PWS 16 Sep 2024.docx

DOCX document 44 KB Posted

Attached to
BPA(s) for Analytical Lab Services
Solicitation number
PANNWD-24-P-0000001834-12373-007
Issued by

About this file

This document is a Performance Work Statement (PWS) for analytical laboratory services to support the U.S. Army Corps of Engineers (USACE) Omaha District Geotechnical Engineering and Sciences Branch Chemistry Section (CENWO-ED-GS). The PWS outlines the requirements for the Contract Laboratory to provide chemical analysis, toxicity testing, microbiological testing, air testing, radiochemical testing, and asbestos testing on various environmental media such as soil, sediment, groundwater, and air samples primarily from the Department of Defense (DoD) Formerly Used Defense Site (FUDS) environmental restoration program. The Contract Laboratory must have an established quality system conforming to ISO/IEC 17025:2017 and be accredited under the DoD Environmental Laboratory Accreditation Program (ELAP). The PWS details the quality control requirements, analytical protocols, data deliverable formats, and other laboratory responsibilities. This PWS supports a federal contract opportunity for BPA(s) for Analytical Lab Services issued by the USACE Omaha District.

View the file

Other files

File Type Posted
BPA Questions and Answers 27_AUG_24.docx DOCX document
PWS_27-Aug_2024.docx DOCX document
BPA Questions and Answers 28_AUG_24.docx DOCX document
BPA Price List.xlsx XLSX spreadsheet
Combined Synopsis Solicitation PANNWD-24-P-0000001834-12373-007.pdf PDF
Previous Experience Template.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR ANALYTICAL LABORATORY SERVICES

16 Sep 2024

1.0 PURPOSE

This scope of work is for analytical services support for the United States (U.S.) Army Corps of Engineers (USACE) Omaha District Geotechnical Engineering and Sciences Branch Chemistry Section (CENWO-ED-GS), in terms of chemical analysis, toxicity testing, microbiological testing including mold identification, air testing, radiochemical testing and asbestos testing. The matrices of interest for analysis are soil, sediment, sludge, groundwater, surface water, biota, air, wipe samples, solid phase microextraction devices (SPMEs), and paint chips. These samples are primarily to be collected from Department of Defense (DoD) Formerly Used Defense Site (FUDS) environmental restoration program. The Contract Laboratory shall provide support to the USACE Project Chemist in terms of providing necessary protocol information required by hazardous waste investigation and remediation programs conducted by, or on behalf of the USACE Omaha District.

2.0 GENERAL DESCRIPTION OF WORK REQUIRED UNDER THIS SCOPE OF WORK

The Contractor, operating as an independent Contractor and not as an agent of the Government, shall provide all necessary personnel, equipment and materials required to obtain technically valid and legally defensible environmental data that will meet or exceed the analytical method criteria and the most current version of the DoD Quality Systems Manual (QSM) for Environmental Laboratories. The Contract Laboratory shall be able to provide all sample analyses using methods listed in the attached Table 1. For all FUDS projects, the Contract Laboratory shall submit data to the FUDSChem portal, as described in Section 6.1.

If services cannot be provided by the Contract Laboratory, services may be sub-contracted to another laboratory. The sub-contracted laboratory shall meet all of the requirements for the Primary Laboratory as specified in this agreement. For each call order, indicate which analytical services will be contracted out and identify the Sub-contract laboratory(s) that will be performing the analyses and provide all pertinent certifications. Should a subcontracted laboratory only be responsible for a particular analysis (such as asbestos) it will only be required to be certified for that particular analysis upon approval of the CENWO-ED-GS (see Section 4.0).

Calls will be issued under the blanket purchase agreements (BPAs). The USACE Contracting Officer (KO) or Contracting Officer’s Representative (COR) will provide the Contractor with any site-specific information upon issuance of each call. Information provided by the USACE on any site will be dependent on the current status of the site. Each call will define the performance requirements of the Contractor. Calls may require, but will not be limited to, any combination of the requirements stated in Section 3.0 below.

The description of work stated herein provides a general understanding of the Contractor functions to be performed; individual calls will contain the specific performance based requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract.

3.0 QUALITY CONTROL REQUIREMENTS

In addition to the requirements outlined in this Scope of Services, all work performed under this contract shall meet the quality control requirements in most recent version of the DoD QSM for Environmental Laboratories (available at https://www.denix.osd.mil/ on the Environmental Data Quality Workgroup page) per DoD Instruction 4715.15 (October 2015). Project libraries should at a minimum conform to the latest version of the DoD QSM, unless specifically overridden by the USACE Project Chemist based on project specific data quality objectives (DQOs). The libraries used for analysis and data review shall be provided as part of the data package (Section 6.0).

4.0 LABORATORY CERTIFICATION

Laboratories performing analyses in support of this procurement must have an established and documented laboratory quality system that conforms to ISO/IEC 17025:2017 as implemented by the DoD Quality Systems Manual for Environmental Laboratories (latest version). Laboratories must possess any required state or host nation certification and/or be accredited for each applicable test method under the DoD ELAP or by a nationally recognized laboratory accreditation body (e.g. NELAP), compliant with ISO/IEC 17011:2017. The Contract laboratory must retain current certification under the DoD Environmental Laboratory Accreditation Program (ELAP). The DoD ELAP provides a means for laboratories to demonstrate conformance to the DoD QSM as authorized by DoD Instruction 4715.15. (More information concerning ELAP can also be found at https://www.denix.osd.mil/ under Environmental Data Quality Workgroup). If the Prime Laboratory subcontracts another laboratory which holds a specific accreditation, the Prime Laboratory shall specify the media, analyte, method, and certification for which the sub-contracted laboratory is responsible. All data from the subcontracted laboratory shall be provided to the Prime Laboratory to be delivered to USACE CENWO-ED-GS in accordance with the analytical deliverable package requirements (see Section 6.0).

Asbestos:

The Contract Laboratory must be accredited under the National Institute of Standards and Technology (NIST) “National Voluntary Laboratory Accreditation Program (NVLAP)” for bulk asbestos analysis. The laboratory shall be fully equipped and use analysts with demonstrated proficiency conducting polarized light microscopy (PLM) in accordance with 40 Code of Federal Regulations (CFR) 763, Subpart E, Appendix E.

Lead:

Laboratory shall participate in the United States Environmental Protection Agency (EPA) National Lead Laboratory Accreditation Program (NLLAP) accredited by either the American Association for Laboratory Accreditation (A2LA) or the American Industrial Hygiene Association (AIHA) and shall successfully participate in the Environmental Lead Proficiency Analytical Testing (ELPAT) program to perform sample analysis. Laboratories selected to perform blood lead analysis shall be Occupational Health and Safety Administration approved. All Prime and subcontracted laboratories shall also identify any additional certifications they hold (State specific, etc.).

5.0 ANALYTICAL PROTOCOL

Analytical methods shown in Table 1 are from: Test Methods for Evaluating Solid Waste, USEPA SW-846, Third Edition, or other published methods such as Contract Laboratory Program (CLP), American Society for Testing and Materials (ASTM), 500/600 methods, EPA microbiological methods (http://www.epa.gov/ microbes/moldtech.htm) or other appropriate method manuals. The most recently published version of SW-846 will be used unless otherwise specified on a project specific basis. The laboratory should be aware of and comply with the project specific DQOs and applicable project requirements specified in task orders.

6.0 ANALYTICAL DATA PACKAGE

All data shall be submitted as electronic data deliverables (EDD) and shall have an electronic pdf “hard copy” report. Specific requirements for each are explained below. The electronic submissions, in the form of e-mail documents, files uploaded to FUDSChem, or CD’s are considered to be part of the analytical data package. A maximum of 28 days from sample receipt to delivery of the data package will be allowed, however, quicker turnaround of electronic submissions is favored.

6.1 Electronic Data Deliverables (EDDs)

All EDDs shall be submitted as Staged Electronic Data Deliverables (SEDDs) Stage 2a (5.2) which include all results, units, method, and instrument quality control data. If the laboratory has the capabilities to provide SEDD Stage 2b, 3 or 4, provide a separate table indicating costs associated with the deliverables. The most current version of SEDD shall be used in conjunction with the most current version of the DoD QSM valid values. For all FUDS projects, the SEDDs will be submitted to the FUDSChem portal, run through the compliance checker, and the laboratory must resolve any non-conformances (errors and warnings) with the project library and/or FUDSChem-required Valid Values or Submission Errors. The electronic library will be collectively developed between the USACE and the laboratory. The finalized library will be maintained by USACE, and a copy of the library used for each sample delivery group (SDG) shall be provided upon submittal of the electronic deliverables. Once the electronic deliverables and the “hard copy” pdf report have been uploaded to FUDSChem by the laboratory and project-specific USACE personnel have been notified via the FUDSChem upload portal that the SEDD and report are available, the USACE Project Chemist will review all data to ensure data completeness is appropriate for the validation process (See Section 6.3 for more specific details).

6.2 Electronic pdf “hard copy” report

The “hard copy” report format will follow the requirements set forth in Appendix A of the latest version of the DoD QSM v.5.0. Generally, there will be a cover sheet, table of contents, case narrative, analytical results, sample management records, quality assurance (QA)/quality control (QC) information and information for third-party review. The case narrative shall specifically address, but is not limited to: all abnormalities and deviations that may affect data quality of analytical results, any issue in the data package that potentially affects the usability of the data, identification of samples for which manual integration was necessary, numerical results were outside the limits of quantitation, and/or any other factor that could affect sample results (air bubbles or excessive headspace in volatile organic analysis (VOA) sample vials, presence of multiple phases, exceeds holding time, temperature and pH excursions, samples broken upon receipt, etc.) The final report should have a full complement of laboratory qualifiers as well as definitions for those qualifiers. Qualifiers should follow the most current version of the EPA National Functional Guidelines (www.epa.gov/superfund/programs/clp/guidance.htm) and the DoD QSM.

All hard copy reports must include all data to enable the Project Chemist to verify compliance with the latest version of the DoD QSM. An example of report elements required at a minimum for Methods 8260/8270 follows below:

· Sample Identification #, Matrix, Prep and Test Method utilized, associated batch information

· Case Narrative

· Chain of Custody, Sample Receipt Forms & Shipping documentation

· Telephone/email records associated with actions taken on quality issues

· QC Verification for gas chromatography-mass spectrometry (GC/MS) (8260/8270)

· Tuning

· BFB ion abundance criteria and relative abundance, injection date and time (CLP Form V)

· Breakdown Check (8270)

· Responses and tailing factors must be reported for DDT, benzidine, and pentachlorophenol.

· Initial calibrations (ICALs)

· Date, time of analysis

· Show a minimum of 5 points used to determine ICAL

· Provide Response Factors (RF) and percent relative standard deviations (%RSD) for all analytes

· Indicate which samples were evaluated as system performance check compounds (SPCCs) and calibration check compounds (CCCs)

· Indicate method for calculation of calibration curve (linear, least square regression (with r value), non-linear regression (with r2 value & number of points used [6-second order, 7-third order]).

· Secondary Source Verification (ICV)

· Provide RF and %RSD for all analytes

· Continuing Calibration Verification (CCV)

· Date, time and frequency of CCV analysis

· Provide RF and %RSD for all analytes

· Indicate which samples were evaluated as SPCCs and CCCs

· Present percent drift (%D)

· Internal Standard Verification

· Report Area counts and retention times as well as the upper (200%) and lower (50%) limits and the 12-hour standard for the ICAL (CLP Form VIII).

· Sample Results

· Analysis results with proper units, reporting limit, method detection limit (MDL) (limit of detection, limit of quantitation), surrogates, % recovery, and QC limits, percent moisture (soils), etc.

· Qualification (flag) Definitions

· Third Party Document Review Items

· Raw data (chromatograms, mass spec results)

· Supporting documentation (run logs, sample prep logs, standard prep logs, etc.)

6.3 Submittal Approval Process:

Within 10 business days of receipt of EDDs and the hard copy report, if data is of sufficient quality and completeness, the USACE Project Chemist will submit to the Laboratory a Memorandum of Approval. EDDs shall still be provided via email, share site, or FUDSChem as appropriate as soon as available. The calendar for approval begins when the hard copy report arrives at the USACE CENWO-ED-GS office. If any discrepancies are found during the data review, the Project Chemist will notify the laboratory of the deficiencies to determine corrective measures.

7.0 OTHER REQUIREMENTS

7.1 Sample Handling and Custody Requirements:

The Contract laboratory shall have a procedure documenting proper sample handling and custody of samples. A Cooler Receipt Form shall be completed and e-mailed to the USACE Project Chemist on the day the samples are received or logged in at the laboratory to communicate the condition of the samples upon receipt. Any problems, such as warm samples (>4oC + 2 oC), broken bottles, missing samples, air bubbles in VOA vials, etc. will require immediate notification by laboratory personnel to the USACE Project Chemist prior to sample analysis.

7.2 Input to the Quality Assurance Project Plan (QAPP)

In order to obtain data of sufficient quality to satisfy data quality objectives for scientifically and legally defensible data, the FUDS environmental restoration program requires a QAPP. The QAPP describes organizational pathways of communication, field sampling efforts and laboratory efforts. The Contract laboratory’s input will be required for inclusion in the QAPP. Following the requirements of National Environmental Laboratory Accreditation Conference Chapter 5 and DoD QSM, the Contract laboratory must have a Quality Assurance or Quality System Manual (QA/QSM). For completion of the QAPP, specific areas addressed in the QA/QSM may need to be expanded upon. The Contract laboratory shall provide all additional information required by the USACE Project Chemist.

· Project/Task Organization: A narrative or organizational chart showing key management and analytical personnel involved with the analysis as well as lines of communication among all project participants, USACE and the lab. Any key subcontractors will also need to be identified.

· Analytical Method Requirements: The laboratory shall perform MDL studies on an annual basis, and make these studies available upon request. The MDL and MDL check samples shall be extraction/digestion method specific and instrument specific and shall include any clean-up methods routinely used. Laboratory standard operating procedures (SOPs) must also be available for attachment to the QAPP as an appendix. The SOP must describe the equipment and apparatus utilized and any specific performance requirements associated with it. Further, the SOP shall describe the calibration, calibration verification, method QC elements, their acceptance criteria and procedures taken for corrective actions.

· Quality Control Requirements: Provide QA/QC checks done by the laboratory for both field QC samples, but also internal laboratory QC verification. The laboratory shall ensure that results from the laboratory internal quality control checks are reported with the associated batch of analytical data and that the sample results and the QC results can be easily correlated.

· Corrective Action: A description of corrective actions taken when results appear unusual, questionable, or the limits of acceptability are exceeded. Provide the limits of acceptability and propose and describe how re-establishment of control is demonstrated.

· Instrument /Equipment Testing, Inspection, and Maintenance Requirements: The laboratory will describe the implementation of the Preventative Maintenance systems and their schedule used to ensure the proper functioning of all laboratory and field apparatus. Identify all equipment by the manufacturer’s name, model number, and accessories. The laboratory should be prepared to provide the types of inspections, documentation, and testing procedures, etc. required for all equipment.

· Instrument Calibration and Frequency: For all instruments, the laboratory may have to describe the procedure used for calibrations and the frequency and types of calibration verification checks employed. The laboratory shall indicate how the records of calibrations are maintained and are traceable to the instrument and analyses.

8.0 RESPONSIVENESS

The laboratory shall identify the laboratory manager who has primary responsibility for project coordination and coordination of analyses. Especially when a short analytical turn-around time is required, the laboratory manager or designate should respond to USACE telephone or e-mail requests for information on short notice. Unresolved inquiries could result in re-performance of analyses in order to obtain data of known quality.

Table 1

Description

Example Methods
Method of Surveillance

Organics

Volatile Organics (VOC) current TCL list

8260
100% Inspection
unpreserved 7 day holding
8260
100% Inspection

1,4-Dioxane

8270 SIM
100% Inspection

Semi-Volatile Organics (BNA) TCL list

8270
100% Inspection
Polynuclear Aromatic Hydrocarbons (PAH)
low level
8270 SIM
100% Inspection
Hydrocarbon Dissolved Gasses (Methand, Ethane, Ethene)
RSK 175
100% Inspection

Toxic Organic Compunds includes individually certified clean 6-L Summa

TO-15
100% Inspection
Polyflourinated Compounds (PFAS)
LC/MS/MS
537 Modified
100% Inspection
Polyflourinated Compounds (PFAS)
LC/MS/MS
DoD QSM Table B-15
100% Inspection
Polyflourinated Compounds (PFAS)
LC/MS/MS
1633
100% Inspection

Organochlorine Pesticides

8081
100% Inspection

Chlorinated Herbicides

8151
100% Inspection
Organophosphorus Pesticides
GC/HPLC
8141
100% Inspection

Polychlorinated biphenyls (PCBs)

8082
100% Inspection

Dioxin/Furan

8280
100% Inspection
8290
100% Inspection
low resolution
1613
100% Inspection

Explosives including PETN, NG

8330B
100% Inspection
w/puck mill grinding
8330B
100% Inspection

Petroleum/ Underground Storage Tanks

Method for the Determination of Volatile Petroleum Hydrocarbons (VPH) Fractions
MAVPH
100% Inspection
Method for the Determination of Extractable Petroleum Hydrocarbons (EPH) Fractions
MAEPH
100% Inspection

Metals Packages

RCRA Metals (8 total):
As, Ba, Cd, Cr, Pb, Se, Ag
6010
100% Inspection
6020
100% Inspection
Hg by CV AA
7470/7471
100% Inspection
CLP TAL (24 total):
Al, Ba, Be, Ca, Cr, Co, Cu, Fe, Mg, Mn, Mo, Ni, K, Ag, Na, V, Zn, Sb, As, Cd, Pb, Se, Tl,
6010
100% Inspection
6020
100% Inspection
Hg by CV AA
7470/7471
100% Inspection

Mercury, Cold Vapor AA

7470/7471
100% Inspection

Chromium, Hexavalent

7196 A, 7199
100% Inspection

Lead (Pb) - paint chips, wipes, air

200.8/6020
100% Inspection

Leaching Proceedures

TCLP

1311
100% Inspection

SPLP

1312
100% Inspection

TCLP VOC

1311/8260
100% Inspection

TCLP Full Suite

Toxicity, Ignitability, Reactivity, corosivity
100% Inspection

General Chemistry

Asbestos (PLM Test Method)

600/R-93/116
100% Inspection

Biochemical Oxygen Demand

405.1
100% Inspection

Chemical Oxygen Demand

410.1 or 410.4
100% Inspection
Common Anions
(Cl-, Br-, NO3-, NO2-, PO43-, SO4-)
300.1, 9056
100% Inspection

Cyanide

335.1, 9010, 9012, 9013, 9014
100% Inspection

Flashpoint

1010A, D93, 1030
100% Inspection

Hardness

130.2, 130.1, SM2340B
100% Inspection

Moisture (%)

100% Inspection

Paint Filter / Liquid Release Test

9096
100% Inspection

TOC

9060, Lloyd Kahn
100% Inspection

Microbiological

Heterotrophic Plate Count

SM9215D
100% Inspection

Fecal Coliform

SM9221
100% Inspection

Total Coliform

SM9223B
100% Inspection

Soil Process Parameters

Particle Size without hydrometer

ASTM D422
100% Inspection

Particle Size with hydrometer

ASTM D422
100% Inspection
Terracore sample kits
for soil VOC

100% Inspection

Summa Canisiter Rental (certified)
for air sampling

100% Inspection

Summa Canisiter Flow Regulator Rental (certified)
for air sampling

100% Inspection

Data Deliverables

Base Package -

EDD - SEDD 2A (current version)

100% Inspection

Level IV report - electronic pdf

100% Inspection

CD with both EDD and Level IV report

100% Inspection compliance checker - validation of all edds

100% Inspection

Additional Items -

SEDD 2B (current version)

100% Inspection

SEDD 3 (current version)

100% Inspection

SEDD 4 (current version)

100% Inspection

ERPIMS (current version)

100% Inspection

FUDSCHEM (current version)

100% Inspection

ERIS (current version)

100% Inspection

OTHER

100% Inspection

Cost Multiplier for Expedited Sample Results with data package to follow within 10 days

24 hour

48 hour

7 day

14 day

File details come from the government source that posted it. Updated .