PWS.docx

DOCX document 86 KB Posted

Attached to
Video Monitor Assembly / RF Amplifier
Solicitation number
FA8517-25-R-0004
Issued by

About this file

This is a Performance Work Statement for depot-level repair of B-1B Automatic Test Equipment (ATE) Components, specifically Video Monitor Assembly (NSN 4920012186082) and RF Amplifier (NSN 5996013838418). The contract is a follow-on to contract FA8517-20-D-0008 expiring June 2025, with a new period of performance of 5 years from award date including 5 ordering periods.

The contractor must provide quality repair services to ensure serviceable "A" condition items through disassembly, testing, inspection and repair, meeting specified turnaround times for routine repairs, SURGE requirements (15 calendar days), and MICAP requirements (30 calendar days). Key requirements include: maintaining AS9100 quality management system compliance, reporting through CAV-AF system, preventing counterfeit electronic parts, managing Government Furnished Property, and meeting packaging requirements per AFMC Form 158. The work will be performed at the contractor's repair facility to support the Air Force Sustainment Center's mission of maintaining B-1 avionics and defensive systems capabilities. Items must be repaired using components equal to or superior to Original Equipment Manufacturer (OEM) specifications, with no more than one late delivery per quarter permitted.

View the file

Other files

File Type Posted
2698029_ITMDESC_REPORT.pdf PDF
3855131_ITMDESC_REPORT.pdf PDF
SpecialPackaging.pdf PDF
FA8517-25-R-0004.pdf PDF
Transportation.pdf PDF
CDRLS.pdf PDF
Packaging.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement for

B-1B Automatic Test Equipment (ATE)

Purchase Request: FD2060-25-00014

1.0 Description of Services

1.1 Objective(s): This PWS establishes the minimum depot level repair requirements of B-1B Automatic Test Equipment (ATE) Components, National Stock Numbers as seen in the Appendix “B” of this document. The contractor shall provide quality repair to ensure a serviceable “A” condition item that efficiently serves its intended purpose, by the required disassembly, test, bench check, inspection and repair. The contractor shall meet Turnaround Time for delivery of routine repaired items, process SURGE, Priority “A” requisitions, and MICAPs per PWS instructions along with tracking and reduce frequency of Product Quality deficiency Reports (PQDR). This contract will increase operational test capability of the Intermediate Automatic Test Equipment (IATE) which will reduce backorders of B-1 avionics and defensive systems Line Replaceable Units (LRUs) and Shop Replaceable Units (SRUs). The increased availability of mission essential LRU’s and SRU’s will improve the B-1 fleet’s ability to protect or defend themselves from enemy detection or attack. The Contractor shall repair submitted hardware, utilizing repair components that are equal to, or superior to, Original Equipment Manufacturer (OEM) components, which meet applicable drawings, handbooks, manuals, and/or specification established by OEM and which will perform in next higher assemblies.

1.2 Benefit to United States Air Force (USAF): This repair will benefit the United States Air Force (USAF) by reducing MICAPs, surge Requisitions and backorders, ensuring proper operation of B-1B ATE.

1.3 Background: This effort is a follow-on requirement to the B-1B Repair Contract FA8517-20-D-0008 that will expire June 2025.

2.0 Services Summary

Performance Objective
PWS Reference
Performance Threshold

Quality of repair

4.4.2
Assets shall be repaired in accordance with T.O.

00-25-234.

Repaired assets shall pass inspection with no failures per repair.

100% of repaired assets shall pass initial test.

There shall be no more than one PQDRs QDRs per contract.

Delivery of repair

4.4.5
Repaired assets shall be delivered in accordance with

the schedule defined by the contract/order.

There shall be no more than 1 late delivery(ies) pe contract year. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by the revised delivery date acceptable to the Government.

CAV-AF reporting
4.3.3
The Contractor shall report production in CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur.
Quality of CDRL deliverable
4.2.1
There shall be no more than one rejection of any

deliverable. There shall be no more than 2 total rejection(s) of deliverables per contract year. The Government will reject a deliverable if 2 or more technical errors or 10 or more minor errors are found within the deliverable. The rejected deliverable shall be corrected and resubmitted within 10 business days of notification of Government rejection.

Receipt of CDRL deliverable
4.2.2
There shall be no more than 2 late submission(s) of

deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

3.0 Government Property

3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.

3.2 Government Property to be Provided: Government property to be provided includes

Noun
NSN
Part No.
Video Monitor Assembly
4920012186082
3200205-003
RF Amplifier
5996013838418
LAB-1020-10/7477

3.3 Reporting of Government Property: The Contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair, and maintain) Government property in its possession in accordance with FAR 52.245-1, and its property management system shall be adequate to satisfy the requirements of this clause. The contractor shall record receipt and return of all Government Furnished Property (GFP), as well as the reporting of shipment, consumption, disposal, or transfer to another contract, in the GFP Module in Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil, as stipulated by DFARS 252.245-7005. This reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract. GFP training and guidance is located at the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/.

3.4 Loss of Government Property

3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.

3.5 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.

4.0 Technical Requirements

4.1 Period and Place of Performance

4.1.1 Contract/Order Period of Performance: The period of performance for the contract will be 5 years from award date with 5 ordering periods.

4.1.2 Place of Performance: These services will be performed at contractor’s repair facility.

4.2 Contract Data Requirements List(s) (CDRL)

Document Identifier Base Year Option Year Option Year Option Year Option Year

DID
Title
PWS Reference(s)
A001
B001
C001
D001
E001
DI-MGMT-82128A
CONTRACT GOVERNMENT FURNISHED MATERIAL (GFM) MONTHLY REQUISITION AND INVENTORY REPORT
4.3.9
A002
B002
C002
D002
E002
DI-MGMT-81634C
Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report
4.3.3
A003
B003
C003
D003
E003
DI-MGMT-80441D
GOVERNMENT PROPERTY (GP) INVENTORY REPORT
4.3.5
A004
B004
C004
D004
E004
DI-MGMT-81838
COMMERCIAL ASSET VISIBILITY (CAV) REPORTING
4.3.3.1
A005
B005
C005
D005
E005
DI-PSSS-81995A
CONTRACT DEPOT MAINTENANCE (CDM) MONTHLY PRODUCTION REPORT
4.3.6
A006
B006
C006
D006
E006
DI-MISC-81832
Counterfeit Prevention Plan
4.3.4.1
A007
N/A
N/A
N/A
N/A
DI-MGMT-81803A
Item Unique Identification (IUID) Marking Plan
4.3.7
A008
N/A
N/A
N/A
N/A
DI-MGMT-81804A
Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
4.3.8

4.2.1 There shall be no more than one rejection of any deliverable. There shall be no more than 1 total rejection(s) of deliverables per Contract year. The Government will reject a deliverable if 2 or more technical errors or 10 or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within 10 business days of notification of Government rejection.

4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Wide Area WorkFlow (WAWF) and submitted directly to the MFT member identified on the CDRL. There shall be no more than 2 late submission(s) of deliverables per Quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.3 Repair

4.3.1 Item Unique Identification

4.3.1.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR.

4.3.1.2 Reporting in IUID Registry

4.3.1.2.1 Transmission of Government property must be recorded in the IUID Registry. The Government is required to record the transfer of GFP to the Contractor. The Contractor is required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government.

4.3.1.2.2 The Government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.

4.3.2 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations. The Contractor shall ensure that classified material is packaged, marked and delivered in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM).

4.3.3 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract, and shall report production in CAV-AF. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250). The Contractor shall provide data on the actions conducted for each unit and report as actions occur. [CDRL Reference in paragraph 4.2, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report]

4.3.3.1 COMMERCIAL ASSET VISIBILITY (CAV) REPORTING: The contractor shall report End Item transactional data through electronic submission in CAV. The Commercial Asset Visibility (CAV) application provides a web-based, automated method of tracking Government owned reparable assets as they flow through the repair cycle at the contractor's repair facility. The main purpose of CAV is to provide an inventory management system for reparable assets while they are at commercial repair vendors. CAV on the World Wide Web allows the contractor to report transactions as they occur. These transactions automatically update the CAV database. An integrated, relational database allows the commercial repair vendors to access their repair data to produce all of the required status and activity reports. [CDRL Reference in paragraph 4.2, DI-MGMT-81838, COMMERCIAL ASSET VISIBILITY (CAV) REPORTING / CAVAF CFM End Item Report]

4.3.4 Counterfeit Electronic Parts: The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end items or otherwise entering the USAF/DoD inventory.

4.3.4.1 COUNTERFEIT PREVENTION PLAN: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee. This DID contains the Requirements, Processes, & Notification Procedure. [CDRL Reference in paragraph 4.2, DI-MISC-81832 COUNTERFEIT PREVENTION PLAN]

4.3.5 Government Property (GP) Inventory Report: The Government Property (GP) Inventory Report enables the contractor to periodically provide to the Department of Defense (DoD) Service or Agency an inventory listing of GP (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract. This Data Item Description (DID) is applicable to all contracts where GP will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation. [CDRL Reference in paragraph 4.2, DI-MGMT-80441D, GOVERNMENT PROPERTY (GP) INVENTORY REPORT / Annual Government Property Physical Inventory Report]

4.3.6 CONTRACT DEPOT MAINTENANCE (CDM) MONTHLY PRODUCTION REPORT: The Contract Depot Maintenance (CDM) Monthly Production Report provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period. This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the contract. [CDRL Reference in paragraph 4.2, DI-PSSS-81995A CDM Monthly Production Report / CDM Production Monthly Status Report].

4.3.7 The Item Unique Identification (IUID) Marking Plan details the Contractor’s strategy to execute marking requirements identified in the Government contract document(s) and Defense Federal Acquisition Regulation Supplement (DFARS). [CDRL Reference in paragraph 4.2, DI-MGMT-81803A ITEM UNIQUE IDENTIFICATION (IUID) MARKING PLAN]

4.3.8 The Item Unique Identification (IUID) Marking Activity, Validation and Verification Report is a tabular list providing IUID marking activity, validation and verification data such as: physical asset marking, registration, inventory audits, quality audits, and verification/validation results. [CDRL Reference in paragraph 4.2, DI-MGMT-81804A IUID VAL/VER REPORT / Item Unique Identification (IUID) Marking Activity, Validation and Verification Report]

4.3.9 CONTRACT GOVERNMENT FURNISHED MATERIAL (GFM) MONTHLY

REQUISITION AND INVENTORY REPORT: The Contract Government Furnished Material (GFM) Monthly Requisition and Inventory Report provides the Government with monthly information for determining GFM balances by condition code, consumption, turn-ins, transfers, due-ins, receipts, and shipping actions. [CDRL Reference in paragraph 4.2, DI-MGMT-82128A CONTRACT GOVERNMENT FURNISHED MATERIAL (GFM) MONTHLY REQUISITION AND INVENTORY REPORT]

4.4 Specific Requirements

4.4.1 The information contained in this section is not intended to be all inclusive or to detract from procedures outlined in the specifications, technical orders, and other directives listed in this work statement, except where specifically noted herein.

4.4.2 Workmanship shall be in accordance with T.O. 00-25-234, General Shop Practice requirements for repair, MIL-PRF-23377J(2), Primer Coating Epoxy, High Solids and MIL-PRF-19500N, General Specification for Semi-Conductor Devices.

4.4.3 Contractor furnished material or parts used for replacement shall equal or exceed those specified by the Original Equipment Manufacturer (OEM). The material or parts shall be entirely suitable for restoration of the reparable item for its intended purposes, and shall be completely interchangeable without alteration of either the parts or the end item. If there is a need to use parts other than the OEM specified parts or the latest government furnished baseline, the standard parts approval procedures through the Defense Electronic Supply Center (DESC) or the Defense Industrial Supply Center (DISC) shall be followed. If a part is disapproved by DESC or DISC, the Procuring Contracting Officer (PCO) has approval authority with engineering concurrence.

4.4.4 Original design of the reparable item and parts thereof, or the design functional capabilities of the item, shall not be changed, modified or altered unless such changes are documented, reported and approved by the Government. The contractor will certify that these items are tested and inspected to the Original Equipment Manufacturer (OEM) or equivalent commercial standards.

4.4.5 The Contractor shall complete the repair and ship serviceable assets IAW the delivery turn around time (TAT) established in the contract schedule, after receipt of asset, for routine, SURGE, and MICAP requirements. The desired TAT for SURGE requirements is 15 calendar days, and MICAP requirements 30 calendar days. Any order issued for SURGE or MICAPs requirements will specify the routine delivery TAT with the expectation that the Contractor will attempt to meet the accelerated delivery as specified above.

The contractor shall forward any production problems (including delays in delivery) to AFSC/PZAAC PCO and the 410th SCMS/GULA Production Management Specialist (PMS) and Logistics Manager (LM). Delivery Performance: There shall be no more than one late delivery per quarter. If the delivery date of any asset will not meet the required delivery date the contractor shall notify the Government of the cause and propose a delivery date. Any extension of the required date will be concurred on by the Program Office and negotiated with the PCO.

4.4.6 Contractor shall ensure early Contractor identification and reporting of Government repairable items which are misidentified, misdirected, or missing recoverable modules/subassemblies.

4.4.7 NFF (No Fault Found): Any item found to be serviceable on initial test and evaluation and deemed by the Contractor as a serviceable item shall be reported to the PCO immediately for disposition. Billing for assets determined as No Fault Found/RETOK will only incur fees for

TT&E."

4.4.8 Over and Above CLIN: Non-repair related discrepancies discovered that are not caused as a result of Contractor actions shall be reported to 410 SCMS/GULA immediately for disposition and/or engineering evaluation. Routine discrepancies shall be reported via email to the Logistic Manager, 410 SCMS/GULA, Robins AFB, GA 31098, with a detailed description of the issue, photos if necessary, recommended course of action or options, and estimated hours to complete repair. Repair of an item that is beyond normal repair issues and requires additional funding will be placed on an “Over & Above” contract line item.

4.4.9 BER (Beyond Economical Repair): Requests for condemnations shall be submitted in writing to the Government PCO within five workdays of the intent to condemn. Condemnation authority shall be requested when the cost to Repair the asset exceeds 75 percent of the unit’s replacement cost. The contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated BERs CLIN. The PCO retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number. The results of any electrical testing performed on the end item shall also be submitted for review. The contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions.

4.4.10 Beyond Physical Repair (BPR) and Condemnation: Upon receipt of an item for repair the contractor shall first determine if the item shall be inducted for repair. Request for condemnation shall be submitted to the PCO for approval/disapproval if the unit falls into one of the criteria specified below:

a. Physical damage destroys 75% of the physical and/or electrical integrity of the unit (i.e.

crushed).

b. Overheating and subsequent destructions of 80% of the internal electrical components and electrical connections.

If an item is initially determined to be Beyond Physical Repair (BPR), in accordance with A and/or B above, the contractor shall utilize the BPR form, attached hereto as Appendix B, for the purpose of requesting direction from the Government. The contractor’s determination of BPR shall be verified by the Government Multifunctional Team (MFT) and ACO. Once determination that the item(s) are BPR and to be destroyed (scrapped), the contractor shall demilitarize the item in accordance with (IAW) DoD 4160.21-M-1, Defense Demilitarization Manual, Appendix 3, DEMIL Code B, USML Item - mutilation to the point of scrap required worldwide. All items condemned that contain precious metals, silver, gold, platinum, rhodium, iridium, and ruthenium, scrap bearing such metals, and items containing recoverable quantities thereof shall be reported via Inventory Schedule to the DCMA Plant Clearance Office for disposition instructions.

4.4.11 When requested, the Contractor shall assist the Contract Administration Office in evaluating product quality deficiency reports and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies IAW T.O. 00-35D-54, USAF Material Deficiency Reporting and Investigation System. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies in workmanship shall be an integral part of the Contractor’s Quality Program at no additional cost to the government.

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis

5.1.1 Designation of Services as Mission-Essential: The Functional Commander/Director has determined certain services under this contract/order are mission-essential and will continue in the event of a crisis. The designation of services as mission-essential will apply to the entire contract.

5.1.2 If the Contractor anticipates not being able to perform the mission-essential services, they shall notify the PCO as soon as possible and fully cooperate with the Government’s efforts to maintain continuity of operations.

5.2 Security Requirements

5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility. The Contractor shall comply with the following security regulations: but not limited to, Department of Defense (DoD) 5200.2-R, Personnel Security Program; DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM); DoD Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual; and Robins Air Force Base Integrated Defense Plan (RAFB IDP) 31-101.

5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. DoDD 5205.02E and DoD Manual 5205.02-M require contractors supporting DoD activities use OPSEC to protect critical information for specified contracts, sub contracts, and information used in the performance of duties in support of Air Force requirements/missions. The Contractor shall ensure Contractor personnel who perform work on (or in) a Government facility comply with the OPSEC procedures and training requirements of the facility as specified in AFI 10-701.

5.2.3 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements. Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.

5.2.4 Access to Government System(s): Access to Government system(s) will not be required to perform tasks under the contract/order.

5.2.5 Common Access Card (CAC)

5.2.5.1 The Contractor shall ensure a CAC is obtained by all contractor/subcontractor personnel who require access to DoD computer networks/systems, for DoD facility entry control and/or for physical access to facilities and buildings to perform tasks under the contract/order. The Contractor shall provide a list of contractor/subcontractor personnel who require a CAC to the PCO. The Government will provide the Contractor instruction on how to utilize Mission Partner Identity, Credential and Access Management (MP-ICAM) and notify the Contractor of approval/disapproval of contractor/subcontractor personnel application. Contractor/subcontractor personnel shall obtain the CAC from the local Real Time Automated Personnel Identification Documentation System (RAPIDS) issuing facility [usually the Military Personnel Flight (MPF)].

5.2.5.2 The Contractor shall immediately report a lost or stolen CAC as directed by local Government policy. The Contractor shall notify the PCO of any change to the list of contractor/subcontractor personnel who require a CAC and provide an updated list within five business days. The Contractor shall return a CAC within five business days once contractor/subcontractor personnel no longer require computer network/system access and/or facility access. The Contractor shall return an expired CAC within five business days after the expiration date. The Contractor shall return any and all CACs within five business days after completion/termination of the contract as directed by local Government policy.

5.3 Environmental Management System (EMS): These services shall not be performed at a Government facility; therefore, the EMS requirement does not apply.

5.4 Agency Affirmative Procurement Programs: In accordance with FAR 23.107, Agency Affirmative Procurement Programs, 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products) and/or United States Department of Agriculture (USDA)-designated products included in the bio-based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio-based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

5.5 Safety Requirements

5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

5.7 Service Contract Reporting (SCR): The contract does not meet the DoD Contract Reporting criteria or reporting dollar threshold; therefore, SCR does not apply.

5.8 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.

5.9 Contractor’s Quality Program: The Contractor's Quality Management System (QMS) shall meet the requirements of AS9100, Quality Management Systems Requirements for Aviation, Space, and Defense Organizations, which is based on the standards of ISO 9001. The contractor must establish an AS9100 compliant quality management system, ensure its functionality and compliance through internal auditing, and undergo a certification audit conducted by an external registrar. The Contractor shall allow the Government access to the records and data collected to demonstrate the suitability and effectiveness of the quality management system. The Government reserves the right to request corrective action if the quality system fails to meet objectives. The Contractor shall permit the program office or its designated representative to periodically review its quality program.

5.10 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

PR: FD2060-25-00014 PWS REVISION: 0 14

6.0 Appendices

Appendix A

Publication
Title of Publication
Date of Publication
Sections(s) that Apply
32 CFR Part 117
National Industrial Security Program Operating Manual (NISPOM).
February 24, 2021
5.2.1
DoDD 4715.1E
Environment, Safety, and Occupational Health (ESOH)
March 19, 2005
Section 5
DoDD) 5205.02E
DoD Operations Security (OPSEC) Program
June 20, 2012
5.2.2
DoD Manual 5205.02-M
DoD Operations Security (OPSEC) Program Manual
November 3, 2008
5.2.2
Public Law 91-596 as amended by Public Law 101-552
Occupational Safety and Health Act of 1970
December 29, 1970

as amended through January 1, 2004

Section 5

File details come from the government source that posted it. Updated .