This document is a Performance Work Statement (PWS) for Human Systems Integration (HSI) Services for Army Systems. The key objectives are to acquire contractor services to perform HSI analysis, assessments, and research in support of the DEVCOM Analysis Center (DAC). This includes tasks such as HSI analysis planning, system analysis, data collection and analysis, modeling, reporting, and database construction and tools. The contractor will be required to develop draft HSI analysis methodologies and plans, participate in test events, provide technical assessment reports, and manage a database of collected data. Monthly and final reports are required. The PWS is in support of a pre-solicitation notice for a potential forthcoming solicitation to provide these HSI services to the U.S. Army. No award date or pricing details are provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources Sought 24R0035 (HSI).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Human Systems Integration (HSI) Services for Army Systems 13 May 2024
C.1 Background
This Performance Work Statement (PWS) identifies the efforts required to provide human systems integration (HSI) services to support the DEVCOM Analysis Center (DAC), Human Systems Integration Division as it conducts the HSI analysis, assessments, and research Army programs. These services are required to support DAC’s Human Systems Integration (HSI) assessments, research and analysis efforts including the areas of event planning and execution, system analysis, research and data base support and modeling. These services will result in technical reports and documentation that support the DAC analysis mission, and focus in the area of system analysis and database support for acquisition systems related to the Army’s legacy and modernization program.
The DAC partners with Program Executive Offices (PEOs), U.S. Army Test and Evaluation Command (ATEC) and G1 office to meet the acquisition time line for modernizing the Army with a focus on, but not limited to, long-range precision fires, next-generation combat vehicle, future vertical lift platforms, mobile & expeditionary Army networks, artificial intelligence, air and missile defense capabilities, and Soldier lethality. Manpower, personnel, training, human factors, safety, cognitive readiness, situational awareness, anthropometric and workload are key Human Systems Integration assessment areas of the analysis. This effort requires implementation of a systems approach for examining usability, functionality, and Soldier performance from an operator and staff perspective. Both qualitative and quantitative data support the HSI assessment will be implemented.
The continuous analysis, assessment and research of the systems in this PWS will employ results from a combination of usability demonstrations, Soldier touch points, Contractor tests, Government developmental tests, logistics/HSI demonstrations, and operational tests. Program documents, Government Furnished Information (GFI) include the Human System Integration assessment and domain assessment, operational requirements document (ORD), Test and Evaluation Master Plan (TEMP), and the Operational and Organizational (O&O) plan. Test and Evaluation (T&E) documents include ATEC’s System Evaluation Plan (SEP), and Data Source Matrix (DSM), Emerging Insights (Quick-Look) Report and System Evaluation Report (SER), DAC analysis reports, briefs and various Event Design Plans (EDP), and Detailed Test Plans (DTP).
C.2 Objective
To acquire Contractor services to perform HSI analysis, assessments and research in support of DAC. This will include research, data analysis, knowledge, and expertise with HSI practices and will include but not limited to HSI data analysis, HSI test and analysis methodology and to prepare HSI summary briefings and reports. Expertise with the development and completion of a human system integration assessment report and a human system integration domain report supports the DAC mission.
C.3 Requirement
For each required system assigned, the Contractor shall develop a draft HSI Analysis Methodology, research or assessment method. The Contractor shall ensure the methodology contains the following components: HSI Assessment, Analysis, Research Event Planning (C.3.1), HSI System Analysis (C.3.2), Effort (C.3.3), Database Effort (C.3.4), and Monthly and Final Reports on Fund Status and Operations (C.3.5). If research or a system assessment is assigned, the contractor will develop an analysis plan or research protocol. The Contractor shall provide the draft HSI Assessment Methodology, analysis plan or research protocol no later than (NLT) two (2) weeks after award. The Contracting Officer's Representative (COR) will provide their feedback and required changes within two (2) week of receipt. The Contractor shall provide the Final Assessment Methodology, plans or protocol to the COR within one (1) week of receipt of COR feedback. The COR will approve the Final Assessment Methodology, plan or protocol within three (3) days of receipt. Upon COR approval, the Contractor shall fully execute the Final Assessment Methodology.
C.3.1 HSI Analysis, Assessment, Research Planning and Execution. The Contractor shall ensure that the HSI Assessment Event Planning portion of the Analysis Methodology, assessment and methodology includes the following documents below:
C.3.1.1 HSI Analysis, Assessment, Research Strategy Planning. The Contractor shall recommend, update, edit, and review the HSI portion of the planning briefings such as the HSI assessment or Domain assessment, standard industry Early Strategy Review (ESR), Concept In-Process Review (CIPR), and Operational Test Readiness Review (OTRR). The Contractor shall provide the assessment and research strategy such as briefings, whitepapers and assessments.
C.3.1.2 System Documentation. The Contractor shall provide a recommended Human System Integration analysis strategy for the continuous assessment of the specified system that include number of people, schedule, test events participation, and cost for labor and Temporary Duty Travel (TDY). The Contractor shall recommend, edit, and review updates of the HSI portion of the HSI Assessment, HSI Analysis, ORD, TEMP, and SEP for the specified system to be provided as Government Furnished Information (GFI) and is due not later than (NLT) ten (10) days after receipt of GFI documents. The Contractor shall ensure that particular emphasis is placed on the continuation of the HSI analysis strategy, analysis methodology, and the data management process. The Contractor shall conduct the analysis planning, to include recommending and revising the analysis focus areas (EFA), measures of effectiveness (MOE), measures of performance (MOP) and data requirements. The Contractor shall provide input to the development of a MOP Methodology Plan for each test event to include the combined use of multiple data sources as well as the design and execution of integrated testing. The Contractor shall recommend survey and interview question sets for each assessment. The Contractor shall provide updates on verification, validation, and accreditation of instrumentation and simulation planned for these events. The Contractor shall conduct assessments, research and analysis from a HSI perspective to include from the cognitive and physical characteristics.
C.3.1.3 Deliverables. The Contractor shall submit all deliverables via electronic disk or secure communications only. Briefings, Input to HSI assessments, research and the HSI portion of the reports, and Final Reports shall be thorough, accurate, complete, and accepted in accordance with the Data Item Description (DID) and must take into account the cognitive and physical Soldier characteristics, if applicable, and the PWS, and are due no later than (NLT) three (3) weeks after the task or analysis deadline provided by the Contracting Officer’s Representative (COR). Monthly and Final Reports on Fund Status and Operations, and Collecting and Reviewing cost and demand data from Providers are due not later than two (2) weeks after receipt of requirements. See Appendix A.
C.3.1.3.1 Briefings and Briefing Material. The Contractor shall provide copies of each briefing product for COR review and modification, followed by one (1) final copy. The COR will provide their comments to the Contractor within four (4) business days of receipt. The Contractor shall submit the updated documents to the COR as the final copy via soft copy (electronic media) within three (3) business days of receiving COR feedback.
C.3.1.3.2 Input into) Documents. The Contractor shall provide input and updates to the HSI portion of the T&E, acquisition, DAC documents NLT five (5) business days after receipt of request by the COR. The Contractor shall provide input and updates to HSI assessments and research documents NLT five (5) business days after receipt of request by the COR. The Contractor shall deliver the documents in an electronic format compatible with Microsoft Office Word. The COR will provide any required changes within three (3) business days. The Contractor shall incorporate the COR’s changes within three (3) business days and shall deliver the final Documents via soft copy (electronic media) to the COR.
C.3.2 – HSI System Analysis.
The Contractor shall recommend, edit, and review updates of the HSI portion of the Government Furnished ORD, TEMP, SEP, system assessments, and research protocols for the specified system within five (5) days of receipt. The Contractor shall ensure that particular emphasis is placed on the HSI portion of the document and include expert assessments for the manpower, personnel, training, habitability, human factors engineering, Soldier survivability, safety and health hazards. The Contractor shall conduct the analysis planning, to include recommending and revising the EFA, MOE, MOP and data requirements. The Contractor shall provide input to the development of a MOP Methodology Plan for each test event to include the combined use of multiple data sources as well as the design and execution of integrated testing. The Contractor shall recommend survey and interview question sets for each assessment. The Contractor shall provide updates on verification, validation, and accreditation of instrumentation and simulation planned for these events.
C.3.2.1 Analysis. The Contractor shall analyze the suitability with regards to manpower, personnel, human factors, change management and training of the required system, with a concentration upon the Suitability Focus Area HSI analysis based on the test and analysis plan schedules. The Contractor shall assess data for the Critical Operational Issues and Criteria (COIC) and Additional Issues (AI) defined by the government and provided as GFI. GFI will be provided NLT five (5) days after system assignment through the use of developmental phase reports and technical test data. The Contractor shall conduct standard industry Operational Testing and Assessments Critical Design Review, Production Qualification/Verification Test events and User Demonstration Assessments to gather data towards system characterization and provide an estimate in Contractor format, of the system’s progress towards entry into formal Operational Testing (OT). The Contractor shall also analyze, provide HSI recommendations and suggestions for systems during rapid fielding initiatives, porotypes, and development.
C.3.2.2 Testing. The Contractor shall observe, participate in developmental, usability, demonstrations, rapid fielding initiatives, Soldier touch points and operational test events in order to collect data which support acquisition decisions and identify anomalies or potential problem areas that can degrade performance and when appropriate assist with the mitigation of the issues as instructed by the COR. The Contractor shall note the method of test, instrumentation and data collection used, and lessons-learned from the HSI testing methodology. The Contractor shall recommend which technical test instrumentation or methodology to utilize in operational test planning, system development, usability assessments and fielding. The Contractor shall note the test item configuration and how it differs from the production configuration and the degree to which test results from this configuration are expected to be representative of the performance of the production system. The Contractor shall prepare and deliver results.
C.3.2.2.1 Various Test Events. The Contractor shall review the developmental test planning, assessment, operational documents (see C.2.2.2) and analyze data and reports to provide a HSI technical assessment of the system’s readiness and maturity as requested by the COR. The Contractor shall address the HSI technical measures of effectiveness and performance outlined in the SEP, system specification, design or how it addresses an Army gap.
C.3.2.3 Draft and Final System Analysis Reports / System Analysis Reporting. The Contractor shall analyze data from data bases such as ACCESS® and shall develop input for analysis products (reviews / briefings / reports) in accordance with the approved test schedule and develop a final HSI insight summary brief and final report based on the System Analysis Plan. The Contractor shall develop draft reports with scored data based on the format required by Department of the Army Pamphlet (DA PAM) 73-1 Test and Analysis in Support of Systems Acquisition and/or Army 602-2, Army Test and Evaluation Command (ATEC) PAM 73-1 "System Test and Analysis Procedures" provided as GFI at system assignment. HSI assessment reports and research findings will follow the HSI reporting requirements format and general research standards. The Contractor shall prepare briefings for COR review in accordance with the test plan.
C.3.2.4 Deliverables. The Contractor shall submit all deliverables via electronic disk or secure communications only. Briefings, input to the HSI portion of the T&E draft, assessments, and final reports shall be thorough, accurate, complete, and accepted in accordance with the DID, if applicable, and the PWS, and are due NLT three (3) weeks after task or analysis deadline provided by the COR. Monthly, and Final Reports on Fund Status and Operations, Collecting and Reviewing cost and demand data from Providers are due NLT two (2) weeks after receipt of requirements from COR. See Appendix A.
C.3.2.4.1 Briefings and Briefing Material. The Contractor shall provide drafts of each HSI briefing product for COR review and modification, followed by one (1) final copy. The COR will provide comments to the Contractor within two (2) business days of receipt. The Contractor shall submit the updated documents to the COR as the final copy via soft copy (electronic media) within three (3) business days of receipt of COR feedback.
C.3.2.4.2 HSI Technical Notes, System Analysis Report System Assessments (SA). The Contractor shall provide details of the effort performed in the continuous analysis, and assessments of a given system when they complete the analysis for incorporation into a results summary report within five (5) days of the conclusion of the operation or field test. The Contractor shall enter test observations, analysis, and results into an analysis database provided as GFP at the end of the operational or field test. The Contractor shall deliver draft technical analysis reports; provide input to T&E documents detailing summary test planning results NLT ten (10) days after testing is complete.
C.3.3 – HSI Analysis Effort C.3.3.1 Data Collection and Analysis during the Experiments. The Contractor shall attend test sites to observe and collect data upon direction by the COR with no less than five (5) days’ notice. The Contractor shall use SAS, Access, Excel, SPSS or R2 and other software to reduce HSI data, perform analysis, summarize data, conduct interviews with test subjects, Soldiers, and system subject matter experts (SMEs) and prepare briefings during the test event. The Contractor shall provide in-progress analysis and make recommendations to the COR during the test event.
C.3.3.2 Performance Analysis. The Contractor shall observe testing, demonstrations, rapid fielding initiatives, early prototypes of the specified system at the test site and shall gather data in its own format in the areas of organization, doctrine, tactics, manpower, human factors, training survivability, and threat. The Contractor shall collect technical performance data relevant to the HSI assessment from events such as STPs, research initiatives in the DAC FT. Bliss C2 Lab and the DAC Immersive Systems Integration Center located at the University of Alabama in Huntsville, Critical Design Reviews, Contractor testing, developmental tests, user assessments, and PM testing, such as Production Qualification Test (PQT) and other available tests or simulations.
C.3.3.3 HSI Analysis/Assessments. The Contractor shall provide research, analysis, test results, conclusions, and recommendations to an integrated process team for a system program manager specified by the COR. The Contractor shall review system software/hardware documentation to ensure it accurately describes the product being developed and tested. The Contractor shall collect and analyze data on system software products to assess software progress and maturity. The Contractor shall research the status of embedded system software development activities and review the status of development within 10 days of receiving the assignment. The Contractor shall identify inconsistencies or discrepancies in documentation, traceability, or testability of software requirements by comparing the documentation to the actual system.
C.3.3.4 Analytic and Reduction. The Contractor shall reduce and analyze HSI data and prepare reports based on specified GFI format and provide continuous analysis at the test site and after the test, at the designated briefing location.
C.3.3.5 Document Review. The Contractor shall review system and HSI research-related documents provided as GFI based on the test, assessment or analysis schedule provided by the COR. Examples of such documents include but are not limited to:
Human Systems Integration Assessment (HSIA) Human Systems Integration Domain Assessment Capability Development Document (CDD) Combat Developer’s Analysis (CDA) Critical Operational Issues and Criteria (COIC) Development Test Plan (DTP) Failure Definition and Scoring Criteria (FDSC) Initial Capability Document (ICD) Mission Needs Statement (MNS) Operational Requirement Document (ORD) System Threat Assessment Report (STAR) Simulation Support Plans Test and Evaluation Master Plan (TEMP) Validation and Verification (V&V) Reports Logistics/HSI Demonstration Plan New Equipment Training (NET) Plan and the Program of Instruction (POI) Test System Technical, Operator and/or Maintainer Operating Manuals and supporting TTP materials
C.3.3.6 Deliverables. The Contractor shall submit all deliverables via electronic disk or secure communications only. Briefings, Input to the HSI portion of the Human System Integration Assessment (HSIA), Test and Evaluation (T&E), and Final Reports, shall be thorough, accurate, complete, and accepted in accordance with the Data Item Description (DID) if applicable and the PWS and are due not later than three (3) weeks after agreed task or analysis deadline. Monthly, and Final Reports on Fund Status and Operations, Collecting and Reviewing cost and demand data from Providers are due not later than two (2) weeks from receiving requirements. See Appendix A.
C.3.3.6.1 The Contractor shall document HSI observations related to suitability throughout the test, assessment, demonstration, development, or research. At the completion of each event, the Contractor shall document observations and shall provide input to the government. The government will provide templates and drafts for the Final Report and Briefing Package. The government will develop the Final Test report and briefing package.
C.3.3.6.2 Document Review. As a result of the document reviews, the Contractor shall submit comments in accordance with DA Form 2028 format. This format is similar to the Army Requirements Oversight Council document comments matrix, or another format approved by the COR and provided as GFI within ten (10) days of system assignment. The Contractor shall submit comments to the COR within seven (7) business days of receipt of the document.
C.3.4 – Database Effort C.3.4.1 Data Base Construction and Tools. The Contractor shall create database tools to perform data storage, reduction, analysis, and summary on data collected during a HSI events such as a test, STP, Demonstration or OA, and provide analysis and reporting of system performance. Tools to analyze HSI domains should be developed along with expert knowledge of SUS, Trust in Automation, Situational Awareness, cognitive and physical characteristics as they apply to overall Soldier/system performance from an HSI perspective.
C.3.4.2 Literature Review. The Contractor shall perform a HSI centric literature review of all previous documentation related to the system to ensure completeness and consistency with relationships identified between data and requirements C.3.4.3 Database Programming. The Contractor shall plan for the development of routines and procedures to support the calculation of each HSI MOP and the analysis of their respective COIC and the Additional Issue(s) (AI). The Contractor shall conduct a complete end-to-end demonstration prior to the start of any applicable test event. The Contractor shall modify and execute the MOP calculation programs based on and IAW the test and system evaluation plan. The Contractor shall ensure the plan includes provisions for calculations to be executed at the test or event site (e.g., Quick-Look / emerging results). The Contractor shall develop routines to evaluate Soldier error rates induced by system design.
C.3.4.4 Cognitive Workload Modeling and Accommodation Modeling. The Contractor shall perform cognitive workload modeling and accommodation modeling to support the HSI analysis at the request of the COR. The Contractor shall have access to and experience in using IMPRINT, Jack and C2 trace as well as other modeling tools provided by the government at the start of the contract.
C.3.4.5 Project Management. The Contractor shall develop and maintain an up-to-date Microsoft Project file which contains the information needed to manage the key events and products for the systems under analysis as the continuous analysis moves toward completion of the System Evaluation Report.
C.3.4.5 Deliverables. Contractor shall submit all deliverables via electronic disk or secure communications only. Briefings, and HSI Reports, shall be thorough, accurate, complete, and accepted in accordance with the Data Item Description (DID), if applicable, and the PWS, and are due not later than three (3) weeks after agreed task or analysis deadline. Monthly, and Final Reports on Fund Status and Operations, Collecting and Reviewing cost and demand data from Providers are due not later than two (2) weeks from receiving requirements.
C.3.4.5.1 Data Bases. During the start of the test events, analysis, assessments, demonstrations, the COR will provide the Contractor with an ATEC Analysis Event Data Base with a standard format as GFP/GFI. The Contractor shall input observations and all relevant and current data from the associated event up and submit an electronic copy of the Analysis Event Data Base to the COR at least once per day or within two (2) hours of receipt of the request by the COR. The Contractor shall update the Analysis Event Data Base as new data is obtained by the analysis team during tests and other events in a format that allows for queries for system analysis purposes.
C.3.4.5.2 Data Queries. The Contractor shall submit the results of data queries of the Analysis Event Data Base used by the COR and provided to the Contractor during test events, in formats such as tables, charts, spreadsheets, or other similar media.
C.3.4.5.3 Data Analysis. The Contractor shall provide tables, graphs, briefings, data bases or other formats which show the results obtained from the comparison or crosswalk of data collected to the requirements) to perform analysis and arrive at HSI conclusions on the capabilities and limitations of the specified system.
C.4 - Reports C.4.1 Monthly Reports The Contractor shall deliver the monthly status reports to the COR on the tenth (10th) business day of each month after contract award. The Contractor shall provide monthly status reports summarizing current program accomplishments measured against the tasks outlined previously, identification and summary of any unresolved problems, incurred costs, meetings attended, planned activities for the next month, issues, and recommendations. The Contractor shall ensure the monthly report includes a spending plan for the period of performance; actual expenditures to date; actual expenditures for the month just ended; and monthly and cumulative variation of actual expenditures from the planned expenditures. The Contractor shall include in the spending plan all costs to include labor, overhead expenses, description (to include cost and results obtained) of each trip taken in the previous month, and fees. The Contractor shall include detailed copies of all invoices submitted to date for payment from both the Prime Contractor as well as all Subcontractors. The Contractor shall ensure each invoice details the labor categories, labor rates, labor hours, and all Other Direct Costs (ODCs). The Contractor shall also answer the following questions within the monthly reports:
1. Is the job progressing on schedule?
1. What is the percent of completion?
1. What is the dollar value completed?
1. What is the total number of contract employees currently on contract?
1. What is the total number of new employees placed on contract this month?
1. Was Contractor Manpower Reporting (CMR) performed during the monthly reporting period? If so, what information was entered?
1. What are names of the Contractor personnel, who are/were deployed during the period covered by this monthly report?
1. Are there any proposed changes to the Analysis Methodology?
Contractor format for the above listed reports is acceptable. The COR will provide their approval or required changes to the Analysis Methodology within three (3) days of receipt.
C.4.2 Final Report The Contractor shall provide a draft final technical report NLT 30 days prior to the end of the contract detailing the findings from all efforts performed under this contract. The Contractor shall ensure the report includes lessons learned, measures of performance / improvement for the evaluated system(s) and recommendations for further enhancements. The COR will review and comment on the draft final technical report within 15 days of receipt. Upon receipt of the COR comments, the Contractor shall revise the final report to incorporate the COR’s comments and deliver one (1) copy electronically as well as ten (10) printed hard copies to the COR NLT ten (10) days prior to the end of the contract.
C.5 – Travel The Contractor is required to go to a test site within five (5) days of notification by the COR to observe and collect data.
C.6 - Training C.6.1 In the event that system-specific training is required to familiarize Contractor personnel with system design or operational concepts, the Contractor shall obtain approval of that training from the COR.
C.7 – Security / Distribution Statement C.7.1 This PWS is unclassified and Distribution Statement A: Public Release applies to the PWS. The Contractor shall have access to classified information and facilities up to the level of TOP SECRET/SCI. DD Form 254 applies. The data collected in performance of this effort has Distribution Statement B and distribution is authorized to U.S. Government Agencies only (Test and Evaluation) (05/10/2024). Other requests data collected in performance of this effort shall be referred to the DEVCOM Analysis Center (DAC), Attn: FCDD-DAH.
C.8 – Antiterrorism and Operations Security (OPSEC) Requirements C.8.1 AT Level I Training. This standard language is for Contractor employees with an area of performance within an Army controlled installation, facility or area. All Contractor employees, to include sub-Contractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and sub-Contractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and sub-Contractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil C.8.2 AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language requires U.S. based contractor employees and associated subcontractor employees to make available and to receive government provided area or responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander, with the unit ATO being the local point of contact.
C.8.3 Locally developed iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility, or area. The contractor and all associated subcontractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance, with the results reported to the COR NLT 30 calendar days after contract award. (https://www.letterkenny.army.mil/ctrresources/ or https://www.swf.usace.army.mil/Missions/Antiterrorism-Community-Awareness/) C.8.4 For contracts that require a formal OPSEC program. All contractor personnel must read and comply with DEVCOM-DAC’s OPSEC Plan. The COR will ensure a copy of the current DAC OPSEC Plan is provided to contractor personnel. All material produced and/or develop by contractor personnel which discuss the support provided to DAC and is to be disseminated into the public domain shall be submitted to the DAC G2/OPSEC Officer prior to its release. This includes all written (hardcopy) and electronic materials produced such as organizational press releases and marketing material.
| In accordance with DFARS 252.204-7000, Government review and approval will be required prior to any dissemination or publication, regardless of medium (e.g., film, tape, document), pertaining to any part of this contract or any program related to this contract except within and between the Contractor and any subcontractors, of unclassified and non-fundamental information developed under this contract or contained in the reports to be furnished pursuant to this contract. |
| All reports, deliverables, products, and content shall be marked in accordance with the classification guidance for information associated with that program. All documentation developed during the course of this Performance Work Statement (PWS) that are deemed property of the U.S. government shall undergo security review and/or OPSEC review for appropriate distribution statement and dissemination controls. The government program manager and DAC Security Office shall approve any reports, documentation, or presentations to be distributed outside of the government prior to distribution or release of information. The developer shall provide this documentation a minimum of 20 days prior to distribution to allow for review and approval. Only that material which has undergone an OPSEC and security review and has been approved shall be released into the public domain. |
C.8.5 For contracts that require OPSEC Training. Per AR 530-1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained with 30 calendar days of their reporting for duty and annually thereafter. The COR will ensure initial & annual training requirements are met.
C.8.6 Army Training Certification Tracking System (ATCTS) registration for Contractor employees who require access to government information systems. All Contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the Information System and then annually thereafter.
C.8.7 For information assurance (IA)/information technology (IT) training. All Contractor employees and associated subcontractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All Contractor employees working in IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six (6) months of appointment to IA/IT functions.
C.8.8 Access and general protection/security policy and procedures. This standard language is for Contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-Contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
C.8.9 For Contractors requiring Common Access Card (CAC). Before CAC issuance, the Contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The Contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
C.8.10 For contracts that require handling or access to classified information. Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified "Confidential," "Secret," or "Top Secret" and requires contractors to comply with: (1) The Security Agreement (DD Form 441), including the 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM) and, (2) any revisions therein, notice of which has been furnished to the contractor.
| Clearance. All contractor personnel working on this PWS require access to classified information and shall have, at a minimum, a final clearance of the SECRET level. In addition, some contractor employees may be required to perform duties described in this PWS which may require a TS/SCI clearance. Exceptions to this policy for new employees and others working under this PWS with interim clearances shall be submitted through the DAC Security Office. |
| DD254. Contractor shall comply with the security requirements listed in the DD form 254 for contracts requiring access to classified information. |
| Automated Information Systems (AIS). All classified efforts under this PWS which require the use of AIS, shall be performed on a Government approved system with the appropriate classification level. |
C.8.11 Controlled Unclassified Information (CUI). Include DFARS clause 252.204-7012, which requires the contractor to comply with NIST 800-171. Also include DFARS provision 252.204-2019 into solicitations. Acquisition officials should follow procedures outlined in DFARS 204.73 and verify vendors have an adequate NIST SP 800-171 summary assessment score within the Supplier Performance Risk System (within PIEE). If the score doesn’t show a medium- or high-level assessment with a score of 110 or better (as described in the “NIST SP 800-171 DoD Assessment Methodology”), include clause 252.204-7020 and obtain the vendor’s “system security plan” and “plan of action” for NIST SP 800-171 verification and assurance by Army security officials.
C.8.12 Threat Awareness Reporting Program. For all contractors with security clearances. Per AR 381-12, Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.
Please see below information for making a report.
| Contact your local Counterintelligence (CI) Office |
| CONUS Spy Hotline: 1-800-CALL-SPY |
| iSALUTE: https://www.inscom.army.mil/isalute/ |
| iWATCH: https://www.swf.usace.army.mil/Missions/Antiterrorism-Community-Awareness/ |
C.9 – Contractor Manpower Reporting ACCOUNTING FOR CONTRACT SERVICES REQUIREMENT – ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (CMRA) The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page C.10 Quarterly Status Meetings
The Contractor shall participate in status meetings, to be held at least quarterly, with the COR and Contracting Officer (KO), to be scheduled by the KO. The meetings will discuss the progress of the contract, performance of the Contractor, and any problems that have arisen or are expected to arise.
Appendix A
Deliverable
Date Due
Briefings and Briefing Materials & Input to HSI Documents
(PWS Para C.3.1.3, 3.2.3, 3.3.3, 3.4.3) No later than three (3) weeks after agreed task or analysis deadline
Final Report
(PWS Para C.3.1.3, C.3.2.4, C.3.3.6, C.3.4.5) No later than three (3) weeks after agreed task or analysis deadline
Monthly and Final Reports on Fund Status and Operations
(PWS Para C.4, C.4.1, C.4.2) Two (2) weeks from end of month
Collecting and Reviewing cost and demand data from Providers
(PWS Para C.4, C.4.1, C.4.2) No later than two (2) weeks from receiving requirements
Contracting Officer:
Legal Advisor: