PWS Cranes and Hoists 3 Jun 26.pdf

PDF 469 KB Posted

Attached to
Cranes and Hoists
Solicitation number
FA442726QZ077
Issued by

About this file

This is a Performance Work Statement (PWS) for Cranes and Hoists Maintenance and Repair Services at Travis Air Force Base, California. The contract requires the Contractor to perform preventive maintenance (PM), inspections, and repairs on 43 cranes and hoists throughout the base, with an estimated workload detailed in Appendix D. The Contractor must conduct three quarterly inspections and one annual load testing inspection annually for each unit. Key service requirements include providing a 24/7 customer service hotline accessible 365 days per year, responding to telephone support inquiries within two hours, performing emergency service calls with on-site response within two hours, and handling routine service calls with on-site response within 24 hours or by 1000 hours Pacific time the next business day. For emergency and routine service calls, the Contractor must complete troubleshooting and minor repairs (not to exceed $100 in parts per unit per call) within six hours or place the system in safe mode. The Contractor must maintain a 96% operational rate for all equipment and submit quarterly reports documenting PM activities, service order work, maintenance logs, telephone call logs, and operational metrics. Minor repairs during preventive maintenance are limited to $50 per unit per quarter, with aggregate costs not to exceed $400 per PM visit across all units.

The Contractor must develop an Operations and Maintenance Plan tailored to each crane/hoist unit, including PM checklists, test procedures, and a Quality Control Plan for Government approval within 30 days of award. The Contractor shall provide all personnel, equipment, supplies, tools, and materials necessary for service delivery and must maintain all licenses and certifications required by OSHA Standards 29 CFR §§ 1910 and 1926, ANSI Standards B30, and manufacturer recommendations. Lead Technicians must have minimum three years of experience with crane and hoist systems and provide documented training proof within five calendar days prior to performance. The Contractor must warrant all installed components for one year minimum on parts and labor, coordinate all work with the Contracting Officer/Contracting Officer's Representative at least five days in advance (except service calls), maintain a comprehensive Maintenance and Repair Log, and comply with all environmental and safety regulations including hazardous materials handling and spill prevention. Performance evaluation will be based on achieving the 96% operational rate, 100% PM completion, 100% hotline and telephone support response compliance, and 100% emergency/routine service call response without callbacks. Contract award and performance initiation are not specified in this PWS document.

View the file

Other files

File Type Posted
Cranes and Hoists - Presolicitation Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cranes and Hoists M&R Services Attachment 1: Performance Work Statement

Contract #

PERFORMANCE WORK STATEMENT

CRANES AND HOISTS

MAINTENANCE AND REPAIR (M&R) SERVICES

3 June 26

TRAVIS AIR FORCE BASE (TAFB)

Table of Contents

1. PURPOSE, DESCRIPTION OF SERVICES, AND REQUIRED TASKS

1.1. PURPOSE

1.2. DESCRIPTION OF SERVICES

1.3. DESCRIPTION OF REQUIRED TASKS

1.3.1. PREVENTIVE MAINTENANCE

1.3.1.1. TECHNICAL DATA

1.3.1.2. CONTRACTOR HOTLINE

1.3.1.3. TELEPHONE SUPPORT

1.3.1.4. PAINT/CORROSION CONTROL

1.3.1.5. MINOR REPAIRS

1.3.2. ADDITIONAL IN-SCOPE WORK IDENTIFIED DURING PREVENTIVE

MAINTENANCE

1.3.3. MAINTENANCE AND REPAIR LOG

2. GOVERNMENT RESOURCES

2.1. GOVERNMENT PARTS/ITEMS

2.2. BASE SUPPORT SERVICES

2.3. UTILITIES

3. CONTRACTOR PERSONNEL AND QUALIFICATIONS

3.1. CONTRACTOR AND SUBCONTRACTOR QUALIFICATIONS

3.2. LEAD TECHNICIAN

3.3. NON-QUALIFIED C TECHNICIAN

3.4. WELDING

3.5. ELECTRICAL

4. SAFETY/ENVIRONMENTAL

4.1. GENERAL

4.2. CRANE OPERATIONS

4.3. SAFETY DATA SHEET

4.4. HAZARDOUS MATERIALS/WASTE SPILLS

4.5. ENVIRONMENTAL COMPLIANCE/HAZARDOUS MATERIALS

5. REQUIRED MEETINGS AND BRIEFINGS

5.1. POST AWARD ORIENTATION/CONFERENCE

5.2. PROJECT MEETINGS

5.3. PREVENTIVE MAINTENANCE OR SERVICE ORDER IN/OUT BRIEFS

5.3.1. GENERAL

5.3.2. IN-BRIEFS

5.3.3. OUT-BRIEFS

6. PLANS AND DATABASES

6.1. OPERATIONS AND MAINTENANCE PLAN

6.2. QUALITY CONTROL PLAN

6.3. MAINTENANCE AND REPAIR LOG

7. DOCUMENTATION OF MAINTENANCE AND REPAIR

7.1. QUARTERLY REPORTS

7.1.1. QUARTERLY REPORTS CONTENT

8. SERVICE CALLS, SERVICE ORDERS, AND ADDITIONAL IN-SCOPE WORK

8.1. SERVICE CALL TYPES

8.1.1. EMERGENCY AND ROUTINE SERVICE CALLS

8.1.2. EMERGENCY

8.1.3. ROUTINE

8.2. SERVICE ORDER

8.3. ADDITIONAL IN-SCOPE WORK

8.3.1. ADDITIONAL IN-SCOPE WORK IDENTIFIED DURING PREVENTIVE

MAINTENANCE AND SERVICE CALLS

8.3.2. ADDITIONAL IN-SCOPE WORK/SERVICE ORDER INFORMATION

9. PERFORMANCE EVALUATION

9.1. SURVEILLANCE

9.2. METHODS

9.3. CRANE & HOIST SYSTEM OPERATIONAL RATES

9.4. PERFORMANCE METRICS

10. GENERAL, ADMINISTRATIVE, AND SECURITY INFORMATION ……………………………..18

10.1. PUBLIC DISCLOSURES

10.2. HOURS OF OPERATION

10.3. WORK COORDINATION

10.4. WORK AREA

10.5. REPLACEMENT EQUIPMENT DISPOSITION

10.6. WARRANTY

10.7. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL

COMMAND AUTHORITY

10.8. GOVERNMENT DATA RIGHTS

APPENDIX A: DEFINITIONS AND ACRONYMS

APPENDIX B: SERVICE ORDER TEMPLATE

APPENDIX C: MAINTENANCE & REPAIR LOG TEMPLATE

APPENDIX D: EQUIPMENT LIST (WORKLOAD ESTIMATE AND DATA)

1. PURPOSE, DESCRIPTION OF SERVICES, AND REQUIRED

TASKS

1.1. PURPOSE

The purpose of the Cranes and Hoists Maintenance and Repair (M&R) Services Contract is to provide preventive maintenance (PM), inspection, and repairs for Cranes and Hoists on Travis Air Force Base.

1.2. DESCRIPTION OF SERVICES

The Contractor shall perform Repair Services, Annual Load Testing Inspection and Quarterly Inspections for Cranes and Hoists at Travis Air Force Base, California in accordance with all applicable laws, regulations, standards, instructions, and commercial practices described in this Performance Work Statement (PWS) with a focus on safety and customer service. The Contractor shall have and maintain all licenses and certificates required to perform all work requirements in the PWS. The Contractor shall, except as specified in the PWS as Government furnished property or services, provide everything needed to perform Cranes and Hoists inspections and repair services at Travis Air Force Base (TAFB) as defined in the PWS. Crane and Hoist Services will be performed throughout Travis AFB, CA. The estimated workload and crane/hoists locations are listed in Appendix D, entitled Workload Estimate and Data. All work performed by the Contractor in the PWS shall conform to the applicable latest editions of the following specifications and standards but not limited to:

- OSHA Standards 29 CFR §§ 1910 and 1926

- American National Standards Institute (ANSI) Standards B30

- Crane Manufacturer’s Association of America (CMAA)

- American Gear Manufacturers Association (AGMA)

- Manufacturer’s Recommendations and Warranty Requirements

1.3. DESCRIPTION OF REQUIRED TASKS

1.3.1. PREVENTIVE MAINTENANCE

The Contractor shall perform three (3) quarterly inspections and one (1) annual load testing inspection of all cranes and hoists to ensure reliable and continuous safe operation of all cranes & hoists listed in Appendix D (Workload Estimate and Data). The work shall be in accordance with the PWS and shall be in accordance with the manufacturer’s instructions and or industrial standards and the standards in the PWS. Some repairs or replacements of parts may require load tests or recertification by the Contractor dependent on the type of repairs or parts replaced as required by all applicable standards. The additional repairs required, testing, and/or recertification will use labor and/or parts line items. The contractor shall conduct the initial Cranes and Hoists PM service within thirty (30) days after contract award and each quarter after that with a Load Test on the 4th quarter of each year. PM services include those actions required to preserve and maintain the systems in such a condition to function efficiently. The Contractor must comply with the recommendations of the manufacturer and all applicable industry guidance. The Contractor is responsible for obtaining the manufacturer specifications. If the manufacturer specifications are not available, the Contractor shall adhere to the following order of precedence

(higher to lower): contents of this PWS, Original Equipment Manufacturer (OEM) requirements, and industry standards. The Contractor shall perform PM and will be responsible for the repair and replacement of all worn or failed components and parts. Replacement parts shall be commercially available off-the-shelf (COTS) items when available, fully compatible with existing systems, and detailed in the quarterly report (see PWS Section 7.1). All new or replacement electronic components shall be open-source programmable code. The Contractor shall identify any additional in-scope repairs during PM (see PWS Section 8.3).

1.3.1.1. TECHNICAL DATA

The Contractor must acquire the OEM’s Operations and Maintenance (O&M) information as needed to conduct all necessary work on existing equipment and provide an electronic copy to accompany the O&M Plan (see PWS Section 6.1).

1.3.1.2. CONTRACTOR HOTLINE

The Contractor must provide a single customer service hotline phone number that can be accessed 24 hours a day, 365 days a year by contract award to be responsive to Government requests. The Contractor’s customer service function must be managed to ensure responsiveness. To be responsive, Contractor personnel must be available during all hours to respond to Government requests. The Contractor must log all calls received and the response calls made by the Contractor. A Telephone Call Log must include the date, time, caller, brief description of the issue, response time for the Lead Technician, and resolution for each telephone call. The Contractor must have a process for resolving Travis AFB concerns and following up on unresolved requests.

1.3.1.3. TELEPHONE SUPPORT

The Contractor shall have an appropriate Lead Technician contact the Government within two (2) hours to discuss and attempt to resolve the situation over the telephone, upon official notification by the CO or Contracting Officer Representative (COR) via the Contractor Hotline or other means.

1.3.1.4. PAINT/CORROSION CONTROL

The Contractor must re-paint any necessary components during the summer PM session to prevent any corrosion. Summer PM will be established IAW the manufacturer’s recommended temperature and environmental recommendations for application. The Contractor must clean, remove corrosion, and apply primer and topcoat compatible with the metal surface in compliance with industry and safety standards.

1.3.1.5. MINOR REPAIRS

The Contractor must, during PM, immediately service any system that is not operating properly as well as supply and install parts to keep the system functional. All labor and work required to perform minor repair shall be included under this contract at no additional cost to the government. Minor repairs consist of $50 per unit per PM visit for parts and materials and shall be included in the contractor's proposal. The total cost of minor repair parts per PM visit must not exceed the aggregate amount of minor repair parts allowance per PM visit.

For example, maintaining and inspecting eight (8) units each PM visit would provide an aggregate $400 allowance for minor parts each PM visit to be used on any combination of the eight (8) units within the contract. If the aggregate amount of total repair parts was $800, the Contractor is responsible for the first $400 of minor repair parts and materials. The Contractor must submit a proposal to the CO/COR for evaluation and approval for the remaining parts and materials cost under the Additional In-Scope Work.

Examples of minor repair parts include, but are not limited to, light bulbs, plastic light lenses, hoses, cable/wire, fuses, valves, switches, relays, etc. Minor repair parts do not include items identified and required for the quarterly maintenance function identified in the PM O&M Plan.

If the inoperable system(s) cannot be repaired during PM or requires parts in excess of the aggregate minor repair parts allowance, the Contractor must notify the CO/COR immediately of the irreparable status of the crane or hoist system.

1.3.2. ADDITIONAL IN-SCOPE WORK IDENTIFIED DURING PREVENTIVE

MAINTENANCE

In-scope tasks for maintenance and repair greater than those required by PM and minor repair are defined as Additional In-Scope Work to ensure equipment operation or to ensure that facilities and equipment can perform per manufacturer’s recommendation over their normal lifecycle. Any Additional In-Scope Work must be documented as a SO (see PWS Sections 8.2 and 8.3).

1.3.3. MAINTENANCE AND REPAIR LOG

The Contractor must maintain and update a Maintenance and Repair Log. The Contractor must provide the Maintenance and Repair Log quarterly to, and upon request by, the CO (see PWS Section 6.3). The Contractor may use the provided Microsoft Excel spreadsheet in PWS Appendix C, or their own format if approved by the CO and as long as the requirements in PWS Appendix C are included at a minimum. The Maintenance and Repair Log shall include a complete history of maintenance tasks and repairs, indicating dates, name of company, and name of technician who performed the work.

2. GOVERNMENT RESOURCES

2.1. GOVERNMENT PARTS/ITEMS STORAGE ON -SITE

The Government may provide on-site storage of limited parts/items for Crane and Hoist repairs.

As part of the PM task, the Contractor must recommend a list of long lead time parts for the Government’s consideration for storage on-base. The Government is under no obligation to provide on-site storage of any parts/items for repairs or maintenance. However, if the CO/COR decides that it is in the best interest of the Government to allow certain parts to be purchased in advance and stored on base the CO my issue a SO for the advanced parts purchase. The part/s would belong to the Government until such time that they are required for installation by the contractor. No cost will be charge for storage.

2.2. BASE SUPPORT SERVICES

The Government will provide emergency medical treatment and emergency patient transportation service for contractor personnel who are injured or become critically ill during the performance of this contract.

The contractor shall reimburse the Government for the cost of medical treatment and patient transportation service at the current in-patient or outpatient treatment rate, as appropriate. The Contractor shall notify the COR of any accident requiring emergency medical treatment within 30 minutes of incident. Fire prevention and protection. Fire department telephone extension is 424- 4911 for emergencies. Security police. The Government will provide general on-base telephone extension is 424-4911 for emergencies.

2.3. UTILITIES

The Contractor shall coordinate with the CO/COR regarding utility availability such as water and electricity to accomplish the requirements of this contract. Any temporary connection of electrical lines that may be required shall be installed, maintained, and removed by the Contractor, and shall not be attempted until proper approvals are obtained from Travis Base Civil Engineer office through coordination with the CO/COR.

3. CONTRACTOR PERSONNEL AND QUALIFICATIONS

3.1. CONTRACTOR AND SUBCONTRACTOR QUALIFICATIONS

The Contractor shall provide personnel possessing the skills, knowledge, and training to satisfactorily perform the services required. Personnel performing work under this PWS shall remain employees of the Contractor (or Subcontractor) and shall not be considered employees of the Government.

3.2. LEAD TECHNICIAN

The Lead Technician performing the work shall be trained on the specific system(s) currently operating at the military base and have no less than three (3) years minimum of experience inspecting and maintaining those types of systems. The lead technician must have documented training in order to perform work on systems included in the scope of the contract. The Lead Technician’s experience in cranes and hoists systems and safety control systems must include documented experience in troubleshooting, modification, maintenance, and repairs of these systems. The Contractor is required to submit to the CO/COR a list of employees proof of qualifications within five (5) calendar days prior to contract performance. A Lead Technician possessing the required training shall oversee all the work on the site. The Lead Technician must be present when work is being performed for PM, Routine and Emergency Service Calls, and Additional In-Scope Work.

3.3. NON-QUALIFIED CRANE AND HOIST TECHNICIAN

The Lead Technician shall oversee the work of non-qualified technicians. Non-qualified technicians may perform cleaning, corrosion control duties, and assist qualified Crane Technicians with inspecting and maintaining the systems.

3.4. WELDING

If a Contractor or Subcontractor employee performs welding, they shall be certified in the Shielded Metallic Arc Welding process utilizing the American Welding Society (AWS) Code of AWS D.1.1 in the 3G and 4G positions for 1” thick A-36 structural steel. The Contractor shall produce a current welding certification to the CO/COR for each employee performing welding prior to the commencement of any work involving welding. The Contractor shall coordinate with and obtain a Travis ABF welding and cutting permit issued by the 60th Civil Engineer office via coordination with the CO/COR prior to any cutting or welding.

3.5. ELECTRICAL

Each Contractor or Subcontractor employee performing electrical work on Crane and Hoist systems shall meet training requirements per the National Electric Code (NFPA 70) and any local State regulations. The Contractor shall ensure a person who possesses a current Cardio Pulmonary Resuscitation (CPR) certification be present at all times when electrical work is being conducted.

4. SAFETY/ENVIRONMENTAL

4.1. GENERAL

The Contractor shall comply with all Federal, State, and local laws and safety regulations (see PWS Appendix C). Compliance with Occupational Safety and Health Administration (OSHA) and other applicable laws and regulations for the protection of Contractor employees is exclusively the obligation of the Contractor. The Government will assume no liability or responsibility for the Contractor’s compliance or noncompliance with such responsibilities. The Contractor is responsible for furnishing Contractor employees with all necessary personal protective equipment and site-related safety equipment to perform services.

4.2. CRANE OPERATIONS

The Contractor shall notify the CO/COR immediately via phone when a crane or hoist system is unsafe and should be de-energized/shutdown until repairs can be made to return the system back to a safe operating condition.

4.3. SAFETY DATA SHEET

In order for TAFB to meet the Hazardous Materials Management, and IAW FAR 23.302 requirements, if hazardous materials are expected to be used during the performance of this contract, the Contractor is required to submit hazardous materials data per the requirements of Federal Standard No. 313 and FAR Clause 52.223-3, Hazardous Material Identification and Material Safety Data, so that the materials can be properly authorized, managed, and tracked. The Contractor must identify/list any hazardous material, as defined under the latest version of Federal Standard No. 313. Each hazardous material item must be identified on a Safety Data Sheet (SDS, formerly known as a Material Safety Data Sheet or MSDS) per FAR Clause 52.223-

3. All Contractor employees shall have ready access to the SDS while they are on the work site, and there can be no issues accessing the SDS to any Contractor employees or the Government.

4.4. HAZARDOUS MATERIALS/WASTE SPILLS

The Contractor must take every reasonable precaution to prevent spills of hazardous materials (HAZMAT) in the performance of the Contractor’s tasks under each Task Order. The Contractor shall immediately report any HAZMAT spills to the installation’s spill response team at 707-424- 2533 or the fire department at 707-424-4911 IAW the installation’s Spill Prevention, Control, and Countermeasure (SPCC) Plan. The Contractor shall comply with this plan when handling and storing all oils, fuels, and HAZMAT. The SPCC Plan can be provided to the Contractor upon request. The Contractor shall clean and dispose of all HAZMAT spills IAW local, state (of Task Order’s location), and Federal laws and regulations and the installation’s Environmental Guide.

The Contractor shall bear full financial obligation incurred from cleaning and disposing of HAZMAT spills, or release of HAZMAT within the confines of the installation or facility caused by Contractor employees.

4.5. ENVIRONMENTAL COMPLIANCE/HAZARDOUS MATERIALS

The Contractor must dispose of oil cans, oil residue, and any oil soaked material (e.g., rags and/or paper towels, granulated materials and sand) off-base. The Contractor must transport and dispose of all waste IAW Federal, State, and local environmental laws and regulations.

5. REQUIRED MEETINGS AND BRIEFINGS

5.1. POST AWARD ORIENTATION/CONFERENCE

A post award “Kick-Off” orientation/conference shall be held via teleconference or face-to-face as determined by the CO within 10 days after the contract award. The purpose of this conference is for the Government and Contractor to discuss contract administration, Government expectations, and the Contractor’s Quality Control Plan (QCP).

5.2. PROJECT MEETINGS

The Contractor shall conduct a project meeting as needed or as requested by the government via teleconference or in person with the Government to discuss any contract issues, work schedule, and coordination plans. The Contractor shall cover the following information in addition to other agenda items:

• Open SOs, numbers, and issues

• PM and SO schedule

• Equipment operational rates

• Site/Installation issues requiring program attention

• Any SO delays (either requiring Government or Contractor action)

5.3. PREVENTIVE MAINTENANCE OR SERVICE ORDER IN/OUT BRIEFS

5.3.1. GENERAL

Prior to conducting PM or Additional In-Scope Work, the Contractor shall provide an in-brief to the CO/COR five (5) days prior to commencement of work. In-briefs shall be conducted on the phone unless Contractor staff needs to meet with base facility staff on-site. In-briefs may also be combined with the reoccurring Project Meeting (see PWS Section 5.2). Out-briefs shall be conducted on-site with the CO/COR upon completion of work to inform the CO/COR of work completed, any information that is relevant to the facility regarding the completed work, and any outstanding issues remaining from the work.

5.3.2. IN-BRIEFS

At a minimum, minutes from in-briefs shall include the following information:

• Identifying PM or SO

• Scope of work

• Schedule, start, and finish dates

• List of Contractor personnel

• Logistics, including personnel requiring base access

5.3.3. OUT-BRIEFS

At a minimum, minutes from out-briefs shall include the following information:

• Status of all completed work

• System operational status

• Review of PM Checklist

• Any SO work that was not completed and reason

• Notification of de-energization of system

• Any follow-on work required (After Service Summary and Any Needed Repair Summary)

• Any remarks pertinent to the effort

6. PLANS AND DATABASES

6.1. OPERATIONS AND MAINTENANCE PLAN

The Contractor shall develop an Operations and Maintenance (O&M) Plans for each individual Crane and Hoist. The O&M Plans must be part of the Contractor’s proposal submission to be evaluated by the Government prior to the award of the contract. Each unit O&M Plan will include, at a minimum, the following:

• PM Checklist tailored specifically for each unit based on site-specific equipment and the manufacturer’s service manual.

• Specific unit test procedures for crane and hoist operations and safety system.

• Reports to be prepared and submitted, and records to be maintained.

• Recommend list of long lead time parts for consideration for storage on-base.

6.2. QUALITY CONTROL PLAN

The Contractor must develop and maintain a Quality Control Plan (QCP) that ensures proper system maintenance. The QCP must illustrate an adequate inspection system and inspection plan to ensure contract compliance. The QCP must be submitted by the contractor to the CO within 30 days from contract award for approval. The Contractor must maintain inspection records and make them available to the Government. The Government may (but is not required or obligated

to) do its own tests and inspections. The plan must include the Contractor’s plan to ensure that all crane and hoist systems are maintained IAW the manufacturer’s product literature, professional commercial standards, and this PWS. The Contractor must develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP must address all service requirements to maintain proper system functionality, to include a description of the process and the qualifications of any key personnel involved with quality control to ensure all tasks are completed within cost, schedule, and quality. The Contractor’s plan must be approved by the CO.

6.3. MAINTENANCE AND REPAIR LOG

The Contractor must develop and maintain a maintenance and repair log. The Contractor may use the provided Microsoft Excel template/spreadsheet in PWS Appendix C, or the Contractor may use their own format if approved by the CO and as long as the requirements in PWS Appendix C are included at a minimum. A maintenance and repair log must be kept for each unit (crane or hoist). For the purpose of this contract, a unit is defined as the collection of equipment at a given facility or location. The log must contain a list of equipment at the facility, the frequency of maintenance on the equipment, the warranty information for all equipment having remaining manufacturer’s warranty, all equipment installed under the contract, and warranty status on new equipment. This list must include vendor, model number, serial number, installation date, warranty start date, the Contractor’s warranty expiration date, and the equipment manufacturer’s warranty expiration date (see PWS Section 10.6). The log shall also contain equipment repair costs (to the system level), deficiencies, and problem areas that need corrective work. Non- serviceable equipment must also be listed on the maintenance log but will not be counted in performance metrics or covered under PM procedures. Equipment may be added to this list only with approval of the CO. The Contractor must submit any requests to remove equipment from the contract or as determined by repair expenses or other factors for consideration. Records in the log shall be maintained for the duration of the contract and turned over to the CO at completion of the contract. The maintenance and repair log as submitted by the Contractor will be electronically recorded and maintained by the Government in the permanent facility files. The information obtained from the maintenance and repair log will be used to schedule the required maintenance and repair work through Contractor efforts as appropriate and update real property records as necessary.

7. DOCUMENTATION OF MAINTENANCE AND REPAIR

7.1. QUARTERLY REPORTS

The Contractor must provide actual dates of completed PMs and SOs since the previous report and a list of pending SOs and associated work plans (including work that does not have an assigned SO, i.e. pending subcontractor proposals, warranty, etc.) that have been identified by the CO/COR or the Contractor. The Contractor shall clearly designate if the pending SO was initiated by the Government (CO/COR) or the Contractor.

7.1.1. QUARTERLY REPORT CONTENT

The Contractor must include the following in each report:

• Executive overview of the condition and work completed on all systems

• Separate report sections for PM at each facility

• Separate report section for each SO repair effort (if any)

• Dates, times, and locations of PM performed/SO repairs and when repairs were completed

• Description of parts/materials replaced, actual cost, and names of technicians performing the repairs

• Narrative describing deficiencies and problem areas that need corrective work

• Narrative of the equipment condition and recommendations for proactive minor and routine repair tasks intended to reduce unscheduled equipment downtime

• Maintenance, repair, inspection, and testing findings identified

• Maintenance and Repair Log and completed PM Checklist

• For equipment under warranty, identify any warranty issues that need to be addressed

• Minutes from In-briefs

• Minutes from Out-briefs

• Minutes of Monthly Project Meetings

• Telephone Call Log

• Operational Rate

• Supporting photographs, if requested by the Government.

8. SERVICE CALLS, SERVICE ORDERS, AND ADDITIONAL IN-

SCOPE WORK

8.1. SERVICE CALL TYPES

Service Calls shall be separated into two (2) different categories: Emergency and Routine. The difference between Emergency and Routine is the on-site response time of two (2) hours for

Emergency Service Calls vs. twenty-four (24) hours or 1000 hours (Pacific local time) the next business day (whichever is greater) for Routine Service Calls. The Government reserves the right to take emergency or routine actions necessary utilizing its own resources to correct any situation that can cause injury, death, or property damage, or impede mission operations.

8.1.1. EMERGENCY AND ROUTINE SERVICE CALLS

Upon official notification by the CO/COR via the Contractor Hotline or other means, the Contractor must have an appropriate Lead Technician contact the Government within thirty minutes (30) minutes to determine the scope of the problem and to attempt to resolve the situation over the telephone. If it is determined that the situation cannot be resolved via Telephone Support, the Contractor shall contact the CO/COR and request a Service Call approval to dispatch a Lead Technician to the site. The Contractor can request the CO provide the notice to proceed by telephone, text, or e-mail. The Contractor must be proactive in pursuance of immediate repairs during Emergency/Routine Service Calls.

8.1.2. EMERGENCY

The Service Call must be designated an emergency if a repair is required to correct a situation that can cause injury, death, or property damage, or impedes mission capabilities.

Required Response Time: The Lead Technician will be on-site within two (2) hours from approval by the CO. Within six (6) hours from arrival on-site, the Lead Technician must complete the troubleshooting, make the needed minor repairs (NTE $100 for parts per unit per call) and/or system adjustments to return the unit to operational status, or place the unit into safe mode until repairs can be completed. This is included in the Firm Fix Price (FFP) for Service Calls. If the crane or hoist cannot be returned to operational status within six (6) hours and under the $100 minor parts threshold included in the FFP Service Call, the Contractor shall provide the CO/COR with a plan to repair before the Contractor leaves the site. The estimate and schedule for the proposed Service Order are required within forty-eight

(48) hours unless otherwise negotiated by the CO.

8.1.3. ROUTINE

All other Service Calls shall be classified as Routine.

Required Response Time: The Lead Technician will be on-site within twenty-four (24) hours or by 1000 hours (Pacific local time) the next business day (whichever is greater) starting from approval by the CO. Within six (6) hours from arrival on-site, the Lead Technician shall complete the troubleshooting, make the needed minor repairs (NTE $100 for parts per u n i t per call) and/or system adjustments to return the crane or hoist to operational status, or place the system into safe mode where normal facility operations can safely resume until repairs can be completed. This is included in the FFP for Service Calls. If the system cannot be returned to operational status within six (6) hours and under the $100 minor parts/call threshold included in the FFP Service Call, the Contractor shall provide the CO/COR with a plan (estimate and schedule) to repair before the Contractor leaves the site. The estimate and schedule for the proposed Service Order are required within forty-eight (48) hours of the Service Call unless otherwise negotiated by the CO.

8.2. SERVICE ORDER

Once the qualified Lead Technician arrives on-site and determines the extent of the repair required, the Contractor shall notify the CO/COR of the scope and cost of the repairs. If the repairs cannot be made within the time (six (6) hours or cost (NTE $100 for parts per unit per call) limits of the Service Call per PWS Sections 8.1.2 and 8.1.3, the Contractor shall submit a SO for CO/COR evaluation and approval. The official repair SO document shall include the relevant facts and proposed costs for the situation (see PWS Appendix B).

8.3. ADDITIONAL IN-SCOPE WORK

Contracts for the performance of maintenance, modification, and repair of various items generally contain Additional In-Scope Work requirements. Additional In-Scope Work requirements task the Contractor to identify needed repairs and recommend corrective action during regular PM or during the performance of a Service Call. If identified, the Contractor shall submit a SO identifying the Additional In-Scope Work and, if appropriate, the CO/COR may authorize the Contractor to proceed with the work. Additional in-scope work exceeding $2,500 may be recompeted to ensure the best value for the Government. The CO/COR will evaluate and approve a SO to execute the Additional In-Scope Work identified by the Contractor during scheduled PM or during the performance of a Service Call.

Additional In-Scope Work requests must be determined by the CO to be within the scope of the basic contract. All Additional In-Scope Work shall be authorized prior to performance of the work, and the price of such work must be determined to be fair and reasonable by the ordering

CO.

8.3.1. ADDITIONAL IN-SCOPE WORK IDENTIFIED DURING

PREVENTIVE MAINTENANCE AND SERVICE CALLS

During performance of PM, or as a result of an Emergency/Routine Service Call, unexpected equipment failures in excess of the minor repair parts allowance may be encountered. In this scenario, the Contractor must notify the CO/COR immediately. The notification will include a written statement to identify recommended repairs and recommend corrective action along with a SO indicating the date of completion to make the repair to include labor, material, and incidental costs to accomplish the work. The Contractor shall not continue with any of the additional work discovered unless the CO/COR authorizes it. All additional work requirements must be determined by the CO/COR within the scope of the contract, and the price of the additional work must be determined to be fair and reasonable by the CO/COR.

8.3.2. ADDITIONAL IN-SCOPE WORK/SERVICE ORDER INFORMATION

The Contractor shall submit an itemized breakdown of the cost or pricing data which has sufficient enough detail to substantiate all costs proposed for the SO. The breakdown shall describe all repairs involved for the Additional In-Scope Work.

Material Pricing: Sufficient information must be provided for each SO material item to substantiate the item’s price. Manufacturer part numbers, key specifications, published catalog pricing, or product descriptions can be submitted to fulfill this requirement. In the case of proprietary equipment, the Contractor shall provide documentation that the prices provided have been charged on other contract numbers or on the General Services Administration’s (GSA) price lists. Pricing shall be considered valid for ninety (90) calendar days after the initial approval unless documentation from the Contractor is provided to verify a price increase has been implemented.

The Contractor must provide parts that are from the OEM or equal and fully compatible for use and do not void any applicable warranties. Replacement parts shall be COTS items when available and fully compatible with existing OEM systems and detailed in the quarterly report.

Used or refurbished parts are acceptable if the Contractor’s proposal identified it as providing benefit to the Government.

Work hours, types of personnel performing the work (see PWS Section 3), and a description of the work to be performed shall be provided. The price breakdown shall include sufficient detail to permit an analysis of all costs associated with labor hours. Tasks shall be separated at the request of the Government if it is unclear as to where labor is allocated relative to the scope.

The SO shall be emailed to the CO/COR with the following subject line:

Contract Number, Service Order Number, and Site/Location

9. PERFORMANCE EVALUATION

9.1. SURVEILLANCE

Verification of performance objectives and surveillance for actual Crane and Hoist M&R services will be accomplished by the COR. COR will perform inspections and surveillance IAW the Quality Assurance Surveillance Plan (QASP), which shall contain the information within PWS Table 2: Services Summary. The COR will evaluate Contractor performance of the services listed in Table 2: Services Summary to determine if the performance thresholds are met, and all surveillance shall be documented with the QASP checklist.

All actions taken by the Contractor to correct deficiencies found by the Government as a result of quality assurance surveillance, and by the Contractor as a result of quality control, shall be at the Contractor’s own expense, and without additional reimbursement by the Government.

Defective repairs shall be accomplished (referred to as a “callback”) within five (5) business days. Re-performance is the preferred method of correcting any unacceptable performance. If performance is still unacceptable after a callback, the Contractor may be issued a Contract Discrepancy Report (CDR), which is a report citing unsatisfactory services or performance for which the Contractor is responsible under the PWS.

9.2. METHODS

Surveillance methods include review of quarterly reports, periodic surveillance, monthly meeting and briefings, periodic surveys, and customer complaints. Surveillance methods can change after contract award based on, but not limited to, acceptance of the Contractor’s QCP (see PWS Section 6.2) or Contractor performance.

9.3. CRANE AND HOIST SYSTEM OPERATIONAL RATES

Each unit shall be operational at least ninety-six (96) percent of the time. Operational is defined as all crane and hoist systems being fully functional at each facility. The operational rate is a quarterly measure beginning after the first instance of PM. Operational downtime shall begin once the Contactor is notified of the non-operational system.

Performance Standard and Acceptable Quality Level: Crane and Hoist operational rate of ninety-six (96) percent.

9.4. PERFORMANCE METRICS

Performance of a service shall be evaluated to determine whether or not it meets the established performance threshold (see PWS Table 2). The performance of the Contractor will also be measured using periodic customer satisfaction surveys. Re-performance is the preferred method of correcting any unacceptable performance.

TABLE 2: SERVICES SUMMARY

SS# Performance Objective PWS Section

Performance Threshold and Remedy

Surveillance Method Rating

The Contractor shall provide all personnel, labor, equipment, supplies, tools, materials, supervision, periodic inspection, minor repair, and other items and services necessary to provide maintenance for Travis Air Force Base Cranes and Hoist systems. The Contractor shall perform three (3) quarterly inspections and one (1) annual load testing inspection of all cranes and hoists to ensure reliable and continuous safe operation of all cranes & hoists listed in Appendix D (Workload Estimate and Data).

1.2, 1.3, 9.3

96% operational rate as described in PWS Section 9.3.

No more than one customer complaint per quarter.

Remedies:

a. Contractor shall provide a written Corrective Action Plan within 5 business days from CO and/or COR notification.

b. Re-performance within 3 days of notification

Review of Quarterly Reports and Periodic Surveillance

2 Full Preventive Maintenance (PM)

1.3.1

100% performance of PM requirements. No more than one customer complaint per quarter.

Remedies:

a. Contractor shall provide a written Corrective Action Plan within 5 business days from CO and/or COR notification.

b. Re-performance within 3 days of notification

Reports and

Contractor Hotline

1.3.1.2

100% of calls responded to within the specified timeframe.

Contractor must be available to respond all the time.

Remedy:

Contractor shall provide a written Corrective Action Plan within 5 business days from CO and/or COR notification.

Reports and

Telephone Support

1.3.1.3

100% of calls responded to within two (2) hours by qualified Lead Technician.

Contractor must be available to respond all the time within

Review of Quarterly

Reports and

10. GENERAL, ADMINISTRATIVE, AND SECURITY

INFORMATION

10.1. PUBLIC DISCLOSURES

The Contractor shall not make a public announcement or disclosure relative to information contained or developed under this contract, except as authorized by the CO/COR.

10.2. HOURS OF OPERATION

Maintenance, periodic inspection, and repair services are normally provided during non-peak hours and working days, excluding legal Federal and National holidays. The Contractor shall coordinate the work schedule with the CO/COR identified in the contract. Travis AFB is open 24 hours a day, 365 days a year.

10.2.1 RECOGNIZED HOLIDAYS

New Year’s Day Labor Day Martin Luther Kng Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Juneteenth Day Thanksgiving Day

Independence Day Christmas Day

10.3. WORK COORDINATION

The Contractor shall coordinate all work with the CO/COR at least [five (5) days] in advance the allowable time as stated in paragraph 1.3.1.4.

Remedy:

Contractor shall provide a written Corrective Action Plan

Emergency/Routine Service Call Repairs

8.1, 8.1.2, 8.1.3

100% of Service Call response made within specified timeframe without a callback.

Remedy:

Contractor shall provide a written Corrective Action Plan

Reports and with the exception of Service Calls. Coordination for Service Calls follows the procedure in PWS Section 8.1. The Government is not responsible for any costs incurred by the Contractor resulting from failing to coordinate work with the CO/COR. If the Contractor plans to use radio/CB transmissions in the performance of work, radio transmission frequency must be approved by the CO/COR.

10.4. WORK AREA

The Contractor shall at all times keep work areas free from any accumulation of debris, waste material, rubbish, tools, scaffolding, equipment, and materials. Upon completion of the job or when away from the work area, the Contractor shall leave the work area and its premises in a clean, neat, safe, and workmanlike condition. The Contractor is responsible for removal and proper disposal of all job-related waste material from the worksite. The Contractor shall be responsible for all work area, traffic barricades, and traffic flagging operations when required.

10.5. REPLACEMENT EQUIPMENT DISPOSITION

The disposition of all replaced equipment including batteries shall be coordinated with the CO/COR as identified in the contract. Unless the CO/COR states in writing that the replaced equipment shall be turned in to the CO/COR, the Contractor shall properly dispose of the equipment or materials off-base.

10.6. WARRANTY

IAW FAR 12.404(b), the Contractor shall provide at least the same warranty terms, including offers of extended warranties, offered to the general public in customary commercial practice.

At a minimum, the Contractor shall provide a one-year parts and labor warranty for all components installed during the performance of the contract. The warranty shall commence upon replacement of parts or system completion and acceptance. System acceptance is defined as approval by the CO/COR. After being notified of a problem with a component under warranty, the Contractor shall investigate the issue and respond to the CO/COR within twenty-four (24) hours, to include weekends. For warranty documentation, refer to PWS Sections 6.3 and 7.1.1.

10.7. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE

NATIONAL COMMAND AUTHORITY

Contractors providing services designated as essential by a Department of Defense Component are expected to use all means at their disposal to continue to provide such services, IAW the terms and conditions of the contract, during periods of crisis until appropriately released or evacuated by military authority. The services provided for by this contract are deemed mission-essential during crisis and emergencies and must continue normal operation. See Department of Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.237-7023, Continuation of Essential Contractor Services, in the contract.

10.8. GOVERNMENT DATA RIGHTS

The Government will retain rights to all documents, materials, electronic files, and configuration data produced under any resulting work. All documents and materials under any resulting contract will be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the CO.

All materials supplied to the Government will be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

APPENDIX A: DEFINITIONS AND ACRONYMS

Additional In-Scope Work: Any labor or parts that exceed the PM and Service Call thresholds.

Authorized Personnel: Individuals authorized to place “calls” to the Contractor for response to a Service Call or any other maintenance action or service covered in the PWS.

Contract Discrepancy Report (CDR): A report issued to the Contractor citing unsatisfactory services or performance for which the Contractor is responsible under the PWS.

Contracting Officer (CO): Individual responsible for ensuring performance of all necessary actions for effective contracting and compliance with the contract terms, safeguarding the interests of the United States in the contractual relationship, ensuring that the Contractor receives impartial, fair, and equitable treatment under this contract, and determining the final assessment of the Contractor’s performance.

Contracting Officer’s Representative (COR): Individual responsible for providing continuous program and technical oversight of the Contractor’s performance, reporting early identification of performance problems to the CO, and documenting Contractor performance.

Damage to Government Property: Damage or abnormal deterioration caused by physical abuse or negligence.

Defective Service: A service output that does not meet the standard of performance associated with the particular service area in PWS Table 2: Services Summary.

Escort: One or more persons who accompany the Contractor in high security areas on a military installation.

Inspection: Detailed visual and technical examination of all hoist or crane and components.

Safety and operational testing to insure proper and safe operations before turning the system back over to the Government.

Minor Repair/Parts Threshold: For PM, the threshold for minor repair/parts is $50 per unit per quarter. For Service Calls, the threshold for minor repairs/parts is $100 per unit per call. The total cost of minor repair parts per quarter shall not exceed the aggregate amount of minor parts allowance per quarter. Minor repair parts do not include items identified and required for the quarter maintenance function identified in the PM O&M Plan. An example of an item required by the PM O&M Plan would be lubricants, hydraulic oil and oil filter change.

Proposal: To submit in writing an offer listing discrepancies identified during inspection of cranes and hoists.

Quality Control Plan (QCP): The Contractor’s program of action to effectively and efficiently manage the quality of performance objectives relating to standards of performance and inspections necessary to assure that the service satisfy the requirements from concept through validation.

Service Call: Additional visits and service requested at any time other than scheduled maintenance. Service Calls shall be separated into two (2) different categories: Emergency and Routine. The difference between Emergency and Routine is the on-site response time of two (2) hours for Emergency Service Calls vs. twenty-four (24) hours or 1000 hours (Pacific local time) the next business day (whichever is greater) for Routine Service Calls.

Service Order (SO): The FFP proposal to perform Additional In-Scope Work identified by the Contractor during scheduled PM or during performance of a Service Call.

Services Summary (SS): Identifies the key service outputs of the contract that shall be evaluated by the Government to assure contract performance.

CLIN Contract Line Item Number CO Contracting Officer CONUS Contiguous United States COR Contracting Officer’s Representative COTS Commercially available off-the-shelf CPR Cardio Pulmonary Resuscitation DFARS Defense Federal Acquisition Regulation Supplement DVD Digital Video Disc EPA Environmental Protection Agency FAR Federal Acquisition Regulation IAW In Accordance With NTE Not-To-Exceed O&M Operations and Maintenance OEM Original Equipment Manufacturer PM Preventive Maintenance PMR Program Management Review PWS Performance Work Statement QC Quality Control QCP Quality Control Plan SDS Safety Data Sheet SO Service Order SOW Statement of Work SPCC Spill Prevention, Control, and Countermeasure SS Services Summary UFC United Facilities Criteria UFGS Unified Facility Guide Specification

APPENDIX B: SERVICE ORDER TEMPLATE

APPENDIX C: MAINTENANCE & REPAIR LOG TEMPLATE

MAINTENANCE & REPAIR LOG

PART I - CONTRACT TASK ORDER INFORMATION

BASE NAME: START DATE:

GATE NAME: FINISH DATE:

FACILITY #: MAINT QUARTER (FY):

MAJCOM: INBRIEF DATE:

OUTBRIEF DATE:

CONTRACTOR: CONTRACT NO.:

CONTRACTOR POC: TASK ORDER NO.:

CONT POC PHONE #: CO:

LEAD TECHNICIAN: CO PHONE #:

LEAD TECH. PHONE #: COR:

COR PHONE #:

PART II - PREVENTIVE MAINTENANCE (FFP)

CONDITION

SAFETY INSPECTION:

OPERATIONAL STATUS:

CHECKLIST ATTACHED:

GENERAL REMARKS:

MINOR REPAIRS ACCOMPLISHED:

SERVICE ORDER REPAIRS ACCOMPLISHED:

Deficiencies/ Problem Areas:

SUMMARY OF EQUIPMENT

Equip. Description Vendor & Model # Warranty Number Installation Date Crane or Hoist Type Power Frequency of Maintenance

ITEMS UNDER WARRANTY

Equip. Description Vendor & Model # Serial # Installation Date Warranty Start Date Contractor's Warranty Exp.

Date Manufacturer's Warranty

Exp. Date

PART III - SERVICE ORDER COST SUMMARY

Description of Work TO Number Labor Materials Other Direct Cost Total

GRAND TOTAL $0.00

PART IV - CERTIFICATION OF SERVICES

SIGNED:

QUALITY ASSURANCE EVALUATOR

DATE

APPENDIX D: EQUIPMENT LIST/WORKLOAD ESTIMATES AND

DATA

APPENDIX D

Workload Estimates and Data The table provides the location, quantity and other pertinent information of the lift equipment. Each Crane/Hoist below requires 3 Quarterly Inspections and 1 Annual Load Test and Inspection.

Items No.

Make - Model - Serial# Pound/ Cap.

Bldg

ACRN Costing (ea)

1001 Yale - W315998A - DEW15X22TR16/5D14 24,000 1 AA O&M

1002 Yale - EEW10X106-M19/6D2 - W316646A 20,000 14 AB O&M

1003 Am-Quip Monorail Hoist-107301 5,000 14 AC O&M

1004 Robbins & Meyers - DD529 - 1730819501 10,000 139 AG O&M

1005 CM Loadstar - H - L746JK 500 139 AH TWCF

1006 Kone SG TR DM - CXT40210020P35FBLOF -

HFW03663

4,000 177 AI O&M

1007 Kone SG TR DM - CXT40210020T36FBLOF -

HO424880

4,000 179 AJ O&M

1008 Kone SG TR DM - CXT40210020T36FBLOF -

HO425334

4,000 179 AK O&M

1009 Yale Bridge Crane - BE050X020L15D - 04I09K689 8,000 554 AL TWCF

1010 CM Loadstar - R - L1057RT 3,000 564 AM TWCF

1011 ACCO Wright - C3W05 - 5332010040 10,000 564 AN TWCF

1012 Budgit - 311532543 - 951154 2,000 803 AQ TWCF

1013 Robbins & Meyers - DB224 - 17454950 4,000 803 AR TWCF

1014 Yale Bridge Hoist - BE050X020L15D - 07F05K85 7,936 805 AS TWCF

1015 Coffing - WRIE0405VZ 2,000 808 AT TWCF

1016 Si erra Crane - WBEEEL3 - 31406 15,000 808 AU TWCF

1017 Detroit Bridge Crane - 150178 15,000 809 AV TWCF

1018 ACCO Wright - C3W07 - 52322010078 15,000 810 AW TWCF

1019 Heco Pacific Yale - 2372 2,000 812 AX TWCF

1020 Sierra Crane - 694664B1M141 10,000 818 AY TWCF

1021 Columbus CM - 6465 - SA192GE 4,000 819 AZ TWCF

1022 AME Crane - 9634/Hoist - 1532265 10,000 837 BB TWCF

1023 AME Crane - 9634/Hoist - 1532266 10,000 837 BC TWCF 1024 GP Crane-Yale WC3M-G36828YH 20,000 843 BE TWCF

1025 Yale - W3BM25 - 06E28F916 7,000 843 BF TWCF

1026 Kone Crane – A224785 – HGW05057 2000 861 BI O&M 1027 Walter/Dankas - CM648 - STH036EK 2,000 879 BJ O&M 1028 Stray-Co - 16931 6,000 916 BK O&M 1029 Coffing - AME9642…