PWS and PRS SDWA FINAL.pdf

PDF 211 KB Posted

Attached to
Safe Drinking Water Sampling/Testing Services Federal contract opportunity
Solicitation number
W9127P21R0005
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Safe Drinking Water Sampling/Testing Services, newest first.
File Type Posted
W9127P21R0005 RFP SDWA water testing amend1.pdf PDF
W9127P21R0005 RFP SDWA water testing.pdf PDF
ATT 1 _PPQSol.pdf PDF
Price Model ATT 2.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. January 2021

PERFORMANCE WORK STATEMENT (PWS)

FOR

SDWA SAMPLING AND ANALYSIS SERVICES

August 4, 2021

1.0 General: The Virgin Islands National Guard (VING) seeks to establish a contract for the mandated Safe

Drinking Water Act (SDWA) testing at VING facilities in St. Croix and St. Thomas, VI.

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform SDWA SAMPLING AND

ANALYSIS Services, as defined in this PWS.

1.2 Background: (VING) seeks to establish a contract for the mandated Safe Drinking Water Act (SDWA) testing at

VING facilities in St. Croix and St. Thomas, VI.

1.3 Period of Performance (PoP): The Period of Performance shall be 1 base year of 12 months and four 12-month option years.

1.4 General Information:

1.4.1 Place and Performance of Services The contractor shall provide services between the hours of 0800 -1700 on

Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at United States Property and Fiscal Office; Joint Force Headquarters, Lionel A.

Jackson Armory, Sprat Hall Facility and Regional Training Institute on St. Croix and SFC Leonard B. Francis

Armory on St. Thomas. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1.1 Telework: The Government will not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the

Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The

Government reserves the right to direct the removal of an employee from Government property or revoke access to

Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:

1.4.3.1 New Year’s Day: January 1st

1.4.3.2 Martin Luther King, Jr.’s Birthday

1.4.3.3 President’s Day

1.4.3.4 Memorial Day

1.4.3.5 Junteenth National Independence Day: June 19th

1.4.3.6 Independence Day: July 4th

1.4.3.7 Labor Day

1.4.3.8 Columbus Day

1.4.3.9 Veteran’s Day: November 11th

1.4.3.10 Thanksgiving Day

1.4.3.11 Christmas Day: December 25th

1.4.3 RESERVED

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the

Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of

Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 RESERVED

1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the

National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB)

(Army Directive 2014-05), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a Government representative).

1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the

COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level

1 awareness training is available at the following website: https://jko.jten.mil/courses/atl1/launch.html.

1.4.5.4 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an

Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.

https://jko.jten.mil/courses/atl1/launch.html

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7 Special Qualifications: The vendor shall be certified by EPA or the state to analyze drinking water samples for compliance monitoring as regulated in Title 40 U.S. Code of Federal Regulations, Part 141.

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the

KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The

CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with

Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 Contractor Travel: The contractor shall travel between the locations identified in section 1.4.1 of this PWS during the performance of this contract to draw water samples.The contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires COR recommendation for approval and/or authorization by the KO prior to travel arrangements being made.

1.4.13 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract.

All documents and materials, to include the source codes of any software, produced under this contract shall be

Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the

Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5.

The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI.

The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government.

The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure

AR Army Regulation

AT/OPSEC Antiterrorism/Operational Security

ATO Antiterrorism Officer

BI Background Investigation

CAC Common Access Card

CFP/M/E Contractor Furnished Property/Materials/Equipment

CM Contract Manager

COOP Continuity of Operations Planning

COR Contracting Officer Representative

DA Department of the Army

DBP Disinfectant By Products

DD254 Department of Defense Contract Security Classification Specification

DEP Division of Environmental Protection

DFARS Defense Federal Acquisition Regulation Supplement

DoD Department of Defense

DPNR Department of Planning and Natural Resources

EPA Environmental Protection Agency

FAR Federal Acquisition Regulation

FPCON Force Protection Condition

GFP/M/E/S Government Furnished Property/Material/Equipment/Services

HAA5 Haloacetic Acids

HQDA Headquarters, Department of the Army

HSPD Homeland Security Presidential Directive

IA Information Assurance

IS Information System(s)

JTR Joint Travel Regulation

KO Contracting Officer

NCIC-III National Crime Information Center Interstate Identification

NGB National Guard Bureau

OCI Organizational Conflict of Interest

PFAS Per-and Polyfluoroalkyl Substances

PII Personally Identifiable Information

PIPO Phase In/Phase Out

POC Point of Contact

PRS Performance Requirements Summary

PSP Personnel Security Program

PWS Performance Work Statement

QA Quality Assurance

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Program

SCR Service Contract Reporting

SDWA Safe Drinking Water Act

SSN Social Security Number

TE Technical Exhibit

TTHMs Total Trihalomethanes

TSDB Terrorist Screening Database

USD(I) Under Secretary of Defense for Intelligence

VING Virgin Islands National Guard

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS.

3.2 Materials: None.

3.3 Equipment: None.

3.4 Services: None.

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract.

The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Per Safe Drinking Water Act, our water has to be tested for various minerals and compounds.

Testing must be done on a regular basis depending on the type of test conducted. The results will determine if the water is potable or non-potable and requires treatment and then re-testing.

Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish all labor, equipment, materials, and supplies required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall visit the locations listed in paragraph 1.4.4, on a monthly basis to test for total coliform bacteria in the water supply. The monthly required sampling shall be completed within the first seven business days of each month.

5.1. Contractor shall conduct Special Testing for lead & copper, nitrate, nitrite, inorganics including cyanide, volatile organics, disinfectant by-products, asbestos and arsenic on an as needed basis. These tests are on an irregular schedule and shall be requested by the COR based on the required schedule according to the SDWA regulations. See table technical exhibit 3. Test results shall be delivered electronically to the COR and DPNR.

5.2 Contractor shall conduct PFAS testing on an as needed basis. These tests are on an irregular schedule and shall be requested by the COR based on the required schedule according to the DoD regulations. See table technical exhibit 3.

Test results shall be delivered electronically to the COR.

5.3 The Contractor shall preserve and test samples in accordance with 40 CFR 141.

5.4 The Contractor shall submit the test results monthly to the COR.

5.5 The Contractor shall provide a report of the test results to the DPNR – DEP after each test.

5.6 The Contractor shall notify the COR immediately after, of any positive test results. A retest of the system shall be taken by the contractor in accordance with the federal and territorial regulations within 24 hours. Test results shall be delivered electronically to the COR and DPNR.

5.7 Per Army Regulation 200-1, 2-2(d), the Contractor is liable for any enforcement actions, fines, and/or penalties resulting from their failure to comply with applicable environmental requirements.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication

(Chapter/Page)

Date of

Publication

Mandatory or Advisory

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar

Defense Federal Acquisition Regulation

Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.

html or https://www.acquisition.gov/dfars

Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm

DoDM 1000.13-M-V1

DoD Identification (ID) Cards

(Enclosure 2, paragraph 3.b)

01/23/2014

(Change 1:

07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards

(FIPS) Publication 201-2

Personal Identity Verification (PIV) of

Federal Employees and Contractors

(paragraph 9)

August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-

2.pdf https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf

DoDM 5200.2 Procedures for the DoD

Personnel Security Program (PSP)

04/03/2017 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5200.46

DoD Investigative and Adjudicative

Guidance for Issuing the Common

Access Card (CAC)

09/09/14

(Change 1:

05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/

Homeland Security Presidential Directive

(HSPD)-12

Policy for a Common Identification

Standard for Federal Employees and

Contractors

08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11

Department of Defense Privacy and Civil

Liberties Programs

01/29/2019

DoD 5400.11-R

Department of Defense Privacy Program

05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDD 8140.01

Cyberspace Workforce Management

10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/

DoD 8570.01-M

Information Assurance Workforce

Improvement Program

12/19/2005

(Change 4:

11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/

DoD 5220.22-M

National Industrial Security Program

Operating Manual (NISPOM)

02/28/2006

(Change 2:

05/18/2016)

Army Directive 2014-05

Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared

Contractors

03/07/2014 https://armypubs.army.mil/ProductMaps/PubForm/Army

Dir.aspx

AR 25-2

Information Assurance

04/04/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.asp x

AR 530-1

Operations Security

09/26/2014 http://armypubs.army.mil/ProductMaps/PubForm/AR.asp x

AR 525-13

Antiterrorism

12/09/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.asp x

AR 381-12

Threat Awareness and Reporting

Program (TARP)

(Section II, ¶ 2-4.b)

06/01/2016 http://armypubs.army.mil/ProductMaps/PubForm/AR.asp x

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 1172-2

Application for Identification

Card/DEERS Enrollment

Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm

I-9

Employment Eligibility Verification

10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf

DD 441

Department of Defense Security

Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm

DD 250

Material Inspection and Receiving

Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance

Objective

Performance Standard Acceptable Quality

Levels (AQL)

Surveillance Method / By

Whom

Total Coliform if

Negative Test

Results

Total Coliform Sampling shall be collected within each month

No month shall go untested. Negative reports shall be submitted no later than 10 days into the next month 100% of the time

COR shall keep a monthly record of submissions.

Total Coliform if

Positive Test

Results

Total Coliform Sampling shall be collected within each month

No month shall go untested. Positive reports shall be submitted no later than 24 hours after the results 100% of the time

COR shall keep a monthly record of submissions.

Total Coliform

Retest

Total Coliform Retest shall be collected with 24 hours after notifying VING of positive results.

Immediately within receiving positive results

100% of the time

Reporting shall be sent to the

COR and to DPNR

Special Tests Special Tests shall be collected at the request of the COR per

Technical Exhibit 3

Test results will be reported to the COR within 30 days 100% of the time

Contractor shall report results to the COR and DPNR

PFAS Tests PFAS samples shall be collected at the request of the COR per

Technical Exhibit 3

Test results will be reported to the COR within 30 days 100% of the time

Contractor shall report the results to the COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference /

Deliverable Title

Frequency Number of

Copies

Medium/Format Submit To

1.4.5.3 AT Level 1

Awareness Training

Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic

Submission

COR

1.4.7 Special

Qualifications

Provide NLT than 15 days after contract awards

1.4.5.4 iWatch

Training Certificates

Provide within 15 calendar days after employee completes training.

Total Coliform

Negative results

Monthly submission

COR and DPNR-DEP

– SDWA Division

Total Coliform

Positive results

Immediately upon detection – retest within 24 hours n/a Telephonic COR

Special Tests Based on an irregular schedule and COR request

1 Electronic

Submission

COR and DPNR-DEP

– SDWA Division

PFAS Annually or as otherwise stated by NGB

1 Electronic submission

TECHNICAL EXHIBIT 3

Irregular Special Testing Schedule

Contaminant Monitoring Frequency

Monitoring

Schedule

Sampling location

Total Coliform Monthly

Within the Distribution

System

Nitrate Annually

Entry Point

Nitrite Triennially

Entry Point

Standard Lead &

Copper

Two Consecutive 6 Month sampling periods. Number of samples based on population served:

Population No . Samples

<100 5

101-500 5

501-3,300 20

Users taps within the distribution system

Reduced Lead &

Copper

Annually for three consecutive year.

Number of samples based on population served:

Population No . Samples

<100 5

101-500 5

501-3,300 10

Arsenic Once Every 3 Years Entry Point

Asbestos Once Every 9 Years

User tap

Inorganics Including

Cyanide Annually for 3 Consecutive Years

Entry Point

Volatile Organics Annually for 3 Consecutive Years

Entry Point

Disinfectants By-

Products (DBPs) HAA5

& TTHMs Population <500 Annually

Maximum residence time

Chlorine Same frequency and location as

Coliform samples

Analyzed with coliform.

Entry point

PFAS Upon request by COR Source

File details come from the government source that posted it. Updated .