This is a Scope of Work document for a Water Department project in Washington involving the removal and replacement of seven heavy-duty, exterior steel frame commercial doors and associated hardware at seven different Water Department Pump Station locations. The project encompasses single or double outswing doors, each 1-3/4 inches thick with metallic-coated steel face sheets and pre-primed, dark grey two-component polyaspartic aliphatic urethane finish. All doors must be equipped with pull handles and deadbolts on the exterior and panic hardware on the interior. The contractor must provide manufacturer cut sheets for all components, develop a work plan for approval prior to removal, and maintain emergency access to pump stations throughout the project. No pre-bid meeting is scheduled. The clarification period deadline for hardware substitution requests is October 29, 2026.
The contractor bears full responsibility for all parts, equipment, labor, materials, removal, and disposal associated with the project. For pump stations with existing commercial storefront-style installations, the contractor must remove the storefront steel, infill with CMU block, and install an appropriately sized steel header over the new door location. All job sites must be secured daily with no overnight material storage permitted; materials and equipment must be brought in and removed each day if work spans multiple days at a single location. Door hardware specifications include approved manufacturers such as Stanley and Hager for butts, Best for locksets, Precision and Von Duprin for exit devices, LCN and Norton for closers, Pemko for thresholds and door bottoms, and Glynn Johnson for overhead stops, with limited approved substitutes listed for most items.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PW ITB 6638-26 Removal and Replacement of Water Pump Station Doors – Phase 1
Scope of Work:
This project will complete the removal and replacement of 7 (seven) heavy duty, exterior steel frame, standard height commercial doors and associated hardware at 7 (seven) different Water Department Pump Station locations.
See Document below located in the ProcureWare documents section for the locations, photos and door type. There will be no pre-bid meeting for this project due to the number of locations.
• PW ITB 6638-26 Door Locations and Photos
Contractor shall have all required hardware, materials, parts necessary for completion of an entire “phase” of the work in their possession prior to beginning work on that phase.
Contractor shall provide a work plan for door removal and new frame mounting for approval by the City prior to removing any existing doors.
All job sites must be made secure each day during the construction period, no location can be left unsecured. A door must be present for emergency access to pump stations. A construction core key must be provided to the Water department radio room for emergency access. Contractor must notify the Water Department radio room when arriving to and leaving a site.
No materials are to be stored overnight on-site. Materials and equipment must be brought in and removed each day of work if there will be multiple days of work at one location.
Contractor shall be responsible for all parts, equipment, labor, and materials required to complete this work. Contractor shall be responsible for all removal and disposal of existing door, door frame, door hardware, frame anchors, paint, mortar, construction debris, etc. related to this work.
Specifications:
Contractor shall provide manufacturer cut sheets for all components to be included in this work.
including but not limited to doors, door frames, door hardware, frame anchors, paint, mortar (grout), etc.
For pump stations with existing commercial storefront style installations (old glass panes in steel frame), contractor shall be responsible for removal of the storefront steel, infilling with CMU block, and installing an appropriately sized steel header over the new door location.
All other existing doors are mounted in existing cast in place concrete, (1) wood frame, or CMU block wall with steel door frames filled with mortar.
All doors shall be pre-primed and painted. All doors should be OUTSWING doors.
All doors will shall be equipped with pull handles and deadbolts on the exterior, and panic hardware (crash bars) on the interior.
EXTERIOR HEAVY DUTY STEEL DOORS AND FRAMES shall ALL BE OUTSWING DOORS and shall meet the following requirements:
A. Construct hollow-metal doors and frames to comply with standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified.
B. Heavy-Duty Doors and Frames: ANSI/SDI A250.8, Level 2; ANSI/SDI A250.4, Level B.
1. Doors:
a. Type: Single or Double
b. Thickness: 1-3/4 inches.
c. Face: Metallic-coated steel sheet, minimum thickness of 0.042 inch, with minimum A60 coating.
d. Edge Construction: Model 1, Full Flush.
e. Edge Bevel: Bevel lock and hinge edges 1/8 inch in 2 inches.
f. Top Edge Closures: Close top edges of doors with flush closures of same material as face sheets. Seal joints against water penetration.
g. Bottom Edges: Close bottom edges of doors with end closures or channels of same material as face sheets. Provide weep-hole openings in bottoms of exterior doors to permit moisture to escape.
h. Core: Manufacturer's standard, Polystyrene, Polyurethane, Polyisocyanurate, or Vertical steel stiffener.
2. Frames:
a. Materials: Metallic-coated steel sheet, minimum thickness of 0.053 inch, with minimum A60 coating.
b. Construction: Full profile welded.
c. Thermal Break Frame.
d. Transom Frame: Same material and thickness as the door frame.
3. Exposed Finish:
a. All doors shall be pre-primed
b. Field Paint Doors with a two-component chemically-cured polyaspartic aliphatic urethane flat finish in dark grey.
c. All bare metal door, frames, anchors, marks from grinding or setting the doors, shall be hand primed with a suitable primer for the topcoat prior to painting.
EXTERIOR DOOR FRAME ANCHORS shall meet the following requirements:
A. Jamb Anchors:
1. Type:
Anchors of minimum size and type required by applicable door and frame standard, and suitable for performance level indicated and wall assembly being mounted to.
DOOR HARDWARE shall meet the following requirements:
Door Hardware Shall meet the requirements in the table below. Any further substitution requests must be submitted for approval via the clarification tab before the clarification period ends on 10/29/2026.
*All products shall be installed per manufacturers specifications.
ITEM MANUFACTURER APPROVED SUBSTITUTE
Butts Stanley Hager, McKinney Locksets Best Stanley Security Solutions Figure 8 Cylinders Best None Exit Devices Precision Von Duprin, Sargent Push Bars Ives Quality, BBW Flushbolts Ives Quality, BBW Closers LCN Norton 7500, Sargent 350 Wall Stops Ives Quality, BBW Overhead Stops Glynn Johnson Rixson, ABH Thresholds Pemko Reese, National Guard Door Bottoms Pemko Reese, National Guard Gasketing Pemko Reese, National Guard