Performance Work Statement Pest Control Services VA Central California Health Care System
Section 1: General Information
1.1 General: This is a non-personal services contract to provide bird (pigeon) abatement services for the VA Central California Health Care System (VACCHCS). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.2 Period of Performance:
Base Year: November 1, 2022 to October 30, 2023 Option Year 1: November 1, 2023 to October 30, 2024 Option Year 2: November 1, 2024 to October 30, 2025 Option Year 3: November 1, 2025 to October 30, 2026 Option Year 4: November 1, 2026 to October 30, 2027
1.3 Place of Performance:
Medical Centers Central California Health Care System 2615 E. Clinton Ave.
Fresno, CA 93703 Fresno County
There are numerous buildings at the Fresno Medical Center. The vendor will be required to provide coverage for all the building located within each campus.
1.6 Hours of Operation: Services will be required during and after business hours, which are 8:00 a.m. to 5:00 p.m., Monday through Friday, including Federal Holidays. Hours may vary based on treatment plan and treatment area. The COR and Contractor will determine best schedule per treatment. Some treatments may be required to take place after duty hours.
1.7 Invoicing: All invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
VA’s Electronic Invoice Presentment and Payment System – The FSC uses a third-party contractor, Tungsten, to transition vendors from paper to electronic invoice submission. Please go to this website: http://www.tungsten-network.com/US/en/veterans-affairs/ to begin submitting electronic invoices, free of charge.
More information on the VA Financial Services Center is available at http://www.fsc.va.gov/einvoice.asp.
Vendor e-Invoice Set-Up Information:
Please contact Tungsten at the phone number or email address listed below to begin submitting your electronic invoices to the VA Financial Services Center for payment processing, free of charge. If you have question about the e-invoicing program or Tungsten, please contact the FSC at the phone number or email address listed below:
· Tungsten e-Invoice Setup Information: 1-877-489-6135
· Tungsten e-Invoice email: VA.Registration@Tungsten-Network.com
· FSC e-Invoice Contact Information: 1-877-353-9791
· FSC e-invoice email: vafsccshd@va.gov
Section 2: Definitions & Acronyms
2.1 Definitions:
Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
Workday. The number of hours per day the Contractor provides services in accordance with the contract.
Work Week. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
COR Contracting Officer Representative IPM Integrated Pest Management MSDS Material Safety Data Sheets PWS Performance Work Statement VA Veterans Affairs VACCHCS Veterans Affairs Central California Health Care System Section 3: Government Furnished Property, Equipment, and Services None
Section 4: Contractor Furnished Items and Services
The Contractor shall provide all equipment, supplies, management, supervision, personnel, and transportation necessary to assure that all services are in accordance with the contract and all applicable laws and regulations. The contractor shall ensure all work meets performance standards specified in this Performance Work Statement (PWS) and referenced documents.
Section 5: Specific Tasks
5.1 General Requirements
A. The Contractor shall furnish all labor, equipment, supplies, parts, supervision, management and transportation necessary to perform bird/pigeon abatement services (interior and exterior) in accordance with the terms and conditions of this contract for all identified locations in section 1.3 of the Performance Work Statement.
B. All tasks shall be accomplished to meet the guidelines in the National Pest Control Association’s “Good Practice Standards.” The Bird Management/Abatement Services required of the Contractor are as follows:
1) Bird Reduction – Perform trapping services to reduce population in order to move on to the next phase of abatement, performing inspections 2-3 times a week during trapping.
2) Bird Repellant – Perform control using Avitrol grain bait as repellant for as needed to move onto the next phase of abatement. Daily inspections when baiting is live.
3) Clean Up – Clean up, remove and sanitize visible bird droppings and nesting areas of activity. The Contractor shall clean up after performance work of pest control. The Contractor shall not dispose any excess pesticides, pesticide container or any material contaminated by pesticides at any location on the Medical Center premises except as specified by the COR.
4) Exclusion – Repair, replace and seal existing bird netting. Install new netting where needed.
5)
4) Roosting Reduction – Install bird control products (pucks, spikes) in areas as needed.
5) Follow Up Services – Monthly follow up services for trapping, repellant and cleaning services as required for 6 mos. (2x annually).
6) Monthly Maintenance – perform monthly maintenance of the existing bird netting. Perform pigeon reduction control services two times a year.
7) Remove old traps from buildings.
8) Install loading doc curtains in pedestrian walkways to allow passage and prevent birds.
5.2 Regulations
Pest management operations shall meet all Federal requirements as identified in Public Law 92-516, Federal Insecticide, Fungicide and Rodenticide Act, dated November 28, 1975, as amended, and Executive Order 12088 (Federal Compliance with Pollution Control Standards) and appropriate Occupational Safety and Health standards regarding hazard communication, personal protective equipment, and exposure standards. The Contractor shall ensure pesticides and pest control operations are in compliance with California Code of Regulations (Title 3, Food and Agriculture), Division 6, Pesticides and Pest Control Operation.
5.3 Scheduling Services
The Contractor shall provide the work schedule of when services shall be performed and submit it to the Contracting Officer Representative (COR) within fifteen (15) days prior to the first day of work. Pest Management tasks must be scheduled for specific days that are identified and provided to the COR. The Contractor is not authorized to perform services on alternate days without prior approval from the COR.
5.4 Inclement Weather
In the event climate or weather conditions make it unsuitable for work or may induce an environmental hazard, the contractor must coordinate with the COR to establish a new date and time for services to be performed.
5.5 Adding/Deleting Building
The scope of this contract includes all the Medical Centers and buildings within the VACCHCS. If changes are needed by either adding a new building or removing a building within the VACCHCS, it will be covered under the scope of this contract. Any changes to the locations listed in section 1.3 of the Performance Work Statement will be handled through a bilateral contract modification.
5.6 Monthly Services
The Contractor shall be flexible to provide services every month for the sites of VACCHCS. Monthly inspections and maintenance of bird netting, spikes, pucks and other exclusion tools is required.
5.7 Reporting to Bldg. 1.
The Contractor reports to VACCHCS, Bldg. 24, Room 2A22 or an alternate location, to the COR or designee to receive the prioritized work requests. The Contractor then provides the required services needed within 2 business days after receiving the work request. Upon completion of services, the Contractor shall notify the COR or designee in writing.
5.9 Recurring Services
The Contractor shall provide a schedule based on a site survey as to when monthly inspections shall occur. The schedule shall be given to the COR within the first 30 days after award of contract. The schedule shall be approved by the COR. The weekly and monthly inspections are as follow:
A. Monthly Inspections. The Contractor shall conduct monthly inspections, provide the necessary corrective actions, and document/record all actions in the logbook located at the following locations.
1) VACCHCS – 1 location: Bldg. 1, Supervisors Office, Room B 2A07. Locations may be changed to meet operational needs.
5.10 Unscheduled Contingency Work
The Contracting Officer’s Representative (COR) shall direct up to 24 times per year of Unscheduled Contingency Work in situations where urgent pest situations have occurred. In case of an emergency, the contractor requires providing pest control service within four (4) hours after contingency work is requested.
5.11 Required Contractor Reporting
A. All Bird Abatement services performed by the contractor during the work shift shall be documented in writing.
B. The Contractor shall supply, complete and submit a monthly chemical usage report to the COR or designee.
C.
C. The Contractor shall be required to furnish to the COR the Material Safety Data Sheets (MSDS) or equivalent and the trade names (if any) and names of chemicals to be used in the performance of this contract prior to initial application.
5.12 Contractor Qualifications
A. The Contractor personnel shall be California certified pesticide applicators to perform under this contract. The Contractor shall furnish a copy of State certification (current Certificates of Competency in Pest Management in any and all categories or sub-categories as identified by the State of California) to the COR after award but prior to the performance of work.
B. The Contractor personnel shall wear an appropriate and professional uniform with the company’s logo/name and nametag.
C. When there is more than one technician performing services, one of the technicians must be fully certified in Pest Management categories. A non-certified technician may assist the certified technician in the performance of the work if the non-certified technician is either with the certified technician or they are within direct line of sight to the certified technician. The certified technician shall assume all responsibility for the non-certified technician.
D. During the period of performance, if the Contractor proposes to add-on or replace personnel, the Contractor shall submit the California Pesticide Applicator Certificate to the COR before starting work. At no time shall the Contractor utilize add-on or replacement personnel who do not meet the certification of this contract.
5.13 Contractor Contingency Plan
The Contractor shall have a contingency/back-up plan in the event, the Contractor is unable to perform services or have services performed as required. The Contractor shall immediately notify the COR or designee and provide a justification for non-performance and institute the contingency and/or back-up plan as quickly as possible
5.14 Special Provisions
The following provisions shall be adhered to by the Contractor in performing pesticide applications of the areas specified below:
A. Food Handling Areas: Treatment of these areas are limited to only times when food is not being held, processed, prepared, served and while not occupied by facility employees. The Contractor shall at no time enter facility elevators which are occupied by food service equipment while in the possession of pesticides or application equipment.
B. Patient Occupied Areas: Contractor shall use pesticides with as low a volatility and as odor-free as possible to keep odor levels from affecting patients.
C. Critical Areas: The Contractor shall submit a list of pesticides for intended use in areas listed below to the COR prior to any application. The planned use of pesticides in these areas requires recognition of the attendant hazards to occupants’ supplies, equipment and surfaces. No substitution can be made at any time without the approval from the COR. In all critical areas the Contractor shall document work completion and keep a record in the critical areas as required by office of the investigator general.
D. Critical Areas:
Pharmacy Respiratory Care Areas Research Facilities Supply Processing Distribution Operating Rooms Intensive Care Units Canteen Kitchens Dietetics Kitchens GI (Gastrointestinal) Clinics Patient Areas
5.15 Restrictions on Pest Control Materials:
A. All rodenticides, traps or bird repellents shall be placed only at times and in areas approved by the COR or designee and unused portions shall be recovered at the latest by a time limit set by the COR or designee.
B. The use of rodenticides other than Chlorophacinone, Scilliroside, Brodifacoum, Cholecalciferol, shall be restricted to locations specifically provided for by the COR.
C. The Contractor shall be required to furnish to the COR initial application of pesticides and rodent control chemicals, sample labels, names of chemicals to be used in the performance of this contract. This information is required by the Medical Service for emergency treatment in the event of ingestion of and/or contact with the material by humans. A list of products and antidotes, Material Safety Data Sheets (MSDS) supplied/required by the Contractor and as required by this paragraph, should be maintained in the Pharmacy and in the Evaluation and Admissions Unit, where an antidote, if required, can be made readily available.
5.16 Schedule of Service
The contractor shall provide a schedule of services for each location listed in section 1.3. The schedule must list all buildings within each location (there are several at Fresno). The schedule must state the frequency and the day of the week that the services will be performed
5.17 Verification of Services Performed
The Contractor shall have a system that verifies the certification of individuals providing pest services to VACCHCS. The contractor shall make this system available for review by the COR. The system may consist of a booklet or binder to verify work performed. An electronic system will be allowable as well.
5.18 Quality Assurance Surveillance Plan
A. The Government will monitor the contractor's performance using the Contractor’s Basic Quality Control Program and Quality Assurance Surveillance Plan (QASP) as established by the COR.
B. The QASP is a systematic method used by the Government to evaluate Contractor’s actions and performance based on Performance Work Statement requirements. The QASP is designed to provide an effective method of monitoring contractor performance for each listed objective on the PWS. A QASP is based on the premise the Government desires to maintain a quality standard in providing pest control services.
5.19 Safety Requirements:
A. The Contractor shall take precautions as the COR or designee may determine to be reasonably necessary to protect the lives and health of occupants at this Medical Center. The COR or designee shall notify the Contracting Officer (CO) of any non-compliance with the terms of the contract. Upon receipt of a Letter of Concern, the Contractor shall correct deficiencies and provide a corrective action letter to the CO.
B. The Contractor shall be responsible to ensure that employees take all necessary safety precautions appropriately in the performance of services i.e. wearing proper face mask, breathing apparatus, clothing, etc. The Contractor shall be responsible to insure employees receive up-to-date training concerning the latest EPA, Federal, State and local regulations.
5.20 Interference to Normal Functions
The Contractor shall be required to interrupt their work at any time so as not to interfere with the normal functioning of the facilities, fire protection systems and pass of facility, patients, personnel, equipment and carts.
5.21 Storage of Pest Control Materials
No pest control materials or equipment shall be stored at any VA installation when the operator is not working.
5.22 Call Back Requirement
If a treatment is inadequate (as per specifications), the Contractor shall return (within four (4) hours after receipt of notification by the COR) to retreat previously treated area.