PWS 12 Laundry Presses.docx
DOCX document 68 KB Posted
- Attached to
- WEST POINT-12 VARIOUS LAUNDRY PRESSING MACHINES Federal contract opportunity
- Solicitation number
- W911SD-23-R-0179
About this file
This memorandum outlines requirements for 12 laundry steam presses for the Department of the Army at West Point. The Army requires 3 apron buck and head presses approximately 54" x 17-20" with padded buck and bare steel head, and 9 legger buck and head presses approximately 53-57" x 16-20" with padded buck and bare steel head. Additional requirements include buck steam pedal, insulated heads and steam lines, adjustable auto-open time and manual override, two-hand auto closing, adjustable air pressure regulator, and steam iron alongside each press. Vendors must complete an on-site visit, remove and dispose of current equipment, install and connect the new equipment to existing utilities, provide a one-year parts and workmanship warranty, and ensure compatibility with facility infrastructure. The related federal contract opportunity is pre-solicitation number W911SD-23-R-0179 for 12 various laundry pressing machines from the Department of the Army Mission and Installation Contracting Command at Fort Eustis.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
LRC WEST POINT
Bldg. 845 Laundry Plant West Point, NY 10996
ASPA-LWP-SSL 3 MAY 2023
Memorandum To: MICC Contract Specialist
Subject: Hot Head Laundry Steam Press (12 each) PWS/Specs
Requirement: The Laundry Facility requires 12 each Hot Head Steam Presses to accomplish the mission of laundering clothing and linens for the USMA cadets and Medical Treatment Facilities. The equipment will replace the current items which are well beyond life cycle expectancy and could cause a delay in the processing of laundry. The presses have a life cycle expectancy of 20 years but are now 63 years old. These are utilized daily to accomplish the mission and meet terms and conditions of the laundry contract. To maintain operational tempo with properly maintained equipment, operation must be seamless and result in minimal operational deficiencies. The intent is to purchase the equipment as soon as practical utilizing the following specifications.
Hot Head Laundry Steam Presses Specifications:
1. 3 each Laundry Hot Head units to be Apron buck & head approximately 54” x 17-20” padded buck with a bare steel head
2. 9 each Laundry Hot Head units to be Legger buck and head approximately 53-57” x 16-20” Padded buck with a bare steel head
3. Buck steam pedal
4. All heads and steam lines need to be insulated on the outside to prevent burns
5. Adjustable time before auto opening
6. Manual open override control
7. Two hand auto closing
8. Adjustable air pressure regulator
9. All steam iron alongside each press
10. Air operated 100psi max available
Vendor Requirements:
1. Must complete a site visit to examine current equipment and ensure new equipment will be compatible with all electric, plumbing, and steam, as necessary, and fits into installation space provided.
2. Must remove and dispose of current equipment, including disconnect of all components tied into facility utilities, and install new equipment.
3. The vendor will be responsible for shipping, delivering, uncrating, installation, start-up, electrical, and demonstration of new equipment and removal of packaging and installation materials. Installation to include connection of new equipment to all existing electric, plumbing, and steam.
4. Must include a standard 1-year warranty on parts and workmanship.