This performance work statement outlines repair and preventative maintenance requirements for a Sauer High Pressure Gas Booster owned by the Army Research Directorate for Mechanical Sciences Division. The contractor will examine the compressor located at Aberdeen Proving Ground, perform maintenance to address an oil leak, and return the unit to proper operation within two weeks of contract award. Additionally, the contractor will conduct annual preventative maintenance visits over three option years to complete tasks according to the compressor manual, and verify proper operation after each service. The deliverable is a maintenance report within 30 days of each visit. Access procedures and security requirements are also defined.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Compressor Service and Maintenance 26 July 2023 C1. Background

The Army Research Directorate for Mechanical Sciences Division currently owns one (1) Sauer High Pressure Gas Booster (Model WP4351) located at Aberdeen Proving Ground. The Sauer High Pressure Gas Booster was purchased under contract W911QX11P0326 in 2011. The equipment is dedicated to delivering high pressure compressed gas to the Spray Combustion Lab (SCRL). Reliable delivery of compressed gas is critical to performing experiments and executing the Government’s mission.

Recently, the compressor developed an oil leak which has increased in severity over time. The oil leak is approaching the point where extended operation is inadvisable due to the possibility of catastrophic failure. The Government requires service on the compressor to return it to a state of proper operation. Further, the Government requires regularly scheduled preventative maintenance support to maximize reliable operation for the remaining service life.

From an inspection of the unit and discussions with the manufacturer, it was determined that the leak is likely coming from an area that necessitates a significant teardown of the machine.

C2. Objective

The Government requires the Contractor to examine the Government-owned Sauer high pressure gas booster (Model WP4351) and perform maintenance and repair at Aberdeen Proving Ground, MD 21005-5066. The objective of this maintenance and repair is to return the compressor to a state of proper operation. Teardown, clean, repair, and rebuild as needed. And further, to provide preventative maintenance support for the Sauer High Pressure Gas Booster.

C3. Requirement C3.1 Initial Maintenance and Repair C3.1.1 The Contractor shall remove and reinstall all electrical, mechanical, and fluid connections from the compressor.

C3.1.2 The Contractor shall provide all tools and spare parts necessary to perform service.

The Government will provide forklift services while the Contractor is completing repair efforts, to remove the compressor from its conex enclosure.

C3.1.3 The Contractor shall remediate all sources of oil egress from the compressor unit and its subsystems.

C3.1.4 The Contractor shall perform the routine 8,000 hour maintenance service on the Sauer High Pressure Gas Booster after it reaches 8,000 operating hours.

C3.1.5 The Contractor shall verify proper compressor operation following service.

C3.1.6 The Contractor shall warranty all parts added as a part of service maintenance and labor throughout the duration of the contract.

C3.1.7 The Contractor shall conduct all services at The Combat Capabilities Development Command (DEVCOM) ARL facilities located at Aberdeen Proving Ground, Maryland.

C3.1.8 The Contractor shall complete the above tasks within two (2) weeks of the contract award date.

C3.1.9 The non-operational time required for the compressor shall not exceed 14 calendar days.

C3.2 Preventative maintenance C3.2.1 The Contractor shall perform service visits once a year as prescribed by the compressor’s service manual, for three (3) twelve (12) month optional periods of performance for Army Research Lab (ARL) in Aberdeen Proving Ground, MD 21005-5066. The Contractor shall ensure the service actions listed below and in the compressor’s service manual are completed at each PM visit:

1. Check screwed connections.

2. Oil Change.

3. Air filter cartridge replacement.

4. Checking valves.

5. Checking piston rings.

6. Replacing gudgeon pins/gudgeon pin bearings.

7. Replacing valves.

8. Checking pistons and cylinders.

9. Checking drive bearings.

10. Replace shaft seals.

11. Checking coupling.

C3.2.2 The Contractor shall verify proper compressor operation following service.

C3.2.3 The Contractor shall conduct all services at The Combat Capabilities Development

Command (DEVCOM) ARL facilities located at Aberdeen Proving Ground, Maryland.

C.4 Deliverables

C.4.1 The Contractor shall provide a maintenance report detailing all work accomplished within 30 days after completion of each service visit in Contractor format.

C.5. Anti-Terrorism-Operational Security (AT-OPSEC) C.5.1 Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

C.5.2 For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C.6. Distribution

Distribution Statement applicable to this PWS and any technical data/documentation generated during performance:

Distribution Statement A. Approved for public release; distribution is unlimited.

Contracting Officer:

File details come from the government source that posted it. Updated .