- Riverfront Park Paw Park Dog Park Development
- Solicitation number
- PW ITB 6632-26
- Issued by
- Spokane County, Tacoma City, Washington
About this file
This is an Invitation to Bid (ITB) document issued by the City of Spokane Parks & Recreation Department for the Riverfront Paw Park Dog Park Development project. The project involves the construction of approximately 0.8 acre dog park within an existing landscaped portion of Riverfront Park in Spokane, Washington. Work includes removal of existing landscape surface, grading and drainage installation, construction of new concrete plaza and pedestrian space, installation of new fencing, artificial surface turf and base, irrigation system and control upgrades, new domestic water supply and drinking fountain, and new fixtures, furnishings, and landscaping. Bidders are required to submit sealed bids in accordance with the specifications and requirements outlined in the ITB document. The project scope is comprehensive and addresses both recreational amenities and necessary infrastructure improvements for the dog park facility.
The ITB document establishes the bidding procedures, evaluation criteria, and contract terms for qualified contractors interested in undertaking the Riverfront Paw Park Dog Park Development. Specific pricing, bid due dates, pre-bid site visit and bidders' conference information, contract award dates, and contract term details would be contained within the complete ITB document. Prospective bidders should review all technical specifications, drawings, and requirements carefully to ensure accurate bid preparation and submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PW ITB #6632-26
PW INVITATION TO BID
PW ITB NUMBER: 6632-26
TITLE: RIVERFRONT PARK PAW PARK DOG PARK
DEVELOPEMTN
BID COORDINATOR: Thea Prince, City of Spokane Purchasing Department
QUESTION DEADLINE:
FRIDAY, OCTOBER 23, 2026 at 5:00pm.
PROPOSAL DUE DATE:
TUESDAY, NOVEMBER 3, 2026
TIME: 11:00 am pst
Bid Submittal:
All Bids shall be submitted electronically through the ProcureWare online procurement system portal:
https://spokane.procureware.com before the due date and time.
BID SUBMITTED BY:
COMPANY
MAILING ADDRESS
PHYSICAL ADDRESS
PHONE NUMBER
E-MAIL ADDRESS
CITY OF SPOKANE - PURCHASING
915 N Nelson St.
Spokane, Washington 99202
(509) 625-6400 https://spokane.procureware.com/
CITY OF SPOKANE
REQUEST FOR PUBLIC WORKS BID
USING AIA FORM A201 – 2007
GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION
REVISED MARCH 18, 2014
INSTRUCTIONS TO BIDDERS
1. SUBMISSION OF BIDS.
Bid Responses shall be submitted electronically through the City of Spokane’s bidding portal: https://spokane.procureware.com on or before the Due Date and time mentioned below. Hard, e-mailed or faxed copies and/or late bids shall not be accepted.
The City of Spokane is not responsible for bids electronically submitted late. It is the responsibility of the Bidder to be sure the bids are electronically submitted sufficiently ahead of time to be received no later than 11:00 a.m. on the bid opening date.
Bid Opening: Sealed electronic bids will be accepted until Tuesday, November 3, 2026, at 11:00am. Bids will be publicly opened at 11:15am. To participate in bid opening, please visit the City’s website at https://my.spokanecity.org/administrative/purchasing/ for the link to attend virtually and the number to attend by telephone. All bid responses must be submitted electronically through the City of Spokane’s bidding portal at https://spokane.procureware.com before the aforementioned deadline. Hard copy and/or late bids will not be accepted.
2. BIDDERS' REPRESENTATION.
Each bidder by making its bid represents that it has read and understands the bidding documents. Each bidder by making its bid represents that it has visited the site and familiarized itself with the local conditions under which the work is to be performed.
3. SUBSTITUTIONS.
A. Each bidder represents that its bid is based upon the materials and equipment described in the bidding documents.
B. No substitution will be considered unless written request has been submitted to the City department representative for approval at least five (5) days prior to the date for receipt of bids. Each request shall include a complete description of the proposed substitute, the name of the material or equipment for which it is to be substituted, manufacturer, warranty, availability of qualified and trained installers, drawings, cuts, performance and test data and any other data or information necessary for a complete evaluation.
C. If the City department representative approves any proposed substitution, the approval will be set forth in an addendum.
4. INTERPRETATION.
If a bidder discovers any errors, discrepancies or omissions in the bid specifications, or has any questions about the specifications, it shall notify the City department representative in writing. Any addenda issued by the City will be incorporated into the contract.
5. WITHDRAWAL OF BIDS.
The bidder may make written request to the City for withdrawal of a sealed electronic bid prior to the scheduled opening. Unless otherwise specified, no bid may be withdrawn for a minimum of sixty (60) calendar days after the opening date.
https://my.spokanecity.org/administrative/purchasing/
6. BIDDER PREQUALIFICATION.
Prior to the award of contract, the apparent successful bidder shall be required to submit evidence of sufficient facilities, equipment, workers with formal and verifiable experience and training in municipal public parks and /or construction projects of similar type and equivalent or larger nature, size, and scope to this project as outlined in detail within project technical specifications, unless waived by the City. To be deemed responsive, the bidding contractor shall have completed (1) park, municipal or school ballfield, artificial field, or landscape installation of equivalent size and scope within the past (3) years
7. BID SECURITY.
The bid shall be accompanied by a bid bond bound to the City of Spokane, in an amount of not less than five percent (5%) of the total bid amount. Bid bonds must be by a surety company authorized to do business as a surety in Washington State. As soon as the bid prices have been compared, the City will release the bid security of all except the three
(3) lowest responsible bidders. When the construction agreement is signed and returned with executed payment and performance bonds, the other bid security will be released.
8. AWARD OF CONTRACT.
Award of contract, when made by the City, will be to the lowest responsive responsible bidder. Unsuccessful bidders will not automatically be notified of results.
9. RECIPROCAL PREFERENCE FOR RESIDENT CONTRACTORS.
A. In accordance with RCW 39.04.380 effective March 30, 2012 the City of Spokane is enforcing a Reciprocal Preference for Resident Contractors. Any public works bid received from a nonresident contractor from a state that provides an in-state percentage bidding preference, a comparable percentage disadvantage must be applied to the bid of that nonresident contractor. A nonresident contractor from a state that provides a percentage bid preference means a contractor that: a) is from a state that provides a percentage bid preference to its resident contractors bidding on public works contracts; and b) at the time of bidding on a public works project, does not have a physical office located in Washington.
B. The state of residence for a nonresident contractor is the state in which the contractor was incorporated or, if not a corporation, the state where the contractor's business entity was formed. All nonresident contractors will be evaluated for out of state bidder preference. If the state of the nonresident contractor provides an in-state contractor preference, a comparable percentage disadvantage will be applied to their bid prior to contract award.
C. This section does not apply to public works procured pursuant to RCW 39.04.155, 39.04.280, or any other procurement exempt from competitive bidding.
10. BIDDER RESPONSIBILITY CRITERIA (MANDATORY).
Before award, the bidder must meet the following mandatory bidder responsibility criteria to be considered a responsible bidder. The bidder may be required by the Owner to submit documentation demonstrating compliance with the criteria. The bidder must:
A. Have a current certificate of registration as a contractor in compliance with chapter
18.27 RCW, which must have been in effect at the time of bid submittal;
B. Have a current Washington Unified Business Identifier (UBI) number;
C. If applicable:
1) Have Industrial Insurance (workers’ compensation) coverage for the bidder’s employees working in Washington, as required in title 51 RCW;
2) Have a Washington Employment Security Department number, as required in title 50 RCW;
3) Have a Washington Department of Revenue state excise tax registration number, as required in title 82 RCW.
D. Not be disqualified from bidding on any public works contract under RCW
39.06.010 or 39.12.065(3).
E. If bidding on a public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship and training council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under chapter 49.04 RCW for the one-year period immediately preceding the date of the bid solicitation; and
F. Until December 31, 2013, not have violated RCW 39.04.370 “Off-Site Prefabricated
Non-Standard Project Specific Items” reporting requirements more than one time as determined by the department of labor and industries.
G. Before award of a public works contract, the bidder under consideration for award of a public works project must submit to the public agency a sworn statement that they have not willfully violated wage payment laws within the past three years in order to be considered a responsible bidder. (See RCW 39.04.350 as modified by SSB 5301, Laws of 2017, ch. 258.).
H. Shall affirm and certify that they will not violate any local, state, or federal labor laws or standards during the course of performing work under the City contract.
I. Shall affirm and certify that the bidder will comply with and notify its principals and subcontractors of the provisions of the Spokane Fair Elections Code, chapter
01.07, SMC
J. As of July 1, 2019, have fulfilled the Department of Labor and Industries’ Public
Works and Prevailing Wage Training Requirement before bidding and/or performing work on public works projects under RCW 39.04.350 and RCW
39.06.020 by either of the following:
• Received training on the requirements related to public works and prevailing wage under chapter RCW 39.04.350 and chapter 39.12; or
• Be certified exempt by the Department of Labor and Industries by having completed three or more public work projects and have a had a valid business license in Washington for three or more years.
This verification requirement and responsibility criteria must be included in any subcontract at every tier for the public works project.
http://apps.leg.wa.gov/Rcw/default.aspx?cite=39.04.320 http://apps.leg.wa.gov/Rcw/default.aspx?cite=49.04 http://apps.leg.wa.gov/Rcw/default.aspx?cite=39.04.370
11. BIDDER RESPONSIBILITY CRITERIA (SUPPLEMENTAL).
A bidder will be deemed not responsible if:
A. the bidder does not meet the mandatory bidder responsibility criteria in SMC
7.06.500 and RCW 39.04.350(1), as amended; or
B. the bidder does not meet the supplemental bidder responsibility criteria as shown in these bid specifications. The bidder may be required by the City to submit documentation demonstrating compliance with the criteria.
If a potential bidder believes that the supplemental bidder responsibility criteria will exclude it from bidding, it may request the City to consider modifying the criteria. Any request shall be submitted to the Purchasing Department no later than five (5) days before the bid opening. The City shall evaluate any such request, and if a decision is made by the City to modify the criteria, the modification shall be communicated to all bidders and plan holders via the issuance of an addendum to the bidding documents. Likewise, in the event the City decides not to modify the criteria, it will endeavor to notify the requesting bidder of its decision.
As evidence that the Bidder meets the supplemental bidder responsibility criteria, the apparent lowest Bidder shall submit to the City within twenty four (24) hours of the notification time the completed supplementary bidder responsibility form with any required documentation. The City reserves the right to request this documentation from other bidders as well, and to request further documentation as needed to assess the bidder’s responsibility.
The basis for evaluation of bidder compliance with the supplemental criteria shall be any documents or facts obtained by the City (whether from the bidder or third parties) which any reasonable owner would rely on for determining compliance. Determinations of responsibility or non-responsibility of a bidder due to the supplemental criteria shall be based on a review of all the supplemental criteria factors as a whole with no single item being determinative.
If the City determines the low bidder does not meet either the mandatory bidder criteria or the supplemental bidder criteria and is therefore not a responsible bidder, the Contracting Agency shall notify the bidder in writing with reasons for the determination. If the bidder disagrees with this determination, it will have a minimum of three (3) business days from receiving the determination to submit additional written information to the City. The City will consider any timely submitted additional information received from the bidder before issuing its subsequent determination. If the bidder disagrees with the City’s subsequent determination it may appeal the determination to the Mayor or designee in writing within two (2) business days of receiving the City’s determination. If the final appeal affirms that the bidder is not responsible, the City will not execute a contract with any other bidder until at least two (2) business days after the bidder determined to be not responsible has received the final determination.
12. REJECTION OF BIDS.
The City reserves the right to reject any or all bids, to waive minor deviations from the specifications, to waive minor informalities in bidding, whenever it is in the City's best interest, and to accept or reject all or part of this Request for Bids, at the prices shown.
13. CONTRACTOR REGISTRATION.
The City is prohibited from executing a contract with a contractor who is not registered or licensed as required by state law.
14. EXECUTION OF CONTRACT.
Within ten (10) days of contract award, the Contractor shall sign and return to the City an executed copy of the contract and payment/performance bonds and approved evidence of insurance unless otherwise mutually agreed by the City and Contractor.
15. PUBLIC WORKS REQUIREMENTS.
The scope of work for this project constitutes a public work under state law. Bidders are warned to take into consideration statutory legal requirements, particularly, the payment of prevailing wages, payment/performance bonds and sales tax implications in making their bids.
16. CONTROLLING ORDER OF DOCUMENTS.
If there are conflicts in the specifications and the terms of this Request for Bids, the controlling order of documents is listed below:
1. Addenda
2. Proposal Form
3. Attachment 1 – Paw Park Bid Drawings
17. ELECTRONIC BID INSTRUCTIONS.
Bidders must go online to the City’s Bidding Portal (https://spokane.procureware.com) to submit bid prices and other documentation as requested. Bidders are asked to read the Welcome Screen and register if they have not done so previously. Once on the bidding portal, follow the steps below to enter the electronic bid:
I. Click on “Bids” located on the left hand column.
II. Find the applicable project and click the “Project Number”.
III. Click on the “Response” tab.
IV. In the “Questions” tab, upload required scanned documents into the bid portal by clicking on “Browse” for each item.
V. Click on the “Pricing” tab and enter pricing as requested. A “Comment” field is available if needed.
VI. Once both the Questions and Pricing information has been entered, the yellow
“Question Response and Pricing Response” information message will change from incomplete to complete. Then the “Submit” button will become available.
VII. Click the “Submit Bid” button and review the terms and conditions, popup window that appears. If you agree to the terms and conditions, click the “I Accept and Submit this Bid” button.
VIII. If you want to remove your bid, click the red “Withdraw Bid” button in the “Response” tab for the appropriate bid.
SCOPE OF WORK
1. PERFORMANCE.
The Contractor will do all work, furnish all labor, materials, tools, construction equipment, transportation, supplies, supervision, permits, organization and other items of work and cost necessary for the proper execution and completion of the RIVERFRONT PARK PAW PARK DOG PARK DEVELOPMENT as described in the attached drawings.
2. ATTACHMENTS.
1. Attachment 1 – Paw Park Drawings (attached)
2. Terms & Conditions
3. Bid Bond Form
4. Subcontractor Form
3. SCOPE OF WORK.
• Base Bid: Construction of approximately 0.8 acre dog within an existing landscaped portion of Riverfront Park, including but not limited to the removal of the existing landscape surface, grading & drainage, installation of new concrete plaza & pedestrian space, new fencing, new artificial surface turf and base, irrigation system & control upgrades, new domestic water supply & drinking fountain, and new fixtures, furnishings & landscaping.
THESE NEXT THREE PAGES MUST BE COMPLETED AND UPLOADED INTO THE CITY OF SPOKANE’S ELECTRONIC BIDDING SYSTEM AND INFORMATION MUST BE SUBMITTED ONLINE PER INSTRUCTIONS TO BIDDERS
PARAGRAPH #16.
BID PROPOSAL
To: Honorable Mayor
Members of the City Council City of Spokane, Washington
PROJECT: PW ITB #6632-26 Riverfront Park Paw Park Dog Park Development
BIDDER'S DECLARATION.
The undersigned bidder certifies that it has examined the site, read and understands the specifications for the above project, and agrees to comply with all applicable federal, state and local laws and regulations. The bidder is advised that by signature of this bid proposal it has acknowledged all bid requirements and signed all certificates contained herein.
BID OFFER.
The price(s) listed in this bid proposal is tendered as an offer to furnish all labor, materials, equipment and supervision required to complete the proposed project in strict accordance with the contract documents. The bidder proposes to do the project at the following price:
BASE BID: $__________________________
Total base bid (no tax)
WASHINGTON STATE RETAIL SALES TAX (9.1%): $__________________________ _
(WAC 458-20-170)
TOTAL (BASE BID + TAX): $__________________________
The Owner reserves the right to accept or reject any or all bid prices within sixty (60) days of the bid date.
ADDENDA.
The undersigned acknowledges receipt of addenda number(s) _____________ and agrees that their requirements have been included in this bid proposal.
CONTRACT COMPLETION TIME.
The bidder agrees to start the work under this contract within ten (10) days of the Notice to Proceed and to substantially complete the specified work within 60 working days of notice to proceed or no later than July 1, 2027, whichever is earlier.
LIQUIDATED DAMAGES.
In the event the bidder is awarded the contract and fails to complete the work within the time limit or any agreed upon time extensions, liquidated damages shall be paid to the City of Spokane in the amount of SIX HUNDRED SEVENTY-FIVE DOLLARS ($675.00) per calendar day until the work is substantially completed and accepted by owner for public use.
BIDDER RESPONSIBILITY.
Washington State Contractor’s Registration No. _____________________________________ (must be in effect at time of bid submittal)
U.B.I. Number ________________________________________________________________
Washington Employment Security Department Number _______________________________
Washington Excise Tax Registration Number _______________________________________
City of Spokane Business License Number _________________________________________ (The successful bidder and all subcontractors shall be licensed or have applied for a license to do business in the City of Spokane prior to proceeding with the proposed project.)
BID SECURITY.
A bid security in the amount of FIVE PERCENT (5%) of the total project bid as indicated above, is attached to this bid proposal. If the bidder is awarded the contract and fails to enter into a construction contract and/or furnish payment / performance bond(s) and proof of insurance within the required time period, the bid security shall be forfeited to the City of Spokane.
NON-COLLUSION.
The undersigned authorized representative of the undersigned firm, being first sworn on oath, certifies that the firm has not, directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this bid proposal is submitted.
The undersigned Bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date for this Project, the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.
I certify (or declare) under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct.
Name of Bidder:
Signature of Bidder's Authorized Representative
Title
Address
Phone
IF INDIVIDUAL
Signed and Sworn To (or Affirmed) Before Me On date
(Seal Or Stamp) _________________________________________ Signature of Notary Public
My appointment expires _____________________
IF PARTNERSHIP
I certify that I know or have satisfactory evidence that the above named person signed this bid proposal, on oath stated that he/she was authorized to sign it and acknowledged it as the partner(s) of the bidder, a partnership, to be the free and voluntary act of such party for the uses and purposes herein mentioned.
IF CORPORATION
I certify that I know or have satisfactory evidence that the above named person signed this bid proposal, on oath stated that he/she was authorized to sign it and acknowledged it as the representative of the bidder, a corporation, to be the free and voluntary act of such party for the uses and purposes herein mentioned.
THIS FORM MUST BE COMPLETED AND UPLOADED INTO THE CITY OF SPOKANE’S
ELECTRONIC BIDDING SYSTEM.
SUBCONTRACTOR LIST
PROJECT NAME: PW ITB #6632-26 Riverfront Park Paw Park Dog Park Development
IMPORTANT: REFER TO SECTION 5.2.1 OF THE SUPPLEMENTAL CONDITIONS FOR
INSTRUCTIONS ON COMPLETING THE SUBCONTRACTOR LIST (use additional pages if necessary):
CONTRACTOR/SUPPLIER _____________________________________________________
TYPE OF WORK/BID ITEM _________________________________________________
AMOUNT _______________________________________________________________
CONTRACTOR'S REGISTRATION NO. _______________________________________
CONTRACTOR/SUPPLIER _____________________________________________________
TYPE OF WORK/BID ITEM _________________________________________________
AMOUNT _______________________________________________________________
CONTRACTOR'S REGISTRATION NO. _______________________________________
CONTRACTOR/SUPPLIER _____________________________________________________
TYPE OF WORK/BID ITEM _________________________________________________
AMOUNT _______________________________________________________________
CONTRACTOR'S REGISTRATION NO. _______________________________________
CONTRACTOR/SUPPLIER _____________________________________________________
TYPE OF WORK/BID ITEM _________________________________________________
AMOUNT _______________________________________________________________
CONTRACTOR'S REGISTRATION NO. _______________________________________
_________ NO SUBCONTRACTORS WILL BE USED ON THIS PROJECT
MINORITY AND WOMEN’S BUSINESS ENTERPRISE GOALS
The City of Spokane has established laudatory goals for the procurement of supplies, materials and services, or for subcontracting work for this project from Minority Business Enterprises (MBE) and Women's Business Enterprises (WBE) as follows:
EITHER MBE OR WBE OR A COMBINATION OF BOTH IN THE AMOUNT OF
THREE PERCENT (3%) OF THE TOTAL PROJECT BID AMOUNT
The current list of the Washington State Office of Minority and Women's Business Enterprises shall be used for all public works construction projects administered by the City.
ACHIEVEMENT OF THE ABOVE GOALS IS ENCOURAGED. WHETHER OR NOT THE
BIDDER ATTAINS THE ABOVE SPECIFIED GOALS WILL NOT BE USED TO DETERMINE
THE RESPONSIVENESS OF THE BIDDER'S BID PROPOSAL.
The bidder shall take the following affirmative steps in considering award of subcontracts to the fullest extent possible to qualified minority and women owned businesses:
(1) including qualified minority and women's businesses on solicitation lists;
(2) insuring that minority and women's businesses are solicited whenever they are potential sources;
(3) dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation of minority and women's businesses;
(4) establishing delivery schedules, where requirements of the work permit, which will encourage participation of minority and women's businesses;
(5) using the services and assistance of the Small Business Administration and the
Washington State Office of Minority and Women's Business Enterprise as appropriate.
MINORITY AND WOMEN'S BUSINESS ENTERPRISE UTILIZATION
The bidder has contacted minority and women's business enterprises (MBE/WBE) and, if the successful bidder on this project, it may award subcontracts to or enter into supply agreements with the following firms as indicated (use additional sheets if necessary):
NAME OF MBE/WBE* IDENTIFICATION & VALUE OF
WA. STATE CERTIFICATION NO. SUBCONTRACTS / SUPPLIES
MINORITY BUSINESS
SUBCONTRACTING GOAL $____________ MBE TOTAL $ __________
WOMEN'S BUSINESS
SUBCONTRACTING GOAL $____________ WBE TOTAL $ __________
COMBINATION GOAL: $____________ MBE/WBE TOTAL $__________
*Designate MBE or WBE
Mr./ Mrs./ Ms. _______________________________________ has been designated as the liaison officer for the administration of the dollar value of contract work to be performed by MBE/WBE firms.
THIS PAGES MUST BE COMPLETED AND UPLOADED INTO THE CITY OF SPOKANE’S
ELECTRONIC BIDDING SYSTEM.
BID BOND
We, _ as Principal, and ________________________________________________________________ as Surety, are held and firmly bound unto the CITY OF SPOKANE, a Washington State municipal corporation, in the penal sum of FIVE PERCENT (5%) OF THE TOTAL AMOUNT BID, for the payment of which we jointly and severally bind ourselves, and our legal representatives and successors.
THE CONDITIONS OF THE OBLIGATION are that if the City of Spokane shall make timely award to the Principal for the
Riverfront Park Paw Park Dog Park Development according to the terms of the bid made by the Principal; and the Principal shall, within the specified time, enter into a contract with the City of Spokane and furnish bond(s) acceptable to the City, if required, then this obligation shall be null and void; otherwise it shall remain in full force and effect; but in no event will the surety's liability exceed this bond's face amount.
SIGNED AND SEALED on
AS PRINCIPAL
By: ________________________________
Title: ______________
A valid POWER OF _________________________________________ ATTORNEY must AS SURETY accompany this bond.
By:
Attorney in Fact
AIA DOCUMENT A201
“GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION”
By reference, the printed document “General Conditions of the Contract for Construction, AIA Document A201, 2007edition, is hereby included and shall be part of the Contract Documents. Copies of AIA Document A201 are available for review at the offices of the Owner. Copies may also be purchased from the American Institute of Architects or its local distributor.
SUPPLEMENTARY GENERAL CONDITIONS OF THE CONTRACT
The following supplements modify the "General Conditions of the Contract for Construction," AIA Document A201, 2007. Where a portion of the General Conditions is modified or deleted by these Supplementary Conditions, the unaltered portions of the General Conditions shall remain in effect.
ARTICLE 1 - GENERAL PROVISIONS
1.1 BASIC DEFINITONS
1.1.1 Change the last sentence in paragraph 1.1.1 to read:
The Contract Documents include Request for Bids, Instructions to Bidders, Bid Proposal
Forms, Bid Bond, Performance Bond, Payment Bond and Contractor’s Bid.
1.1.1 Add the following to paragraph 1.1.1:
It shall be the responsibility of the Contractor and each subcontractor to appraise themselves of all conditions, limitations and requirements of these documents which are considered a part of each section of each division of this specification as if printed therein.
1.1.1.2 Add a subparagraph 1.1.1.2 to read:
Should conflict occur in or between drawings and specifications, Contractor is deemed to have estimated the more expensive way of doing work unless he asked for and obtained written decision by addenda as to which method or materials will be required.
1.1.1.3 Add a subparagraph 1.1.1.3 to read:
Where the word "similar" occurs on drawings, it shall be used in its general sense and not as meaning identical, and all details shall be worked out in relationship to their location and their connection to other parts of the work.
1.1.1.4 Add a subparagraph 1.1.1.4 to read:
Where used in conjunction with the Architect's response to submittals, requests, applications, inquiries, reports and claims by the Contractor, the meaning of the term
"approved" will be held to the limitations of the Architect's responsibilities and duties as specified in the Conditions of the Contract. In no case will "approval" by the Architect be interpreted as an assurance to the Contractor that the requirements of the contract documents have been fulfilled.
1.1.5 Add the following to paragraph 1.1.5
Where on any drawings a portion of work is drawn out and remainder is indicated in outline, the drawn out parts shall apply also to other like portions of the work. Where detail is indicated by starting only, such details shall be continued throughout the courses or parts in which it occurs and shall also apply to all other similar parts in the work unless otherwise indicated.
Drawings are in general diagrammatic and do not necessarily show complete details of the work, or materials, and do not necessarily show the construction sequence that may affect the Contractor means and methods. The Contractor shall coordinate to sequence the parts to a completed whole.
1.1.6 Add the following to paragraph 1.1.6:
These specifications are of the abbreviated or "streamlined" type and frequently include incomplete sentences. The word "product" includes materials, systems and equipment. The word "selected" means "selected by the Architect". The word "coordinate" means "satisfactorily combine the work of all trades for a complete and operating installation."
Words such as "shall", "the Contractor shall", "shall be", and similar mandatory phrases shall be supplied by inference in the same manner as they are in a note on the drawings. The Contractor shall provide all items, articles, materials, and operations listed, including all labor, materials, equipment and incidentals required for their completion.
1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS
1.2.1 Add a subparagraph 1.2.1 to read:
Conflicts in the documents shall be brought to the Architect's attention. In the event of conflicts or discrepancies among the contract documents, interpretations will be made by the Architect in accordance with this principle of complementary relationship among documents, with reference to the following priorities if necessary to reach a conclusion:
a. Modifications.
b. Agreement.
c. National, State and Local Codes and Ordinances.
d. Supplementary Conditions.
e. General Conditions of the Contract for Construction.
f. Project Manual and any Addenda. Addenda of later date take precedence over those of earlier date.
g. Drawings. Drawings of larger scale and greater detail take precedence over drawings of smaller scale and less detail.
1.2.2 Add the following to Paragraph 1.2.2:
Such organization shall not operate to make the Architect an arbiter to establish subcontract limits between Contractor and Subcontractor.
1.2.4 Add a subparagraph 1.2.4 to read:
Conditions of the Contract shall be read by all prime contractors and by each subcontractor or sub-subcontractor and shall be considered a part of each section of the Technical Specifications. Provisions of Contract Documents are binding on the contractors, subcontractor and sub-subcontractors for all work shown or indicated on the original Contract Documents plus any additional work authorized by change order, interpretation or field orders.
1.2.5 Add a subparagraph 1.2.5 to read:
The Contractor shall notify the Architect of any condition he finds where, in his judgment, it will be desirable to modify the requirements to produce the best results. If the Contractor fails to make such request, it is deemed to have accepted the specified and/or detailed method of installation as being adequate to produce first class, satisfactory work. Should conflict occur in or between drawings and specifications, the Contractor is deemed to have estimated on the more expensive way of doing the work unless it shall have asked for, and obtained a written decision seven (7) calendar days before submission of proposal as to which method or materials will be required. Manufacturer's equipment specifications are based on models and/or construction and installation methods prevailing at the date of invitation and/or advertisement to submit to manufacturer's model and/or construction changes and other variations from the items specified shall be furnished and installed at no additional cost to Owner.
1.2.6 Add a subparagraph 1.2.6 to read:
Requests by the Contractor for written interpretations and/or detail drawings shall be made to the Architect in a timely manner such as will allow ample time for their preparation and delivery without causing delays in the work. Failure of the Contractor to request needed clarifications and/or its proceeding with affected work prior to receiving same shall indicate its acceptance of any and all costs and/or delays required on account of necessary corrections.
ARTICLE 2 - OWNER
2.1 GENERAL
2.1.1 Add a new sentence to read:
The Owner is the City of Spokane, Washington.
2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER
2.2.5 Delete subparagraph 2.2.5 and replace with:
The Contractor will be furnished free of charge three (3) copies of drawings and project manuals. Unless otherwise agreed, additional sets will be furnished at the cost of reproduction, postage and handling.
ARTICLE 3 - CONTRACTOR
3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR
3.2.1 Add the following to subparagraph 3.2.1:
If the Contractor observes any errors, discrepancies or omissions in the Contract
Documents, it shall promptly notify the Architect, requesting clarification. If the Contractor proceeds with Work affected by such errors, discrepancies or omissions without receiving such clarification, it does so at its own risk. Any adjustments involving such circumstances made by the Contractor, prior to approval by the Architect, shall be at the Contractor's risk and the settlement of any complications or disputes arising therefrom shall be at the Contractor's sole expense.
3.3 SUPERVISION AND CONSTRUCTION PROCEDURES
3.3.4 Add a subparagraph 3.3.4 to read:
The Contractor shall be solely responsible for any claims for wages or compensations by the Contractor's employee, agents, representatives, including subcontractors.
3.3.5 Add a subparagraph 3.3.5 to read:
All grades, levels, bench marks, locations and corners shall be correctly verified by the
Contractor.
3.3.6 Add a subparagraph 3.3.6 to read:
In accordance with RCW 39.06.020, the Contractor must verify responsibility criteria for each first tier subcontractor, and a subcontractor of any tier that hires other subcontractors must verify responsibility criteria for each of its subcontractors. Verification shall include that each subcontractor, at the time of subcontract execution, meets the responsibility criteria listed in RCW 39.04.350(1) and possesses an electrical contractor license, if required by chapter
19.28 RCW, or an elevator contractor license, if required by chapter 70.87 RCW. This verification requirement, as well as the responsibility criteria, must be included in every public works contract and subcontract of every tier.
3.4 LABOR AND MATERIALS
3.4.1 Add the following to subparagraph 3.4.1:
The Contractor shall be solely responsible for all materials and equipment until the completed project is delivered and accepted by the Owner. The Contractor shall, at its own expense, secure and maintain a storage area for his materials and equipment."
http://apps.leg.wa.gov/rcw/default.aspx?cite=39.04.350 http://apps.leg.wa.gov/rcw/default.aspx?cite=19.28 http://apps.leg.wa.gov/rcw/default.aspx?cite=70.87
3.4.2 Add the following to subparagraph 3.4.2:
After the Contract has been executed the Owner and the Architect will consider a formal request for the substitution of products in place of those specified only under the following conditions set forth in the General Requirements (Division 1 of the Specifications).
a. Required product cannot be supplied in time for compliance with Contract time requirements.
b. Required product is not acceptable to governing authority, or determined to be non-compatible, or cannot be properly coordinated, warranted, or insured, or has other recognized disability as certified by Contractor.
c. Substantial advantage is offered Owner after deducting offsetting disadvantages including delays, additional compensation to Architect for redesign, investigation, evaluation, and other necessary services, and similar considerations.
By making requests for substitutions based on the above paragraph, the Contractor:
a. represents that it has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified;
b. represents that it will provide the same warranty for the substitutions as it would have for the product specified;
c. certifies that the cost data presented is complete and includes all related costs for the substituted product and for Work that must be changed as a result of the substitution, except for the Architect's redesign costs, and waives all claims for additional costs related to the substitution which subsequently become apparent; and
d. will coordinate the installation of the accepted substitute, making such changes as may be required for the work to be complete in all respects.
3.5 WARRANTY
3.5 Revise the third sentence to read:
Work not conforming to these requirements, including substitutions not properly approved and authorized, shall be considered defective.
Revise the last sentence to read;
The Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.
3.5.1 Add a subparagraph 3.5.1 to read:
The Contractor guarantees all work, labor and materials for one (1) year following final acceptance of the Work. If any unsatisfactory condition or defect develops within that time, the Contractor shall immediately place the Work in a satisfactory condition and repair all damage caused by the condition or defects at its sole expense. This guarantee does not apply to Work which has been abused or neglected by the Owner. This guarantee shall be separate from and in addition to any more extensive warranty requirements specified for certain elements and products used in the Work.
3.6 TAXES:
3.6.1 Add a subparagraph 3.6.1 to read:
The Washington Department of Revenue has issued special rules designed to assist the
Contractor in accurately reporting to the Department of Revenue the Contractor’s tax liability.
Although the Owner may furnish information in the specification regarding the application of state taxes to a particular contract or bid item, it shall be the Contractor’s responsibility as to the correct interpretation of the laws and regulations relating to such taxes. Adjustments will not be made in the amount to be paid by the Owner under the contract because of any misunderstanding by the Contractor as to the Contractor’s liability for, or the amount of, any taxes. If the Contractor is in doubt as to the tax procedures in any particular case, the Contractor shall consult with the Washington State Department of Revenue.
3.6.2 Add a subparagraph 3.6.2 to read:
The contract sum and any agreed variations thereof shall include all taxes imposed by law, and properly chargeable to the project except Sales Tax. Sales Tax applicable to the contract sum will be collected from the Owner and shall be paid to the State Department of Revenue by the Contractor in conformance with the law. State of Washington Sales Tax shall not be included in the bid price, except that the retail sales tax upon sales and rentals to prime contractors and subcontractors of tools, machinery and equipment, and consumable supplies, such as hand and machine tools, cranes, air compressors, bulldozers, lubricating oil, sandpaper and form lumber which are primarily for use by the Contractor rather than for resale as a component part of the finished structure, shall be included in the bid price. (WAC-458-20-170).
3.7 PERMITS, FEES AND NOTICES
3.7.1 Add the following to subparagraph 3.7.1:
Below is a list of permits that may be required on typical projects, and where they may be obtained. The list is included for the Contractor’s benefit and is not considered exhaustive.
Note that the Northside Landfill is in the City of Spokane. The Southside Landfill is in Spokane County.
City Business License, Taxes and Licenses 625-6070 Hydrant Permit, Hydrant Foreman 625-7800 Hydrant Permit, Engineering Services 625-6300 NOI/Construction Stormwater Permit, Department of Ecology (360) 407-6467
3.7.6 Add a subparagraph 3.7.6 to read:
The Contractor and every subcontractor (and suppliers when legally required) shall obtain a
City business license prior to beginning their work.
3.7.7 Add a subparagraph 3.7.7 to read:
The Contractor shall pay for the use of municipal or private property for storage of materials, parking, temporary obstructions, enclosures, opening and patching of streets, etc., off of the property arising from construction and completion of work. The Contractor shall furnish to the Owner and the Architect no later than the preconstruction conference the permit numbers for mechanical, electrical, plumbing and any other required permits that must be obtained through governing agencies.
3.9 SUPERINTENDENT
3.9.1 Delete subparagraph 3.9.1 and replace with:
The Contractor shall employ a competent superintendent and necessary assistant who shall be in attendance at the Project site during the progress of the Work. The superintendent shall be satisfactory to the Owner and the Architect and shall not be changed except with the consent of the Owner and the Architect, which shall not be unreasonably withheld, unless the superintendent proves to be unsatisfactory to the Contractor and ceases to be in his employ. The superintendent shall represent the Contractor and all communication given to the superintendent shall be as binding as if given to the Contractor. Important communications will be confirmed in writing. Other communications will be so confirmed on written request in each case.
3.9.4 Add a subparagraph 3.9.4 to read:
Contractor shall be responsible to fully inform its superintendent of all project progress, problems, decisions, changes, and deficiencies as they happen.
3.11 DOCUMENTS AND SAMPLES AT THE SITE
3.11.1 Add a subparagraph 3.11.1 to read:
Record drawings shall be kept clean, and notations shall be made using clear, concise drafting techniques acceptable to the Architect.
The Contractor shall also maintain at the site for availability of the Owner and/or Architect one copy of all inspection reports and other written communications from the Architect and/or subcontractors, other prime contractors, materials suppliers, etc.
3.18 INDEMNIFICATION
3.18.2 Add the following to subparagraph 3.18.2:
The Contractor recognizes that this waiver was specifically entered into pursuant to the provisions of RCW 4.24.115 and was the subject of mutual negotiation.
ARTICLE 4 - ADMINISTRATION OF THE CONTRACT
4.2 ADMINISTRATION OF THE CONTRACT
4.2.1 Add the following to subparagraph 4.2.1:
If the Owner has not designated an Architect to provide Contract Administration, the word
“Architect” shall be read as the Owner’s Representative.
ARTICLE 5 - SUBCONTRACTORS
5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE
WORK
5.2.1 Delete subparagraph 5.2.1 and replace with:
The Bidder shall at time of bid opening submit the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performances of the work. The Bidder shall not list more than one subcontractor for each category of work identified, unless the subcontractors vary with bid alternates, in which case the Bidder must indicate which subcontractor will be used for which alternate. As circumstances change during the Work, the Contractor shall submit the names of all person or entities (including those who are to furnish materials or equipment fabricated to a special design).
Not later than seven (7) days after the date of Notice to Proceed, the Contractor shall furnish in writing to the Owner through the Architect the names of persons or entities proposed as manufacturers for each of the products identified in the General Requirements (Division 1 of the Specifications) and, where applicable, the name of the installing subcontractor.
The Contractor shall submit as part of the bid, the names of the subcontractors with whom the bidder, if awarded the contract, will subcontract for performance of the work of HVAC (heating, ventilation and air conditioning); plumbing as described in chapter 18.106 RCW;
and electrical as described in chapter 19.28 RCW; or to name itself for the work. The prime contract bidder shall not list more than one (1) subcontractor for each category of work identified unless subcontractors vary with bid alternates, in which case the prime contract bidder must indicate which subcontractor will be used for which alternate. Failure of the prime contract bidder to submit as part of the bid the names of such subcontractors or to name itself to perform such work or the naming of two (2) or more subcontractors to perform the same work shall render the prime contract bidder’s bid nonresponsive and, therefore, void.
5.3 SUBCONTRACTUAL RELATIONS
5.3.1 Add a subparagraph 5.3.1 to read:
It is the responsibility of any subcontractor whose work must be applied or installed on or within work of other trades to examine conditions affecting its work. The subcontractor should notify the Contractor, in writing, with copy to the Architect, of any unsuitable or improperly prepared surfaces or conditions. Commencing work or absence of notification in writing constitutes acceptance of surfaces or conditions by a subcontractor, and it will be its responsibility to correct any defect in its work appearing thereafter.
ARTICLE 7 - CHANGES IN THE WORK
7.1 GENERAL
7.1.4 Add a new subparagraph 7.1.4 to read:
The combined overhead and profit included in the total cost to the Owner for a change in the
Work shall be based on the following schedule:
a. For Contractor, for any work actually performed by Contractor’s own forces, fifteen percent
(15%) of the direct cost of material and labor up to $50,000 or ten percent (10%) of direct costs of changes exceeding $50,000.
b. For Contractor, for any work performed by its subcontractor(s), eight percent (8%) of the amount due each subcontractor up to $50,000 or six percent (6%) of the cots due each subcontractor for costs exceeding $50,000.
c. For each subcontractor (including lower tier subcontractors), for any work actually performed by its own forces, fifteen percent (15%) of the direct cost of materials and labor up to $50,000 or ten percent (10%) of direct costs of changes exceeding $50,000.
d. For each subcontractor, for any work performed by its subcontractor(s) of any lower tier, eight percent (8%) of the amount due the sub-subcontractor up to $50,000, or six percent (6%) of the costs due each subcontractor for costs exceeding $50,000.
7.2 CHANGE ORDERS
7.2.2 Add a subparagraph 7.2.2 to read:
Any Change Order prepared, shall constitute a final and full settlement of all matters relating to or affected by the change in the Work, including, but not limited to, all direct, indirect, and consequential costs associated with the change and any and all adjustments to the Contract Sum and Contract Time. In the event a Change Order increases the Contract Sum, the Contractor shall include the work covered by such Change Order in the Application for Payment as if such work were originally part of the Project and Contract Documents.
7.2.3 Add a subparagraph 7.2.3 to read:
Contractor shall promptly respond to Change Order request for proposal within fifteen (15) days or such longer period as may be mutually acceptable for complex changes.
7.2.4 Add a subparagraph 7.2.4 to read:
The Contractor shall provide a cost breakdown for all adjustments in the contract sum, i.e.
Change Orders, Proposals, and Construction Change Directives.
7.3 CONSTRUCTION CHANGE AUTHORIZATION
7.3.6 Revise the last sentence in subparagraph 7.3.6 to read:
Such agreement shall be effective immediately and shall be incorporated into a future
Change Order.
7.3.11 Add a subparagraph 7.3.11 to read:
Overhead is defined as costs for all noncraft labor, temporary construction facilities, field engineering, schedule updating, as-built drawings, home office cost, B&O taxes, office engineering, estimating costs, small tools, safety, insurance and any other cost incidental to the change in the Work.
ARTICLE 8 - TIME
8.3 DELAYS AND EXTENSIONS OF TIME:
8.3.1 Delete paragraph 8.3.1 and replace with:
If the Contractor is delayed at any time in the commencement or progress of the Work by an act or neglect of the Owner or Architect, or of an employee of either, or of a separate contractor employed by the Owner, or by changes ordered in the Work, or by labor disputes, fire, unavoidable casualties or other causes beyond the contractor’s control, or by delay authorized by the Owner pending mediation and arbitration or by other causes which may justify delay as determined both by the Architect and Owner, then the Contract Time shall be extended by Change Order for such reasonable time.
8.3.4 Add a subparagraph 8.3.4 to read:
The Contract time shall be adjusted only for changes in the work pursuant to Article 7, and excusable delay pursuant to this Paragraph 8.3 as determined by the Architect. In the event the Contractor requests an extension of the contract time, it shall furnish the justification and supporting evidence as the Architect may deem necessary for a determination as to whether the Contractor is entitled to an extension of…
This is the start of the file's text. The full file is on GovTribe.