PWS_28-07-25.pdf
PDF 320 KB Posted
- Attached to
- FA8251-25-Q-0001 _ DED Power Supply Federal contract opportunity
- Solicitation number
- FA8251-25-Q-0001_DED_Power_Supply
About this file
This Performance Work Statement (PWS) details the repair requirements for F-16 Data Entry Display (DED) Power Supply units for the Department of the Air Force at Ogden Air Logistics Center. The PWS specifies repair services for two specific power supply part numbers (10-01126-07 and 10-01126-06) with corresponding National Stock Numbers, focusing on returning these components to serviceable "A" condition through comprehensive testing, inspection, repair, and quality assurance processes.
Key technical requirements include conducting mission capability repairs, performing detailed inspections, implementing corrosion control, managing electrostatic discharge risks, conducting environmental stress screening, and executing final acceptance testing. The contractor must maintain robust supply chain risk management, implement counterfeit electronic part detection procedures, and comply with multiple technical orders and directives. Reporting requirements are extensive, including daily end-item transactional reporting through the Commercial Asset Visibility Air Force (CAV AF) system, monthly production reporting, annual government property inventory reporting, and maintenance data documentation in the Defense Repair Information Logistics System (DRILS).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA825125Q0001_Amend 001.pdf | ||
| FA8251-25-Q-0001.pdf | ||
| SOW.pdf | ||
| CDRLS.pdf | ||
| 2734_RQR_SectionC.pdf | ||
| 2734_RDL.pdf | ||
| Packaging.pdf | ||
| Transportation.pdf | ||
| CAV AF Reporting Requirement.pdf | ||
| 2914_RDL.pdf | ||
| DRILS.pdf | ||
| 2914_RQR_SectionC.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
Ogden Air Logistics Center (OO-ALC) AFMC Hill
AFB, UT 84056-5609
PERFORMANCE WORK STATEMENT (PWS)
REPAIR FOR:
Dated: 8 July 2025
Data Entry Display Power Supply
P/N(s): 10-01126-07 and 10-01126-06 NSN(s): 6130-21-914-2914 and 6130-01-207-2734
F - 16
PWS for Repair of F-16 DED Power Supply
V1.3 8 July 2025
TABLE OF CONTENTS
1. SCOPE OF SERVICE…………………………………….………………….….……. 3
2. NON-MISSION ESSENTIAL SERVICE…………………………………….….…... 3
3. DEFINITIONS AND ACRONYMS…………………………………………………...3
4. DESCRIPTION OF SERVICES………………………………………………
4.1. MICAPs…………………………………………………………………………… 4
4.2. Inspection………………………………………………………………………….. 4
4.3. Corrosion Control and Treatment………………………………………….…
4.4. Electrostatic Discharge Control…………………………………………………….5
4.5. ESS Test…………………………………………………………………………
4.6. AT………………………………………………………………………….….…... 5
4.7. Repairs………………………………………………………………….……..……5
4.8. Final Acceptance Test………………………………………………….………
4.9. Shipping……………………………………………………………….…..………. 6
4.10. Condemnation and Disposition……………………………………….…………
4.11. PQDR……………………………………………………………….…………..…. 6
5. GFP, GFM, GFE……………………………………………………….………………. 6
6. SECURITY AND FOREIGN DISCLOSURE………………………………….……. 6
7. SCRM RISK MANAGEMENT ……………………………………………………… 7
8. COUNTERFEIT ELECTRONIC PART DETECTION AND AVOIDANCE...….. 9
9. IUID MARKING………………………………………………………………….…... 10
10. CONTRACT DATA REQUIREMENT LISTS (CDRLs)………….………………. 10
11. SERVICE SUMMARY…………………………………………………………….…. 12
12. TECHNICAL ORDERS AND OTHER DIRECTIVES………………………….… 12
1. SCOPE OF SERVICE. The Performance Work Specification (PWS) establishes the requirement to test and, if necessary, repair the following F-16 items Data Entry Display Power Supply (DED PS) to serviceable “A” condition but, not like new cosmetically. The qualified repair source/contractor will repair the items per OEM specification, approved technical orders and methods approved through the cognizant engineer at the time of qualification or during continuing qualification. DED PS item repairs are categorized as just-in-time repairs, not scheduled repairs, the contractor shall provide and maintain all the capabilities to test and repair the mentioned items to serviceable “A” condition such as, but not limited to, all the expertise, labor, tools, equipment, and parts in order to deliver the serviceable items within the time period specified on the contract. The contractor shall maintain test and repair records that include cost accounting records of all items serviced under the contract.
2. NON-MISSION ESSENTIAL SERVICE. This effort is considered a Non-Mission Essential Service. According to Department of Defense Instruction (DoDI) 1100.22 it is determined that the Contractor will not be required to provide services during crisis unless otherwise directed by an authorized government representative. The contractor will contact the Contracting Officer (CO) for instructions concerning services if a crisis occurs.
3. DEFINITIONS AND ACRONYMS.
ACRONYM OR
PHRASE
DEFINITION
AT Acceptance Test: The functional and operational tests performed on the end- item to ensure that all performance standards are satisfactorily met to restore the end-item to a serviceable condition.
CO Contracting Officer BER Beyond Economical Repair CALIBRATION A comparison between two instruments, one of which is a standard of higher accuracy, to detect and correlate or adjust any variation in the accuracy of the instrument or equipment item being compared or tested.
CAV AF Commercial Asset Visibility Air Force. This is the end item production reporting system for contractor repairs and GFM transactions.
CCA Circuit Card Assembly CDRL Contract Data Requirements List CND Cannot Duplicate CONDEMN A normally repaired item which, due to the extent of required work process, has been deemed uneconomical to make serviceable.
DD FORM 1348-1A Department of Defense (DoD) form required to be created and attached on all government property being shipped from the contractor’s facility IAW DLM 4000.25-1 (ref most current amendment or replacement).
DISASSEMBLE To remove the components that make up the end-item in accordance with disassembly instructions IAW OEM technical data.
DoD Department of Defense
DRILS Defense Repair Information Logistics System ESS Environmental Stress Screening GFE Government Furnished Equipment GFP Government Furnished Property: F-16 Data Entry Display, Head, Tray, DED PS GFM Government Furnished Material IAW In Accordance With IUID Item Unique Identification – The program was an initiative incorporated by the
Government to improve the tracking of assets during transit, operation, storage, and repair. This program was implemented to provide an easier means for the contractor and
V1.3 8 July 2025
ACRONYM OR
PHRASE
DEFINITION
DoD to track unique assets through electronically scanning the asset tag which identifies the item.
MICAP Mission Capability
NSN National Stock Number OEM Original Equipment Manufacturer- BAE PQDR Product Quality Discrepancy Report QAR Quality Assurance Representative RECOVERABLE An unserviceable item that can have maintenance performed to restore it to a serviceable condition.
RTOK Retest Okay
SERVICEABLE Capable of meeting the requirements and performing the function for which it was designed or modified and meets all test requirements established by this work specification and the technical data cited in the PWS.
SOW Statement of Work
SRU Shop Replaceable Unit UPDATE To bring an end-item up to the latest acceptable government approved configuration without changing its original form, fit or functional capability.
4. DESCRIPTION OF SERVICE. The contractor shall inspect, test, repair, update, reassemble, calibrate, and retest GFP IAW contractor’s technical data specifications to bring the asset to serviceable condition.
4.1. Mission Capability (MICAPs). MICAPs will be identified to the contractor and work priorities will be set by direction of the Government to ensure “repair to demand” versus “batch repairing”. To meet this, the contractor will be allowed to move components among reparable end items to expedite repairs.
However, this practice shall be limited as to not to produce BER assets as a direct result.
4.2. Inspection. An inspection for proper identity, completeness, and obvious damage shall be performed on each item upon its receipt at the contractor’s facility. Any deficiencies found as a result of the inspection shall be brought to the attention of the Production Manager. The contractor shall accomplish a complete inspection of each GFP, GFE, and GFM for the following:
a. Loose, missing or damaged materials and attaching hardware as well as, on the structural parts for dents, punctures, bent pins, cracked, wrinkled or misalign conditions that may cause chafing.
4.3. Corrosion Control and Treatment. Accomplish corrosion control and treatment as required, using methods and materials IAW SAE-AS12500, MIL-STD-1568, T.O. 1-1-689 as applicable, and specification drawings.
4.4. Electrostatic Discharge Control. (Define requirement or mark N/A) The contractor shall implement or maintain an Electrostatic Discharge (ESD) control program in accordance with MIL-PRF-87893 ESD.TR20.20, paragraphs 5.1, 5.4, 5.5, 5.6, 5.7, 5.8.2, 5.10, 5.11, 5.12, and 5.13 and with T.O. 00-25- 234, Section VII for all electronics ESD sensitive end items/components.
V1.3 8 July 2025
4.5. Environmental Stress Screening (ESS). The contractor shall conduct an ESS test IAW established approved methods for source qualification or at a minimum when the same serial number returns to repair for the same fault less than 12 months from previous repair date IAW ESD-TR20.20 and MIL- HDBK-344A. If this is within the contractor’s warranty this will be at no cost to the Government.
4.6. Acceptance Test (AT). GFP that passes AT and deemed to be serviceable will not be repaired and instead will be considered to meet CND/RTOK conditions. The contractor shall immediately return the GFP to the Government.
4.7. Repairs. The repairs consist of minor to major overhaul including complete or substantial teardown into component parts. The tear-down includes repairing or replacing components and/or sub-assemblies. The GFM, such as reusable disassembled item component, shall be used as replacement components for restoring the SRUs to serviceable condition before charging the Government for parts. The cost of the GFM will not pass to the Government. The GFMs are not required to maintain the end item identification.
a. Maintenance and replacement of accessory and component parts shall be IAW Section 5, the technical data cited in Section 12, and the contractor’s technical data. In the event, that a deviation from the technical data is required and the contractor desires the use of a substitute part, an approval request in letter form shall be submitted to the Production Manager via e-mail to obtain approval or disapproval.
b. Serviceable precision matched or mated component parts shall be handled in a manner to ensure their reinstallation as a matched set.
4.8. Final Acceptance Test. The contractor shall perform a final acceptance test and checkout to ensure the repaired GFP is serviceable prior to returning it to the Government. Test and checkout shall be accomplished IAW the specifications in Section 12 and the contractor’s technical data. Upon satisfactory completion of the final acceptance test the contractor shall cover and seal all port, vents, and electrical connections/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment IAW NAS 847.
4.9. Shipping. Reusable shipping containers, packaging, and crating material in which the asset is received shall be handled with care. Reusable containers shall be stored for reuse, and configuration of the containers shall not be altered. All assets will always be returned or shipped utilizing a DD 1348-1A unless otherwise directed by the Government. DD 1348-1A is the authorized shipping document, not a DD250, so that the item can be properly identified.
4.10. Condemnation and Disposition. Authorization shall be obtained from the CO. The contractor shall email the Production Manager initially for the authorization request. If the Production Manager approves the request the Production Manager will contact the CO for authorization.
a. The contractor will be allowed to retain condemned units for cannibalization of spare parts as GFM upon approval of the Production Manager.
b. GFP shall have correlated inputs into CAV for correct D035 supply adjustments to NSN inventory.
4.11. Product Quality Discrepancy Report (PQDR). If a GFP is received from the contractor and at any time during the warranty period, the asset becomes unserviceable the Government will initiate a PQDR and return the asset back to the contractor. The contractor shall repair the GFP to serviceable condition at no additional cost to the Government. In addition, if an asset is returned for rework as a result of a PQDR more than 1 time in any 12-month period then the contractor shall also conduct an ESS at no
V1.3 8 July 2025 additional cost to the Government before returning the GFP to serviceable condition. The contractor shall coordinate actions with the CO and Production Manager. Any tests that will be excluded as part of this effort will have prior written approval from the Production Manager.
5. Government Furnished Property (GFP), Government Furnished Material (GFM), Government Furnished Equipment (GFE).
5.1. Joint Inspection There shall be a joint inspection between the Government and Contractor of Government furnished property, equipment and/or materials within 30 calendar days after contract award and within 30 calendar days before the contract ending date. The contractor shall sign the Government’s joint inspection sheet to show acceptance of assets received.
5.2. Contractor shall notify the CO, within one (1) workday of any damages when the dollar value exceeds
$50,000.00 and within two (2) workdays for any damages less than $50,000.00 during the execution of the contract.
5.3. When the Government owned asset is in the possession of the contractor, the asset shall be accounted for, tracked and stored in a secure area where they are protected and handled in such a manner against all damage, weather, and foreign matter. Further, the contractor shall secure the asset to prevent any damages, pilferages, or loss while in the contractor’s possession IAW DoD 5200.1-R.
5.4. GFP. GFP is the F-16’s DED Group Items:
DED Power Supply
PN: 10-01126-07 or 16VE173002-7
NSN: 6130-21-914-2914
PN: 10-01126-06 or 16VE173002-6
NSN: 6130-01-207-2734
5.5. GFM. Are materials supplied to the Contractor for incorporation into an end item to bring it to serviceable condition. It includes, but are not limited to, raw and processed material, parts, components, and assemblies. Nevertheless, the contractor is ultimately responsible for providing all the parts to repair the GFP to serviceable ‘A’ condition within the delivery date of the contract. The GFM is excess serviceable materials from condemned or are reusable disassembled item components from a nonserviceable GFP.
5.6. GFE. Is provided to the contractor by the Government. The contractor is responsible to ensure the GFE is always serviceable, including maintenance, upgrades, as well as providing safety, security, and accountability of the GFE while in their possession. For software updates, the Government is required to purchase these via the mandatory source (AFWay) or obtain a waiver prior to purchasing any software through open market. The cost to maintain the GFE shall be on a separate contract, not a repair contract, and negotiated prior to being approved and rendered. No GFE is applicable to the DED item contract.
6. SECURITY AND FOREIGN DISCLOSURE.
6.1. DD Form 254, DoD Contract Security Classification Specification, is REQUIRED at a secret level because of the classified data generated by the F-16’s: Not applicable to this contract.
6.2. Destructive Notice. For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program (NISPOM), Section 12 and DoD5200.1-R, Information Security Program Regulation. For
V1.3 8 July 2025 unclassified, limited documents, destroy by any method that shall prevent disclosure of contents or reconstruction of the document.
6.3. Per export control limitations, Foreign Disclosure Restrictions IAW AFMCMAN 21-149, and AFMCI 20- 102 Do Apply.
7. SCRM RISK MANAGEMERNT.
Contractor must provide a comprehensive Supply Chain Risk Management (SCRM) Plan in accordance with the instructions to offeror prior to award. This plan must be maintained during performance of this contract, will be incorporated into the contract at award, and must illustrate executable processes for identifying supply chain risks as early as possible. The SCRM plan will address the broad spectrum of supply chain risks that have the potential to jeopardize the integrity of products, services, people, and technologies; compromise intellectual property; disrupt the flow of product, materiel, information, and finances needed for continued Air Force operations; and/or drive materiel cost increases to the program. The plan and processes apply to the Contractor and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain from raw material stage to delivery of a finished product.
7.1 The SCRM plan must clearly address the following:
(a) Continuity of Operations (COOP) – Contractor will develop and/or update a Continuity of Operations Procedure/Plan (COOP), which outlines the processes and actions to prepare for, and respond to, planned/unplanned supply chain challenges.
(b) Foreign Influence – The Contractor will disclose any Foreign Ownership, Control, or Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A Standard Form 328 Certificate Pertaining to Foreign Interest must be submitted to the Government cognizant security office.
(c) Cybersecurity -The Contractor will implement a cybersecurity protection of supply chain information plan and provide a copy to the U. S. Government. As part of this process, the Contractor will conduct early and continuous monitoring throughout the life of the agreement to prevent or reduce impacts of cyber vulnerabilities where adversaries are able to exploit, steal, alter, manipulate, interrupt, or destroy system functionality, information, or technology. The plan must:
(i) Include a description of how the Contractor and any of the Contractor’s subcontractors will provide to the government a system security plan (or extract thereof) in accordance with the NIST Special Publication (SP) 800-171, “Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations” in effect at the time the solicitation is issued or as authorized by the contracting officer, to describe the Contractor’s unclassified information system(s)/network(s) where covered defense information associated with the execution and performance of this contract is processed, is stored, or transmits.
(ii) Include a description of how Contractor will protect the supply chain from exploitation due to the insertion of counterfeits/malware, unauthorized production, tampering, theft, insertion of malicious software and hardware, functionality alteration, and any other elements that would allow adversaries to gain unauthorized access to data, alter data, interrupt communications, or otherwise disrupt operations.
Inform the U. S. Government of any instances of unauthorized access and/or compromise, such as those listed in item “b” to the Contractor’s digital information and parts and components.
8. COUNTERFEIT ELECTRONIC PART DETECTION AND AVOIDANCE. Contractors and subcontractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. The contractor’s policies and procedures shall be IAW AS5553 standard and DFARs clause 252.246-7008, Source of Electronic Parts.
8.1. At a minimum, the CPP shall address:
8.2. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.
8.3. Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref.
AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H)
a. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies, or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies, or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A)
b. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance, and implementation of the CPP. The
8.4. CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D)
8.5. Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material, and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer.
8.6. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of
V1.3 8 July 2025 counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref.
AS5553, paragraph 4.1.4, 4.1.5, appendix E)
8.7. Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential.
These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, paragraph 4.1.4, appendix E)
8.8. Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies, and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies, and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, paragraph 4.1.6, appendix F)
8.9. Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI). The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, paragraph 4.1.7, appendix G)
8.10. Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may
V1.3 8 July 2025 be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.
9. Item Unique Identification (IUID) MARKING (IAW AFMCI 20-104 PARAGRAPH 3.12)
9.1. The contractor shall replace damaged markings, identification, and decals. IUID markings are required for all end-items and subcomponents to the end-item IAW with contractor’s technical order and the Government’s technical orders and directives listed in Section 12.
9.2. Each completed end-item will be permanently and legibly marked with the contractor’s facility identification. This identification will display the name of the contractor facility, date of maintenance and contract number. This identification can be by decalcomania, rubber stamp, or stencil. When using rubber stamp or stencil, use permanent, waterproof ink or paint of contrasting color; also, end-item identification plates shall reflect the latest configuration/update, i.e., National Stock Number, Part Number as applicable.
9.3. For items that do not have an IUID marking specifications the contractor shall develop the marking specifications in accordance with the latest version of MIL-STD-130N.
9.4. IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Ensure 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the contractor shall notify the CO for determination.
9.5. IUID markings which will be potentially destroyed during repair due to technical direction (i.e. paint removal, sand blasting, etc.) shall be recorded prior to maintenance action and replaced with the same UII as part of the repair action.
9.6. The contractor shall submit the required and applicable data for legacy items to the DoD IUID Registry per the data submission procedures at https://wawf.eb.mil.
10. Contract Requirements List. (CDRL) Reporting and data requirements shall be provided IAW the DD Form
1423-1, CDRL.
10.1. Commercial Asset visibility air Force (CAV AF) End Item Reporting: The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW CDRL A001. This information will be accessed by the program PMS and 416 SCMS/GUMAC personnel in order to ascertain production status. Transactions and data will be submitted by contractor daily IAW CAV AF Contractor User Guide, Version 9.0.4 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall have an Identity Certificate only;
an encryption certificate is not required. Reporting must be accomplished for each Contractor facility/location AND subcontractor locations if applicable. (CDRL A001)
a. Commercial Asset Visibility Air Force (CAV AF): The purpose of CAV AF is to maintain asset visibility and accountability throughout the repair process, update asset condition and balance to USAF supply systems, reports financial and inventory imbalances, and feeds production and unit repair costs to the maintenance and budgeting systems.
https://wawf.eb.mil/
V1.3 8 July 2025
b. DD Form 1348-1A (or most current version) Requirement: The contractor will use DD Form 1348-1A Single Line-Item Release/Receipt Document. It will be initiated and printed in CAV AF. If CAV AF is down, then a manual DD 1348-1A may be utilized, updating CAV one business day. It is imperative that the contractor, in completing the DD Form1348-1A, perpetuate some information from the incoming shipping document DD Form 1348-1A for each item received and for all outgoing shipments. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250).
c. Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250).
10.2. Contract Depot Maintenance (CDM) Production Report: The contractor shall report monthly by contract delivery order on all applicable categories, totals and on-hand balances, providing all listed DID requirements for each repair location, including subcontractor facilities, if applicable, for the contract’s maintenance occurrence actions during the reporting period IAW CDRL A002.
10.3. Government Property Inventory Report: The contractor shall provide an Annual Government Property Inventory Report IAW CDRL A003. The contractor shall conduct an annual 100% physical inventory over the course of a year’s time of each NIIN as not to impede maintenance operations. Upon completion of all NIIN’s 100% physically inventory, the contractor shall provide the AF government inventory listing of the result of all AF Government Furnished Property (GFP) in the contractor’s possession, by contract, and by National Stock Number (NSN). The contractor shall submit a Table for each designated repair facility/DoDAAC location for which the contractor has received inventory during the reporting period, including subcontractor facilities if applicable. The report should include all AF Government Furnished Property in possession of the Contractor.
10.4. Maintenance Data Collection Reporting. Serial number tracking by the contractor Is REQUIRED for all received assets. The contractor shall document all maintenance actions involving maintenance with the disassembly, cleaning, inspection, maintenance, and replacement of repaired end-items. The contractor shall load Maintenance Data to the Defense Repair Information Logistics System (DRILS) in IAW CDRL A004.
10.5. Counterfeit Protection Plan (CPP). The contractor shall adhere to a counterfeit mitigation program. The contractor shall submit the Counterfeit Protection Plan to the government IAW CDRL B001. Specific guidance for Counterfeit Mitigation Plan is detailed in section 8.
10.6. Item Unique Identification (IUID) Marking Plan. The contractor shall provide and conform to an Item Unique Identification (IUID) marking plan. A copy of the contractors IUID marking plan will be provided to DCMA, contracting, and the program representative within 60 days of award. IAW CDRL C001.
V1.3 8 July 2025
11. SERVICE SUMMARY
Performance Objective Performance Threshold
PWS
Para.
Method of Surveillance Frequency
The contractor shall report End Item transactional data through electronic submission in CAV AF A001. 100% 10.1
Government Inspection All GFP
The contractor shall report monthly by contract delivery order on all applicable categories, totals, and on-hand balances IAW A002 100% 10.2
Government Inspection Monthly
The contractor shall provide an Annual Government Property Inventory Report IAW CDRL A003 100% 10.3
Government Inspection Annually
The contractor shall document all maintenance actions in DRILS
IAW CDRL A004. 100% 10.4
Government Inspection All GFP
The contractor shall adhere to a counterfeit mitigation program.
The contractor shall submit the Counterfeit Protection Plan (CPP) to the government IAW CDRL B001 100% 10.5
Government Inspection
One Time
The contractor shall provide and conform to an Item Unique Identification (IUID) marking plan
IAW CDRL C001 100% 10.6
Government Inspection
One Time
12. TECHNICAL ORDERS AND OTHER DIRECTIVES
12.1. Specific (Reference Technical Orders or EO)
• T.O. 12S2-4-12-3 Overhaul Instruction, Data Entry Display Power Supply Assembly
• T.O. 12S2-4-12-4 Illustrated Parts Breakdown, Data Entry Display Power Supply Assembly
12.2. General (Reference Technical Orders)
• AFMCMAN 21-149 Contract Depot Maintenance (CDM) Program
• AFI 63-1201 Assurance of Operational Safety, Suitability and Effectiveness
• DoDI 4140.1 Supply Chain Material Management Policy (Replacing DoD
• Directive 4140.1 Dec 2011)
• DoDI 4140.67 DoD Counterfeit Prevention Policy (Apr 26 2013)
• DoD 4160.28-M Vol 1. Publication, Defense Demilitarization: Program
Administration (Incorporated and cancelled DoD 4160.21-M-1 June 2011)
• DoD 4100.39-M Federal Logistics Information System (FLIS Manual)
• DLM 4000.25.1 Military Standard Requisitioning and Issue Procedures
(MILSTRIP) replacing DoD 4000.25-1-M Jun 2012
• DLM 4000.25-2 Military Standard Transaction Reporting and Accountability
V1.3 8 July 2025
Procedures (MILSTRAP) replacing DoD 4000.25-2-M Jun 2012
• CAV AF Manual Commercial Asset Visibility Air Force (Version 9.0.4 or higher)
• MIL-HDBK-344 Environmental Stress Screening of Electronic Equipment
• MIL-I 46058C Insulating Compound, Electrical
• MIL-HDBK-454C Requirements for Electronic Equipment
• MIL-STD-130 Identification Marking of U.S. Military Property
• SAE-AS12500 Corrosion Prevention and Deterioration Control of Electronic
Components and Assemblies
• ESD-TR20.20 Handbook for the Development of an Electrostatic Discharge Control Program for the Protection of Electronic Parts, Assemblies and Equipment.
• MIL-STD-1568E Materials and Processes for Corrosion Prevention and Control in
Aerospace Systems
• NAS 847 Cap and Plug, Protective, Dust and Moisture Seal
• ANSI/ESD-S20.20-2021 ESD Association Standard for the Development of an Electrostatic Discharge
Control Program for – Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)
• MIL-STD-130 Identification Marking of U.S. Military Property
• T.O. 00-5-1 AF Technical Order System
• T.O. 00-5-3 AF Technical Order Life Cycle Management
• T.O. 1-1-689 Avionics Cleaning/Corrosion Manual
• T.O. 1-1-691 Aircraft Weapon System Cleaning and Corrosion Control
• T.O. 33B-1-1 Non-Destructive Inspection Methods
• T.O. 00-20-2 Maintenance Data Documentation
• T.O. 00-25-234 General Shop Practice Requirements for The Repair, Maintenance and Test of Electrical Equipment
• T.O. 00-25-260 Asset Marking and Tracking Item Unique Identification (IUID)
Marking Procedures
12.3. Applicable Non-Government Publications.
Technical orders/manuals, technical directives and other applicable publications required to accomplish the work effort, but not in possession of the contractor, shall be acquired as authorized and directed by the CO. Commercial publications can be substituted for technical orders and military standards if the contractor can substantiate to the engineering control authority that such publications will accomplish the same purpose.
NOTE: Primary source for military specifications and standards is:
DLA DOCUMENT SERVICES/QUICK SEARCH ASSIST
700 Robbins Ave Bldg. 4, Sec D.
Philadelphia, PA 1911-5094
DSN: 442-6396
COMM: (215) 697-6396
WEB: http://quicksearch.dla.mil/ http://quicksearch.dla.mil/ http://quicksearch.dla.mil/ http://quicksearch.dla.mil/
| PERFORMANCE WORK STATEMENT (PWS) |
| Contractor must provide a comprehensive Supply Chain Risk Management (SCRM) Plan in accordance with the instructions to offeror prior to award. This plan must be maintained during performance of this contract, will be incorporated into the contract a... |
| 7.1 The SCRM plan must clearly address the following: |
| (a) Continuity of Operations (COOP) – Contractor will develop and/or update a Continuity of Operations Procedure/Plan (COOP), which outlines the processes and actions to prepare for, and respond to, planned/unplanned supply chain challenges. |
| (b) Foreign Influence – The Contractor will disclose any Foreign Ownership, Control, or Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A Standard Form 328 Certificate Pertaining to Foreign Interest must be sub... |
| (c) Cybersecurity -The Contractor will implement a cybersecurity protection of supply chain information plan and provide a copy to the U. S. Government. As part of this process, the Contractor will conduct early and continuous monitoring throughout th... |
| 10.1. Commercial Asset visibility air Force (CAV AF) End Item Reporting: The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW CDRL A001. This information will be acce... |
| a. Commercial Asset Visibility Air Force (CAV AF): The purpose of CAV AF is to maintain asset visibility and accountability throughout the repair process, update asset condition and balance to USAF supply systems, reports financial and inventory imba... |
| b. DD Form 1348-1A (or most current version) Requirement: The contractor will use DD Form 1348-1A Single Line-Item Release/Receipt Document. It will be initiated and printed in CAV AF. If CAV AF is down, then a manual DD 1348-1A may be utilized, updat... |
| c. Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy... |
| 10.2. Contract Depot Maintenance (CDM) Production Report: The contractor shall report monthly by contract delivery order on all applicable categories, totals and on-hand balances, providing all listed DID requirements for each repair location, includi... |
| 10.3. Government Property Inventory Report: The contractor shall provide an Annual Government Property Inventory Report IAW CDRL A003. The contractor shall conduct an annual 100% physical inventory over the course of a year’s time of each NIIN as not ... |
| 10.4. Maintenance Data Collection Reporting. Serial number tracking by the contractor Is REQUIRED for all received assets. The contractor shall document all maintenance actions involving maintenance with the disassembly, cleaning, inspection, mainten... |
| 10.5. Counterfeit Protection Plan (CPP). The contractor shall adhere to a counterfeit mitigation program. The contractor shall submit the Counterfeit Protection Plan to the government IAW CDRL B001. Specific guidance for Counterfeit Mitigation Plan ... |
| 10.6. Item Unique Identification (IUID) Marking Plan. The contractor shall provide and conform to an Item Unique Identification (IUID) marking plan. A copy of the contractors IUID marking plan will be provided to DCMA, contracting, and the program re... |
File details come from the government source that posted it. Updated .