PWS - Bldg 122 & 144 Mold Testing.docxPWS - Bldg 122 & 144 Mold Testing.docx
DOCX document 97 KB Posted
- Attached to
- BLDG 122 & 144 Mold Testing
- Solicitation number
- SRC0000042884
- Issued by
- Clark County, Stratton Village, Ohio
About this file
This is a Performance Work Statement (PWS) for repair services issued by the 178th Civil Engineer Squadron at Springfield-Beckley Air National Guard Base in Springfield, Ohio, for mold testing and assessment services at Buildings 122 and 144. The contractor shall provide comprehensive environmental inspection and testing services including visual assessments, moisture investigations, mold-related sampling, and laboratory analysis for the two buildings totaling approximately 38,434 square feet combined. The scope of work encompasses building walkthroughs, moisture assessments, HVAC component inspections, development of sampling plans, photographic documentation, environmental sample collection, and delivery of draft and final assessment reports with remediation cost estimates and corrective action recommendations. An optional site visit is scheduled for November 18 at 9:00 AM to 10:00 AM, with all bidding questions to be posted in the inquiry tab on Ohio Buys. The period of performance is two months or 60 days, with draft reports due within 10 business days of laboratory results receipt and final reports due within 10 business days of government comment receipt.
The PWS does not identify specific pricing information, set-asides, or funding amounts in the document. However, contractors must include all applicable labor, materials, supervision, permits, equipment, overhead, profit, and incidental costs in their bid submissions to Ohio Buys. The contractor must demonstrate qualifications including prior experience with comparable commercial or institutional facilities, trained and qualified personnel in environmental sampling and mold investigation, and use of a laboratory accredited under the American Industrial Hygiene Association Environmental Microbiology Laboratory Accreditation Program. All contractor personnel require installation access, security clearance, valid photo identification, and base passes. The contractor shall provide a one-year warranty on all materials, labor, and work performed, comply with Build America, Buy America Act requirements, and maintain full responsibility for site safety and personnel security. The government will furnish existing utilities and facilities but no equipment for the project duration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR SERVICES
PERFORMANCE WORK STATEMENT (PWS)
FOR
Bldg. 122 &144 Mold Testing Project No: A3127013 Prepared by 178th Civil Engineer Squadron Springfield-Beckley ANGB, OH, 45502
4 NOV 2026
Contents
INTRODUCTION……………………………………………………………………………………3
PERSONNEL / SECURITY REQUIREMENTS………………………………………….….……3
SAFETY & CODE COMPLIANCE…………………………………………………………...……4
GENERAL REQUIREMENTS…………………………………………………………..…..…...…4
DETAILED DESRIPTION OF WORK…………………………………………………….………5
GENERAL INFORMATION…………………………………………………………………..……6
DEFINITIONS & ARCONYMS………………………………………………………………….…7
CODE, CRITERIA & STANDARDS……………………………………………………...……..…8
i
PERFORMANCE WORK STATEMENT (PWS)
For Repair Services
1. INTRODUCTION
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to perform the services for this project, A3127013, Mold Testing at Bldg. 122, and 144 as defined in this PWS.
Objective: The objective of this Statement of Work is to obtain qualified environmental inspection and testing services to assess potential mold conditions within the complete building identified below. The Contractor shall perform a visual assessment, moisture investigation, and appropriate mold-related sampling and laboratory analysis, then provide recommendations for corrective action with an associated cost estimate.
Location: The work site for this project is at Springfield-Beckley Air National Guard Base, Springfield, OH, 45502.
Site Visit: A site visit will be held for this project. Please see the “Inquiries” section on Ohio Buys for the date/time. Upon arrival, please notify Security Forces that you are here for the site visit, and Civil Engineer personnel will escort you on base. Ensure any attendees have valid driver’s license(s) and be prepared for a vehicle search.
Points of Contact:
Technical Inspector: Mr. Nick Owens – (937) 525-2589 / nicholas.owens.2@us.af.mil Technical Inspector: Mr. Shane Ober -- (937) 327-2163 / shane.ober.1@us.af.mil Base Civil Engineer: Mr. Blake Melling – (937) 327-2352 / blake.melling.1@us.af.mil Dig Permit: OUPS Reporting – 1-800-362-2764
2. PERSONNEL & SECURITY REQUIREMENTS
2.1. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Base Civil Engineer Flight. A security briefing will be conducted prior to the start of the contract. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces office.
2.2. Unscheduled gate closures by Security Forces may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This sometimes cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
2.3. Contractor employees should only enter restricted areas when required to do so. They must gain prior approval and be always escorted by base personnel in these areas.
2.4. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
2.5. The contractor shall obtain base passes for all contractor personnel who will require access to the installation(s) cited in the contract. All contractors entering the base must possess a REAL ID or Government-issued CAC. Contractors shall provide appropriate personal information for the Visitor Request Form two weeks prior to start of work.
2.6. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.
2.7. The contractor shall ensure compliance with all personal identity verification requirements as directed by Security Forces and/or local policy. All Contractor personnel shall have a minimum of one (1) form of photo identification with them at all times. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
2.8. The Contractor shall recover base passes upon job completion and return to Government within five (5) days of Final Inspection, if physical passes provided.
3. SAFETY & CODE COMPLIANCE
3.1. The Government is not liable for any injury incurred by Contractor, Contractor personnel, or other persons while they are on site. Contractor shall take full responsibility for the safety of all personnel within the project site, including base personnel.
3.2. The Contractor shall ensure that employees are supplied with and use proper safety equipment (i.e. gloves, safety boots) described in OSHA, EM 385 & EM 304 and follow safe work procedures, which protect Contractor employees and personnel in the vicinity of the job site in accordance with all current OSHA requirements. The Contractor shall assume any liability for any injury incurred by Contractor personnel while working on site.
3.3. The Contractor shall always adhere to model building codes (NEC, IBC, IPC, NFPA etc.), Ohio Building Codes, Unified Facilities Criteria (UFCs) and Manufacturer installation requirements/recommendations. The Contractor is to stop work and immediately inform the Government if they believe any requirements deviate from code.
4. GENERAL REQUIREMENTS
4.1. A full-time Superintendent must be appointed and always present during work. The superintendent will be responsible for all onsite activities. Submit name(s) of Superintendent, and any identified alternates, to the Base Civil Engineer or Deputy Base Civil Engineer prior to starting the project.
4.2. The Contractor shall perform a job site cleanup each day and remove all debris and refuse from the site. Unoccupied areas to be broom swept daily. Occupied areas shall be kept free of dust and debris at all times.
4.3. The Base Civil Engineer or Deputy Base Civil Engineer must approve all Material Submittals prior to procurement. See the attached required Material Submittals list for this project.
4.4. The Contractor is required to submit a Project Schedule with project milestones. This schedule must be approved by the Base Civil Engineer or Deputy Base Civil Engineer prior to starting any work. If any changes to the original schedule should occur, the Contractor must resubmit a schedule within 7 days.
4.5. The Contactor is responsible for obtaining any required dig permits, utility locates, and all other permits as needed to complete the work described in this SOW.
4.6. The Contractor shall schedule a final inspection with the Base Civil Engineer or Deputy Base Civil Engineer to verify quality and completeness of the work. Only upon verification of quality and completion shall the project be considered complete and ownership be taken by the Government
4.7. The Contractor shall provide a 1-year warranty on all material, labor, installed equipment, and work performed in this SOW in addition to any manufacturer’s warranties. Warranties shall be submitted using the submittal process within 30 days of project completion.
4.8. All components of this project must comply with the Build America, Buy America ("BABA") Act. Pub. L. No. 117-58, §§ 70901-52.
5.
BID REQUIREMENTS
5.1. All bids shall be submitted to Ohio Buys.
5.2. Contractors may opt to include a brief synopsis of the services provided in their bid. Information provided in this manner will only be treated as situational awareness that the contractor understands the scope of work included in the PWS. Any discrepancies between the information provided in bid submissions and the requirements in the PWS shall differ to the PWS as the governing document of the true requirement of the project. Failure to include an item from the PWS in a bid submission does not excuse the contractor from being responsible for performing the work.
5.3. Pricing shall include all applicable labor, materials, supervision, permits, equipment, overhead, profit, and incidental costs necessary for a complete installation.
6. DETAILED DESCRIPTION OF WORK
The Contractor shall furnish all labor, supervision, equipment, materials, transportation, sampling supplies, and report necessary to perform mold assessment and testing services for buildings 122 and 144. (Bldg. 122; ~18,548 SQFT) (Bldg. 144; ~19,886 SQFT)
6.1. Conduct a Building Walkthrough
6.1.1. Perform a visual inspection of accessible interior spaces within the identified inspection area.
6.1.2. Document visible water damage, staining, suspected mold growth, musty odors, damaged building materials, condensation, leaks, and other moisture-related conditions.
6.1.3. Identify accessible areas where conditions may support mold growth, including ceilings, walls, flooring, mechanical rooms, restrooms, utility spaces, plumbing penetrations, windows, HVAC components, and storage areas
6.2. Perform Moisture Assessment
6.2.1. Use appropriate non-destructive moisture-detection equipment to identify elevated moisture levels in accessible building materials.
6.2.2. Assess potential moisture sources, including roof leaks, plumbing leaks, HVAC condensate issues, exterior-water intrusion, inadequate ventilation, flooding history, or condensation.
6.2.3. Document moisture readings and locations where practical.
6.3. Inspect HVAC and Ventilation Components
6.3.1. Conduct a visual assessment of accessible HVAC components and associated areas, including air-handling units, supply and return vents, condensate pans, drain lines, filters, ductwork access points, and mechanical rooms.
6.3.2. Identify conditions that may contribute to moisture accumulation, microbial growth, or distribution of contaminants.
6.4. Development of a Sampling Plan
6.4.1. Develop a site-specific sampling plan based on observed conditions, building size, occupancy, and suspected areas of concern.
6.4.2. Coordinate the sampling plan with the Government/Facility POC before conducting invasive sampling, if applicable.
6.4.3. The sampling plan shall identify proposed sample types, locations, rationale, quantities, and testing laboratory information.
6.5. Document Conditions
6.5.1. Take clear, date-stamped photographs of relevant conditions, including suspected mold growth, water damage, moisture sources, sampling locations, and affected materials.
6.5.2. Prepare a floor plan, sketch, or location map identifying inspected areas and sample locations.
6.6. Collect Environmental Samples
6.6.1. Collect mold and environmental samples appropriate to the conditions observed. Samples may include air, surface, bulk material, dust, or tape-lift samples, as warranted.
6.6.2. Include outdoor or other appropriate reference samples when needed to support interpretation of indoor air results.
6.6.3. Clearly identify and document each sample location, collection time, sample type, and field observations.
6.6.4. Maintain sample custody and submit samples to a qualified laboratory for analysis.
6.7. Contractor Qualifications
The Contractor shall:
6.7.1. Have demonstrated experience performing building moisture investigations and mold-related assessments in occupied commercial, institutional, industrial, or residential facilities of comparable size and complexity.
6.7.2. Use personnel trained and qualified in environmental sampling, moisture assessment, and mold investigation.
6.7.3. Use an appropriately qualified laboratory for sample analysis. The laboratory must be accredited under the American Industrial Hygiene Association (AIHA) Environmental Microbiology Laboratory Accreditation Program (EMLAP).
6.7.4. Maintain all licenses, certifications, insurance, and authorizations required by applicable federal, state, local, installation, and organizational requirements.
6.7.5. Provide qualifications for the proposed project manager, field personnel, and laboratory before work begins.
6.8. Safety, Access, and Site Coordination
6.8.1. The Contractor shall comply with all applicable site-access, safety, security, and occupational-health requirements.
6.8.2. The Contractor shall coordinate inspection dates, building access, escorts, work hours, and sampling activities with the Government/Facility POC.
6.8.3. The Contractor shall take reasonable precautions to minimize disruption to building occupants and operations.
6.8.4. The Contractor shall not remove or remediate suspected mold-contaminated materials unless specifically authorized in writing under a separate scope of work.
6.8.5. If the Contractor identifies an immediate condition that may present a significant health, safety, or facility risk—such as active water intrusion, widespread visible growth, or compromised building materials—the Contractor shall promptly notify the POC.
6.9. Deliverables
The Contractor shall provide the following deliverables within 10 business days of the site visit, provide the POC with preliminary notification of any significant or urgent findings requiring immediate attention.
Draft Assessment Report
Within [10] business days after receipt of laboratory results, provide a draft report containing:
Executive summary;
Description of the building and inspected area, including total square footage;
Inspection date(s) and personnel conducting the work;
Scope and methods used;
Identified moisture sources and contributing building conditions;
Description and photographs of observed water damage or suspected mold growth;
Moisture-reading results and location information;
Sampling plan, sample locations, sample types, and laboratory results;
Interpretation of findings in relation to observed building conditions;
Identification of affected areas, using estimated square footage where practicable;
Recommended corrective actions, prioritized as immediate, short-term, and long-term;
Recommendations for moisture control, repair, cleaning, removal, containment, or further assessment, as applicable;
Cost estimate for remediation and/or corrective actions;
Limitations and assumptions
6.10. Final Assessment Report
6.10.1. Within 10 business days after receipt of Government/Facility comments, provide a final report incorporating approved comments.
6.10.2. The final report shall be delivered electronically in searchable PDF format.
6.10.3. Period of Performance: The Period of Performance shall be 2 months (or 60 Days)
6.11. Acceptance Criteria
The Government/Facility POC will consider the work acceptable when:
6.11.1. The inspection and sampling activities are completed as approved;
6.11.2. All laboratory results and chain-of-custody documentation are provided;
6.11.3. The report clearly identifies findings, affected locations, estimated square footage, and recommended actions;
6.11.4. A cost estimate for remediation is received and approved;
6.11.5. Deliverables are complete, accurate, readable, and submitted within the required timeframe.
6.11.6. The Contractor addresses Government/Facility comments on the final report.
6.12. Government-Furnished Information
The Government/Facility will provide, when available:
6.12.1. Building floor plans;
6.12.2. Access to relevant building areas
6.12.3. Known occupant complaints or areas of concern.
6.13. Assumptions and Limitations
6.13.1. This scope is limited to accessible areas unless otherwise authorized.
6.13.2. Concealed conditions inside walls, above ceilings, beneath flooring, or within inaccessible mechanical systems may require additional investigation.
6.13.3. Mold sampling results are only one component of a building-condition assessment and shall be interpreted with visual observations, moisture conditions, and building history.
6.13.4. Any suspected hazardous materials encountered during the assessment shall be reported to the POC. Work in those areas shall not proceed without appropriate direction and controls.
6.13.5. The Facility/Contracting Officer should validate all required contract language, safety requirements, reporting requirements, and applicable local or installation-specific requirements before release.
GENERAL INFORMATION
6.14. Data Rights: The Government has unlimited rights to all data deliverables under this contract.
6.15. Location and Facility Information: The primary work site is Springfield-Beckley ANG Base, Springfield, OH. Work may be completed at various buildings across the installation, as needed.
6.16. The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
6.17. Equipment: The government will not furnish any equipment for the duration of this project.
6.18. Property: Existing utilities, and facilities are all on government property and will be furnished to work on as part of the project.
6.19. Access and General Protection/Security Policy and Procedures:
6.20. The contractor may access the base between the hours of 0730 – 1600 Monday through Friday, except for recognized U.S. holidays (see below) or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.
Federal Holidays New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day
7. DEFINITIONS & ACRONYMS
Definitions Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime contractor.
Defective Service: A service output that does not meet the standard of performance associated with the PWS.
Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
Physical Security: Actions that prevent the loss or damage of Government property.
Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
Acronyms
| A-E | Architect-Engineer | ||
| ANGETL | Air National Guard Engineering Technical Letter ANGI | Air National Guard Instruction | |
| COA | Course of Action | ||
| COR | Contracting Officer Representative DD | Department of Defense (Form) | |
| DoD | Department of Defense | ||
| ECF | Entry Control Facility FPSON | Force Protection Condition | |
| GFP/M/E/S Government Furnished Property/Material/Equipment/Services ID | Identification | ||
| KO | Contracting Officer MILCON | Military Construction NGB | National Guard Bureau |
| PCR | Planning Charrette Report | ||
| POL | Petroleum, Oils, and Lubricants | ||
| PWS | Performance Work Statement QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan UFC | Unified Facility Criteria | |
| UMMC | Unspecified Minor Military Construction |
8. CODES, CRITERIA, & STANDARDS
The contractor shall follow all applicable Department of Defense (DoD), U.S. Air Force, federal, state, local codes, regulations, and design standards. These will also be provided electronically to the A-E upon selection and award of contract. They shall include, but are not limited to:
ANGETL 15-01-04, Mechanical Engineering.
ANGETL 15-01-05, Electrical and Communications.
UFC 1-200-01, DOD Building Code.
UFC 1-200-02, High Performance and Sustainable Building Requirements.
UFC 3-501-01, Electrical Engineering, with Change 1.
UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, with Change 2.
All other applicable UFCs, Federal, State, and Local codes and regulations.
image1.jpg
File details come from the government source that posted it. Updated .