This is a Performance Work Statement (PWS) for the 306th Rescue Squadron's procurement and installation of a cargo rack system for ISU-90 containers at Davis-Monthan Air Force Base, Arizona. The contractor must furnish all labor, materials, equipment, and services to provide and install a cargo rack system accommodating 20 ISU-90 containers, with maximum dimensions of 106 feet length x 22 feet height x 18 feet width for the cargo bay, and total system dimensions not exceeding 113 feet length x 22 feet height x 18 feet width including stairs and catwalks. The system requires up to 40 concrete footers installed 12-18 inches deep at 3000-4000 psi, a canted/sloped roof for UV and wind protection, staircase and catwalk access to second-level containers, and must be forklift operable.

Key specifications include ISU-90 containers measuring 108" x 88" x 91.35" and weighing 1,720 lbs each with 10,000 lb capacity, requiring the rack to support all 20 containers at full capacity. The installation must be completed entirely on existing asphalt surface with concrete footers, maintaining 10-foot clearance from overhead power lines and 3-foot clearance from fire hydrants. Work hours are Monday-Friday 7 AM to 5 PM, and the contractor must provide site preparation, system testing, waste removal, maintenance manuals, warranty documents, and ensure all technicians are fully certified. The contractor must coordinate with the 355th Civil Engineering Squadron and comply with all DMAFB security requirements, environmental regulations, and safety standards.

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought ISU Cargo Rack System, newest first.
File Type Posted
LAYOUT CARGO MUST BE HERE.jpg JPG image
PHOTOS of SITE.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement for 306th Rescue Squadron Procure and Install Cargo Rack System for ISU-90 Containers

1.0. Description of Services. The contractor shall furnish all labor, parts, tools, materials, equipment, transportation, personnel, management, supervision and training necessary to provide and install a Cargo Rack system to accommodate 20 ISU-90 containers. The contractor is also required to provide site preparation as necessary.

The dimensions of the cargo bay system are constrained to a maximum of 106 feet in length, 22 feet in height, and 18 feet in width. A staircase and catwalk system are also required in order to have access to second level ISUs. The stairs must be added to the side of the bay system, but the total dimensions of the rack system and stairs must not exceed 113 feet in length, 22 feet in height, and 18 feet in width. To support building location High Wind conditions the system will require up to 40 Concrete footers installed to depths of 12” to 18” below the surface at 3000 to 4000psi of standard concrete.

The building site features an established asphalt ("blacktop") surface bordered by gravel. The ISU-90 Cargo rack, including its associated catwalk, is to be installed completely on the asphalt surface at Civil Engineering Squadrons approved location. The approved site is clear of any interference with fire hydrant piping or overhead power lines. While the site is clear, the builder will take precautions regarding existing overhead power lines located within 20 feet of the approved site, as well as the nearby fire hydrant.

A canted/sloped roof is to be installed to protect equipment against hazardous UV rays and winds and promote water runoff. Ensure the cargo rack bay system is forklift operable. This requirement is requested in support of the 306th Rescue Squadron at Davis-Monthan AFB (DMAFB), Tucson, AZ.

1.0.1. Cargo Rack/Bay Dimensions: Maximum 106 ft L x 22 ft H x 18 ft W.

1.0.2. Total System Dimensions (Bay, Staircases, Ladders, etc.): Maximum 113 ft L x 22 ft H x 18 ft W.

1.0.3. Footers: Up to 40 concrete footers (3000-4000psi), 12"-18" deep, required for high wind conditions.

1.0.4. Roof: Canted/sloped roof required for UV and wind protection as well as water runoff.

1.0.5. Access: Staircase and catwalk system required for second-level ISU access.

1.0.6. Forklift Operable: Cargo rack bay system must be forklift operable.

1.0.7. ISU Size (EACH): 108 inches wide x 88 inches long x 91.35 inches high.

1.0.8. ISU Weight Capacity (EACH): The ISU-90 container typically weighs 1,720 lbs and has a capacity of 10,000 lbs. Cargo rack must hold all 20 ISU-90’s at full capacity.

1.0.9. Building Location: Needs to be built entirely onto the established asphalt utilizing concrete footers. The Catwalk needs to be on the asphalt as well. Catwalk over the dirt/gravel is NOT allowed.

1.1. Contractor Requirements. Provide the requested equipment / installation in guidance with the 355th Civil Engineering Squadron.

1.2. Items Needing Maintenance. N/A

1.3. Work Schedule. The proposal needs to be based on the normal working hours, Monday through Friday 7 A.M. until 5 P.M., with the option of overtime, weekends, or shift work as requested in advance by the contractor.

1.3.1. Permits. The contractor shall ensure all permits, manifests, and environmental requirements, etc. are accomplished prior to beginning work.

1.3.2. Scope of Work for AFSOUTH A2Y. After purchasing the ISU-90 Rack System, the vendor shall prepare the area for the rack (level site, install concrete footers and hookup electrical requirements then deliver and install the system in the provided area.

1.3.3. System Testing. Upon completing installation of the access control system, the contractor shall test the system in the presence of the 306 RQS Point of Contact (POC). If the system does not function properly, the contractor shall make any necessary adjustments/repairs to ensure the system is fully functional.

1.3.4. Waste Removal. The contractor shall remove all debris from the work site and place it in the contractor provided disposal containers. The contractor shall dispose of waste at a permitted off-base waste site. Upon completion of services, the surrounding area shall be completely free of all waste.

1.3.5. Maintenance Manual and/or Warranty Documents. Upon completion the contractor shall provide the Programs Office with two copies of all necessary maintenance manuals and warranty documents.

1.3.6. Contractor Personnel Qualifications. The contractor shall ensure only fully certified qualified technicians perform installation of the access control system. The contractor shall provide proof of technician qualifications upon request by the Government.

1.4. General Information

1.4.1. Contract Manager. The contractor shall designate a primary contract manager, who will be responsible for the performance of services. The contractor shall submit the name of the contract manager in writing to 306 RQS POC. The contract manager shall have full authority to act for the contractor on all matters relating to the daily operation of the contract. The contract manager shall be available during normal business hours to discuss performance with Government personnel.

1.4.2. Contractor Employee Restrictions. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

1.4.3. Conflict of Interest. The contractor shall not employ any individual who is an employee of the United States Government if the employment of that individual would create a conflict of interest, nor shall the contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval of the employment in accordance with DODD 5500-7, Standards of Conduct. In addition, the contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities.

1.4.4. Work Hours. The contractor shall perform installation of the access control system during the hours of 7:00 a.m. – 5:00 p.m., Monday through Friday, except Federal Holidays. If the contractor wants to perform installation services outside of the work hours, it will require advance coordination. Requests will be considered on a case-by-case basis.

1.4.5. Power Lines Clearnce: OSHA Standards – 1910.269, Electric Power Generation, transmission, and distribution section (k)(2)(i)(A) states that “For lines and equipment at 50 kilovolts or less, this distance is 3.05 meters (10 feet).” The ISU-90 Rack must be built on the asphalt; the location has been approved for that siting location and won’t interfere with the powerlines.

1.4.6. Fire Hydrant Proximity: 2024 International Fire Code (IFC) Chapter 5, Section 507.5.5 Clear Space Around Hydrants states that a 3-foot (914 mm) clear space shall be maintained around the circumference of the fire hydrant. There is no interference or access issues.

1.4.6.1. Recognized Federal Holidays. The following federal holidays are observed at Davis- Monthan AFB. The contractor will not perform installation services on federal holidays, or the day set aside for observation to include down days.

New Year’s DayLabor Day Martin Luther King's BirthdayColumbus Day Presidents’ DayVeterans’ Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

1.4.7. Fire Prevention and Safety. Contractor employees shall comply with DMAFB Fire Protection Program, Air Force Occupational Safety & Health (OSHA), Air Force Occupational Safety, and the Fire Prevention and Health Program. Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor, and the government will assume no liability or responsibility for the contractor’s compliance or noncompliance with such responsibilities.

1.4.7.1. Safety Equipment. The contractor is responsible for providing all safety equipment for contractor employees. Contractor employees shall always use proper safety equipment during the performance of this contract and shall perform all tasks in a safe manner. The Government has the right to terminate the contract if the contractor is practicing unsafe work practices or lacks proper safety equipment, at no cost to the Government.

1.4.8. Environmental Protection Compliance. The contractor shall comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations/requirements change during the term of the contract, the contractor shall comply with such law/regulation as changed. The contractor is responsible for any penalties, fines, etc. resulting from violations. The contractor shall immediately notify the Contracting Officer and Program Office when violations occur and cooperate fully with fire department personnel and Government investigators.

1.4.9. Work Areas. The contractor shall, at all times, keep work areas free from accumulations of waste material, rubbish, tools, scaffolding, equipment, and materials. Upon completion of the job or when away from the work site, the contractor shall leave the work area and premises in a clean, neat, safe and workmanlike condition. The contractor is responsible for removal and proper disposal of all job-related waste material at a permitted site.

1.4.10. Inspection of Services. The contractor’s work shall be subject to inspection at any time. The presence or absence of a Government inspector shall not relieve the contractor from strict compliance with the requirements of the PWS, nor shall the presence of an inspector relieve the contractor from any deficiency that may be noted during the final inspection.

1.4.11. Smoking in Air Force Facilities. Contractors are advised that the Air Force has placed restrictions on the smoking of tobacco products in Air Force facilities. AFI 40-102, Tobacco Use in the Air Force, outlines the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as Government personnel. Smoking is permitted only in designated smoking areas.

1.5. Security Requirements

1.5.1. DMAFB Passes. The contractor shall obtain DMAFB passes for all employees requiring access to DMAFB. Applications for passes must be submitted to 306 RQS. Applicants may obtain passes from the Security Forces Pass and Badge Section, at the Craycroft Visitor Center, DMAFB, during the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday.

1.5.2. Listings of Employees. Upon contract award the contractor shall provide a listing of contractor employees that will perform services on DMAFB to 306 RQS, so security checks can be performed. The list shall include the contractor employee’s first and last name, date of birth, social security number, driver’s license number and state of issue. The contractor shall submit an updated listing to 306 RQS when an employee's status or information changes.

1.3.4. Traffic Laws. Contractor employees shall comply with all DMAFB traffic regulations. Contractor employees are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges and debarment from the base. The use of cell phones is prohibited while driving on DMAFB, unless the phone is hands free phone. Seat belt use is mandatory for all vehicle occupants.

1.3.5. Random Personnel and Vehicle Searches. Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base and may result in loss of base driving privileges and debarment from the base.

1.3.6. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor owned vehicle or privately owned vehicle while on Davis-Monthan AFB.

1.3.7. For Official Use Only (FOUO). The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

1.3.8. Reporting Requirements. Contractor personnel shall immediately report to an appropriate Government authority any information or circumstances of which they are aware may pose a threat to the security of Department of Defense personnel, contractor personnel, resources, and classified or unclassified defense information.

1.3.9. Physical Security. The contractor shall safeguard all Government property, including controlled forms provided for contractor use. At the close of each work period, Government equipment, facilities, and other valuable materials shall be secured.

1.6. Government Provided Services

1.6.1. Utilities. The Government will provide water and electricity inside of facilities; however, the contractor is responsible for outside lighting of the facilities. The contractor shall practice utility conservation and is responsible for operating under conditions that prevent the waste of utilities.

1.6.2. Emergency Services. The Government will provide security forces services (call 228- 4444 for emergencies only), and fire protection services (call 228-3333). There are no emergency medical services available on DMAFB, therefore the contractor should call 911 for medical emergencies. If the contractor calls 911 from a government phone, the contractor must tell the operator that they are calling from DMAFB.

File details come from the government source that posted it. Updated .