This is a Request for Quote (RFQ) issued by Pioneer Valley Performing Arts Charter Public School (PVPA), a Massachusetts public charter school located in South Hadley, for construction services to renovate two interior art spaces to improve arts curriculum instruction. The base scope of work involves removing the inner wall dividing music rooms 201 and 203 to create one larger music room, patching affected walls and ceiling grids, and removing the door and frame from room 201 into the hallway with finishing work. The project also includes removing inner walls and doors between theatrical spaces 132, 134, and 136 with ceiling grid patching. The Add-Alternate Quote requires re-centering and aligning ceiling grids in all spaces with associated electrical, sprinkler, HVAC, and other alterations, with the contractor bearing all additional costs. The RFQ was made available on May 20, 2026; facility walkthroughs were scheduled for June 3, 2026 at 3:30 PM; contractor questions were due by June 5, 2026 at 2 PM; responses to questions and addenda were provided by June 8, 2026; quote submissions were due by June 11, 2026 at 2 PM via email; and award notification was planned for no later than June 15, 2026. The anticipated project start date is June 29, 2026, with completion required by July 31, 2026.
Compensation is structured as a fee-for-service arrangement based on contractor completion of approved services, with payments made within 30 days of invoice submission and no advanced payments. All permitting, inspections, dust and floor protections, and debris removal must be included in the quote. Prevailing wage rates apply to this project, as specified in Appendix A with detailed wage classifications and effective dates. Contractors must demonstrate 3 to 5 years of commercial contracting experience, ample documented experience with public school projects, and provide three professional references including school references where possible. A letter of financial stability from the contractor's financial institution and evidence of required insurance coverage, including worker's compensation and employer's liability with minimum limits of $1,000,000 per occurrence, must be submitted prior to contract execution. The contractor must ensure all identified key personnel remain on the project and maintain 24-hour emergency availability. If the contract exceeds $25,000, a Payment Bond of at least 50 percent of the contract price is required within ten days of award notification. Late bids may be deemed non-responsive, and PVPA reserves the right to reject any or all bids and make awards in the school's best interest.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTE
Pioneer Valley Performing Arts Charter Public School is inviting quotes for the renovation of two art spaces within our school.
Prepared May 4, 2026 Proprietary and confidential
Pioneer Valley Performing Arts Charter Public School (PVPA) is a Massachusetts public charter school located at 15 Mulligan Drive, South Hadley, MA 01075. PVPA, started in 1996, is a regional school that serves students in Franklin, Hampshire, and Hampden counties. The current enrollment is 400+ students who come to PVPA from over 60 cities and towns. PVPA offers its students intensive exposure to the performing arts within the context of an excellent college preparatory curriculum.
Schedule of Events
The quote will be made available Wednesday, May 20, 2026 Facility job walkthrough (Recommended) Wednesday, June 3, 2026 @ 3:30 pm Contractor questions submitted (via email) no later than Friday June 5, 2026, by 2 pm Responses to questions & any addenda Monday, June 8, 2026 Deadline for Quote submission (via email preferred) Thursday, June 11, 2026, by 2 pm Quote acceptance notification to the contractor no later than Monday, June 15, 2026 Anticipated projected start date. Monday, June 29, 2026 Completion by Friday, July 31, 2026
The dates stated are estimated time frames supplied only as a courtesy to the contractors. These dates may change and are not binding. Late bids may be deemed non-responsive. If PVPA Charter Public School is closed at the scheduled bid submission deadline, the deadline will be postponed until the next regular business day.
All questions and quotes are preferred to be sent via email:
Scope of Work-Related Questions Contractual-Related Questions
John P. Kulas Marcy Conner PVPA Facilities Manager PVPA Chief Financial Officer Phone: (413) 552 – 1580 ext. 125 Phone: (413) 552 - 1591 Fax: (413) 552 – 1594 Fax: (413) 552 - 1594 Email: jkulas@pvpa.org Email: mconner@pvpa.org
Base Quote $__________________
Add-Alternet Quote $__________________
Any Additional Quote Information
The above quotation is hereby submitted for consideration of the award.
(Good Faith Form)
The undersigned states under penalty of perjury that this Proposal is made and submitted in good faith, without fraud, collusion, or any connection of any kind with any other person for the same work; that he has informed himself fully in regard to the specifications and forms attached; and that he has made his own examinations and estimates and from them makes this Bid/Quote. As used in this certification, the word “person” shall mean any natural person, business, partnership, corporation, union, committee, club, or other organization, entity, or group of individuals.
The undersigned understands that the Awarding Authority is the Pioneer Valley Performing Arts Charter Public School which reserves the right to make no award, to reject any or all Bids/Quotes, to call for new Bids/Quotes if necessary, or to award to other than the lowest responsible, responsive Bidder/Quoter if it is in the best interest of the Pioneer Valley Performing Arts Charter Public School to do so and to waive any informalities in the bid/quote procedure.
FIRM NAME: __________________________________________ DATE:__________________________
REPRESENTATIVE: __________________________________________________________________
REPRESENTATIVE TITLE: ____________________________________________________________
I. PURPOSE / SCOPE
The purpose of this project is to renovate two interior building classroom spaces to provide better arts curriculum instruction to the students of PVPA. All permitting and inspections as required, dust, and floor protections (to include common, elevator, etc. areas), and removal/disposal of all construction materials/debris must be included within the provided quote. Prevailing wage rates shall be applied (Appendix A). All flooring and electrical work (both demolition and new work) for the base quote will be coordinated and carried by other contractors that will be secured by PVPA. The contractor shall provide and carry/hold a $ value for the Add-Alternate Quote within this RFQ.
Base Quote Information Arts music space 201 & 203: Remove the inner recording studio (rm. 203) wall that divides 201/203, making one bigger music (201 & eliminating 203) room. Keep the back office (205) walls and doors. Removed walls and door depicted in the image below, highlighted in pink.
➢ All electrical, data, phone, and life safety notifications within walls will be disengaged before demolition of the wall.
➢ The door and door frame 201 into the hallway will be removed and framed/sealed/finished back in (Paint and cove base to be done by others).
➢ Patch any walls affected by demo work
➢ Patch ceiling grid at demolished wall locations (please note grid within classrooms may not align, and a soffit may be required.
Arts theatrical space 132, 134, & 136:
➢ All electrical, data, phone, and life safety notifications within walls will be disengaged before demolition of the wall.
➢ Remove the inner walls and door between 132, 134, & 136. Removed walls & door depicted in the image below, highlighted in pink.
➢ Patch ceiling grid at demolished wall locations (please note grid within classrooms may not align, and a soffit may be required.
Add-Alternate Quote Information Arts music space 201 & 203 + Arts theatrical space 132, 134, & 136: Same as base quote but re-center/align ceiling grid in all above new spaces
➢ May require some electrical, sprinkler, HVAC, or other alterations.
➢ The contractor must provide a quote and carry/hold all additional costs for this work.
II. METHOD OF COMPENSATION UNDER THE CONTRACT
The method of compensation under this Contract will be "fee for service," based on the Contractor’s completion of the services listed in the Scope of Services (Section I) as approved by the School and in accordance with the Contract. Advanced payments shall not be made. Payment is generally made within 30 days subsequent to a Contractor submitting a correctly executed invoice with appropriate backup. No payments shall be made for Massachusetts’ sales tax. Invoices may be submitted no more frequently than monthly for the tasks completed and shall be itemized according to the expense categories in Section I of the contract Scope of Work. Offsets for damages may be deducted by the School.
III. DURATION OF THE CONTRACT
The anticipated duration of the Contract is until all aspects of the proposed job are completed to our satisfaction.
Not to extend past July 31, 2026.
IV. QUALIFICATIONS AND RELATED EXPERIENCE
1. 3 - 5 years of commercial contracting experience.
2. Ample documented experience with public school projects.
3. 3 professional references, including phone numbers and a contact person. (Preferably Schools)
4. Letter of financial stability from the company’s financial institution.
V. ESSENTIAL PERSONNEL
The respondent must provide resumes for essential personnel or subcontractors, with their qualifications clearly specified. Key employees who will have primary responsibility for each of the project tasks must be clearly identified. By submission of this bid, the respondent agrees to ensure that the work is assigned to the identified personnel. In no event will the Contractor be allowed to replace the key personnel so assigned during the Contract unless the School makes a prior determination that the qualifications of the replacement exceed or equal those of the individual being replaced. The contractor will designate an employee who is available 24 hours per day in the case of an emergency. Acceptable CORI forms must be submitted for each identified person working on this project. Any costs associated with orienting new personnel to the project will be borne solely by the Contractor.
VI. GENERAL SPECIFICATIONS
1. WORKMANSHIP:
All work described in these specifications is to be executed in a thoroughly substantial, professional, and workmanlike manner.
2. SCHOOL PROPERTY AND SECURITY:
A. Any damage occurring due to the work or related activities under this contract shall be repaired as soon as possible at the Contractor’s expense and to the satisfaction of the School.
B. The School can neither accept nor assume responsibility for the security of the Contractor’s material or equipment, which is lost, stolen, or vandalized.
C. The Contractor shall confine apparatus and storage of materials to areas directed by the School and shall not unreasonably encumber the premises with materials.
3. SCHEDULING AND COORDINATING:
For the period relevant to this project, the building hours are 7:30 a.m. to 3:30 p.m. All work shall be coordinated through the PVPA Facilities Manager or designated representative.
4. GUARANTIES AND WARRANTY:
The Contractor shall pay to the School all expenses, losses, and damages incurred as a consequence of any defect, omission, negligence, or error by the Contractor’s employees or Subcontractor's employees.
In the event that the same is not paid within 30 days of receipt by the Contractor of notice of such expenses, losses, and damages, then the School may affect payment due to the Contractor.
5. DISCRIMINATION AND SEXUAL HARASSMENT:
A. PVPA Charter Public School does not discriminate on the basis of race, color, national origin, sex, sexual orientation, religion, age, or handicap in admission or access to or treatment or employment in its programs and activities. The Contractor must comply with the terms of the School's policies on sexual harassment issues while carrying out its activities on School property. Copies of the School's harassment policies may be obtained in the School’s Business Office.
B. Non-discrimination in Employment and Affirmative Action: The Contractor shall not discriminate against a qualified employee or applicant for employment because of race, color, national origin, ancestry, age, sex, sexual orientation, religion, veteran status, or disability. The Contractor shall in performance of this contract's affirmative action plan, employ minority and female subcontractors, vendors, and suppliers. The Contractor agrees to comply with all applicable federal, state statutes, rules, and regulations prohibiting discrimination in employment, including Title VII of the Civil Rights Act 1964, the Age Discrimination in Employment Act of 1967, Section 504 of the Rehabilitation act of 1973, the Americans with Disabilities Act of 1990, Massachusetts General Laws, Chapter 151B, all applicable administrative orders and executive orders, and all other applicable federal and state law and by-laws of the town of South Hadley.
6. PROTECTION OF LIVES AND HEALTH:
A. The Contractor shall comply with all Federal, State, and Local laws, ordinances, by-laws, rules, orders, regulations, and codes in the work under this contract.
B. The Contractor shall comply with all Federal, State, and Local laws, ordinances, by-laws, rules, orders, regulations, and codes regarding transporting, handling, storage, removal, and disposal of all flammable, regulated, and/or unregulated materials required for the work covered under this contract and shall be responsible for all associated fees and/or charges.
C. The Contractor shall take all precautions for preventing injuries to persons and property in or about the building, taking into account that there are over 400 students on the site at most times from 7 am to 9 pm.
D. The Contractor shall not permit smoking by employees in the school building or on school grounds, nor allow the use of intoxicating beverages or non-prescription controlled substance drugs inside or outside the building.
E. The contractor shall assume the defense of, indemnify, and save harmless the School, its officers, and employees from all claims relating to labor performed or furnished; of injuries to any person or corporation received or sustained by or from the Contractor, his employees, and/or subcontractors and employees, in performing the work, or in consequence of the use of any improper materials, implements or labor used or employed therein; and to any act, omission or neglect of the Contractor and his/her employees therein engaged.
F. Should the School Administration deem that the Contractor is not abiding by the provisions of this section or that a serious unsafe condition exists which threatens the health, lives, safety, or property of the School community, its teachers, students, or staff, an immediate suspension of operation - without additional expense to the School - may be ordered until such unsafe acts or conditions are corrected.
G. The Contractor’s failure to comply with any of the requirements of this Document / Contract shall be cause for immediate termination of the Contract.
H. The Contractor shall keep itself fully informed of all existing and future, Federal, State, County, and municipal laws, orders, ordinances, by-laws, rules, policies, procedures, and regulations including but not limited to any OSHA regulations and health codes as well as those pertaining to affirmative action, equal opportunity and anti-discrimination as they pertain in any manner affecting those engaged or employed in the work or the materials and equipment used or employed in the work or in any way affecting the conduct of the work, and of all such orders and decrees of bodies or tribunals having jurisdiction or authority over same and all provisions required by law to be made part of this agreement which provisions are hereby incorporated by reference and made part hereof.
I. The Contractor is able to (1) furnish labor that can work in harmony with all other elements of labor employed or be employed in the work; (2) that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish (sic) documentation of successful completion of the said course with the first certified payroll report for each employee; and (3) that all successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration.
8. CONTRACTOR'S LIABILITY INSURANCE:
A. The Contractor agrees to furnish and keep in full force during the term of the agreement workmen's compensation and employer's liability insurance covering all persons employed by the contractor who are engaged in the performance of the services rendered to the School. The Contractor shall include a provision that there will be no right of subrogation against the School in the event of a worker's compensation or liability insurance payment.
The Contractor shall have and maintain without deductibility, Contractor’s Public Liability and Property Insurance and Contractor’s Protective Public Liability and Protective Property Damage Liability Insurance in not less than the following amounts:
A. Worker’s Compensation
1) State Statutory
2) Applicable Federal Statutory
3) Employer’s Liability Each Accident $1,000,000
Disease policy limit $500,000 Disease per employee $100,000
B. Comprehensive General Liability (including Premises Operations: Independent Contractor’s Protective: Products and Completed Operation Broad Form Property)
1) Bodily Injury
a) Each Person $1,000,000
b) Annual Aggregate $1,000,000
2) Property Damage
a) Each Occurrence $1,000,000
b) Annual Aggregate $1,000,000
C. Contractual Liability
1) Bodily Injury
a) Each Occurrence $1,000,000
2) Property Damage
a) Each Occurrence $1,000,000
b) Annual Aggregate $1,000,000
D. Personal Injury with Employment Exclusion deleted
1) Annual Aggregate $1,000,000
E. Comprehensive Automobile Liability
1) Bodily Injury
a) Each Person $1,000,000
b) Each Occurrence $1,000,000
2) Property Damage
a) Each Occurrence $1,000,000
All insurance policies required herein shall contain the following provisions or its equivalent with the same meaning and intent:
“The insurance company waives any right of subrogation and indemnification against Pioneer Valley Performing Arts Charter Public School, its trustees, officers, employees or their agents, or the Commonwealth of Massachusetts which may arise by reason of any payments under this policy.”
Insurance certificates are to be delivered to PVPA Charter Public School Business Office, prior to the start of the contract.
B. The Contractor shall submit to the School, promptly upon contract award, copies of all required insurance certificates to cover all damage to School property or private property and personal injury, including but not limited to student, faculty, staff, or visitor automobiles on campus grounds.
C. The Contractor shall be liable for damage throughout the entire term of the Contract. Upon completion of the contract, the Pioneer Valley Performing Arts Charter Public School may have 60 days after the end of the contract to identify any damages to the School or persons which are identifiable; and after notice to the Contractor, may offset damages from final payment and/or bill the Contractor for such damages.
D. The Contractor will provide evidence, promptly upon contract award, that its employees are covered under an unemployment compensation program.
9. CONTRACT TERMINATION:
The successful contractor will be required to enter into a contract containing the following provisions:
Pioneer Valley Performing Arts Charter Public School reserves the right to terminate this contract with or without cause or if the successful contractor fails to comply with the provisions of the contract. The School reserves the right to terminate any and all parts of this contract specification due to lack of or reduction in financial appropriations that fund this contract.
10. GENERAL PROVISIONS
A. The contractor agrees that upon written direction by the School, setting forth reasonable cause, the Contractor will remove from service under the contract any of its employees.
B. The Contractor shall not subcontract any portion of this contract unless approved in writing by the School.
C. All contract prices shall remain firm for at least sixty (60) days after the closing date and throughout the term of the contract.
D. The Contractor will comply with all prevailing wage requirements, if applicable. See Appendix A.
E. The submitted rates shall include complete costs involved with accomplishing the required work. Product orders FOB destination. The School will make no payments to the vendor/contractor unless covered in the bid/quote.
F. If the respondent takes exception to any of the terms or conditions listed in the specifications, it must be so noted in his/her bid/quote.
G. The School reserves the right to reject any bid/quote that is not in full compliance with the contract specifications; reject any or all bids/quotes wholly or in part; to waive technicalities or minor deviations;
to make awards in a manner deemed in the best interest of the School, and to correct any award or specification erroneously made as a result of a clerical error on the part of the School.
H. Bids/quotes must be made on the forms supplied by the School. Should the respondent find discrepancies in or omissions from the specifications, or shall be in doubt as to their meaning, he/she shall at once notify the School in writing. The School will not be responsible for any oral instructions. In turn, if the School desires, it will notify the other respondents in writing. Any bulletins and/or addenda issued during the time of submission are to be covered in the bid closing the contract thereof.
I. The Contractor shall execute a letter of agreement within ten working days of receipt of notification of contract award from the School.
J. The Contractor agrees to comply with all state and federal immigration laws.
K. Pursuant to M.G.L. c.62C, Section 49A, the Contractor certifies that it has complied with all federal and state tax laws.
L. This bid/quote submittal may be awarded as one full contract or maybe awarded as multiple contracts.
M. If the low bid/quote is significantly higher than the designer’s construction cost estimate, it is the right of the Pioneer Valley Performing Arts Charter Public School to analyze the bid/quote to determine why.
After the bid is analyzed, it is up to the discretion of the Pioneer Valley Performing Arts Charter Public School to either continue with the awarding process or wait and quote again at a later time.
N. If the bid/quote exceeds $25,000, then the contractor, within ten days of notification of contract award, must furnish a Payment Bond in the amount of at least 50% of the contract price. Bond must be from sureties licensed by the Massachusetts Division of Insurance.
11. TO BE INCLUDED IN QUOTE SUBMITTAL
Letter of financial stability from the company's financial institution.
3 Professional references.
Certificate Of Tax Compliance Bid deposit included with a bid (If Applicable)
Bidders'/Quoters’ acknowledgment of any addendum (If Applicable)
Completion of all required bid/quote information in the correct format and signed.
12. EVALUATION FACTORS FOR AWARD
Any award to be made pursuant to this quote will be based upon the quote, with appropriate consideration given to operational, technical, cost, time frame, and management requirements. Evaluation of bids/quotes will be based upon the vendor’s / contractor’s information contained, the responsiveness to the quote, as well as the total price quoted for all items covered by the quote.
The following elements will be the primary (but are not limited to) considerations in evaluating all submitted bids/quotes and in the selection of a Vendor or Vendors:
1. Final price of the project.
2. Completion of all required quote information in the correct format and signed.
3. The Vendor’s stability, qualifications, experiences, references, and record of past performance in delivering such services.
4. Availability of sufficiently high-quality Vendor personnel with the required skills and experience for the specific approach proposed.
5. The ability to fulfill the contract within the specified time frame.
Pioneer Valley Performing Arts Charter Public School may, at its discretion and without explanation to the prospective Vendors, at any time choose to discontinue this bid without obligation to such prospective Vendors.
Thank You for Your Submittal Pioneer Valley Performing Arts Charter Public School
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALEY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: Pioneer Valley Performing Arts Charter School City/Town: SOUTH HADLEY
Contract Number:
Description of Work: Pioneer Valley Performing Arts Charter Public School is inviting quotes for the renovation of two art spaces within our school.
Job Location: 15 Mulligan Drive
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, the awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. The updated wage schedule must be provided to all contractors, including general and sub-contractors, working on the construction project.
This annual update requirement is generally not applicable to 27F “rental of equipment” contracts. For such contracts, the prevailing wage rates issued by DLS shall remain in effect for the duration of the contract term. However, if the prevailing wage rate sheet issued does not contain wage rates for each year covered by the contract term, the Awarding Authority must request updated rate sheets from DLS and provide them to the contractor to ensure the correct rates are being paid throughout the duration of the contract. Additionally, if an Awarding Authority exercises an option to renew or extend the contract term, they must request updated rate sheets form DLS and provide them to the contractor.
This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request Number” on all pages of this schedule.
An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.
The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or a sub-contractor.
Apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentices must keep their apprentice identification card on their persons during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DAS regardless of whether they are registered with another federal, state, local, or private agency must be paid the journeyworker's rate.
Every contractor or subcontractor working on the construction project must submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee’s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. For a sample payroll reporting form go to http://www.mass.gov/dols/pw.
Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617)
626-6953.
Contractors must obtain the wage schedules from awarding authorities. Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties.
Employees not receiving the prevailing wage rate set forth on the wage schedule may file a complaint with the Fair Labor Division of the office of the Attorney
General at (617) 727-3465.
Page 1 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
1/1/2026 $40.95 $16.17 $21.78 $0.00 $0.00 $78.90
6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90
12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64
(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24
1/1/2026 $41.02 $16.17 $21.78 $0.00 $0.00 $78.97
6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97
12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71
(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31
1/1/2026 $41.14 $16.17 $21.78 $0.00 $0.00 $79.09
6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09
12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83
(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
12/1/2025 $36.75 $10.65 $9.75 $8.57 $0.00 $65.72
6/1/2026 $38.05 $10.65 $9.75 $8.57 $0.00 $67.02
12/7/2026 $39.35 $10.65 $9.75 $8.57 $0.00 $68.32
6/7/2027 $40.75 $10.65 $9.75 $8.57 $0.00 $69.72
12/6/2027 $42.15 $10.65 $9.75 $8.57 $0.00 $71.12
6/5/2028 $43.65 $10.65 $9.75 $8.57 $0.00 $72.62
AIR TRACK OPERATOR
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $45.15 $10.65 $9.75 $8.57 $0.00 $74.12
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $36.74 $10.65 $9.75 $6.56 $0.00 $63.70
6/1/2026 $38.04 $10.65 $9.75 $6.56 $0.00 $65.00
AIR TRACK OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 3 (HEAVY & HIGHWAY)
12/1/2026 $39.33 $10.65 $9.75 $6.56 $0.00 $66.29
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
ASBESTOS WORKER (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (SPRINGFIELD)
12/1/2025 $40.32 $14.50 $4.30 $6.25 $0.00 $65.37
12/1/2025 $36.25 $10.65 $9.75 $8.57 $0.00 $65.22
6/1/2026 $37.55 $10.65 $9.75 $8.57 $0.00 $66.52
12/7/2026 $38.85 $10.65 $9.75 $8.57 $0.00 $67.82
6/7/2027 $40.25 $10.65 $9.75 $8.57 $0.00 $69.22
12/6/2027 $41.65 $10.65 $9.75 $8.57 $0.00 $70.62
6/5/2028 $43.15 $10.65 $9.75 $8.57 $0.00 $72.12
ASPHALT RAKER
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $44.65 $10.65 $9.75 $8.57 $0.00 $73.62
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $36.24 $10.65 $9.75 $6.56 $0.00 $63.20
6/1/2026 $37.54 $10.65 $9.75 $6.56 $0.00 $64.50
ASPHALT RAKER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 3 (HEAVY & HIGHWAY)
12/1/2026 $38.83 $10.65 $9.75 $6.56 $0.00 $65.79
Page 2 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
AUTOMATIC GRADER-EXCAVATOR (RECLAIMER)
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2023 $39.56 $13.78 $12.15 $3.00 $0.00 $68.49
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BACKHOE/FRONT-END LOADER OPERATOR
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2023 $39.56 $13.78 $12.15 $3.00 $0.00 $68.49
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
12/1/2025 $36.25 $10.65 $9.75 $8.57 $0.00 $65.22
6/1/2026 $37.55 $10.65 $9.75 $8.57 $0.00 $66.52
12/7/2026 $38.85 $10.65 $9.75 $8.57 $0.00 $67.82
6/7/2027 $40.25 $10.65 $9.75 $8.57 $0.00 $69.22
12/6/2027 $41.65 $10.65 $9.75 $8.57 $0.00 $70.62
6/5/2028 $43.15 $10.65 $9.75 $8.57 $0.00 $72.12
BARCO-TYPE JUMPING TAMPER
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $44.65 $10.65 $9.75 $8.57 $0.00 $73.62
For apprentice rates see "Apprentice- LABORER"
BATCH/CEMENT PLANT - ON SITE
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2023 $39.03 $13.78 $12.15 $3.00 $0.00 $67.96
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
12/1/2025 $36.75 $10.65 $9.75 $8.57 $0.00 $65.72
6/1/2026 $38.05 $10.65 $9.75 $8.57 $0.00 $67.02
12/7/2026 $39.35 $10.65 $9.75 $8.57 $0.00 $68.32
6/7/2027 $40.75 $10.65 $9.75 $8.57 $0.00 $69.72
12/6/2027 $42.15 $10.65 $9.75 $8.57 $0.00 $71.12
6/5/2028 $43.65 $10.65 $9.75 $8.57 $0.00 $72.62
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $45.15 $10.65 $9.75 $8.57 $0.00 $74.12
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $36.74 $10.65 $9.75 $6.56 $0.00 $63.70
6/1/2026 $38.04 $10.65 $9.75 $6.56 $0.00 $65.00
BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &
HIGHWAY)
LABORERS
LABORERS - ZONE 3 (HEAVY & HIGHWAY) 12/1/2026 $39.33 $10.65 $9.75 $6.56 $0.00 $66.29
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
BOILER MAKER
BOILERMAKERS LOCAL 29
BOILERMAKERS LOCAL 29
1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
Page 3 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
2/1/2026 $56.36 $12.84 $15.57 $5.89 $0.00 $90.66
8/1/2026 $58.56 $12.84 $15.57 $5.89 $0.00 $92.86
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (SPRINGFIELD/PITTSFIELD) 2/1/2027 $59.96 $12.84 $15.57 $5.89 $0.00 $94.26
BULLDOZER/POWER SHOVEL/TREE SHREDDER
/CLAM SHELL
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2023 $39.56 $13.78 $12.15 $3.00 $0.00 $68.49
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
12/1/2025 $49.10 $10.65 $9.75 $9.80 $0.00 $79.30
6/1/2026 $50.65 $10.65 $9.75 $9.80 $0.00 $80.85
CAISSON & UNDERPINNING BOTTOM MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98
4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40
5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82
6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25
7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66
8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10
Apprentice to Journeyworker Ratio: 1:4
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 2/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $28.18 $12.84 $15.57 $5.89 $0.00 $62.48
2 60.00 $33.82 $12.84 $15.57 $5.89 $0.00 $68.12
3 70.00 $39.45 $12.84 $15.57 $5.89 $0.00 $73.75
4 80.00 $45.09 $12.84 $15.57 $5.89 $0.00 $79.39
5 90.00 $50.72 $12.84 $15.57 $5.89 $0.00 $85.02
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.28 $12.84 $15.57 $5.89 $0.00 $63.58
2 60.00 $35.14 $12.84 $15.57 $5.89 $0.00 $69.44
3 70.00 $40.99 $12.84 $15.57 $5.89 $0.00 $75.29
4 80.00 $46.85 $12.84 $15.57 $5.89 $0.00 $81.15
5 90.00 $52.70 $12.84 $15.57 $5.89 $0.00 $87.00
Apprentice to Journeyworker Ratio: 1:5
Page 4 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
12/1/2026 $52.15 $10.65 $9.75 $9.80 $0.00 $82.35
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $47.95 $10.65 $9.75 $9.80 $0.00 $78.15
6/1/2026 $49.50 $10.65 $9.75 $9.80 $0.00 $79.70
CAISSON & UNDERPINNING LABORER
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.00 $10.65 $9.75 $9.80 $0.00 $81.20
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $48.28 $10.65 $9.75 $9.80 $0.00 $78.48
6/1/2026 $49.83 $10.65 $9.75 $9.80 $0.00 $80.03
CAISSON & UNDERPINNING TOP MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.33 $10.65 $9.75 $9.80 $0.00 $81.53
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $36.25 $10.65 $9.75 $8.57 $0.00 $65.22
6/1/2026 $37.55 $10.65 $9.75 $8.57 $0.00 $66.52
12/7/2026 $38.85 $10.65 $9.75 $8.57 $0.00 $67.82
6/7/2027 $40.25 $10.65 $9.75 $8.57 $0.00 $69.22
12/6/2027 $41.65 $10.65 $9.75 $8.57 $0.00 $70.62
6/5/2028 $43.15 $10.65 $9.75 $8.57 $0.00 $72.12
CARBIDE CORE DRILL OPERATOR
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $44.65 $10.65 $9.75 $8.57 $0.00 $73.62
For apprentice rates see "Apprentice- LABORER"
3/1/2026 $43.81 $9.19 $11.25 $6.90 $0.00 $71.15
9/1/2026 $44.76 $9.19 $11.25 $6.90 $0.00 $72.10
CARPENTER
CARPENTERS
CARPENTERS LOCAL 336 - HAMPDEN HAMPSHIRE
FRANKLIN 3/1/2027 $45.66 $9.19 $11.25 $6.90 $0.00 $73.00
Apprentice: CARPENTER
Effective Date: 3/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $19.71 $9.19 $0.00 $1.38 $0.00 $30.28
2 45.00 $19.71 $1.28 $0.00 $1.38 $0.00 $22.37
3 55.00 $24.10 $9.19 $0.00 $2.76 $0.00 $36.05
4 55.00 $24.10 $9.19 $0.00 $2.76 $0.00 $36.05
5 70.00 $30.67 $9.19 $11.25 $4.14 $0.00 $55.25
6 70.00 $30.67 $9.19 $11.25 $4.14 $0.00 $55.25
7 80.00 $35.05 $9.19 $11.25 $5.52 $0.00 $61.01
8 80.00 $35.05 $9.19 $11.25 $5.52 $0.00 $61.01
Apprentice: CARPENTER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $20.14 $9.19 $0.00 $1.38 $0.00 $30.71
2 45.00 $20.14 $9.19 $0.00 $1.38 $0.00 $30.71
3 55.00 $24.62 $9.19 $0.00 $2.76 $0.00 $36.57
4 55.00 $24.62 $9.19 $0.00 $2.76 $0.00 $36.57
Page 5 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
10/1/2025 $27.37 $7.38 $4.47 $1.00 $0.00 $40.22CARPENTER WOOD FRAME
CARPENTERS
CARPENTERS-ZONE 3 (Wood Frame) 10/1/2026 $28.47 $7.38 $4.47 $1.00 $0.00 $41.32
All Aspects of New Wood Frame Work
1/1/2026 $48.13 $13.20 $16.30 $2.93 $1.69 $82.25
7/1/2026 $49.32 $13.20 $16.30 $2.93 $1.69 $83.44
1/1/2027 $50.51 $13.20 $16.30 $2.93 $1.69 $84.63
7/1/2027 $51.70 $13.20 $16.30 $2.93 $1.69 $85.82
CEMENT MASONRY/PLASTERING
PLASTERERS AND CEMENT MASONS LOCAL 534
Plasterers and Cement Masons - Zone 2
Apprentice: CARPENTER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
5 70.00 $31.33 $9.19 $11.25 $4.14 $0.00 $55.91
6 70.00 $31.33 $9.19 $11.25 $4.14 $0.00 $55.91
7 80.00 $35.81 $9.19 $11.25 $5.52 $0.00 $61.77
8 80.00 $35.81 $9.19 $11.25 $5.52 $0.00 $61.77
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $16.42 $7.38 $0.00 $0.00 $0.00 $23.80
2 60.00 $16.42 $7.38 $0.00 $0.00 $0.00 $23.80
3 65.00 $17.79 $7.38 $0.00 $1.00 $0.00 $26.17
4 70.00 $19.16 $7.38 $0.00 $1.00 $0.00 $27.54
5 75.00 $20.53 $7.38 $3.80 $1.00 $0.00 $32.71
6 80.00 $21.90 $7.38 $3.80 $1.00 $0.00 $34.08
7 85.00 $23.26 $7.38 $3.80 $1.00 $0.00 $35.44
8 90.00 $24.63 $7.38 $3.80 $1.00 $0.00 $36.81
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $17.08 $7.38 $0.00 $0.00 $0.00 $24.46
2 60.00 $17.08 $7.38 $0.00 $0.00 $0.00 $24.46
3 65.00 $18.51 $7.38 $0.00 $1.00 $0.00 $26.89
4 70.00 $19.93 $7.38 $0.00 $1.00 $0.00 $28.31
5 75.00 $21.35 $7.38 $3.80 $1.00 $0.00 $33.53
6 80.00 $22.78 $7.38 $3.80 $1.00 $0.00 $34.96
7 85.00 $24.20 $7.38 $3.80 $1.00 $0.00 $36.38
8 90.00 $25.62 $7.38 $3.80 $1.00 $0.00 $37.80
Page 6 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
1/1/2028 $52.89 $13.20 $16.30 $2.93 $1.69 $87.01
12/1/2025 $36.25 $10.65 $9.75 $8.57 $0.00 $65.22
6/1/2026 $37.55 $10.65 $9.75 $8.57 $0.00 $66.52
12/7/2026 $38.85 $10.65 $9.75 $8.57 $0.00 $67.82
6/7/2027 $40.25 $10.65 $9.75 $8.57 $0.00 $69.22
12/6/2027 $41.65 $10.65 $9.75 $8.57 $0.00 $70.62
6/5/2028 $43.15 $10.65 $9.75 $8.57 $0.00 $72.12
CHAIN SAW OPERATOR
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $44.65 $10.65 $9.75 $8.57 $0.00 $73.62
For apprentice rates see "Apprentice- LABORER"
COMPRESSOR OPERATOR
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2023 $39.03 $13.78 $12.15 $3.00 $0.00 $67.96
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
CRANE OPERATOR
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2023 $43.06 $13.78 $12.15 $3.00 $0.00 $71.99
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE)
PAINTERS LOCAL 35
1/1/2026 $59.56 $10.35 $12.00 $12.60 $0.00 $94.51
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.07 $13.20 $16.30 $0.00 $0.00 $53.57
2 60.00 $28.88 $13.20 $16.30 $2.93 $1.69 $63.00
3 65.00 $31.28 $13.20 $16.30 $2.93 $1.69 $65.40
4 70.00 $33.69 $13.20 $16.30 $2.93 $1.69 $67.81
5 75.00 $36.10 $13.20 $16.30 $2.93 $1.69 $70.22
6 80.00 $38.50 $13.20 $16.30 $2.93 $1.69 $72.62
7 90.00 $43.32 $13.20 $16.30 $2.93 $1.69 $77.44
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.66 $13.20 $16.30 $0.00 $0.00 $54.16
2 60.00 $29.59 $13.20 $16.30 $2.93 $1.69 $63.71
3 65.00 $32.06 $13.20 $16.30 $2.93 $1.69 $66.18
4 70.00 $34.52 $13.20 $16.30 $2.93 $1.69 $68.64
5 75.00 $36.99 $13.20 $16.30 $2.93 $1.69 $71.11
6 80.00 $39.46 $13.20 $16.30 $2.93 $1.69 $73.58
7 90.00 $44.39 $13.20 $16.30 $2.93 $0.00 $76.82
Page 7 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
PAINTERS LOCAL 35 - ZONE 3
12/1/2025 $48.00 $10.65 $9.75 $9.65 $0.00 $78.05
6/1/2026 $49.55 $10.65 $9.75 $9.65 $0.00 $79.60
12/7/2026 $51.05 $10.65 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.65 $10.65 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.25 $10.65 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.93 $10.65 $9.75 $9.65 $0.00 $85.98
DEMO: ADZEMAN
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $57.60 $10.65 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $49.00 $10.65 $9.75 $9.65 $0.00 $79.05
6/1/2026 $50.55 $10.65 $9.75 $9.65 $0.00 $80.60
12/7/2026 $52.05 $10.65 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.65 $10.65 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.25 $10.65 $9.75 $9.65 $0.00 $85.30
6/5/2028 $56.93 $10.65 $9.75 $9.65 $0.00 $86.98
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $58.60 $10.65 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $48.75 $10.65 $9.75 $9.65 $0.00 $78.80
6/1/2026 $50.30 $10.65 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.80 $10.65 $9.75 $9.65 $0.00 $81.85
6/7/2027 $53.40 $10.65 $9.75 $9.65 $0.00 $83.45
12/6/2027 $55.00 $10.65 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.68 $10.65 $9.75 $9.65 $0.00 $86.73
DEMO: BURNERS
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $58.35 $10.65 $9.75 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $49.00 $10.65 $9.75 $9.65 $0.00 $79.05
6/1/2026 $50.55 $10.65 $9.75 $9.65 $0.00 $80.60
12/7/2026 $52.05 $10.65 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.65 $10.65 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.25 $10.65 $9.75 $9.65 $0.00 $85.30
DEMO: CONCRETE CUTTER/SAWYER
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.78 $10.35 $0.00 $0.00 $0.00 $40.13
2 55.00 $32.76 $10.35 $0.00 $6.93 $0.00 $50.04
3 60.00 $35.74 $10.35 $0.00 $7.56 $0.00 $53.65
4 65.00 $38.71 $10.35 $0.00 $8.19 $0.00 $57.25
5 70.00 $41.69 $10.35 $12.00 $8.82 $0.00 $72.86
6 75.00 $44.67 $10.35 $12.00 $9.45 $0.00 $76.47
7 80.00 $47.65 $10.35 $12.00 $10.08 $0.00 $80.08
8 90.00 $53.60 $10.35 $12.00 $11.34 $0.00 $87.29
Apprentice to Journeyworker Ratio: 1:1
Page 8 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
6/5/2028 $56.93 $10.65 $9.75 $9.65 $0.00 $86.98
12/4/2028 $58.60 $10.65 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $48.75 $10.65 $9.75 $9.65 $0.00 $78.80
6/1/2026 $50.30 $10.65 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.80 $10.65 $9.75 $9.65 $0.00 $81.85
6/7/2027 $53.40 $10.65 $9.75 $9.65 $0.00 $83.45
12/6/2027 $55.00 $10.65 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.68 $10.65 $9.75 $9.65 $0.00 $86.73
DEMO: JACKHAMMER OPERATOR
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $58.35 $10.65 $9.75 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
12/1/2025 $48.00 $10.65 $9.75 $9.65 $0.00 $78.05
6/1/2026 $49.55 $10.65 $9.75 $9.65 $0.00 $79.60
12/7/2026 $51.05 $10.65 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.65 $10.65 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.25 $10.65 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.93 $10.65 $9.75 $9.65 $0.00 $85.98
DEMO: WRECKING LABORER
LABORERS
LABORERS - ZONE 3 (BUILDING & SITE)
12/4/2028 $57.60 $10.65 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
DIVER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $78.11 $10.08 $11.62 $12.67 $0.00 $112.48 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Diver wage 70/80/90 2A $69.83, 3A $91.79,4A $102.14 Total Rate
DIVER TENDER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $49.19 $10.08 $11.62 $12.67 $0.00 $83.56 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Piledriver wage 70/80/90 2A $54.20, 3A $73.93,4A $82.05 Total Rate
DIVER TENDER (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $83.69 $10.08 $11.62 $12.67 $0.00 $118.06
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
DRAWBRIDGE - SEIU LOCAL 888
DRAWBRIDGE - SEIU LOCAL 888
7/1/2020 $26.77 $6.67 $3.93 $0.00 $0.16 $37.53
12/28/2025 $53.26 $13.75 $8.40 $6.96 $0.00 $82.37
6/28/2026 $54.41 $14.00 $8.43 $7.03 $0.00 $83.87
ELECTRICIAN (Including Core Drilling)
ELECTRICIANS LOCAL 7
ELECTRICIANS LOCAL 7
1/3/2027 $55.56 $14.25 $8.47 $7.09 $0.00 $85.37
Page 9 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
1/1/2026 $69.23 $16.38 $11.06 $10.70 $0.00 $107.37ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 41
ELEVATOR CONSTRUCTORS LOCAL 41
1/1/2027 $72.23 $16.48 $11.16 $11.00 $0.00 $110.87
Apprentice: ELECTRICIAN (Including Core Drilling)
Effective Date: 12/28/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $21.30 $7.65 $0.63 $0.00 $0.00 $29.58
2 45.00 $23.97 $7.65 $0.70 $0.00 $0.00 $32.32
3 50.00 $26.63 $13.75 $7.53 $0.00 $0.00 $47.91
4 55.00 $29.29 $13.75 $7.61 $0.00 $0.00 $50.65
5 65.00 $34.62 $13.75 $9.84 $0.00 $0.00 $58.21
6 70.00 $37.28 $13.75 $11.30 $0.00 $0.00 $62.33
Apprentice: ELECTRICIAN (Including Core Drilling)
Effective Date: 6/28/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $21.76 $7.80 $0.63 $0.00 $0.00 $30.19
2 45.00 $24.48 $7.80 $0.70 $0.00 $0.00 $32.98
3 50.00 $27.21 $14.00 $7.53 $0.00 $0.00 $48.74
4 55.00 $29.93 $14.00 $7.61 $0.00 $0.00 $51.54
5 65.00 $35.37 $14.00 $9.84 $0.00 $0.00 $59.21
6 70.00 $38.09 $14.00 $11.30 $0.00 $0.00 $63.39
Apprentice to Journeyworker Ratio: 2:3
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $34.62 $16.38 $0.00 $0.00 $0.00 $51.00
2 55.00 $38.08 $16.38 $11.06 $10.70 $0.00 $76.22
3 65.00 $45.00 $16.38 $11.06 $10.70 $0.00 $83.14
4 70.00 $48.46 $16.38 $11.06 $10.70 $0.00 $86.60
5 80.00 $55.38 $16.38 $11.06 $10.70 $0.00 $93.52
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $36.12 $16.48 $0.00 $0.00 $0.00 $52.60
2 55.00 $39.73 $16.48 $11.16 $11.00 $0.00 $78.37
3 65.00 $46.95 $16.48 $11.16 $11.00 $0.00 $85.59
Page 10 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
1/1/2026 $48.46 $16.38 $11.06 $10.70 $0.00 $86.60ELEVATOR CONSTRUCTOR HELPER
ELEVATOR CONSTRUCTORS LOCAL 41
ELEVATOR CONSTRUCTORS LOCAL 41
1/1/2027 $50.56 $16.48 $11.16 $11.00 $0.00 $89.20
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
12/1/2025 $36.24 $10.65 $9.75 $6.56 $0.00 $63.20
6/1/2026 $37.54 $10.65 $9.75 $6.56 $0.00 $64.50
FENCE & GUARD RAIL ERECTOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 3 (HEAVY & HIGHWAY)
12/1/2026 $38.83 $10.65 $9.75 $6.56 $0.00 $65.79
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
FIELD ENG.INST/ROD-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
6/1/1999 $18.84 $4.80 $4.10 $0.00 $0.00 $27.74
FIELD ENG.PARTY CHIEF:BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
6/1/1999 $21.33 $4.80 $4.10 $0.00 $0.00 $30.23
FIELD ENG.SURVEY CHIEF-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
6/1/1999 $22.33 $4.80 $4.10 $0.00 $0.00 $31.23
12/28/2025 $53.26 $13.75 $8.40 $6.96 $0.00 $82.37
6/28/2026 $54.41 $14.00 $8.43 $7.03 $0.00 $83.87
FIRE ALARM INSTALLER
ELECTRICIANS LOCAL 7
ELECTRICIANS LOCAL 7
1/3/2027 $55.56 $14.25 $8.47 $7.09 $0.00 $85.37
For apprentice rates see "Apprentice- ELECTRICIAN"
12/28/2025 $53.26 $13.75 $8.40 $6.96 $0.00 $82.37
6/28/2026 $54.41 $14.00 $8.43 $7.03 $0.00 $83.87
FIRE ALARM REPAIR / MAINTENANCE
/ COMMISSIONING
ELECTRICIANS LOCAL 7
ELECTRICIANS LOCAL 7 1/3/2027 $55.56 $14.25 $8.47 $7.09 $0.00 $85.37
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN"
FIREMAN
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2023 $39.03 $13.78 $12.15 $3.00 $0.00 $67.96
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
4 70.00 $50.56 $16.48 $11.16 $11.00 $0.00 $89.20
5 80.00 $57.78 $16.48 $11.16 $11.00 $0.00 $96.42
Apprentice to Journeyworker Ratio: 1:1
Apprentice: FIREMAN
Effective Date: 12/1/2023
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
Page 11 of 31Wage Request Number: 20260507123730Issue Date: 05/07/2026
Supplemental
Unemployment Total Rate
12/1/2025 $28.09 $10.65 $9.75 $6.56 $0.00 $55.05
6/1/2026 $29.21 $10.65 $9.75 $6.56 $0.00 $56.17
FLAGGER & SIGNALER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 3 (HEAVY & HIGHWAY)
12/1/2026 $29.21 $10.65 $9.75 $6.56 $0.00 $56.17
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
3/1/2026 $44.34 $8.56 $11.25 $6.90 $0.00 $71.05
9/1/2026 $45.29 $8.56 $11.25 $6.90 $0.00 $72.00
FLOORCOVERER
FLOORCOVERERS LOCAL 2168
FLOORCOVERERS LOCAL 2168 ZONE III
3/1/2027 $46.19 $8.56 $11.25 $6.90 $0.00 $72.90
Apprentice: FIREMAN
Effective Date: 12/1/2023
St…