PUMP PERFORMANCE TEST WORKSHEET.pdf
PDF 114 KB Posted
- Solicitation number
- PAN-023661-X2
About this file
The document is a Pump Performance Test Worksheet for emergency vehicles, specifically designed to document comprehensive testing of fire department pump systems in accordance with NFPA 1910 standards. The worksheet captures detailed technical specifications and performance metrics including vehicle identification, pump characteristics, environmental conditions, and multiple test scenarios such as capacity tests, overload tests, and pressure control device assessments.
The related federal contract opportunity is a sources sought notice by the Mission and Installation Contracting Command (MICC) at Fort Leonard Wood, Missouri, seeking qualified contractors to perform annual mobile fire emergency vehicle inspections. The requirement involves inspecting seven fire trucks from manufacturers including Pierce, Ferrara, Oshkosh, KME International, Ford, and E-One. The procurement is potentially set aside for small businesses, with a NAICS code of 541990 and a small business size standard of $16.5 million. Interested parties must submit a 10-page capabilities statement by 2 pm CST on 31 March 2025, demonstrating NFPA 1910 certification and capability to perform comprehensive emergency vehicle inspections. The anticipated contract will have one base year and four option years, with a blanket purchase agreement structure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ANN INSPECTION BUMPER-TO-BUMPER (B2B) WORKSHEET.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUMP PERFORMANCE TEST
IAW NFPA1910
© 2024 National Fire Protection Association
Emergency vehicle number or designation ___________
Manufacturer __________________________________
Serial no. _____________________________________
Engine make __________________________________
Pump make ___________________________________
Year manufactured _____________________________
Model _______________________________________
Vehicle identification no. _________________________
Model _______________________________________
Model _______________________________________
Pump rated capacity __________________ (gpm) (L/min) at _______________(psi) (kPa)
Speed check taken from _________________________ Ratio to engine ________________________________
Test site location ___________________________________________________________________________________
Tests performed from __ Draft __ Hydrant
Suction hose size _____________________ (in.) (mm) Length _________________________(ft) (m)
At start of tests At end of tests
Atmospheric pressure
Air Temperature
Water temperature
Elevation of test site
Lift
Governed engine speed ___________________________ Actual maximum engine speed ____________________
Verify operation of pump shift indicator __________________________________________________________________
Verify operation of pump engine control interlock at pump operator’s panel _____________________________________
Maximum vacuum attained _________________________ Vacuum drop in 5 minutes ________________________
Time to prime pump ________________________________________________________________________________
Pressure control device test:
Rise while pumping capacity at 150psi ________________________________________________________________
Rise while pumping capacity at 90 psi ________________________________________________________________
Rise while pumping at 50 percent capacity at 250 psi ____________________________________________________
Intake relief valve test results _________________________________________________________________________
Tank to pump water flow test ___________________ (gpm) (L/min)
Gauge accuracy _____________________________ Flowmeter accuracy ___________________________________
Pump Test Results Capacity test Overload test 200 psi test 250 psi test Duration Average nozzle pressure Corrected pressure Gallons per minute Average pump pressure rpm-engine Rpm-pump
Comments
PUMP PERFORMANCE TEST
IAW NFPA1910
© 2024 National Fire Protection Association
20-Minute Capacity Test Layout _____________________________ Nozzle size _______ Position of transfer valve _______________
Pump Intake Pump Discharge
Time
Counter (if used) rpm
Tach
Engine temperature
Oil pressure
Voltage
Automatic Transmission
Temp (if equipped)
Apparatus gauge
Test
Apparatus
Test
Pilot/ flow
5-Minute Overload Test
10-Minute 200 psi Test
10-Minute 200 psi Test
Person conducting the test ___________________________________________________________________________
Representing _____________________________________________________________________________________
Signature _____________________________________________________ Date ___________________________
AHJ representative _____________________________________________ Date ___________________________