PWS_Buses.docx
DOCX document 78 KB Posted
- Attached to
- Bus Lease / Rental
- Solicitation number
- W911RZ-23-Q-0064
About this file
This performance work statement outlines requirements for bus rental services in support of military training exercises at Fort Irwin, California. The contractor shall provide four 44-passenger buses delivered to specified locations between 11-23 October 2023 and 10-22 November 2023. The contractor must maintain vehicles, provide 24/7 customer service and equipment recovery, and replace vehicles within 24 hours of breakdowns. The contractor is responsible for delivering buses in good working order, conducting preventative maintenance, and picking up all equipment within 24 hours of the period of performance ending on 22 November 2023. The performance work statement establishes quality control and quality assurance requirements and outlines applicable regulations, policies, and technical references the contractor must follow.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS) [418th CSB TEMPLATE] Version 1 August 2021
PERFORMANCE WORK STATEMENT (PWS)
NTV - Buses
OPERATION 3ABCT NTC ROTATION 24-02
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal service contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The United States (U.S.) Government shall not exercise supervision or control over the Contractor’s employees performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in turn shall be responsible to the U.S. Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide four (4) 44 passenger buses as defined in this PWS except for those items specified as government furnished property (GFP) and government furnished services (GFS). The contractor shall perform to the standards in this contract.
1.2 Background: 4ID, 3ABCT is conducting their rotation to the National Training Center (NTC) in Fort Irwin, California to exercise a division-level training objective of deployment readiness. The Contracted Buses will be utilized to augment existing Fort Irwin TMP fleets and provide capabilities to 3ABCT not available from the TMP Fleet; primarily, this benefit will be to provide freedom of maneuver for key personnel to and from the Yermo Railyard, LSA Santa Fe, and the greater Fort Irwin Area.
1.3 Objectives: The Objective of this contract is to provide a means of vehicular transport (x44 Passenger Buses), capable of four-wheel drive, to key personnel who will be operating in rugged and austere conditions IVO Fort Irwin California.
1.4 Scope: This contract includes all functions, tasks, and responsibilities normally performed by an equipment rental or fleet rental company/provider; to include: delivery and pick up of equipment to the specified location in accordance with the Period of Performance, 24 hour customer service availability, and equipment recovery and replacement (in event of damages or breakdowns). All equipment provided should be delivered in such a state so that their regular service intervals do not fall within the Period of Performance. In the event a contractor must conduct preventative maintenance on equipment they will notify the COR no later than 48 hours from when they wish to pick up the equipment. The Contractor will be responsible for providing the Government with replacement equipment in the event that such a request must be actioned. All else, the Government is not responsible for any damages caused to equipment (whether wholly caused by or attributing to) a missed service interval or for the costs of any regular preventative maintenance.
1.5 Description of Requirement
| Location |
| Type |
| *QTY |
| Dates* |
| LSA Santa Fe / YERMO |
| 44 Passenger Bus |
| 4 |
| 11-23OCT23 |
| LSA Santa Fe / YERMO / RUBA |
| 44 Passenger Bus |
| 4 |
| 10-22NOV23 |
* Dates and quantity may be subject to change due to mission requirements.
1.6 General Information:
1.6.1 Quality Control Plan (QCP): The Contractor shall develop, implement, and maintain a QCP and program to ensure all work described in this contract is performed at or above the standard defined in the Performance Requirements Summary (PRS). The QCP is developed by the contractor for its internal use to ensure that it performs and delivers high-quality service. The contractor’s QCP is the means by which the contractor ensures all work complies with the requirements of the contract. The QCP identifies and corrects potential and actual problem areas throughout the entire scope of the contract.
1.6.1.1 The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor shall submit their QC Plan as part of the contractor’s proposal if QCP will be evaluated. The QCP shall be submitted within thirty (30) days of contract award. After acceptance of the QCP, the contractor shall receive the contracting officer’s (KO) acceptance in writing of proposed changes to the QC procedures. The contractor shall submit QCP changes within five (5) days to the KO and Contracting Officer’s Representative (COR) for review and approval prior to implementation.
1.6.1.2 The Quality Control Plan shall address as a minimum:
1.6.1.2.1 Inspection Program. Included shall be a quality control inspection program covering all general and specific tasks included in the contract scope of work. It shall specify tasks or areas to be inspected on a scheduled or unscheduled basis, the manner in which inspections are to be conducted, the titles of the individuals who will perform the inspections, and the percentage of the work that will be inspected on a recurring basis. In developing this inspection program, the Contractor shall identify the key activities and associated characteristics in each process that have a significant influence on specific services and provide for methods for evaluation of the selected characteristics.
1.6.1.2.2 Deficiency Identification. The QCP shall include a method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable as defined in the PRS. This shall contain processes for corrective action without dependence upon Government direction.
1.6.1.2.3 Deficiency Correction. The program shall contain process control and process performance measurement procedures that shall include how the Contractor shall implement preventive corrective actions. The Contractor shall demonstrate that it has designed quality into the delivery of services thereby mitigating the risk(s) associated with delivery of deficient or nonconforming services.
1.6.1.2.4 Documentation and Enforcement. The QCP shall include a method of documenting and enforcing quality control operations of both prime contractor and subcontractor work; including inspection and testing.
1.6.1.2.5 Trend Analysis. The QCP shall include a method of performing trend analysis and assessments through the use of metrics.
1.6.1.2.6 Surveillance Methods. The QCP shall contain specific surveillance techniques for all contract services. The surveillance methods shall be comprehensive and adaptable to the reporting system of the plan.
1.6.2 Operations Security (OPSEC) SOP/Plan Requirements. Does not require a formal OPSEC program.
1.6.3 Quality Assurance (QA): The government shall evaluate the contractor’s performance under this contract in accordance with (IAW) the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed IAW the performance standards and contract quality requirements are met. Contract quality requirements” means the technical requirements in the contract relating to the quality of the product or service and those contract clauses prescribing inspection, and other quality controls incumbent on the contractor, to ensure the product or service conforms to the contractual requirements. It defines how the performance standards will be applied, the frequency of surveillance, the performance threshold, and deductions, if applicable.
1.6.3 Recognized Holidays:
| New Year’s Day | Labor Day | ||
| Martin Luther King Jr.’s Birthday | Columbus Day | ||
| President’s Day | Veteran’s Day | ||
| Memorial Day | Thanksgiving Day | ||
| Independence Day | Christmas Day |
Juneteenth
Contractor may be required to work during the Thanksgiving Holiday (o/a 23-27NOV23) pending end of training requirements and date. 22NOV23 is the anticipated last day of the period of performance (POP).
1.6.4 Hours of Operation: The contractor is responsible for conducting business between the hours of 0800-1600 Fort Irwin, CA local time (PST), Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at site(s) within the boundaries of the Fort Irwin National Training Center and nearby town of Yermo, CA.
1.6.6 Type of Contract: The Government anticipates the award of a Firm Fixed Price contract.
1.6.7 Access and General Protection Policy and Procedures:
1.6.7.1 FPCON. In addition to the changes otherwise authorized by the changes of clause of contract, should the US Government Force Protection Condition (FPCON) at any individual installation change, the Government may require changes in contractor security matters or process in accordance with DoDI 2000.16. During FPCONs Charlie and Delta, only contract services that have been deemed “mission essential” by the Government will continue. Contract services will resume when the FPCON is reduced to Bravo or lower.
1.6.7.1.1 HPCON: The contractor shall be responsible for adhering to the installation’s Health Protection Condition (HPCON) guidance regarding the COVID-19 precautionary measures.
1.6.7.2 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use.
1.6.7.3 Escorts: The Contractor and all associated sub-contractor employees performing services under this contract shall be escorted at all times by host nation security personnel or by an individual designated by the Contracting Officer Representative (COR) while accessing U.S. facilities or activities.
1.6.7.4 Personnel Security Clearance Requirements: Reserved
1.6.7.4.1 Drug-free Work Force. Reserved
1.6.7.5 Background Checks. The Contractor shall ensure contractor employees and subcontractor employees performing services under this contract have passed a security check conducted by the State Police Department of their U.S. residence. Security checks that have been completed as part of a personnel security clearance background investigation, or a previous background check that was a condition of employment, meet this requirement. Documentation of these checks will be made available to the KO or COR upon request. The Government retains the right to exclude any employee from performance of duties under this contract if a background security check reveals an employee is a security risk. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. If the Government determines additional background checks are required, at a minimum, and upon request from the Government, the Contractor shall provide to the KO or COR, the following information on any contractor or subcontractor employee performing services under this contract:
· Full birth name
· Married name (if applicable)
· SSN or local equivalent (ID card number)
· Date of birth
· Place of birth (city, country)
1.6.7.5.1 Background Check Notification Requirements: If a background check on any employee or subcontractor employee performing services under this contract, whether the check was conducted as a condition of employment or as part of the contract with the Government, reveals any information from any source (including host country law enforcement) of criminal activity by Contractor employees, subcontractors, or subcontractor employees, the Contractor shall immediately notify the KO and COR of that information. The Contractor shall make notification of:
(1) Traffic violations, other than parking, will be reported to the KO or COR only if the contract is for drivers for the Government;
(2) Any suspicious activity by Contractor employees, subcontractors, or subcontractor employees the Contractor believes may pose a risk to U.S. or host nation national security or imminent risk of deadly bodily harm to any person; and
(3) Any actions taken against Contractor employees, subcontractors, or subcontractor employees pursuant to this requirement.
1.6.7.5.2 Remedies. In addition to other remedies available to the Government, the Contractor’s failure to comply with the requirements of this paragraph my result in requiring the Contractor to remove a Contractor employee or employees from the performance of the contract.
1.6.7.5.3 Subcontracts. The Contractor shall include the substance of this paragraph and the preceding paragraph in all subcontracts.
1.6.7.6 Uncleared Contractor Common Access Card (CAC) Credentialing and Access Procedures
1.6.7.6.1 Contractor Common Access Card (CAC) Eligible Requirements: Before CAC issuance, the Contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The Contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DOD facility and access, via logon, to DOD networks on-site or remotely; (2) Remote access, via logon, to a DOD network using DOD-approved remote access procedures; or (3) Physical access to multiple DOD facilities or multiple non-DOD federally controlled facilities on behalf of the DOD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management. Contractor personnel shall return CAC to appropriate U.S. Government authorities within five (5) days of the end of their contractual duties.
1.6.7.6.1.1 Federal Installation/Facility Access: Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The employee performing services under this contract shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, Security Office or the host nation equivalent.
1.6.7.6.2. Contractor Non CAC Eligible Requirements for DOD Facility and Installation Access: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.7.7 Access to Government Information Systems. Reserved
1.6.7.8 Key Control: Reserved
1.6.7.8.1. Only authorized Contractor personnel shall use Government issued key(s) and/or key card(s). Contractor personnel shall follow security access requirements when entering secure areas. Contractor shall receive appropriate security clearance approval to allow visitor(s) access in secure areas.
1.6.7.9 Lock Combinations: Reserved
1.6.8 Post Award Conference/Contract Periodic Progress Meetings: The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The KO, COR, with other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.9 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: ensure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10 Key Personnel: The following contractor personnel are considered key personnel by the government: Contract Manager (CM)/Alternate CM. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contracting Officer prior to start of contract performance. The Contract Manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
Qualifications for all key personnel are listed below:
a) Contract Manager and Alternate Contract Manager: Contractor shall hire and staff personnel who can communicate with Government representatives and where reading, understanding, and discussing environmental, health, and safety warnings are an integral part of an employee’s duties. Contractor’s employee shall be able to understand, read, write, and speak the English language fluently. English shall be the only language used with regard to this contract for written correspondence, discussions and other business transactions.
1.6.10.1 Personnel/Employees/Sub-contractors. For purposes of this paragraph, the term “personnel” or “employee(s)” or “sub-contractors” refers to any person performing work related to this contract, including but not limited to, the Contractor’s employees, agents, representatives, or Subcontractors. The Contractor shall staff this effort with trained, competent and capable employee(s) for the discipline they are assigned to. Contractor personnel shall present a clean, neat and professional appearance. The Contractor shall ensure that employees meet all applicable Federal, State, Local, and installation certification, licensing, medical requirements, and qualifications to perform all assigned tasks and functions as defined in this contract prior to commencement of work. The Contractor shall not permit any personnel to work under this contract if such person is identified by a Government authorized representative to the Contractor as a potential threat to the health, safety, security, general well-being, or operational mission of the Army and Fort Irwin National Training Center, California. All Contractors’ personnel shall comply with installation security and access procedures and the Contractor’s final SP.
1.6.11 Special Qualifications or Certifications: Reserved
1.6.11.1 IA/IT Training Certification: Reserved
1.6.12 Identification of Contractor Employees: Contractor employees shall identify themselves as Contractor personnel and shall avoid representing themselves as Government employees. This identification includes meeting attendance, answering Government telephones, email communications, and working in other situations where Contractor status is not obvious. Contractor personnel identification shall be easily identifiable through the display of badges, name tags, lanyards, etc.
1.6.12.1 Badging of Contractor Employees: If required by the Government, contract personnel and all associated subcontractors employees accessing U.S. facilities or activities, shall present a valid picture ID provided by the Government while accessing Government owned or contracted facilities and shall adhere to facility security policies and restrictions. If applicable, Government issued access badges will not be worn outside designated facility where visible to the general public. Contractor personnel shall return all U.S. Government issued identification to appropriate U.S. Government authorities within five (5) days of the end of their contractual duties.
1.6.12.2 Uniform: Reserved
1.6.13 Contractor Travel: Reserved
1.6.14 Other Direct Costs (ODC): Reserved
1.6.15 Data Rights: Reserved
1.6.16. Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. Neither the Contractor, nor Contractor personnel, shall divulge, nor release data or information developed, or obtained under performance of this work statement, except to authorize Government personnel or upon written approval of the KO. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall apply, and shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.6.16.1 Non-Disclosure Statements: Reserved
1.6.16.2 Advertisement and Social Media: The Contractor shall NOT post information to public website or social media locations, personal or professional, that in any way disclose names, locations, hotel data, participants, discussions, pictures, etc. before, during or after the contract period of performance without the express consent of the Government. The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at (http://www.defenseimagery.mil/products/DODimagery/commercialuse.html). The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.6.16.3 INFORMATION ASSURANCE: At no time will the Contractor or associated sub-contractor employees transmit government documents or information over using methods that do not meet the security requirements specified in the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, "Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations" such as personal electronic mail accounts, public digital data storage sites (cloud storage), social media platforms or instant messaging. Approved government sites such as U.S. Army Aviation and Missile Research Development and Engineering Center (ARMDEC) Safe Exchange at https://safe.amrdec.army.mil/SAFE/About.aspx, or All Partners Access Network (APAN) at https://community.apan.org/, or other transmission means determined by the government must be used.
1.6.17 Organizational Conflict of Interest (OCI) The Contractor shall not knowingly employ any person who is a U.S. Government employee if employing that person would create a conflict of interest. Additionally, the Contractor shall not knowingly employ any person who is an employee of the Government, either military or civilian, unless such person seeks and receives written approval according to DOD 5500.7-R, Joint Ethics Regulations (JER) by the individual’s commander or director. A copy of the authorization will be provided to the COR. In addition, the Contractor is prohibited from employing Government Quality Assurance Representatives (QAR) whom the Contractor knows or should have known are responsible for monitoring any contracts/subcontracts awarded to the service provider.
1.6.18 Phase-in/Phase-Out (PIPO) Period: Reserved
1.6.19 General Training Requirements:
1.6.19.1 Anti-Terrorism (AT) Level I Training. Reserved
1.6.19.2 OPSEC Awareness: If the Contractor, or a subcontractor, or employees of either disclose any information that disrupts or harms the Government's operations or activities, then the Government retains the right to exclude any employee from performance of duties under this contract. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. By way of example, personnel shall not sketch or take photos of government facilities or activities, unless related to service to be provided. All government paper products and removable digital storage material that is received, generated, or stored during the contract will be destroyed completely when no longer needed to preclude recognition of information.
1.6.19.3 Information Assurance (IA) Training. NA
1.6.19.4 Information Assurance (IA)/Information Technology (IT) Training. NA
1.6.19.5 Threat Awareness Reporting Program (TARP Training). NA
1.6.19.6 iWATCH Training. NA
1.6.19.7 OPSEC Training. NA
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1.1. Contractor. The total contractor organization or a separate entity of it; such as an affiliate, division, or plant that performs its own purchasing.
2.1.2. Contracting officer (KO). A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
2.1.3. Contracting Officer’s Representative (COR). An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
2.1.4. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. Performance Work Statement (PWS). A statement of work for performance-based acquisitions that describes the required results in clear, specific, and objective terms with measurable outcomes.
2.1.8. Physical Security. Protection of the perimeter area, government property, and assets that prevent the loss or damage of Government property.
2.1.9. Quality Assurance. The various functions, including inspection, performed by the government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
2.1.10. Quality Assurance Surveillance Plan (QASP). A plan describing how the agency will survey, observe, test, sample, evaluate and document the Contractor’s performance in meeting critical performance standards identified in the contract.
2.1.11. Quality Control (QC). Tasks performed by the Contractor to improve the quality of the organization’s output.
2.1.12. Shall. An imperative command; has a duty to or is required to. Denotes that a regulation must be followed unless the contracting officer has obtained a deviation.
2.1.13. Subcontractor. Any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.
2.1.14. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.15. Work Week. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
| ALMS | Army Learning Management System | |
| ANSI | American National Standards Institute | |
| AOR | Area of Responsibility | |
| AR | Army Regulation | |
| ATCTS | Army Training Certification Tracking System | |
| AT | Anti-Terrorism | |
| CAC | Common Access Card | |
| CFR | Code of Federal Regulations | |
| CI | Counter Intelligence | |
| CLIN | Contract Line Item Number | |
| CONUS | Continental United States (excludes Alaska and Hawaii) | |
| COR | Contracting Officer Representative | |
| DD Form 254 | Department of Defense Contract Security Requirement List | |
| DOD | Department of Defense | |
| DODD | Department of Defense Directive | |
| DODI | Department of Defense Instruction | |
| FAR | Federal Acquisition Regulation | |
| FHP | Force Health Protection | |
| FCG | Foreign Clearance Guide | |
| FY | Fiscal Year | |
| GFE | Government Furnished Equipment | |
| GFP | Government Furnished Property | |
| IA | Information Assurance | |
| IAW | In Accordance With | |
| IT | Information Technology | |
| JPAS | Joint Personnel Adjudication System | |
| JTR | Joint Travel Regulation | |
| KO | Contracting Officer | |
| LOA | Letter of Authorization | |
| NCIC-III | National Crime Information Center Interstate Identification Index | |
| NIST | National Institute of Standards and Technology | |
| ODC | Other Direct Costs | |
| OCI | Organizational Conflict of Interest | |
| OCONUS | Outside Continental United States (includes Alaska and Hawaii) | |
| ODC | Other Direct Costs | |
| OSHA | Occupational Safety and Health Administration | |
| OPSEC | Operation Security | |
| PIPO | Phase In/Phase Out | |
| POP | Period of Performance | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan | |
| QCP | Quality Control Program | |
| RA | Requiring Activity | |
| SCR | Service Contract Reporting | |
| SOP | Standard Operating Procedures | |
| SPOT | Synchronized Predeployment and Operational Tracker | |
| TE | Technical Exhibit | |
| TSDB | Terrorist Screening Data Base | |
| U.S.C. | United States Code |
PART 3
GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1 Government Furnished Property. The Government will not provide property or services in the performance of this contract.
PART 4
CONTRACTOR FURNISHED FACILITIES AND EQUIPMENT
4.1 Contractor Furnished Facilities and Equipment – General
4.1.1 The contractor shall procure material, equipment, and supplies, which are incidental to the provision of services of this PWS. The contractor shall ensure on-site maintenance personnel are equipped with proper individual / hand tools for the effort to be completed (i.e. general mechanics tools). The Government will not provide individual tools to be used by maintenance personnel under this effort. Each employee mechanic must have their own tools. The Government has revoked its assumption of risk regarding individual tools used under this effort. At no time will the Government be responsible for the replacement of lost, damaged, or broken individual tools.
4.1.2 Except for those items and services specifically stated in Part 3 as Government-furnished, the contractor shall furnish everything needed to perform this contract according to all its terms and conditions as stated in specific sections of this PWS and as identified in the Purchasing/Invoicing Guide.
4.1.3 Contractor-furnished equipment or items, inoperable or unserviceable for any reason, must be removed from the U.S. Government’s Installation within ten (10) business days after failure. The condition of contractor-furnished equipment shall not relieve the contractor of responsibility to provide services as required in this contract. The contractor shall immediately notify the KO and COR, in writing, of circumstances regarding delay of work due to equipment or material problems.
4.1.4 The contractor shall furnish additional telephone and peripheral equipment requirements not furnished by the U.S. Government, if required. All additional costs must be approved in writing by the KO prior to the items being placed in service.
4.1.5 All contractor furnished vehicles shall be maintained in a neat, presentable, and operational condition and shall meet Government safety inspection standards. The contractor’s vehicles not meeting standards shall not be operated or stored on U.S. Government installations. The contractor shall provide a sign on the right and left side of contractor furnished vehicles with the contractor's company name and telephone number.
4.2 Materials and Equipment
4.2.1 The contractor shall use the equipment type and size suitable for the required operation and shall operate the equipment from existing Government-furnished electrical power sources. The contractor shall affix a highly visible, permanent contractor’s nameplate on all contractor-owned equipment. The contractor shall ensure that if commingling of U.S. Government and contractor-furnished equipment occurs, each set of equipment is easily identifiable and can be separated for inspection and inventory as required.
4.2.2 The contractor shall maintain a sufficient quantity of on-hand materials and supplies to perform all work required under this Contract. Failure on the part of the contractor to provide sufficient quantities and quality of supplies and materials within the specifications of the Contract shall not be cause for reduction in any service or performance. The contractor shall maintain stocks to ensure continuous operation of critical systems as approved by the KO. Critical systems are those that are directly related to health care, safety, and mission accomplishment. The contractor shall provide a system for rapid procurement of items whose usage levels do not require maintenance of on-hand stocks. This system shall include a list of vendors for each such mission-critical repair item, information on availability, and expected delivery times.
PART 5
SPECIFIC TASKS
5. Specific Tasks: The Contractor shall be responsible for delivering four (4) x44 Passenger Buses each fulfilling the requirements as specified in section 1 of this PWS to LSA Santa Fe between the hours of 0800-1000 Fort Irwin Local Time (PDT) on 11 October 2023 and 10 November 2023. The Contractor will communicate with the COR no less than 24 hours before the prescribed deliver date/time affirming the expected time any deliverables will arrive. The Contractor may elect to deliver the vehicles up to two (2) days earlier than the start of the PoP, but no earlier than 09 October 2023 and 08 November 2023. If the Contractor should elect to choose an earlier delivery date they will communicate with the COR no less than 24 hours beforehand of their intended delivery date. The Government will not be charged any additional cost for any deliveries made prior to 11 OCT 2023 and 10 NOV23. The purpose of these deliveries is only to allow flexibility for the Vendor and shall not be considered an extension or change to the PoP. The Government and COR may not be available for a joint inspection if the equipment is delivered early. The vendor may have to wait to conduct the joint inspection.
5.1. Basic Services. four (4) x44 Passenger Buses. The vehicle shall seat a minimum of x44 passengers in the interior and shall use either unleaded gasoline or diesel. The Vehicle shall have working air conditioning and locks. All parts must be fully functional IAW the operator’s manual. The Contractor shall ensure vehicles are delivered with all necessary original equipment parts IAW the operator’s manual and have a full tank of fuel. Each vehicle shall contain one (1) 5lb fire extinguisher.
5.2. Task Heading. Four (4) 44 Passenger Buses
5.3. Service Contract Reporting (SCR): Reserved
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 30 of each calendar year using http://sam.gov.
5.4. Delivery of Rental Equipment. All vehicles shall be delivered to LSA Santa Fe, Fort Irwin, CA 92310. Vehicles are required to arrive between the hours of 0800-1000 the day the POP begins to allow adequate time for a joint visual inspection. All set up must be complete and equipment ready for use at time of delivery.
MGRS: 11S NU 304 977.
LAT / LONG: 35.22188, -116.66595
5.5. Customer Service. The Contractor is responsible for providing 24 hour customer service availability to the Government for the duration of the PoP. This availability shall be defined as having the means to receive communication from the COR outside of normal duty hours, and respond to any emergency requirements as submitted by the COR. This Customer Service POC will be familiar with the terms of the contract and be authorized to act with full power of the Contractor. That is, they will be fully capable of scheduling requests for recovery, exchange, or maintenance as necessary and as specified in this PWS. If Customer Service is permitted to action these specified tasks, but else is not serving in a role for which they would normally conduct invoices, or are authorized to arbitrate on the Contractor’s behalf, then this will be specified, and a designated representative who is able to perform these tasks will contact the COR with their information. During non-duty hours the Contractor shall provide the COR with a phone number/email available to be reached for accomplishment of the above specified tasks. Non-Duty hours are defined as Monday-Sunday 1600 – 0800 and Saturday-Sunday 0000 – 2400. Communication will be made possible through phone, text, and email. Normal communications during non-duty hours will be for the submission of new requests or for communication of minor issues which do not impact the overall performance of the contract but nonetheless the contractor should be made aware of. The contractor is not required to respond to normal communication made during non-duty hours, but should still expect to receive such communication for future action. Emergency Communications will still be answered, and be considered the start of the 24 hour window of time the Contractor is expected to achieve emergency services. When possible any communication made to the contractor during non-duty hours will be made in the following order: 1. Text, 2. Call, 3. Email.
5.6. Maintenance/Recovery. The Contractor is responsible for any and all maintenance so as to keep all deliverables in good working condition for the duration of the PoP. In the event of a breakdown, the Contractor is responsible for recovery of the equipment. The Contractor will ensure that all normal access requirements are met prior to conducting any recovery efforts that occur on Government Land.
5.6.1. Exchange of Equipment/Equipment Swap. The Contractor is responsible for replacing any equipment which they must recover or exchange due to preventative maintenance. In the event of an unexpected breakdown the Contractor will have twenty-four (24) hours from initial notification to replace the equipment. In the event of a scheduled exchange, the contractor will provide a replacement equipment at the time the exchange occurs. All replacement equipment will at a minimum meet the standard as specified in this PWS.
5.6.2 The Government reserves the right to conduct recovery operations in the event that failure to conduct an immediate recovery of the equipment would create an unsafe training environment, or risk of critical mission failure.
5.6.3 Pick up of Deliverables. The Contractor is responsible for picking up all deliverables no later than 24 hours after end of the PoP at the same locations where they were delivered. The COR will inform the Contractor of any change to the Pick up location no later than 24 hours from the end of the PoP. The Government is not responsible for any losses, damages, or fees incurred due to Contractor failure to pick up all deliverables from the specified time. If a delay would lead to the Contractor being unable to pickup equipment on the specified date, the Contractor will notify the COR as soon as possible. The Government will not be charged for any delays in picking up deliverables nor will this be considered an extension to the PoP.
5.6.4 Claims Process: If a claim is submitted, it requires the joint pre-inspection and post-inspection sheets to accompany the claim form. Both must be provided to the KO at the time of claim submission. The pre and post-inspection sheets must only be signed by the COR that is indicated on the contract, or the appointed representative.
5.7 Quantity: In the event changes occur, the Contracting Officer Representative (COR) will notify the Contractor within 24 hours to make adjustments accordingly.
5.8 NTC Maneuver Area Control Plan
5.8.2 Purpose: The National Training Center (NTC) and Fort Irwin have established Maneuver Area Control Operational Procedures and Activities within the NTC Training Area to ensure training fidelity, safety and compliance with NTC and Army Regulations. The Maneuver Area Control Operational Procedures ensure that NTC has control over personnel entering and using the NTC maneuver area for tactical, training and support purposes.
5.8.3 Applicability: Maneuver area control procedures are applicable to all personnel (both military and civilian) who enter the training area in a non-tactical vehicle.
5.8.4 Responsibility: Organizations and activities requiring military, civilian or Contractor access to the range complex are responsible for all approvals required by range regulations, SOPs and this directive. Sponsors will ensure that users understand requirements and have required equipment. Sponsors are the first source of Range Communications Systems (RCS) radios. If RCS radios are not available, Range Support will issue an RCS for the duration of the requirement only.
5.8.5 Range Passes: Range Access passes will be issued only when the following criteria are met, and only for the duration of the requirement (See Attachment 1).
5.8.6 NOTE: Increased security may delay Contractors’ delivery time. It is the Contractors’ responsibility to plan and prepare prior to the beginning of the POP to gain access to the installation.
(a) Valid driver’s license for type vehicle used.
(b) Valid range briefing and safety card.
(c) Possession of training area access handbook.
(d) Proof of need to go down range (contract number and POP (not the contract work order, etc.)
5.8.7 Range Safety Briefings and Range Cards: All users of the training area are required to have received the range safety briefing within the last year and must carry and present the range card on demand. Range cards are valid for the calendar year from 1 January to 31 December. Personnel who do not have a range safety card must be escorted in the maneuver area by a range safety cardholder who accepts the responsibility for their control while down range.
5.8.8 NTC Vehicle Markings: All Non-Tactical Vehicles (NTVs) that enter the training area are required to have the required Physical Markings. Vehicles will be marked on the left and right door and the front with markings that are clearly legible from 100 feet and indicate the parent or sponsor of the vehicle. Markings can be permanent, magnetic or other type signs that are temporarily used. Range Support will also have generic vehicle ID signs for vehicle not having other required markings. Rotation markings (such as UN or IP) may be used in addition to the identifying signs.
5.8.9 Range Communications: Range communications downrange must be maintained in one of two ways. FM communication may be used on the Range control frequency (38.90). The Range Communications System (RCS) radio is the other permissible means. Cell phones are not permissible communications means unless specifically approved by the NTC Chief of Staff. NTVs will not be allowed into the training area without an operating RCS or an escort of a vehicle with an operational RCS.
5.8.10 Checkpoints: Checkpoints will serve as the entry control points to the maneuver area for all non- tactical vehicles (NTV) entry into the maneuver area. The checkpoints may not be bypassed by non-tactical vehicles. All NTVs will be physically checked for compliance (marking, range pass, range safety card, common means) before admittance to the maneuver area. All checkpoints will be clearly marked with warning signs and access instructions. Common bypass routes will be clearly marked with instructions to use the nearest checkpoint.
Checkpoint Locations:
(1) North -- Barstow Road at the water tower.
(2) East -- Langford Lake Road east of the cantonment area.
(3) West -- NASA Security Checkpoint (on the tank trail)
(4) South -- Fort Irwin Road tank trail vicinity NU233967
5.9 Violators and Enforcement: Military personnel and range patrols are authorized to require violators to leave the maneuver area. Other personnel are encouraged to report violations to Range Support for action. The Range Control Officer will withdraw or suspend installation training area privileges upon determination that any person, organization or agency willfully violated this directive, local range regulations and procedures; or from any person whose ability or conduct is incompatible with the safe use of Government range facility.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
6.1.1 DOD Commercial Use of Imagery Guidelines
6.1.2 AR 190-13, The Army Physical Security Program
6.1.3 Army Directive 2014-05, Policy and Implementation Procedures for CAC Credentialing Access for Uncleared Contractors
6.1.4 DOD 5220.22-M, National Industrial Security Program Operating Manual
6.1.5 Defense Federal Acquisition Regulation Supplement (DFARS)
6.1.6 Joint Travel Regulation (JTR)
6.1.7 AR 735-5, Policies and Procedures for Property Accountability
6.1.8 DODD 8570.01, Information Assurance Training Certification and Workforce Management
6.1.9 DOD 8570.01-M, Information Assurance Workforce Improvement Program
6.1.10 AR 25-2, Information Assurance
6.1.11 DODI 2000.16 DoD Antiterrorism (AT) Program
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1 Attachments:
7.1.1 Attachment 1 – Performance Requirements Summary
7.1.2 Attachment 2 – Deliverables Schedule
ATTACHMENT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The standard should relate to timeliness, quality, or quantity (metrics) of service required by the Contractor is stated in the PWS verbiage. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement)
| Standard |
| Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”) |
| Incentive (Positive and/or Negative) |
1. Combating Trafficking in Persons FAR 52.222-50 c The Contractor shall Notify its employees of
a. The United States Government's zero tolerance policy described in paragraph
(b) of this clause The actions that will be taken against employees for violations of this policy. Such actions may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment.
| 100% Compliance |
| Contractor compliance rate shall be utilized as objective evidence of contract compliance and documented into the CPAR system; contractor shall re-perform the service |
PRS # 1.
a. 1.6.1.1
b. QCP The contractor shall provide the Government their QCP.
The QCP shall be submitted within thirty (30) days of contract award.
After acceptance from KO, the contractor shall submit QCP changes within five (5) days to the KO and COR for review and approval prior to implementation.
| 100% Compliance |
| First failure will result in the issuance of a Non- Conformance Report (NCR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO |
PRS # 2.
a. 1.6.7
b. Access and General Protection Policy and Procedures The contractor shall adhere to the Government’s access and general protection policy and procedures.
| The contractor shall ensure sub-contractors understand and behave according to policies and procedures IOT access the installation/facilities and operate appropriately/safely in the Government’s best interests. |
| 100% Compliance |
| First failure will result in the issuance of a Non- Conformance Report (NCR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO |
PRS # 3.
a. 1.6.3
b. Access and General Protection Policy and Procedures The contractor shall provide quality goods and services as outlined within the PWS.
| The contractor shall deliver, transport, pick-up, maintain, and service goods and services that are of acceptable quality. |
| 90% Compliance |
| First failure will result in the issuance of a Non- Conformance Report (NCR) Continuance of not meeting performance standard (2 or more) a corrective action plan will be developed at the discretion of the KO |
PRS # 4.
a. 1.6.10.1
b. Personnel, Employees, and Sub-contractors Professionalism The contractor shall behave and maintain a professional manner and display a positive/cooperative attitude.
| The contractor shall avoid negative and suspicious behaviors resulting in complaints concerning lack of professional behaviors. The contractor shall work with the KO/COR to correct any concerns. |
| 90% Compliance |
| More than three validated complaints over the PoP from internal and external sources will reflect negatively in the COR's final report |
PR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .