This document includes a Performance Work Statement (PWS) and notice of intent to sole source a federal contract opportunity. The PWS specifies requirements for a novel lightweight compact heavy-fuel rotary engine for future tactical unmanned aircraft to be developed by the DEVCOM Army Research Laboratory (ARL). Key requirements for the engine include an overall system weight under 150 pounds, capability to operate on JP-8 fuel, and a minimum continuous power output of 75 horsepower. The related sole source pre-solicitation notice provides additional context, indicating the Army Contracting Command Aberdeen Proving Ground intends to award a contract for the engine design and development work on a sole source basis using FAR 6.302-1. Interested parties can review further details in the attached synopsis and PWS documents.

View the file

Other files

File Type Posted
Synopsis-RFI (Sole Source using 6.302-1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Heavy Fuel Wankel Rotary Engine Design and Development

31 May 2022

C.1 Background

The DEVCOM Army Research Laboratory (ARL) requires a novel lightweight compact heavy-fuel rotary engine for future tactical unmanned aircraft (FTUAS). The engine must meet the following minimum requirements:

Overall system weight: <20 pounds (lbs) max engine mass Power: 25 horsepower (hp) up to 20,000 feet (ft) Overall efficiency: <0.4 pound per horsepower-hour (lb/hph) Fuel types: Heavy Fuel - Kerosene Spark Plug Lifetime: 100+ Hours if spark plug is used

ARL identified that the AIE’s patented Self-Pressurizing-Air Rotor Cooling System (SPARCS), their unique dual spring apex seal system, and their unique dual spark system solved the inherent Wankel engine problems, and AIE has the potential to advance this base engine to incorporate turbocharging, direct injection, combustion chamber optimization, weight reduction and engine optimization to meet the Government requirements.

C.2 Objective

The objective of this procurement is for the Contractor to design, develop and deliver a novel lightweight compact heavy-fuel rotary engine, and engine design and technical data to the Government.

C.3 Requirement

C.3.1 The Contractor shall develop a 225CS-026 baseline combustion model and perform the baseline engine performance analysis.

C.3.2 The Contractor shall develop a baseline computational fluid dynamics (CFD) fuel model and perform one (1) dimensional sensitivity analysis.

C.3.3 The Contractor shall perform turbocharger matching and performance analysis for the new engine design, and perform turbocharger thermal balance analysis.

C.3.4 The Contractor shall perform a direct fuel injection system market research for the engine new design.

C.3.5 The Contractor shall develop one (1) dimensional model for direct injection and timing and perform its analysis, and perform one (1) dimensional spark timing analysis.

C.3.6 The Contractor shall perform one (1) dimensional analysis for direct injection geometry and injection timing.

C.3.7 The Contractor shall perform sensitivity analysis of one (1) dimensional and computation fluid dynamics (CFD) model correlation.

C.3.8 The Contractor shall design, develop and analyze combustion chamber geometries, and down select one geometry for the new engine.

C.3.9 The Contractor shall investigate the weight reduction strategy for the 225CS liquid-cooled engine.

C.3.10 The Contractor shall investigate the packaging and the weight reduction strategy for the 225CS air-cooled engine, and measure its performance.

C.3.11 The Contractor shall develop a scorecard of liquid- versus air-cooled engine configurations.

C.3.12 The Contractor shall build new engines using optimized direct fuel injection system, optimized combustion chamber, and an optimized and balanced turbocharger, on a lighter weight core engine. After the final design, the Contractor shall build three

(3) engine systems.

C.3.13 The Contractor shall develop a design of experiment plan for the new engine validation testing, and measure its validation test results.

C.3.14 The Contractor shall perform Initial Design Review (IDR), Preliminary Design Review (PDR), Development Design Review (DDR), Test Readiness Review (TRR), and Critical Design Review (CDR) with the Government.

C.4. Deliverables

The period of performance of this contract is two (2) years or 24 months from the date of the contract award.

C.4.1 The Contractor shall deliver (DEVCOM Army Research Laboratory, 6375 Johnson Road (B321), Aberdeen Proving Ground, Maryland 21005) two (2) 225CS-026 heavy-fuel baseline engines for the Government to generate its own baseline technical data.

The engine, spare parts, and associated manuals shall be submitted to the Government no later than two (2) months after Contract Award.

C.4.2 The Contractor shall deliver the 225CS-026 baseline combustion model, its analysis results, and technical reports. The deliverable shall be submitted to the Government no later than three (3) months after Contract Award.

C.4.3 The Contractor shall deliver the baseline computational fluid dynamics (CFD) fuel model, one (1) dimensional sensitivity analysis results, and technical reports. The deliverable shall be submitted to the Government no later than six (6) months after Contract Award.

C.4.4 The Contractor shall deliver the turbocharger matching analysis and performance results and technical reports. The deliverable shall be submitted to the Government no later than one (1) month after Contract Award.

C.4.5 The Contractor shall deliver the turbocharger thermal balance analysis results and technical reports. The deliverable shall be submitted to the Government no later than four (4) months after Contract Award.

C.4.6 The Contractor shall deliver the direct injection system market research report.

The deliverable shall be submitted to the Government no later than two (2) months after Contract Award.

C.4.7 The Contractor shall deliver the one (1) dimensional model and analysis for direct injection and timing, and technical report. The deliverable shall be submitted to the Government no later than three (3) months after Contract Award.

C.4.8 The Contractor shall deliver the one (1) dimensional spark timing analysis results and technical report. The deliverable shall be submitted to the Government no later than three (3) months after Contract Award.

C.4.9 The Contractor shall deliver the one (1) dimensional analysis results for direct injection geometry and injection timing and technical report. The deliverable shall be submitted to the Government no later than three (3) months after Contract Award.

C.4.10 The Contractor shall deliver the sensitivity analysis results of one (1) dimensional and computation fluid dynamics (CFD) model correlation, and its technical report. The deliverable shall be submitted to the Government no later than six (6) months after Contract Award.

C.4.11 The Contractor shall deliver the design and analysis results of combustion chamber geometry development, and its technical report. The deliverable shall be submitted to the Government no later than 10 months after Contract Award.

C.4.12 The Contractor shall deliver the technical report on the combustion chamber geometry development, geometry down selection, and strategies. The deliverable shall be submitted to the Government no later than 12 months after Contract Award.

C.4.13 The Contractor shall deliver the technical report on the 225CS liquid-cooled engine weight reduction opportunities. The deliverable shall be submitted to the Government no later than three (3) months after Contract Award.

C.4.14 The Contractor shall deliver the technical report on the 225CS air-cooled packaging, weight reduction opportunities, and performance. The deliverable shall be submitted to the Government no later than seven (7) months after Contract Award.

C.4.15 The Contractor shall deliver the integrated CAD models and overall summary report. The deliverable shall be submitted to the Government no later than 10 months after Contract Award.

C.4.16 The Contractor shall deliver the sensitivity analysis of down selected hardware and overall summary report. The deliverable shall be submitted to the Government no later than eight (8) months after Contract Award.

C.4.17 The Contractor shall deliver the overall summary report on the scorecard of liquid- versus air-cooled configurations. The deliverable shall be submitted to the Government no later than 10 months after Contract Award.

C.4.18 The Contractor shall deliver the developed design of experiment plan for validation testing. The deliverable shall be submitted to the Government no later than 17 months after Contract Award.

C.4.19 The Contractor shall deliver the validation test results of the newly designed engine. The deliverable shall be submitted to the Government no later than 24 months after Contract Award.

C.4.20 The Contractor shall deliver at least three (3) newly designed engines and its spare parts, and maintenance and technical manuals. The deliverable shall be submitted to the Government no later than 24 months after Contract Award.

C.5 RELEASE OF INFORMATION

C.5.1 Distribution Statements

C.5.1.1 The Contractor shall distribute this PWS according to the following distribution statement:

• DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

C.5.1.2 The Contractor shall ensure that all information generated from this PWS is distributed according to the following distribution statement:

• DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Critical Technology; 21 April 2022; Other requests for this document shall be referred to FCDD-RLC-V, Building 4603, Room 110, Aberdeen Proving Ground, Maryland 21005

Contracting Officer:

5/31/2022

X Ariel M. Amey

Contracting Officer (KO) Signed by: AMEY.ARIEL.M.1469952971

Legal Advisor:

5 /3 1 /2 0 2 2

X B ra d R a m o s

Le g a l A d v i s o r S ig n e d b y : R A M O S . B R A D F O R D .C R A IG . 1 2 4 3 3 1 2 8 3 0