PWS CSS 23446 AGGREGATE for CONNEAUT LAKE PA038.docx
DOCX document 39 KB Posted
- Solicitation number
- W15QKN-20-Q-5164
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
99th Readiness Division Directorate of Public Works JB MDL, New Jersey 08640-5000
January 15, 2020
| Project Name: | FY20 Aggregate | |
| Project/CSS#: | CSS# 23446 | |
| Project Location: | Keystone Local Training Area (LTA) – PA038 | |
| 6467 Mike Wood Blvd |
Conneaut Lake, PA 16316
| Acceptance POC: | RFOS: Scott Kawski (W56D5Q) Wk (814) 836-4712 Cell (609) 744-1123 | |
| Project POC/ALT: | FAC COR: Ed Stone Wk (814) 382-2893 Cell NA | |
| Field Eng. Tech: | CW2 Shawn Knauff | Wk (814) 382-2893 Cell (609) 414-1835 |
HQ Eng. Tech: Rich Heagler Wk (609) 562-7644 Cell (732) 715-2216
1.0. DESCRIPTION OF SERVICES: This is a firm-fixed price supply contract to provide aggregate during fiscal year 2020 to facilitate the repair, renovation and construction of roadways located at LTA Keystone in northwestern Pennsylvania. The contractor shall provide all materials to the place of performance as annotated in paragraph 5.0 for use during the period of performance as annotated in paragraph 4.0 of this PWS. The Government will exercise supervision and control over this material throughout the period of performance.
The contractor is responsible for delivery.
2.0. BACKGROUND: The 99th Division (Readiness) is responsible for management and maintenance of the Keystone Local Training Area (LTA) near Conneaut Lake (Geneva), Pennsylvania. This LTA was constructed in the 1980s by the Army Corp of Engineers and has since physically degraded. Furthermore, changing training requirements require significant improvements to provide continued usefulness to the US Army Reserve and other users. The Army Reserve intends to employ Engineer Soldiers, through Troop Construction, to accomplish the renovations and improvements. Only construction materials and select rental equipment, which is not organic to the engineer unit’s MTOE, will need to be procured for this project and delivered to the project site.
3.0. SCOPE:
3.1. Contractor shall provide the following Bill of Materials – to be verified by RFOS/COR.
3.1.1 Aggregate
| Description |
| Quantity |
| Unit |
| Limestone, crushed, 2A |
| 1,166.00 |
| tons |
| Limestone, crushed, #57 |
| 110.00 |
| tons |
| Limestone, crushed, 3 |
| 396.00 |
| tons |
| Limestone, crushed, rip rap/R3 |
| 110.00 |
| tons |
| Sand, mason |
| 22.00 |
| tons |
| Sand, concrete |
| 22.00 |
| tons |
4.0 PERIOD OF PERFORMANCE: The period of performance shall be as follows
4.1. Deliver Construction Materials and Consumable/expendables NLT 13 July 2020.
5.0 PLACE OF PERFORMANCE:
Keystone Local Training Area (LTA), ECS 103 6467 Mike Wood Blvd Conneaut Lake, PA 16316
Delivery Address:
99th Readiness Division, ECS 103 ATTN: CW2 Shawn Knauff 6467 Mike Wood Blvd Conneaut Lake, PA 16316
6.0 POINTS OF CONTACT
POC for delivery is CW2 Shawn Knauff
| Email: shawn.j.knauff.mil@mail.mil |
| Phone: 814-382-2893 / Cell: 609-414-1835 |
POC for this PWS is CW3 Mark J Bowling
| Email: mark.j.bowling4.mil@mail.mil |
| Phone: 609-562-7489/ Cell: 609-744-0993 |
image1.png image2.png
File details come from the government source that posted it. Updated .