PW24_00001 APPROVED PLANS.PDF
PDF 39 MB Posted
- Solicitation number
- PE-66098-NONST-2025-000000072
- Issued by
- Fulton County, Georgia
About this file
I apologize, but I cannot see the actual contents of the file that would be associated with ID 5d6eb140e2df35269cabccfeed2fdeeb. While I can see that it appears to be an approved plans document (PW24_00001 APPROVED PLANS.PDF), I would need access to the actual contents of the file to provide a meaningful summary of its key details, specifications, and requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plan Holders List for 5030 High Point Road Dr.pdf | ||
| ITB 25_026 5030 High Point Road Drainage Impr.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR
FULTON COUNTY
SANDY SPRINGS, GA 30342
5030 HIGH POINT ROAD
STORMWATER SYSTEM REPLACEMENT
THE CITY OF SANDY SPRINGS
70 MANSELL CT., STE. 200
ROSWELL, GEORGIA 30076
PHONE: 678.395.4920
M
AG
N
ET
IC
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
Nataling Adkisson
PW24-00001R1
DAVID M. AUTOPOLSKY
GENNYE & MATTHEW KRASNER
BETH TEFILLAH CONGREGATION, INC.
WILLIAM & VICTORIA RIORDAN
5030 High Point Road GeoSurvey
GeoSurvey
Know what's below.
before you dig.Call Dial 811
Or Call 800-282-7411
H
IG
H P
O
IN
T
RO
AD
(V
AR
IA
BL
E
R/ W
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
M
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
M
AG
N
ET
IC
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
STANDARD EROSION CONTROL NOTES
1. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT
UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION
OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE
JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST ACQUIRING THE NECESSARY
VARIANCES AND PERMITS
2. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF
EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR
CONCURRENT WITH, LAND DISTURBING ACTIVITIES.
3. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION
CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
4. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD GREATER THAN 14 DAYS SHALL BE
STABILIZED WITH TEMPORARY SEEDING; DISTURBED AREAS IDLE 30 DAYS SHALL BE
STABILIZED WITH PERMANENT VEGETATION.
5. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST WEEKLY,
AFTER EACH RAIN, AND REPAIRED AS NECESSARY.
6. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF
DETERMINED NECESSARY BY ON-SITE INSPECTION.
7. ALL OF THE SITE IS UNDER THE SOIL CLASSIFICATION OF UgE, URBAN
LAND-GROVER-MOUNTAIN PARK COMPLEX, 10 TO 25 PERCENT SLOPES, STONY
8. ALL OF THE SITE IS CLASSIFIED AS UNSHADED ZONE X PER FEMA FLOOD MAP 13121C0163F, EFFECTIVE 09/18/2013.
M
AG
N
ET
IC
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
2. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF
EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR
CONCURRENT WITH, LAND DISTURBING ACTIVITIES.
3. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION
CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
4. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD GREATER THAN 14 DAYS SHALL BE
STABILIZED WITH TEMPORARY SEEDING; DISTURBED AREAS IDLE 30 DAYS SHALL BE
STABILIZED WITH PERMANENT VEGETATION.
M
AG
N
ET
IC
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
2. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF
EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR
CONCURRENT WITH, LAND DISTURBING ACTIVITIES.
3. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION
CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
4. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD GREATER THAN 14 DAYS SHALL BE
STABILIZED WITH TEMPORARY SEEDING; DISTURBED AREAS IDLE 30 DAYS SHALL BE
STABILIZED WITH PERMANENT VEGETATION.
M
AG
N
ET
IC
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
N: 1415944.5787 E: 2235570.0346
N: 1415926.2476 E: 2235570.3565
N: 1415887.1574 E: 2235569.5487
N: 1415914.6205 E: 2235602.8025
N: 1415926.2548 E: 2235598.2544
N: 1415928.2326 E: 2235619.5337
N: 1415936.0263 E: 2235629.2758
N: 1415900.0289 E: 2235519.0995
N: 1415950.6703 E: 2235605.9760
N: 1415928.9364 E: 2235544.4565
N: 1415918.0984 E: 2235596.7947
N: 1415900.4539 E: 2235535.3569
N: 1415890.6378 E: 2235559.1364
N: 1415941.5035 E: 2235518.2150
N: 1415941.4736 E: 2235529.9297
N: 1415953.4615 E: 2235632.7708
N: 1415988.1668 E: 2235614.7911
N: 1415914.0838 E: 2235632.9202
N: 1415896.9341 E: 2235614.0353
N: 1415961.2381 E: 2235529.9297
N: 1415961.3099 E: 2235559.7512
N: 1415906.6017 E: 2235604.4432
N: 1415964.5923 E: 2235604.4742
N: 1415923.1431 E: 2235529.5421
M
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
M
AG
N
ET
IC
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
M
AG
N
ET
IC
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
0Node Summary - Existing Condition (100yr)
SNElement Element InvertGround/Rim InitialSurchargePonded PeakMax HGL Max Min Time of TotalTotal Time ID Type Elevation (Max) Water Elevation AreaInflowElevationSurchargeFreeboard PeakFlooded Flooded
ElevationElevation Attained Depth Attained FloodingVolume Attained Occurrence
(ft) (ft) (ft) (ft) (ft²) (cfs) (ft) (ft) (ft)(days hh:mm) (ac-in) (min) 1EastCurbInlet Junction 960.30 964.81 960.30 0.00 0.00 7.08 960.88 0.00 3.93 0 00:00 0.00 0.00 2WestCurbInlet Junction 961.10 964.88 961.10 0.00 0.00 7.59 961.57 0.00 3.31 0 00:00 0.00 0.00 3WestHW Junction 947.60 952.00 947.60 0.00 0.00 7.99 951.77 0.00 1.03 0 00:00 0.00 0.00 4Out-02 Outfall 945.00 7.99 945.00 5EastHWPondingStorage Node 953.40 958.00 953.40 0.00 8.02 955.49 0.00 0.00
Node Summary - Proposed Condition (100yr)
SNElement Element InvertGround/Rim InitialSurchargePonded PeakMax HGL Max Min Time of TotalTotal Time ID Type Elevation (Max) Water Elevation AreaInflowElevationSurchargeFreeboard PeakFlooded Flooded
ElevationElevation Attained Depth Attained FloodingVolume Attained Occurrence
(ft) (ft) (ft) (ft) (ft²) (cfs) (ft) (ft) (ft)(days hh:mm) (ac-in) (min) 1AA-2_Inflow Junction 950.30 964.90 950.30 0.00 0.00 8.05 951.00 0.00 13.90 0 00:00 0.00 0.00 2AA-2_Outflow Junction 950.30 964.90 950.30 0.00 0.00 7.69 951.06 0.00 13.84 0 00:00 0.00 0.00 3HW_InletEast Junction 955.00 960.50 955.00 0.00 0.00 1.76 956.47 0.00 4.03 0 00:00 0.00 0.00 4AA-1_OutWest Outfall 949.84 7.69 950.60 5AA-2_Store Storage Node 950.30 964.90 950.30 0.00 8.05 960.45 0.00 0.00 6AA-3_PipeStoreStorage Node 951.00 964.90 951.00 0.00 7.81 951.62 0.00 0.00 7East_Pond Storage Node 955.00 960.50 955.00 0.00 1.97 956.47 0.00 0.00
Link Summary - Proposed Condition (100yr)
SNElement ElementFrom To (Outlet) Length Inlet Outlet AverageDiameter or Manning'sPeakDesign Flow Peak Flow/Peak FlowPeak Flow Peak Flow Total TimeReported ID Type (Inlet) Node Invert Invert Slope HeightRoughnessFlow CapacityDesign Flow Velocity Depth Depth/SurchargedCondition
Node ElevationElevation Ratio Total Depth Ratio
(ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1LINK_OCS Pipe AA-2_Inflow AA-2_Store 0.07 951.00 0.00 1358571.4300 0.000 0.01508.05 0.00 0.00 0.00 0.00 0.00 0.00 2Pipe_CrossingPipe AA-3_PipeStoreAA-2_Inflow 35.00 951.00 950.30 2.0000 36.000 0.01507.78 81.75 0.10 7.30 0.62 0.21 0.00Calculated 3Pipe_East Pipe HW_InletEast AA-3_PipeStore 16.00 955.00 951.00 25.0000 36.000 0.01501.76 289.03 0.01 11.23 0.17 0.06 0.00Calculated 4Pipe_West Pipe AA-2_Outflow AA-1_OutWest 28.00 950.30 949.84 1.6400 24.000 0.01507.69 25.13 0.31 7.03 0.76 0.38 0.00Calculated 5ToEastHW ChannelEast_Pond HW_InletEast 3.00 955.00 955.00 0.0000 66.000 0.03201.76 8.34 0.21 0.60 1.47 0.27 0.00 64in.@950.3 Orifice AA-2_Store AA-2_Outflow 950.30 950.30 4.000 1.36 76in.@955 Orifice AA-2_Store AA-2_Outflow 950.30 950.30 6.000 2.21 8Weir Weir AA-2_Store AA-2_Outflow 950.30 950.30 4.13
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
ENGINEER CERTIFICATION STATEMENTS:
"I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS
PREPARED AFTER A SITE VISIT TO THE LOCATIONS
DESCRIBED HEREIN BY MYSELF OR MY AUTHORIZED AGENT,
UNDER MY SUPERVISION."
GSWCC LEVEL II DESIGN PROFESSIONAL
DATE: 4/26/2024
CERTIFICATION # 0000079981
24 HOUR EROSION CONTROL CONTACT:
NAME:
ADDRESS:
PHONE #:
SITE DATA:
TOTAL SITE = 0.25 ACRES
DISTURBED = 0.17 ACRES
PROJECT RECEIVING WATERS = UNKNOWN
EXISTING LAND USE: SITE IS THE LOCATION OF A CULVERT CROSSING FOR HIGH
POINT ROAD NORTHEAST IN FULTON COUNTY, GEORGIA.
FUTURE LAND USE: NO CHANGE FOR THE USE OF THE SITE, IT WILL REMAIN A
CULVERT CROSSING. THE SIZING OF THE CULVERT CROSSING WILL CHANGE.
RUNOFF COEFFICIENT:
WEIGHTED PRE-CONSTRUCTION CURVE NUMBER (CN): 55
WEIGHTED POST-CONSTRUCTION CURVE NUMBER (CN): 55
STANDARD EROSION CONTROL NOTES:
1. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT
UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED
VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS
MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST
ACQUIRING THE NECESSARY VARIANCES AND PERMITS
2. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE
INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND
PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING ACTIVITIES.
3. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE
EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT
SOURCE.
4. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD GREATER THAN 14 DAYS SHALL
BE STABILIZED WITH TEMPORARY SEEDING; DISTURBED AREAS IDLE 30 DAYS
SHALL BE STABILIZED WITH PERMANENT VEGETATION.
5. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST
WEEKLY, AFTER EACH RAIN, AND REPAIRED AS NECESSARY.
6. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED IF DETERMINED NECESSARY BY ON-SITE INSPECTION.
BEST MANAGEMENT PRACTICES FOR PETROLEUM SPILL
CLEANUP AND CONTROL
LOCAL STATE AND MANUFACTURER'S RECOMMENDED
METHODS FOR SPILL CLEANUP WILL BE CLEARLY POSTED
AND PROCEDURES WILL BE MADE AVAILABLE TO SITE
PERSONNEL.
MATERIAL AND EQUIPMENT NECESSARY FOR SPILL
CLEANUP WILL BE KEPT IN THE MATERIAL STORAGE AREAS.
TYPICAL MATERIALS AND EQUIPMENT INCLUDES, BUT IS
NOT LIMITED TO, BROOMS, DUSTPANS, MAPS, RAGS,
GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST AND
PROPERLY LABELED PLASTIC AND METAL WASTE
CONTAINERS.
SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE
REVIEWED AFTER A SPILL AND ADJUSTED AS NECESSARY
TO PREVENT FUTURE SPILLS.
ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON
DISCOVERY. ALL SPILLS WILL BE REPORTED AS REQUIRED
BY LOCAL, STATE AND FEDERAL REGULATIONS.
FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A
SHEEN ON SURFACE WATER), THE NATIONAL RESPONSE
CENTER (NRC) WILL BE CONTACTED WITHIN 24 HOURS AT
1-800-426-2675.
FOR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL
RESPONSE CENTER (NRC) WILL BE CONTACTED WITHIN 24
HOURS AT 1-800-426-2675.
FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE
WATER IMPACTS, THE GEORGIA EPD WILL BE CONTACTED
WITHIN 24 HOURS.
FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE
WATER IMPACTS, THE SPILL WILL B E CLEANED UP AND
LOCAL AGENCIES WILL BE CONTACTED AS REQUIRED.
THE CONTRACTOR SHALL NOTIFY THE LICENSED
PROFESSIONAL WHO PREPARED THIS PLAN IF MORE THAN
1320 GALLONS OF PETROLEUM IS STORED ONSITE (THIS
INCLUDES CAPACITIES OF EQUIPMENT) OR IF ANY ONE
PIECE OF EQUIPMENT HAS A CAPACITY GREATER THAN 660
GALLONS. THE CONTRACTOR WILL NEED A SPILL
PREVENTION CONTAINMENT AND COUNTERMEASURES
PLAN PREPARED BY THAT LICENSED PROFESSIONAL.
WOOSEOK AHN
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
CONTROL IN GEORGIA, TABLE 5-20.2. THE SILT FENCE SHOULD BE KEPT ERECT AT ALL TIMES AND REPAIRED WHEN REQUESTED BY THE SITE INSPECTOR OR THE PROJECT DESIGN PROFESSIONAL OF RECORD. SILT SHOULD BE REMOVED WHEN ACCUMULATION REACHES ½ HEIGHT OF THE BARRIER. THE PERIMETER SILT FENCE SHOULD BE INSPECTED DAILY FOR ANY FAILURES. ANY FAILURES OF SAID
FENCING SHOULD BE REPAIRED IMMEDIATELY.
4. INLET SEDIMENT PROTECTION MEASURES SHALL BE INSTALLED ON ALL EXISTING STORM STRUCTURES AS SHOWN ON THE PLAN. SEE SEPARATE DETAILS FOR SPECIFICS ON TYPE OF INLET PROTECTION
SPECIFIED.
5. STONE CHECK DAMS SHALL BE INSTALLED IN AREAS OF CONCENTRATED FLOWS AS SHOWN ON THE PLAN.
6. TREE PROTECTION FENCING SHOULD BE INSTALLED PRIOR TO THE START OF ANY LAND DISTURBANCE ACTIVITY AND MAINTAINED UNTIL FINAL LANDSCAPE IS INSTALLED. THE TREE PROTECTION FENCING SHOULD BE INSPECTED DAILY. ANY FAILURES OF SAID FENCING SHOULD BE REPAIRED IMMEDIATELY.
ADDITIONAL SILT BARRIERS MUST BE PLACED AS SHOWN ON THE PLAN AS ACCESS IS OBTAINED DURING CLEARING. NO GRADING SHALL TAKE PLACE UNTIL SILT BARRIER INSTALLATION AND SEDIMENT PONDS ARE
CONSTRUCTED AS SHOWN ON THE CLEARING PHASE EROSION CONTROL PLAN.
THE CONTRACTOR CAN UTILIZE CLEARED TREES AS INITIAL BRUSH BARRIER SEDIMENT CONTROL IN AREAS
SHOWN ON PLAN WHERE INITIAL GRADING ACTIVITIES WILL NOT OCCUR.
NO BURN OR BURY PITS SHALL BE PERMITTED ON THE CONSTRUCTION SITE WITHOUT WRITTEN PERMISSION
BY THE OWNER AND/OR THE ENGINEER OF RECORD.
ALL ITEMS IN THIS SECTION OF THE SPECIFICATIONS SHALL MEET THE REQUIREMENTS AS SET FORTH IN SECTION 161, 162, 163, AND 164 OF THE GEORGIA D.O.T. STANDARD SPECIFICATIONS, FOR ROADS AND
BRIDGES.
MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 14 DAYS OF LAND
DISTURBANCE.
ALL DISTURBED AREAS LEFT MULCHED AFTER 30 DAYS SHALL BE STABILIZED WITH PERMANENT VEGETATION.
SEDIMENT AND EROSION CONTROL MEASURES SHOULD BE CHECKED AFTER EACH RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE HALF THE
CAPACITY OF THE DEVICE.
THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION, WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1-3” OF STONE, AS CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLE ON TO
PUBLIC ROADWAY OR INTO STORM DRAIN MUST BE REMOVED IMMEDIATELY.
CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO
ENSURE MEASURES ARE FUNCTIONING PROPERLY.
FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB UNTIL SUCH MEASURES ARE CORRECTED BACK TO THE
APPROVED EROSION CONTROL PLANS.
THE SITE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES INCLUDING REPLACING OR REPAIRING ANY DAMAGED DEVICES DUE TO ANY CONSTRUCTION ACTIVITY BY
OTHERS.
DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO ENSURE THAT LAND STRIPPED OF ITS NATURAL GROUND COVER IS EXPOSED ONLY IN SMALL QUANTITIES AND THEREFORE LIMITED DURATIONS, BEFORE PERMANENT EROSION PROTECTION IS ESTABLISHED. NOTE
SUB PHASES SHOWN ON PLANS.
EARTHWORK OPERATIONS IN THE VICINITY OF STREAM BUFFERS SHALL BE CAREFULLY CONTROLLED TO
AVOID DUMPING OR SLOUGHING INTO THE BUFFER AREAS.
SEDIMENT SHALL NOT BE WASHED INTO INLETS. IT SHALL BE REMOVED FROM THE SEDIMENT TRAPS AND
DISPOSED OF AND STABILIZED SO THAT IT WILL NOT ENTER THE INLETS AGAIN.
EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS.
THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE APPROVED PLANS IF DRAINAGE PATTERNS DURING THE CONSTRUCTION ARE DIFFERENT FROM THE PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL BE REPORTED TO THE
DESIGN PROFESSIONAL IMMEDIATELY.
THE CONTRACTOR SHALL FURNISH AND MAINTAIN ALL NECESSARY BARRICADES WHILE ROADWAY FRONTAGE
IMPROVEMENTS ARE BEING MADE.
TYPE “C” SILT FENCE SHOULD BE INSTALLED AT THE TOE OF ALL FILL SLOPES 10 FEET GREATER IN HEIGHT.
THE SILT FENCE SHOULD BE PLACED IN ACCORDANCE WITH THE MANUAL FOR EROSION CONTROL IN GEORGIA, TABLE 6-20.0. THE SILT FENCE SHALL BE MAINTAINED UNTIL PERMANENT GROUND COVER IS ESTABLISHED ON THE SLOPE. SILT SHALL BE REMOVED WHEN ACCUMULATION REACHES ½ HEIGHT OF THE BARRIER. ADDITIONALLY, DIVERSION DIKES SHALL BE CONSTRUCTED ALONG THE TOP OF ALL SAID FILL SLOPES WITH THE USE OF TEMPORARY DOWN DRAINS TO CONTROL STORM WATER RUN OFF AS SHOWN ON
THE PLANS. SEE SEPARATE DETAILS FOR ADDITIONAL INFORMATION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING BARRIERS AT THE TOE OF SLOPES UNDER CONSTRUCTION. THESE BARRIERS SHALL BE AS SHOWN IN THE PLANS. THESE BARRIERS MAY BE RELOCATED AND REUSED AFTER PERMANENT SLOPE STABILIZATION BECOMES FULLY ESTABLISHED. AS THEY ARE RELOCATED, ANY DEFECTIVE MATERIALS IN THE BARRIER SHALL BE REPLACED. IN ADDITION, ALL
DEBRIS AND SILT AT THE PREVIOUS LOCATION SHALL BE REMOVED.
CUT AND FILL SLOPES ARE NOT TO EXCEED “2H:1V”.
TYPE “C” SILT FENCE SHALL BE PLACED AT THE TOE OF ALL DIRT STOCK PILE AREAS. SEE SEPARATE DETAILS
FOR ADDITIONAL INFORMATION.
INLET SEDIMENT PROTECTION MEASURES SHALL BE INSTALLED ON ALL STORM STRUCTURES AS THEY ARE CONSTRUCTED. SEE PLAN VIEW FOR SPECIFIC TYPE AND SEPARATE DETAILS FOR ADDITIONAL INFORMATION
ON TYPE OF INLET PROTECTION SPECIFIED.
STORM DRAIN OUTLET PROTECTION SHALL BE PLACED AT ALL OUTLET HEADWALLS AS SOON AS THE
HEADWALL IS CONSTRUCTED. SEE SEPARATE DETAILS FOR ADDITIONAL INFORMATION.
STONE CHECK DAMS SHALL BE INSTALLED IN AREAS OF CONCENTRATED FLOWS AS SHOWN ON THE PLAN.
SEE SEPARATE DETAIL FOR ADDITIONAL INFORMATION.
ALL DRAINAGE SWALES SHALL BE STABILIZED AS SOON AS FINAL GRADE IS ACHIEVED.
ALL GRADED AREAS SHALL BE APPLIED WITH VEGETATIVE COVER AS SOON AS FINAL GRADE IS ACHIEVED.
MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 14 DAYS OF LAND
DISTURBANCE.
ALL DISTURBED AREAS LEFT MULCHED AFTER 30 DAYS SHALL BE STABILIZED WITH TEMPORARY GRASSING.
CONTRACTOR SHALL INSPECT CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE
MEASURES ARE FUNCTIONING PROPERLY.
ALTERNATIVE BMP'S
USE OF ALTERNATIVE BMP'S WHOSE PERFORMANCE HAS BEEN DOCUMENTED TO BE EQUIVALENT OR SUPERIOR TO CONVENTIONAL BMP'S AS CERTIFIED BY A DESIGN PROFESSIONAL MAY BE ALLOWED (UNLESS
DISAPPROVED BY EPD OR THE GEORGIA SOIL AND WATER CONSERVATION COMMISSION).
REQUIRED DOCUMENTATION FOR ALTERNATIVE BMPS:
1. ONE PAGE SUMMARY DETAILING WHY THE ALTERNATIVE BMP IS EQUIVALENT
OR SUPERIOR TO THE CONVENTIONAL BMP'S FOUND IN THE “MANUAL FOR EROSION
AND SEDIMENTATION CONTROL IN GEORGIA” (MANUAL).
2. DOCUMENTED SIDE BY SIDE TESTING (ALTERNATIVE BMP VS. CONVENTIONAL
BMP) USING THE APPROPRIATE DESIGN REQUIREMENTS AND SPECIFICATIONS
CONTAINED IN THE MANUAL.
3. PROOF THAT THE ALTERNATIVE BMP WAS PREVIOUSLY INSTALLED AND
WORKED UNDER CONDITIONS COMPARABLE TO THE ENVIRONMENTAL CONDITIONS
OF THE PROPOSED SITE. THIS CAN BE DOCUMENTED WITH PHOTOGRAPHS.
4. ALL SPECIFICATIONS INCLUDING THE DESIGN REQUIREMENTS AND THE
PROCEDURES FOR PROPER INSTALLATION AND MAINTENANCE.
ALL FORMS OF DOCUMENTATION MUST BE SIGNED AND CERTIFIED BY THE DESIGN
PROFESSIONAL WHO IS PREPARING THE ES&PC PLAN AND MUST INCLUDE THE
DESIGN PROFESSIONAL’S SEAL AND GSWCC DESIGN PROFESSIONAL CERTIFICATION.
NOTE: IF LIMITS OF DISTURBANCE FOR STAND ALONE PROJECT REQUIRES
DISTURBING 50 ACRES OR MORE AT ANY ONE TIME, WRITTEN AUTHORIZATION FORM
THE ENVIRONMENTAL PROTECTION DIVISION (EPD) DISTRICT OFFICE SHALL BE
INCORPORATED INTO THIS ES&PC PLAN. IF EPD APPROVES THE REQUEST, THE PLAN
MUST INCLUDE 4 OF THE BMP'S LISTED IN APPENDIX 1 OF GSWCC CHECKLIST, OR
PART III.C.2. OF NPDES GAR 100001.
NOTE: IF SITE DISCHARGES INTO AN IMPAIRED STREAM AS DESCRIBED BELOW,
PROVIDE THE FOLLOWING INFORMATION AND DELINEATE ADDITIONAL BMP'S ON
ES&PC PLANS.
ANY PERMITTEE WHO INTENDS TO OBTAIN COVERAGE UNDER THE NPDES GAR#
100001 FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION
ACTIVITY INTO AN IMPAIRED STREAM SEGMENT, OR WITHIN ONE (1) LINEAR MILE
UPSTREAM OF AND WITHIN THE SAME WATERSHED AS, ANY PORTION OF AN IMPAIRED
STREAM SEGMENT IDENTIFIED AS “NOT SUPPORTING” ITS DESIGNATED USE(S), AS
SHOWN ON GEORGIA’S 2008 AND SUBSEQUENT “305(B)/303(D) LIST DOCUMENTS
(FINAL)” AT THE TIME OF NOI SUBMITTAL, MUST SATISFY THE REQUIREMENTS OF PART
III.C. OF THIS PERMIT IF THE IMPAIRED STREAM SEGMENT HAS BEEN LISTED FOR
CRITERIA VIOLATED, “BIO F” (IMPAIRED FISH COMMUNITY) AND/OR “BIO M” (IMPAIRED
MACROINVERTEBRATE COMMUNITY), WITHIN CATEGORY 4A, 4B OR 5, AND THE
POTENTIAL CAUSE IS EITHER “NP” (NONPOINT SOURCE) OR “UR” (URBAN RUNOFF).
THOSE DISCHARGES THAT ARE LOCATED WITHIN ONE (1) LINEAR MILE OF AN
IMPAIRED STREAM SEGMENT, BUT ARE NOT LOCATED WITHIN THE WATERSHED OF
ANY PORTION OF THAT STREAM SEGMENT, ARE EXCLUDED FROM THIS
REQUIREMENT. GEORGIA’S 2008 AND SUBSEQUENT 305(B)/303(D) LIST DOCUMENTS
(FINAL)” CAN BE VIEWED ON THE EPD WEBSITE,
WWW.GAEPD.ORG/DOCUMENTS/305B.HTML.
1. IF A TOTAL MAXIMUM DAILY LOAD (TMDL) IMPLEMENTATION PLAN FOR SEDIMENT
HAS BEEN FINALIZED AT LEAST SIX (6) MONTHS PRIOR TO THE PERMITTEE’S
SUBMITTAL OF THE NOI, THE EROSION, SEDIMENTATION AND POLLUTION CONTROL
PLAN (PLAN) MUST ADDRESS ANY SITE-SPECIFIC CONDITIONS OR REQUIREMENTS
INCLUDED IN THE TMDL IMPLEMENTATION PLAN THAT ARE APPLICABLE TO THE
PERMITTEE’S DISCHARGE(S) TO THE IMPAIRED STREAM SEGMENT WITHIN THE
TIMEFRAME SPECIFIED IN THE TMDL IMPLEMENTATION PLAN. IF THE TMDL
IMPLEMENTATION PLAN ESTABLISHES A SPECIFIC NUMERIC WASTELOAD ALLOCATION
THAT APPLIES TO AN PERMITTEE’S DISCHARGE(S) TO THE IMPAIRED STREAM
SEGMENT, THEN THE PERMITTEE MUST INCORPORATE THAT ALLOCATION INTO THE
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN AND IMPLEMENT ALL
NECESSARY MEASURES TO MEET THAT ALLOCATION. A LIST OF TMDL
IMPLEMENTATION PLANS CAN BE VIEWED ON THE EPD WEBSITE, WWW.GAEPD.ORG.
2. IN ORDER TO ENSURE THAT THE PERMITTEE’S DISCHARGE(S) DO NOT CAUSE OR
CONTRIBUTE TO A VIOLATION OF STATE WATER QUALITY STANDARDS, THE PLAN
MUST INCLUDE AT LEAST FOUR (4) OF THE FOLLOWING BEST MANAGEMENT
PRACTICES (BMP'S) FOR THOSE AREAS OF THE SITE WHICH DISCHARGE INTO OR
WITHIN ONE (1) LINEAR MILE UPSTREAM AND WITHIN THE SAME WATERSHED
AS THE IMPAIRED STREAM SEGMENT:
A. DURING CONSTRUCTION ACTIVITIES, DOUBLE THE WIDTH OF THE 25 FOOT
UNDISTURBED VEGETATED BUFFER ALONG ALL STATE WATERS REQUIRING A BUFFER
AND THE 50 FOOT UNDISTURBED VEGETATED BUFFER ALONG ALL STATE WATERS
CLASSIFIED AS “TROUT STREAMS” REQUIRING A BUFFER. DURING CONSTRUCTION
ACTIVITIES, EPD WILL NOT GRANT VARIANCES TO ANY SUCH BUFFERS THAT ARE
INCREASED IN WIDTH PURSUANT TO THIS SECTION.
B. INCREASE ALL TEMPORARY SEDIMENT BASINS AND RETROFITTED STORM WATER
MANAGEMENT BASINS TO PROVIDE SEDIMENT STORAGE OF AT LEAST 3600 CUBIC
FEET (134 CUBIC YARDS) PER ACRE DRAINED.
C. USE BAFFLES IN ALL TEMPORARY SEDIMENT BASINS AND RETROFITTED STORM
WATER MANAGEMENT BASINS TO AT LEAST DOUBLE THE CONVENTIONAL FLOW PATH
LENGTH TO THE OUTLET STRUCTURE.
D. PLACE A LARGE SIGN (MINIMUM 4 FEET X 8 FEET) ON THE SITE VISIBLE FROM THE
ROADWAY IDENTIFYING THE CONSTRUCTION SITE, THE PERMITTEE(S), AND THE
CONTACT PERSON(S) AND TELEPHONE NUMBER(S).
E. USE ANIONIC POLYACRYLAMIDE (PAM) AND/OR MULCH TO STABILIZE AREAS LEFT
DISTURBED FOR MORE THAN SEVEN (7) CALENDAR DAYS IN ACCORDANCE WITH PART
III.D.1. OF THIS PERMIT.
F. CONDUCT TURBIDITY AND TOTAL SUSPENDED SOLIDS (TSS) SAMPLING AFTER
EVERY RAIN EVENT OF 0.5 INCH OR GREATER WITHIN ANY 24 HOUR PERIOD,
RECOGNIZING THE EXCEPTIONS SPECIFIED IN PART V.D.6.D. OF THIS PERMIT.
G. COMPLY WITH THE APPLICABLE END-OF-PIPE TURBIDITY EFFLUENT LIMIT, WITHOUT
THE “BMP DEFENSE” AS PROVIDED FOR IN O.C.G.A. 12-7-6(A)(1).
H. LIMIT THE TOTAL PLANNED SITE DISTURBANCE TO LESS THAN 50% IMPERVIOUS
SURFACES (EXCLUDING ANY STATEMANDATED BUFFER AREAS FROM SUCH
CALCULATIONS).
I. LIMIT THE AMOUNT OF AREA DISTURBED AT ANY ONE TIME TO NO GREATER THAN 25
ACRES OR 50% OF THE TOTAL PLANNED SITE, WHICHEVER IS LESS.
J. USE “DIRT II” TECHNIQUES TO MODEL AND MANAGE STORM WATER RUNOFF (E.G.,
SEEP BERMS, SAND FILTERS, ANIONIC PAM), AVAILABLE ON THE EPD WEBSITE,
WWW.GAEPD.ORG.
K. ADD APPROPRIATE ORGANIC SOIL AMENDMENTS (E.G., COMPOST) AND CONDUCT
PRE- AND POST-CONSTRUCTION SOIL SAMPLING TO A DEPTH OF 6 (SIX) INCHES TO
DOCUMENT IMPROVED LEVELS OF SOIL CARBON AFTER FINAL STABILIZATION OF THE
CONSTRUCTION SITE.
L. USE MULCH FILTER BERMS, IN ADDITION TO A SILT FENCE, ON THE SITE PERIMETER
WHEREVER STORM WATER MAY BE DISCHARGED.
M. APPLY THE APPROPRIATE GEORGIA DEPARTMENT OF TRANSPORTATION
APPROVED EROSION CONTROL MATTING OR BLANKETS OR BONDED FIBER MATRIX TO
ALL SLOPES STEEPER THAN 3:1.
N. USE APPROPRIATE EROSION CONTROL MATTING OR BLANKETS INSTEAD OF
CONCRETE IN CONSTRUCTION STORM WATER DITCHES AND STORM DRAINAGES
DESIGNED FOR A 25 YEAR, 24 HOUR RAINFALL EVENT.
O. USE ANIONIC PAM UNDER A PASSIVE DOSING METHOD (E.G., FLOCCULANT BLOCKS)
WITHIN CONSTRUCTION STORM WATER DITCHES AND STORM DRAINAGES THAT FEED
INTO TEMPORARY SEDIMENT BASINS AND RETROFITTED MANAGEMENT BASINS.
P. INSTALL SOD FOR A MINIMUM 20 FOOT WIDTH, IN LIEU OF SEEDING, ALONG THE
SITE PERIMETER WHEREVER STORM WATER MAY BE DISCHARGED.
Q. USE A SURFACE DRAINING SKIMMER DESIGNED TO DRAIN TEMPORARY SEDIMENT
BASINS AND RETROFITTED STORMWATER MANAGEMENT BASINS OVER A MINIMUM
THREE (3) DAY PERIOD.
R. CERTIFIED PERSONNEL SHALL CONDUCT INSPECTIONS AT LEAST TWICE EVERY
SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF THE STORM THAT
IS 0.5 INCHES RAINFALL OR GREATER IN ACCORDANCE WITH PART IV.D.4.A.(2). (A) – (C)
OF THIS PERMIT.
S. APPLY THE APPROPRIATE COMPOST BLANKETS (MINIMUM DEPTH 1.5 INCHES) TO
PROTECT SOIL SURFACES UNTIL VEGETATION IS ESTABLISHED DURING THE FINAL
STABILIZATION PHASE OF THE CONSTRUCTION ACTIVITY.
T. USE ALTERNATIVE BMP'S WHOSE PERFORMANCE HAS BEEN DOCUMENTED TO BE
SUPERIOR TO CONVENTIONAL BMP'S AS CERTIFIED BY A DESIGN PROFESSIONAL
(UNLESS DISAPPROVED BY EPD OR THE STATE SOIL AND WATER CONSERVATION
COMMISSION).
RETENTION OF RECORDS
1. THE PRIMARY PERMITTEE SHALL RETAIN THE FOLLOWING RECORDS AT THE
CONSTRUCTION SITE OR THE RECORDS SHALL BE READILY AVAILABLE AT A
DESIGNATED ALTERNATE LOCATION FROM COMMENCEMENT OF CONSTRUCTION
UNTIL SUCH TIME AS A NOT IS SUBMITTED IN ACCORDANCE WITH PART VI:
A. A COPY OF ALL NOTICES OF INTENT SUBMITTED TO EPD;
B. A COPY OF THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN
REQUIRED BY THIS PERMIT;
C. THE DESIGN PROFESSIONAL’S REPORT OF THE RESULTS OF THE INSPECTION
CONDUCTED IN ACCORDANCE WITH PART IV.A.5. OF THIS PERMIT;
D. A COPY OF ALL MONITORING INFORMATION, RESULTS, AND REPORTS REQUIRED
BY THIS PERMIT;
E. A COPY OF ALL INSPECTION REPORTS GENERATED IN ACCORDANCE WITH PART
IV.D.4.A. OF THIS PERMIT;
F. A COPY OF ALL VIOLATION SUMMARIES AND VIOLATION SUMMARY REPORTS
GENERATED IN ACCORDANCE WITH PART III.D.2. OF THIS PERMIT; AND
G. DAILY RAINFALL INFORMATION COLLECTED IN ACCORDANCE WITH PART
IV.D.4.A.(1)(C) OF THIS PERMIT.
2. COPIES OF ALL NOTICES OF INTENT, NOTICES OF TERMINATION, REPORTS, PLANS,
MONITORING REPORTS, MONITORING INFORMATION, INCLUDING ALL CALIBRATION
AND MAINTENANCE RECORDS AND ALL ORIGINAL STRIP CHART RECORDINGS FOR
CONTINUOUS MONITORING INSTRUMENTATION, EROSION, SEDIMENTATION AND
POLLUTION CONTROL PLANS, RECORDS OF ALL DATA USED TO
COMPLETE THE NOTICE OF INTENT TO BE COVERED BY THIS PERMIT AND ALL OTHER
RECORDS REQUIRED BY THIS PERMIT SHALL BE RETAINED BY THE PERMITTEE WHO
EITHER PRODUCED OR USED IT FOR A PERIOD OF AT LEAST THREE YEARS FROM THE
DATE THAT THE NOT IS SUBMITTED IN ACCORDANCE WITH PART VI OF THIS PERMIT.
THESE RECORDS MUST BE MAINTAINED AT THE PERMITTEE’S PRIMARY PLACE OF
BUSINESS OR AT A DESIGNATED ALTERNATIVE LOCATION ONCE THE CONSTRUCTION
ACTIVITY HAS CEASED AT THE PERMITTED SITE. THIS PERIOD MAY BE EXTENDED BY
REQUEST OF THE EPD AT ANY TIME UPON WRITTEN NOTIFICATION TO THE
PERMITTEE.
PROVIDE THE APPLICABLE FEMA FIRM MAP NUMBER AND DATE NOTING THAT THE
SITE IS OR IS NOT WITHIN A FEMA FLOOD HAZARD AREA. FOR PROPERTIES WITH
CREEKS OR STREAMS THAT ARE NOT IDENTIFIED WITHIN THE FEMA FLOOD MAPS, A
FLOOD STUDY SIGNED AND SEALED BY A GEORGIA REGISTERED PROFESSIONAL
ENGINEER IS REQUIRED THAT IDENTIFIES THE 100-YEAR HIGH WATER ELEVATION(S)
AND CONTOUR LOCATION. SHOW ON PLANS.
IF THE SITE IS WITHIN THE 2,000 FOOT CHATTAHOOCHEE CORRIDOR, PROVIDE A
METROPOLITAN RIVER PROTECTION ACT (MRPA) CERTIFICATE FROM THE ATLANTA
REGIONAL COMMISSION (ARC).
PRE-CONSTRUCTION NOTIFICATION (PCN) MAY BE REQUIRED TO THE NORTHERN
SECTION OFFICES OF THE U.S. ARMY CORPS OF ENGINEERS FOR STREAM CHANNEL
OR WETLANDS IMPACTS WITHIN THE PROPOSED PROJECT SCOPE. PLEASE PROVIDE
COPIES OF ALL CORRESPONDENCES AND ANY REMEDIATION REQUIREMENTS AS A
CONDITION OF CORPS PERMIT APPROVAL. PLEASE BE SURE AND CHECK THE MOST
RECENT SAVANNAH DISTRICT REGIONAL PERMITTING CONDITIONS.
EROSION, SEDIMENTATION, AND POLLUTION CONTROL NOTES
PRIOR TO LAND-DISTURBING ACTIVITIES, THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE AREA EROSION CONTROL INSPECTOR. CALL (404) 546-1300 TO CONTACT THE
INSPECTOR.
THIS PLAN HAS BEEN PREPARED TO MEET THE REQUIREMENTS UNDER THE STATE OF GEORGIA,
DEPARTMENT OF NATURAL RESOURCES, ENVIRONMENTAL PROTECTION DIVISION (EPD), GENERAL PERMIT NUMBER GAR 100002 FOR AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES), STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY
FOR INFRASTRUCTURE.
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING
ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH
MULCH OR TEMPORARY SEEDING.
PRIOR TO THE DEDICATION AND ACCEPTANCE OF SANITARY SEWER, STORM SEWER OR STREET
INFRASTRUCTURE TO THE CITY OF ATLANTA, "AS-BUILT" DRAWINGS AND 3-YEAR MAINTENANCE BONDS ARE
REQUIRED. THE STREET CONSTRUCTION SHALL DEMONSTRATE ADEQUATE COMPACTION WITH
PROFESSIONAL TESTING AND REPORTS PREPARED BY A GEORGIA REGISTERED PROFESSIONAL CIVIL ENGINEER. THE SANITARY SEWER INSTALLATION SHALL INCLUDE AN INTERNAL TELEVISION INSPECTION, A
SUCCESSFUL MANDRELL PULL AND SUCCESSFUL LEAK-DOWN PRESSURE TEST.
PRIOR TO FINAL SIGNOFF, APPLICANT IS REQUIRED TO SUBMIT AN ELECTRONIC FORMAT (AS DETERMINED BY THE DEPARTMENT OF WATERSHED MANAGEMENT) AND A PAPER FORMAT OF THE ACTUAL "AS BUILT" PLANS FOR ANY STORMWATER MANAGEMENT FACILITIES OR PRACTICES AFTER FINAL CONSTRUCTION IS COMPLETED. THE PLAN MUST SHOW THE AS BUILT CONFIGURATION FOR ALL STORMWATER MANAGEMENT
FACILITIES AND PRACTICES AND MUST BE CERTIFIED BY A PROFESSIONAL ENGINEER.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST WEEKLY, AFTER EACH RAIN, AND REPAIRED AS NECESSARY.
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED
NECESSARY BY ON-SITE INSPECTION.
ALL SILT FENCES MUST BE TYPE C, WIRE BACKED, AND MEET THE REQUIREMENTS OF SECTION 171-TEMPORARY SILT FENCE FOR THE DEPARTMENT OF TRANSPORTATION, QUALIFIED PRODUCTS LIST #36.
THE LEVEL II QUALIFIED DESIGN PROFESSIONAL WHO SEALED THESE PLANS IS TO INSPECT THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMP'S WITHIN
7 DAYS AFTER INSTALLATION.
ALL AMENDMENTS AND REVISIONS TO THE EROSION & SEDIMENT CONTROL PLANS WHICH WILL HAVE A SIGNIFICANT EFFECT ON BEST MANAGEMENT PRACTICE (BMP) WITH A HYDRAULIC COMPONENT MUST BE
CERTIFIED BY THE DESIGN PROFESSIONAL.
NO NON-EXEMPT ACTIVITIES SHALL BE CONDUCTED IN THE 25' STATE WATERS BUFFER OR THE 75' CITY OF ATLANTA RIPARIAN BUFFER WITHOUT FIRST OBTAINING THE NECESSARY VARIANCES AND PERMITS.
THE PROPERTY OWNER AND CONTRACTOR ARE EQUALLY RESPONSIBLE FOR ALL EROSION CONTROL
ACTIVITIES.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN QUALIFIED PROFESSIONAL ADVICE WHEN QUESTIONS ARISE CONCERNING DESIGN AND EFFECTIVENESS OF EROSION CONTROL DEVICES, NOT THE
CITY OF ATLANTA.
ALL TEMPORARY AND PERMANENT SEEDING MUST BE PERFORMED AT THE APPROPRIATE SEASON. IN SUCH INSTANCES WHERE THE ESTABLISHMENT OF VEGETATION IS INOPPORTUNE DUE TO SEASON OR DROUGHT, DISTURBED AREAS SHALL BE TEMPORARILY STABILIZED USING 2”-4” OF MULCH (DS1). ADDITIONAL
PLANTINGS WILL BE NECESSARY IF A SUFFICIENT STAND OF GRASS FAILS TO GROW.
THE CITY'S DESIGNEE WILL VERIFY ADEQUATE VEGETATIVE COVER (100% COVER, 70% DENSITY) OF PERMANENT STABILIZATION (Ds3, Ds4).
SILT FENCES SHALL NOT BE PLACED IN STREAM BUFFER OR FLOODPLAINS, UNLESS UTILIZED FOR THE CONSTRUCTION OF AN EXEMPT ACTIVITY (I.E. ROADWAY DRAINAGE STRUCTURES, SEWER/WATER CROSSINGS, OR DRAINAGE STRUCTURES) PER THE APPROVED PLANS. FOR SUCH DISTURBANCES WITHIN THE BUFFER, THE AREA SHALL BE IMMEDIATELY STABILIZED USING EROSION CONTROL MATTING AND/OR
BLANKETS ONCE THE ACTIVITY IS COMPLETE.
SEDIMENT STORAGE VOLUME (67 CY/ACRE) MUST BE INSTALLED PRIOR TO ANY OTHER LAND DISTURBANCE
ACTIVITY AND IN PLACE UNTIL FINAL STABILIZATION OCCURS.
FOR EACH SITE ON WHICH LAND DISTURBING ACTIVITY OCCURS, EACH ENTITY OR PERSON ACTING AS EITHER A PRIMARY, SECONDARY, OR TERTIARY PERMITTEE, AS DEFINED IN THE STATE GENERAL PERMIT, SHALL HAVE AS A MINIMUM ONE PERSON WHO IS IN RESPONSIBLE CHARGE OF EROSION AND
SEDIMENTATION CONTROL ACTIVITIES ON BEHALF OF SAID ENTITY OR PERSON AND MEETS THE APPLICABLE (LEVEL 1A) EDUCATION OR TRAINING CERTIFICATION REQUIREMENTS (O.C.G.A. 12-7-19(A)(2)).
SUBCONTRACTORS INVOLVED WITH LAND DISTURBANCE ACTIVITIES SHALL MEET THE EDUCATION
REQUIREMENTS (LEVEL 1) DESCRIBED IN O.C.G.A 12-7-19.
THE CONTRACTOR SHALL OBSERVE THE PROJECT SEQUENCE SHOWN ON THE PLANS. THE CONTRACTOR SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO ENSURE THAT LAND STRIPPED OF ITS
NATURAL COVER IS EXPOSED ONLY IN SMALL QUANTITIES.
THE OWNER AGREES TO PROVIDE AND MAINTAIN OFF-STREET PARKING ON THE SUBJECT PROPERTY DURING
THE ENTIRE CONSTRUCTION PERIOD.
NO STAGING AREAS, MATERIAL STORAGE, CONCRETE WASH OUT AREAS, OR DEBRIS BURN AND BURIAL
HOLES SHALL BE LOCATED WITHIN 500 FEET OF DESIGNATED TREE PROTECTION AREAS.
A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE AT ALL
TIMES.
PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, THE LIMITS OF LAND DISTURBANCE AND ALL STREAM BUFFERS SHALL BE CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS, OR OTHER APPROPRIATE MEANS. THE LOCATION AND EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY SHALL BE DEMARCATED FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE
SHALL OCCUR OUTSIDE THE APPROVED LIMITS INDICATED ON THE APPROVED PLANS.
PRIOR TO ANY OTHER CONSTRUCTION, A STABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED
AT EACH POINT OF ENTRY TO OR EXIT FROM THE SITE OR ONTO ANY PUBLIC ROADWAY.
THE FOLLOWING INITIAL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED PRIOR TO ANY OTHER
CONSTRUCTION ACTIVITY.
1. THE CONSTRUCTION EXIT, CONSISTING OF A MINIMUM PAD SIZE OF 20 FEET BY 50 FEET WITH A MINIMUM OF 6” THICK STONE, SHALL BE PLACED AS SHOWN ON THE PLAN. THE STONE SIZE SHOULD CONSIST OF COURSE AGGREGATE BETWEEN 1-1/2” & 3-1/2” IN DIAMETER AND OVERLAID ON A GEOTEXTILE UNDERLINER.
THE GEOTEXTILE UNDERLINER SHALL MEET THE REQUIREMENTS OF AASHTO M288-96, SECTION 7.3
SEPARATION REQUIREMENTS.
2. IMMEDIATELY AFTER THE ESTABLISHMENT OF CONSTRUCTION ENTRANCE/EXITS, ALL PERIMETER EROSION CONTROL AND TEMPORARY SEDIMENT BASINS SHALL BE INSTALLED AS SHOWN ON THE INITIAL PHASE
EROSION CONTROL PLAN.
3. TYPE “C” SILT FENCE SHOULD BE INSTALLED AT THE PERIMETER OF THE DISTURBED AREA AS SHOWN ON THE PLAN. THE SILT FENCE SHOULD BE PLACED IN ACCORDANCE WITH THE MANUAL FOR EROSION .
PERMITTED BY: _________________________________________ DATE: ______________________
PERMIT #: ___________________________________________________________________________
THESE PLANS WERE REVIEWED WITH RESPECT TO CITY BUILDING AND DEVELOPMENT CODES
ONLY. NO EFFORT WAS MADE TO CHECK THE STRUCTURAL, MECHANICAL, ELECTRICAL OR
PLUMBING DESIGN OTHER THAN TO COMPARE THE SUBMITTED PLANS WITH THE APPLICABLE
BUILDING CODES.
STRUCTURAL INTEGRITY DURING CONSTRUCTION IS THE TOTAL RESPONSIBILITY OF THE
OWNER AND THE OWNER'S AGENTS. THIS PERMIT IS SUBJECT TO ALL SANDY SPRINGS
ORDINANCES AND GEORGIA STATE LAWS.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE
REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE OWNER AND THE OWNER'S AGENT SHALL REQUEST AND PASS ALL INSPECTIONS PRIOR
TO THE CONCEALMENT OF WORK.
PERMIT
APPROVED
05/09/2024
5030 HIGH POINT RD
AN
SE
LL
C
T.
, S
TE
. 2
RO
SW
EL
L, G
EO
RG
IA
PH
O
N E:
.3
.4
CONCRETE WASHOUT
IT IS PROHIBITED TO WASHOUT THE DRUM OF CONCRETE TRUCK ON SITE. SEE DETAILS SHEET
FOR BEST MANAGEMENT PRACTICES FOR CONCRETE WASHDOWN OF TOOLS, CONCRETE MIXER
CHUTES, HOPPERS, AND THE REAR OF THE VEHICLE ONLY.
POTENTIAL SOURCES OF STORMWATER POLLUTION
PETROLEUM BASED PRODUCTS - CONTAINERS FOR PRODUCTS SUCH AS FUELS, LUBRICANTS, AND TAR WILL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS INCLUDES ON-SITE VEHICLE AND
MACHINERY DAILY INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH
EQUIPMENT. EQUIPMENT MAINTENANCE AREAS WILL BE LOCATED AWAY FROM STATE WATERS,
NATURAL DRAINS, AND STORMWATER DRAINAGE INLETS. IN ADDITION, TEMPORARY FUELING
TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER TO PREVEN/MINIMIZE SITE
CONTAMINATION. DISCHARGE OF OILS, FUELS, AND LUBRICANTS IS PROHIBITED. PROPER
DISPOSAL METHODS WILL INCLUDE COLLECTION IN A SUITABLE CONTAINER AND DISPOSAL AS
REQUIRED BY LOCAL AND STATE REGULATIONS.
PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS WILL BE STORED IN TIGHTLY SEALED ORIGINAL
CONTAINERS WHEN NOT IN USE. EXCESS PRODUCT WILL NOT BE DISCHARGED TO THE STORM
WATER COLLECTION SYSTEM. EXCESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS AND
PRODUCT CONTAINERS WILL BE DISPOSED OF ACCORDING TO MANUFACTURER'S SPECIFICATIONS
AND RECOMMENDATIONS.
FERTILIZER/HERBICIDES - THESE PRODUCTS WILL BE APPLIED AT RATES THAT DO NOT EXCEED
THE MANUFACTURER'S SPECIFICATION OR ABOVE THE GUIDELINES SET FORTH IN THE CROP
ESTABLISHMENT OR IN THE GSWCC MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA.
ANY STORAGE OF THESE MATERIALS WILL BE UNDER ROOF IN SEALED CONTAINERS.
BUILDING MATERIALS - NO BUILDING OR CONSTRUCTION MATERIALS WILL BE BURIED OR DISPOSED OF ONSITE. ALL SUCH MATERIAL WILL BE DISPOSED OF IN PROPER WASTE DISPOSAL PROCEDURE.
SOLID MATERIALS, INCLUDING BUILDING MATERIALS, SHALL NOT BE DISCHARGED TO WATERS OF
THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404 PERMIT.
REMEDIATION OF PETROLEUM SPILLS AND LEAKS
LOCAL, STATE AND MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE
CLEARLY POSTED AND PROCEDURES WILL BE MADE AVAILABLE TO SITE PERSONNEL.
MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL
STORAGE AREAS. TYPICAL MATERIALS AND EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO
BROOMS, DUSTPANS, MOPS, RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST, AND
PROPERLY LABELED PLASTIC AND METAL WASTE CONTAINERS.
SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE REVIEWED AFTER A SPILL AND
ADJUSTED AS NECESSARY TO PREVENT FUTURE SPILLS.
ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY. ALL SPILLS WILL BE REPORTED
AS REQUIRED BY LOCAL, STATE, AND FEDERAL REGULATIONS.
THE CONTRACTOR SHALL NOTIFY THE LICENSED PROFESSIONAL WHO PREPARED THIS PLAN IF
MORE THAN 1320 GALLONS OF PETROLEUM IS STORED ONSITE (THIS INCLUDES CAPACITIES FOR EQUIPMENT) OR IF ANY ONE PIECE OF EQUIPMENT HAS A COUNTERMEASURES PLAN PREPARED BY
THAT LICENSED PROFESSIONAL.
FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE WATER), THE NATIONAL
RESPONSE CENTER (NRC) WILL BE CONTACTED WITHIN 24 HOURS AT 1-800-424-8802.
FOR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL RESPONSE CENTER (NRC) WILL BE
CONTACTED WITHIN 24 HOURS AT 1-800-424-8802.
FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE GEORGIA
ENVIRONMENTAL PROTECTION DIVISION (EPD) WILL BE CONTACTED WITHIN 24 HOURS.
FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE SPILL WILL BE
CLEANED UP AND LOCAL AGENCIES WILL BE CONTACTED AS REQUIRED.
SEVEN DAY INSPECTION
THE PRIMARY PERMITTEE MUST RETAIN THE DESIGN PROFESSIONAL WHO PREPARED THE
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN, EXCEPT WHEN THE PRIMARY
PERMITTEE HAS REQUESTED IN WRITING AND EPD HAS AGREED TO AN ALTERNATE DESIGN
PROFESSIONAL, TO INSPECT THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE
REQUIREMENTS AND PERIMETER CONTROL BMP'S WHICH THE DESIGN PROFESSIONAL DESIGNED
WITHIN SEVEN (7) DAYS AFTER INSTALLATION. THE DESIGN PROFESSIONAL SHALL DETERMINE IF
THESE BMP'S HAVE BEEN INSTALLED AND ARE BEING MAINTAINED AS DESIGNED. THE DESIGN
PROFESSIONAL SHALL REPORT THE RESULTS OF THE INSPECTION TO THE PRIMARY PERMITTEE
WITHIN SEVEN (7) DAYS AND THE PERMITTEE MUST CORRECT ALL DEFICIENCIES WITHIN TWO (2)
BUSINESS DAYS OF RECEIPT OF THE INSPECTION REPORT FROM THE DESIGN PROFESSIONAL
UNLESS WEATHER RELATED SITE CONDITIONS ARE SUCH THAT ADDITIONAL TIME IS REQUIRED.
REVISIONS / AMENDMENTS
THE PRIMARY PERMITTEE SHALL AMEND/REVISE THIS PLAN WHENEVER THERE IS A CHANGE IN
DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE,…
This is the start of the file's text. The full file is on GovTribe.