This is a Performance Work Statement (PWS) for emergency communications equipment reconfiguration services at Joint Base Elmendorf-Richardson (JBER), Alaska, dated 18 February 2026. The contractor shall provide all necessary management, personnel, equipment, tools, materials, and supervision to safely shut down, disconnect, relocate, and restore full functionality to specified communications systems within the Emergency Communications Center (ECC) at Building 8517, Room 2.

The scope includes reconfiguring critical communications equipment consisting of the Monaco fire dispatch/alarm system, VESTA 911 system, Motorola base station radios, monitor tower mount, keyboards, mice, landline phones, and clock. Work tasks encompass project management and coordination; equipment shutdown and relocation; re-installation and system restoration; cable management and infrastructure modifications including moving ethernet ports and fabricating new Cat 6 or higher cables with professional termination and labeling; system testing and acceptance; and site cleanup. The contractor shall perform work during regular business hours (0800-1630, Monday through Friday) with a maximum primary ECC downtime of 5-7 business days. The contractor is responsible for obtaining base access passes, maintaining professional appearance, and complying with all applicable Federal, State, and local safety laws including OSHA standards and Electrostatic Discharge (ESD) handling procedures. Performance requirements mandate 100% functionality of all relocated systems with zero defects, zero physical damage to Government equipment, professionally managed and labeled cabling per industry best practices (TIA-568 and TIA-606 standards), and a debris-free work area upon completion. Any system failures or equipment damage resulting from contractor performance must be remedied at the contractor's expense. Final acceptance is granted only after the Technical Adviser POC verifies all systems are fully functional and all work meets satisfactory standards.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT FOR

EMERGENCY COMMUNICATIONS EQUIPMENT RECONFIGURATION SERVICES

18 Feb 2026

JBER-E, ALASKA

TABLE OF CONTENTS

PART 1: GENERAL INFORMATION

1.1. DESCRIPTION OF SERVICES/INTRODUCTION

1.2. SCOPE

1.3. PERIOD OF PERFORMANCE

1.4. GENERAL INFORMATION

1.4.1. PRE-WORK CONFERENCE

1.4.2. WORKING HOURS

1.4.3. SECURITY REQUIREMENTS

1.4.4. SAFETY REQUIREMENTS

1.5. QUALITY ASSURANCE

PART 2: DEFINITIONS & ACRONYMS

2.1. DEFINITIONS

2.2. ACRONYMS

PART 3: GOVERNMENT FURNISHED ITEMS AND SERVICES

3.1. SERVICES

3.2. FACILITIES

PART 4: CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

4.1. GENERAL

4.2. MATERIALS

PART 5: SPECIFIC TASKS

5.1. TASK 1: PROJECT MANAGEMENT AND COORDINATION

5.2. TASK 2: EQUIPMENT SHUTDOWN AND RELOCATION

5.3. TASK 3: RE-INSTALLATION AND SYSTEM RESTORATION

5.4. TASK 4: CABLE MANAGEMENT AND INFRASTRUCTURE

5.5. TASK 5: SYSTEM TESTING AND ACCEPTANCE

5.6. TASK 6: SITE CLEAN-UP

PART 6: APPLICABLE PUBLICATIONS

PART 7: ATTACHMENT/TECHNICAL EXHIBIT LISTING

PART 1: GENERAL INFORMATION

1.1. DESCRIPTION OF SERVICES/INTRODUCTION: The contractor shall provide all necessary management, personnel, equipment, tools, materials, and supervision required to reconfigure critical communications equipment within the Emergency Communications Center (ECC) at Joint Base Elmendorf-Richardson (JBER), AK, at Bldg. 8517, room #2 as defined in this Performance Work Statement (PWS).

1.2. SCOPE: The contractor shall safely shut down, disconnect, relocate, and restore full functionality to specified communications systems. This includes the Monaco fire dispatch/alarm system, VESTA 911 system, Motorola base station radios, and other associated miscellaneous items. The work involves moving equipment to new workstations, modifying network infrastructure including moving ethernet ports and fabricating new cables, and providing professional cable management. A critical component of this PWS is the requirement that all systems are brought back to full operational status post-relocation.

1.3. PERIOD OF PERFORMANCE: The Period of Performance will be determined at the time of award and coordinated with the Technical Adviser POC.

1.4. GENERAL INFORMATION:

1.4.1. PRE-WORK CONFERENCE: The contractor shall attend a pre-work conference with the Technical Adviser POC to discuss the project plan and schedule prior to commencing any work.

1.4.2. WORKING HOURS: The contractor shall perform work during regular business hours, 0800-1630, Monday through Friday. The final work schedule must be coordinated with and approved by the Technical Adviser POC at least 14 days prior to the start of work.

1.4.3. SECURITY REQUIREMENTS: The contractor is responsible for obtaining all required base access passes. Contractor personnel shall be clearly identifiable and must maintain a professional appearance.

1.4.4. SAFETY REQUIREMENTS: The contractor shall perform all work in a safe manner and shall comply with all applicable Federal, State, and local safety laws and regulations, including OSHA standards for electrical work and Electrostatic Discharge (ESD) handling procedures.

1.5. QUALITY ASSURANCE: The Government will monitor the contractor’s performance in accordance with the Performance Requirements Summary (See Part 7).

PART 2: DEFINITIONS & ACRONYMS

2.1. DEFINITIONS:

2.1.1 Technical Adviser POC: The Government official responsible for technical oversight and administration of the contract.

2.1.2Critical System: A system whose failure would impact the mission capability of the Joint Emergency Communications Center.
2.1.3Fully Functional: A state where a system, including all its hardware and software components, operates in accordance with manufacturer specifications and mission requirements without any degradation of performance.
2.1.4Professional Cable Management: The practice of organizing, securing, and labeling cables in a neat, orderly, and professional manner to ensure system serviceability and prevent hazards.

2.2. ACRONYMS:

ESD: Electrostatic Discharge JBER: Joint Base Elmendorf-Richardson JECC: Joint Emergency Communications Center OSHA: Occupational Safety and Health Administration PWS: Performance Work Statement QC: Quality Control

PART 3: GOVERNMENT FURNISHED ITEMS AND SERVICES

3.1. SERVICES: The Government will provide access to available utilities, including water, electricity, heating, and cooling, at no cost to the contractor for the sole purpose of accomplishing the work specified herein.

3.2. FACILITIES: The Government will provide the contractor with access to the ECC work site.

PART 4: CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES

4.1. GENERAL: The Contractor shall furnish all supervision, labor, equipment, tools, and materials required to perform all work specified in this PWS.

4.2. MATERIALS: The contractor shall provide all consumable materials, including but not limited to ethernet cabling (Cat 6 or higher), RJ-45 connectors, cable ties, and labeling materials required for the reconfiguration and cable management tasks.

PART 5: SPECIFIC TASKS

5.1. TASK 1: PROJECT MANAGEMENT AND COORDINATION: The contractor shall coordinate with the Technical Adviser POC to develop a detailed project and cutover plan. This plan must be approved by the Technical Adviser POC prior to any work commencing and must include a phased approach to minimize system downtime. The primary ECC should not be down for more than 5-7 business days.

5.2. TASK 2: EQUIPMENT SHUTDOWN AND RELOCATION: The contractor shall perform a coordinated shutdown of all systems to be moved in accordance with manufacturer specifications. The contractor shall carefully disconnect, label, and safely move the following equipment to new workstations as identified by the Technical Adviser POC:

5.2.1 Monaco fire dispatch/alarm system components.

5.2.2 VESTA 911 system components.

5.2.3 Motorola base station radio consoles and associated equipment.

5.2.4 All associated peripherals: monitor tower mount, 2 keyboards, 2 mice, 2 landline phones and 1 clock.

5.3. TASK 3: RE-INSTALLATION AND SYSTEM RESTORATION: The contractor shall re-install all equipment at the new workstations. A critical requirement of this task is the complete restoration of system functionality. Should any system or component fail to come back online or function as required due to the contractor's performance of the work, the contractor shall be solely responsible for all labor, parts, and services necessary to remedy the issue and restore full functionality at the contractor's own expense.

5.4. TASK 4: CABLE MANAGEMENT AND INFRASTRUCTURE: The contractor shall be responsible for all network and power cable modifications. This includes moving existing ethernet ports where feasible and creating, terminating, and testing new ethernet cables as required to reach the new workstation locations. The contractor shall provide professional cable management for all relocated workstations, ensuring all cables are neatly routed, secured, and labeled at both ends.

5.5. TASK 5: SYSTEM TESTING AND ACCEPTANCE: Upon completion, the Technical Adviser POC and ECC personnel will conduct a full functional test of all relocated systems. Final acceptance will be granted only after the Technical Adviser POC verifies that all systems are 100% functional and all work described in this PWS has been completed to a satisfactory standard.

5.6. TASK 6: SITE CLEAN-UP: The contractor shall remove all debris, excess materials, and tools from the work site upon completion, leaving the area in a clean and orderly condition.

PART 6: APPLICABLE PUBLICATIONS

The contractor shall adhere to the latest editions of relevant industry standards for telecommunications cabling, such as those from the Telecommunications Industry Association (TIA), TIA-568 and TIA-606.

PART 7: ATTACHMENT/TECHNICAL EXHIBIT LISTING:

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective
PWS Paragraph Ref.
Performance Standard
Method of Surveillance
Incentive/Disincentive
System Functionality
5.3
100% of all relocated systems (Monaco, VESTA, Motorola, etc.) are fully functional with zero defects or degradation.
100% Government inspection and functional testing.
Failure to meet the standard requires the contractor to re-perform services and provide all necessary parts/labor to achieve 100% functionality at no additional cost to the Government.
Equipment Safety
5.2
Zero physical damage to any Government equipment during relocation.
100% Government inspection.
Contractor must repair or replace any damaged equipment to its original condition or value at no cost to the Government.
Cable Management
5.4
100% of workstation cabling is professionally managed, labeled, and secured per industry best practices.
100% Government Inspection
Rework of all non-compliant cabling within 24 hours of notification at no cost to the Government.
Site Cleanliness
5.6
Work area is free of all contractor-generated debris upon completion.
100% Government inspection.
Contractor will be required to return to the site to clean up any remaining debris at no additional cost.