security Program Operating Manual
(NISPOM)
28 Mar 13 Entire
AFI 31-101 Integrated Defense 2 Aug 04 Entire
RAFBI 31-101 Robins Integrated Defense Plan 31-101 Jan 2012 Para
8.8.2.1
IAW AFI 91-204 Safety Investigations and Reports
9 Aug 12 http://www.e-publishing.af.mil
Paragraph 2.12
Public Law 91-596 Occupational Safety and Health Act (OSHA) 1 Jan 04 Sec 5-6
(DODD 4715.1E) Environmental, Safety, and Occupational Health (ESOH)
19 Mar 05 http://www.dtic.mil/ whs/directives/corres/ pub1.html
Entire
DoDD 5205.02E
DoD Operations Security 20 Jun 12 Entire
DoD Manual 5205.02-M
DoD Operations Security (OPSEC) Program Manual 3 Nov 08 Entire http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/ http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/pub1.html
Paragraph Reference
DoD 5200.2-R Personnel Security Program 23 Feb 96 Entire
RAFB 01560 Environmental Requirements Feb 2013 See Part 1
T.O. 00-35D-54 (for Product Quality Deficiency Report (PQDRs)
USAF Deficiency Reporting, Investigation, and Resolution
1 Nov 11 Entire
T.O. 00-25-234
General Shop Practice Requirement for the Repair Maintenance and Test of Electrical Equipment
Aug 1998; Chg 39, 21 Jul 11
Entire
6.2 Appendix B: NSN List
NSN Noun Part Number
6130-01-567-4294KV
Console Power Distribution Assembly MPD411198-001
6.3 Appendix C- Beyond Physical Repair (BPR)/Beyond Economical Repair (BER) Template
Appendix B
BER TEMPLATE
CONTRACT NUMBER:
CLIN:
TRACKING #: 0 0
NSN:
PART NUMBER:
SERIAL NUMBER:
CONTRACT REPAIR UNIT PRICE:
DESCRIPTION:
EST TO REPAIR:
ACTION REQUESTED:
SIGNATURES:
CUSTOMER RESPONSE (APPROVE/DISAPPROVE)
DISPOSITION INSTRUCTIONS: (SCRAP, RETURN ETC)
XXXXXX DATE:
CONTRACTS AUTHORIZATION DATE:
| 5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure contractor/subcontractor personnel who perform wo... |
| Appendix B |
| BER TEMPLATE |
File details come from the government source that posted it. Updated .