This document is a Performance Work Statement (PWS) for a contract to provide preventative maintenance and service for three Computer Numerical Control (CNC) HASS Machines located at the Army Research Laboratory (ARL) at Aberdeen Proving Ground (APG).

The objective is for the contractor to perform necessary work to ensure the three CNC HASS Machines (serial numbers 1147998, 1167245, 1167195) are properly serviced and maintained annually under a one-year base period and four one-year option periods. The contractor shall contact the Technical Point of Contact every four months to schedule two annual preventative maintenance on-site service visits. The contractor shall perform software upgrades as needed, conduct comprehensive calibration analysis testing, and complete various performance assurance program checks and maintenance on the machines. The contractor shall provide a maintenance report within 30 days after each service visit. The document states the distribution is approved for public release with unlimited distribution.

The related federal contract opportunity is a sole source solicitation for the preventative maintenance service for the three CNC HASS Machines at ARL-APG.

View the file

Other files

File Type Posted
Combination Synopsis-Solicitation for Commercial Purchases_24Q0099.docx DOCX document
DD1423_24Q0099.doc DOC document
Provisions and Clauses Full-Text Attachment_24Q0099.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Aberdeen Proving Ground (APG)

Service & Preventative Maintenance of CNC HASS Machine

24 April 2024 C.1 Background The Manufacturing Sciences & Technology Branch (MSTB) of the Army Research Laboratory (ARL) requires a preventative maintenance and service contract for three Computer Numerical Control (CNC) HASS Machines (SN: 1147998, SN: 1167245, SN: 1167195). The three CNC HASS Machines are crucial to the MSTB as they can manufacture the intricate machine parts as needed for the MTSB. The CNC HASS machines can also mill, drill, bore, tap, and perform various other work all without changing the attachment of the work piece. The machines can automatically bring several various different tools to the work location, making them versatile and crucial to the operations of the MTSB.

C.2 Objective

The Contractor shall perform the necessary work to ensure the three (3) CNC HASS Machines (SN: 1147998, SN: 1167245, SN: 1167195) are properly serviced and maintained annually under a one (1) base year and four (4) option year agreement.

C.3 Requirement

C3.1. The Contractor shall contact the assigned Technical Point of Contact (TPOC) once every four (4) months starting four (4) months from contract award to schedule each of the two (2) annual Preventative Maintenance (PM) on-site service visits for the calendar year. The Contractor shall provide their availability for the next four weeks and the Government will select a date and time that is mutually acceptable.

C3.2. The Contractor shall ensure that the first service visit be completed no later than six (6) months of receiving the purchase order.

C3.3. The Contractor shall follow all ARL-APG facility installation and facility access procedures provided by the Government security escort on the facility prior to the Contractors commencement of work at two (2) times per year.

C3.4. The Contractor shall perform software upgrades as needed which will be determined by the Government.

C3.5. The Contractor shall ensure that a Comprehensive Calibration Analysis will be run on all three (3) machines and shall ensure that the following checks are done to the necessary machines. The checks to be done are:

C3.5.1. Vibration Analysis

C3.5.2. Drawbar Force Test

C3.5.3. Geometry Inspection

C3.5.4 Renishaw Ball Bar Test C3.6. The Contractor shall ensure that following Performance Assurance Program (PA) checks are performed on the three (3) machines when applicable and necessary. The PA checks and the corresponding steps for each check are as follows:

C3.6.1. Way Lube System

· Clean filters

· Inspect lines and fittings

· Check operation

· Verify lube/pump operation C3.6.2. Lubrication Systems

· Clean filters

· Inspect lines and fittings

· Verify lube/pump operation C3.6.3. Pneumatic System

· Clean filters

· Replace filters

· Check pressure/adjust the regulator

· Inspect system for leaks C3.6.4. Coolant System

· Remove/Check pump and motor C3.6.5. Mechanical System

· Check machine level

· Verify spindle sweep

· Verify spindle tram

· Check gear shift operation

· Check spindle lube and airblast

· Check spindle orientation alignment

· Check shot pin operation

· Change gearbox oil

· Check backlash in X,Y, and Z-axis

· Inspect drive belt

· Inspect and adjust tool changer system

· Inspect spindle taper condition

· Inspect way cover wipers

· Check drawbar height

· Drawbar dynamometer test

· Spindle run-out test

· Check drawbar stroke for correct tool knockout dimension

· Verify Automatic Tool Changer (ATC) tool change

· Inspect ATC system

· Lubricate ATC mechanism bearings C3.6.6. Electrical System

· Check voltages

· Inspect connections/terminals

· Inspect grounds

· Check limit switches/safety locks

· Inspect and clean spindle sensor

· Clean electrical cabinet

· Check safety interlocks C3.6.7. Gib Adjustment

· Adjustment of Gibs to maintain axis rigidity and accuracy C.4 Deliverables

C.4.1 The Contractor shall provide a maintenance report detailing all work accomplished within 30 days after completion of the service visit in Contractor format.

C.5. ANTI-TERRORISM /OPERATIONAL SECURITY (AT/OPSEC):

C5.1. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractor’s employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

C.6. DISTRIBUTION STATEMENT:

C.6.1. Determination of the PWS document:

Distribution Statement A: Approved for public release, distribution is unlimited

C.6.2. Determination for Information generated from Contract:

Distribution Statement A: Approved for public release, distribution is unlimited

Contracting Officer:

File details come from the government source that posted it. Updated .