Pulsed RF Source CDRLs_DIDs.pdf
PDF 2 MB Posted
- Attached to
- Pulsed RF Source
- Solicitation number
- N6426722R1004
About this file
This is a combined synopsis/solicitation for a pulsed RF source from the Department of the Navy Naval Sea Systems Command. The solicitation seeks proposals for the procurement of a pulsed RF calibration source to be used for the calibration of RF test equipment. Interested offerors should submit proposals by the closing date of July 15, 2022. The source will be used to calibrate RF measurement equipment at Naval Surface Warfare Center facilities. The solicitation includes details on the required technical specifications for the pulsed RF source, instructions for proposal preparation and submission, and the evaluation criteria. Award is expected to occur by September 2022, with delivery of the first unit within 180 days of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6426722R1004 Redacted.pdf | ||
| Attachment2_SmallBusinessSubChecklist.pdf | ||
| Attachment1_ CSS_Dec-2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Source: https://assist.dla.mil -- Downloaded: 2018-10-04T13:04Z Check the source to verify that this is the current version before use.
DATA ITEM DESCRIPTION
Title: SYLLABUS
Number: DI-MISC-81459A Approved Date: 20070927 AMSC Number: F9011 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: 11 Applicable Forms: N/A Use/Relationship: The syllabus is the standardized plan for conducting training in a given course of instruction. It establishes a course configuration baseline and is used as a course control document.
a. This Data Item Description (DID) is applicable to all contacts requiring training course development.
b. This DID contains to format, content, and intended use information for the data deliverable resulting from the work task described in the contract.
c. DI-MISC-81459A supersedes DI-MISC-81459.
Requirements:
1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices and revision, shall be as specified in the contract.
2. Format. The Syllabus shall be in contractor format.
3. Content. The Syllabus shall include the following sections:
3.1. Course accounting. This section shall include the following information:
a. Course title
b. Course number
c. Course purpose
d. Course description
e. Course prerequisites
f. Course approval information
g. Course phase of training.
h. Grading procedures
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Source: https://assist.dla.mil -- Downloaded: 2017-04-28T17:45Z
DI-MISC-81459A
i. Status upon graduation
j. Training strategy
k. Academic training, aircrew training devices, and flying inventory
l. Class start date
m. Quota control
3.2. Course training standards. This section shall include the following information:
a. Training elements to be accomplished
b. Standards of accomplishment for each element
c. Course map
d. Course sequence
e. Training schedule matrix
3.3. Academic media. This section shall include the following information.
a. Lectures and description
b. Workbook and description
c. sound and slides and description
d. Interactive courseware (ICW) lessons and description
e. Required instructional manuals
3.4. Aircrew and maintenance training devices. This section shall include the following information:
a. Device requirements
b. Mission statement and objective for each training device
c. Explanation of sortie elements to be accomplished
3.5. Flying training. This section shall include the following information:
a. Special instructions and restrictions on flight portion of training
b. Explanation of sorties (e.g. time, number)
c. Mission outline
d. Elements to be accomplished
3.6. Criterion-referenced objectives. This section shall include the following information:
a. Terminal objectives
3.7. Course data. This section shall include the following information:
a. Course length
b. Breakdown of classroom and simulator hours
c. Class start date
d. Instructor contact hours
e. Class size
f. Specialty
g. Individual training plan
h. Class frequency
i. Task list
3.8. Facilities and resources. This section shall include the following information:
a. Location of training
b. Student reporting instruction
c. Instructor staffing requirements
d. Multiple instructor requirements
e. Classroom and simulator layout
f. Student library of reference materials
g. Instructor accessibility
h. Facility usage requirements per student
3.9. Explanation of terms. This section shall include the following information:
a. Terms unique to the training command or training system.
3.10. Curriculum outline of instruction. The curriculum outline shall provide detailed training data for each aircrew and maintenance position. The outline shall provide the sequence in which the courses are to be presented for each aircrew and maintenance position. The curriculum, outline shall contain the following:
a. Curriculum title and scope
b. Academic hours
c. Tasks
d. Terminal objectives
d. Enabling objectives
f. Method of instruction
g. Training support equipment and materials
h. Student library
4. End of DI-MISC-81459A.
Data Item Description
Title: Software/Firmware Change Request Approval Date: 20100420 Number: DI-MISC-81807 Limitation: N/A AMSC Number: N9130 GIDEP Applicable: N/A DTIC Applicable: N/A Office of Primary Responsibility: SH/PMS-408 Applicable Forms: N/A
Use/relationship: The Software/ Firmware Change Request will be used to alert or inform the government about changes to software and firmware and also to provide detailed information to the government about the changes and the estimated cost of the software/firmware changes.
This DID contains the format, content and preparation instructions for the data product generated by the specific and discrete work task requirement as delineated in the contract.
Requirements:
1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions shall be as specified in the contract.
2. Format. The Software/Firmware Change Request shall be presented in the Contractor’s format.
3. Content. The Software/Firmware Change Request shall contain all the information identified in Figures 1-7.
4. End of DI-MISC-81807.
Page 1 of 8 Pages
DI-MISC-81807
SOFTWARE CHANGE REQUEST (SCR), PAGE 1
2. DATE
3. JUSTIFICATION CODE
1. ORIGINATOR NAME AND ADDRESS (include e-mail address and telephone number)
Name:
Organization:
Street 1:
Street 2:
City, State, Zip Code:
Telephone Number: ( ) ext:: E-mail address:
4. TYPE OF SCR
Class I Class II
5. PRIORITY
Emergency Urgent Routine
6. SCR DESIGNATION 7. BASELINE AFFECTED
a. CI/CSCI AFFECTED
b. CAGE CODE
c. SYSTEM DESIGNATION
FUNCTIONAL ALLOCATED PRODUCT
d. SCR No.
e. REVISION
f. TYPE Preliminary Final
8. OTHER SYS/CONFIG ITEMS AFFECTED
YES NO
9. IN PRODUCTIO N
10. DOCUMENTS AFFECTED
CAGE CODE SPEC/DOC NO. REVISION SCN/NOR/ECN/ECO NO.
11. TITLE OF CHANGE
12. CONTRACT NO. & LINE ITEM
13. CONFIGURATION ITEM NOMENCLATURE
14. PROCURING CONTRACTING OFFICER
15. LOWEST ASSEMBLY AFFECTED
a. NOMENCLATURE
b. PART NO.
16. DESCRIPTION OF CHANGE
17. NEED FOR CHANGE
18. PRODUCTION EFFECTIVITY BY SERIAL NUMBER
19. EFFECT ON PRODUCTION DELIVERY
SCHEDULE
20. RETROFIT
a. RECOMMENDED ITEM EFFECTIVITY
b. ESTIMATED KIT DELIVERY SCHEDULE
c. PLATFORMS AFFECTED
21. ESTIMATED COST or (SAVINGS) UNDER CONTRACT
No Additional Cost/Savings – In Scope of the Contract
22. SUBMITTING ACTIVITY AUTHORIZING SIGNATURE
22a. TITLE
23. APPROVAL/DISAPPROVAL
a. LCCB CHAIRMAN
DATE :
RECOMMEND APPROVAL
RECOMMNED DISAPPROVAL
b. CCB CHAIRMAN
DATE :
APPROVED
DISAPPROVED
Figure 1 Page 2 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 2
SCR NUMBER & REV:
EFFECT ON FUNCTIONAL/ALLOCATED CONFIGURATION IDENTIFICATION
24. OTHER SYSTEMS AFFECTED
25. OTHER CONTRACTORS/ACTIVITIES AFFECTED
26. CONFIGURATION ITEMS AFFECTED
27. EFFECTS ON PERFORMANCE ALLOCATIONS AND INTERFACES IN SYSTEM SPECIFICATION
28. EFFECTS ON EMPLOYMENT, INTEGRATED LOGISTICS SUPPORT, TRAINING, OPERATIONAL, EFFECTIVENESS, OR SOFTWARE
29. EFFECTS ON CONFIGURATION ITEM SPECIFICATIONS
30. DEVELOPMENTAL REQUIREMENTS AND STATUS
31. TRADE-OFFS AND ALTERNATIVE SOLUTIONS
32. DATE BY WHICH CONTRACTUAL AUTHORITY IS NEEDED
Figure 2 Page 3 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 3
SCR NUMBER & REV:
EFFECTS ON PRODUCT CONFIGURATION IDENTIFICATION, LOGISTICS, AND OPERATIONS
(X) FACTOR ENCL. PAR. (X) FACTOR ENCL. PAR.
33. EFFECT ON PRODUCT CONFIGURATION
IDENTIFICATION OR CONTRACT
35. EFFECT ON OPERATIONAL
EMPLOYMENT
a. PERFORMANCE a. SAFETY
b. WEIGHT-BALANCE STABILITY (Aircraft) N/A N/A b. SURVIVABILITY
c. WEIGHT-MOMENT (Other equipment) N/A N/A c. RELIABILITY
d. CDRL, TECHNICAL DATA d. MAINTAINABILITY
e. NOMENCLATURE e. SERVICE LIFE
f. OPERATING PROCEDURES
g. ELECTROMAGNETIC INTERFERENCE 34. EFFECT ON INTEGRATED LOGISTICS
SUPPORT (ILS) ELEMENTS
h. ACTIVATION SCHEDULE
a. ILS PLANS i. CRITICAL SINGLE POINT FAILURE ITEMS
b. MAINTENANCE CONCEPT, PLANS, PROCEDURES j. INTEROPERABILITY c LOGISTICS SUPPORT ANALYSIS
d. INTERIM SUPPORT PROGRAMS 36. OTHER CONSIDERATIONS
e. SPARES AND REPAIR PARTS N/A N/A a. INTERFACE
f. TECH MANUALS/PROGRAMMING TAPES b. OTHER AFFECTED EQUIPMENT/GFE/GFP N/A N/A
g. FACILITIES N/A N/A c. PHYSICAL CONSTRAINTS N/A N/A P h. SUPPORT EQUIPMENT N/A N/A d. COMPUTER PROGRAMS AND RESOURCES
i. OPERATOR TRAINING e. REWORK OF OTHER EQUIPMENT N/A N/A
j. OPERATING TRAINING EQUIPMENT f. SYSTEM TEST PROCEDURES
k. MAINTENANCE TRAINING g. WARRANTY/GUARANTEE
l. MAINTENANCE TRAINING EQUIPMENT h. PARTS CONTROL N/A N/A
m. CONTRACT MAINTENANCE i. ENVIRONMENTAL
n. PACKAGING , HANDLING, STORAGE, AND
TRANSPORTABILITY
N/A N/A j. FMS RELEASE
37. ALTERNATE SOLUTIONS
38. DEVELOPMENTAL STATUS
39. RECOMMENDATIONS FOR RETROFIT
40. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS
a. ORGANIZATION
b. INTERMEDIATE
c. DEPOT
d. OTHER
41. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT
42. THIS CHANGE MUST BE ACCOMPLISHED
BEFORE WITH AFTER THE FOLLOWING CHANGES:
43. IS CONTRACTOR FIELD
SERVICE ENGINEERING
REQUIRED?
44. OUT-OF-SERVICE TIME
45. EFFECT OF THIS SCR AND PREVIOUSLY APPROVED SCRs
46. DATE CONTRACTUAL AUTHORITY NEEDED
FOR PRODUCTION:
FOR RETROFIT:
Figure 3 Page 4 of 8 Pages
Figure 4 Page 5 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 5 SCR NUMBER and REV:
48. ESTIMATED COSTS SAVINGS/SUMMARY, RELATED SCRs (Use parentheses for savings)
FACTOR
CAGE CODE
(a)
SCR NUMBER
(b)
COSTS/SAVINGS
UNDER CONTRACT
(c)
OTHER COSTS/
SAVINGS
(d)
a. PRODUCTION COST/SAVING (Subtotal of Costs/Savings Elements from block 51a applicable to aircraft, ship, tank, vehicle, missile, or its subsystem)
SUBTOTAL PRODUCTION COSTS/SAVINGS
b. RETROFIT COSTS (Applicable to aircraft, ship, tank, vehicle, missile, or its subsystem)
SUBTOTAL RETROFIT COSTS
c. INTEGRATED LOGISTICS SUPPORT COSTS/SAVING REVISED
REQUIREMENTS
(1) ITEM RETROFIT (If not covered under “b”) (Applicable to aircraft, ship tank, vehicle, missile, or its subsystem)
(2) ILS SUBTOTAL (Applicable to aircraft, ship, tank, vehicle, missile or its subsystem)
(3) OPERATOR TRAINER (Net total cost/saving from each SCR covering operator trainer)
(4) MAINTENANCE TRAINER (Net total cost/saving from each SCR covering maintenance trainer)
(5) OTHER TRAINING EQUIPMENT
(6) SUPPORT EQUIPMENT (Net total cost/saving from each SCR on support equipment)
(7) ILS PLANS
(8) MAINTENANCE CONCEPT, PLANS, SYSTEM DOCUMENTS
(9) INTERIM SUPPORT PLAN
RECURRING COSTS
NEW REQUIREMENTS
PROCURIN
G
ACTIVITY
CODE
NON-
RECURRING
COSTS UNIT QTY TOTAL
(10) PROVISIONING DOCUMENTATION
(11) OPER TRNR/TRNG DEVICES/EQUIP
(12) MANUALS/PROGRAMMING TAPES, SPARES,
REPAIR PARTS (For 11)
(13) MAINTENANCE TRNR/TRNG DEVICES/
EQUIPMENT
(14) MANUALS/PROGRAMMING TAPES, SPARES,
REPAIR PARTS (For 13)
(15) SUPPORT EQUIPMENT
(16) MANUALS/PROGRAMMING TAPES (For 15)
(17) PROVISIONING DOCUMENTATION (For 15)
(18) REPAIR PARTS (For 15) N/A N/A N/A N/A N/A N/A N/A
(19) SUBTOTAL ILS COSTS/SAVINGS (Sum of c. 1 through c. 18)
CAGE CODE SCR NUMBER
d. OTHER COSTS/SAVINGS (Total from block 48d of related SCRs)
TOTAL OTHER COSTS/SAVINGS
SUBTOTALS OF COLUMNS
SUBTOTAL UNDER CONTRACT
Figure 5 Pages 6 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 6
SCR NUMBER and REV:
49. TITLE OF CHANGE
50. DATE AUTHORIZATION TO PROCEED
RECEIVED BY CONTRACTOR (YYMMDD)
S START DELIVERY C COMPLETED DELIVERY PROGRESS POINT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Figure 6 Page 7 of 8 Pages a.
C O
(1) Software Engineering
N F I
(2) Software Documentation
G U R
(3) Software Engineering Test
A T
(4) Update TDP b.
S
(1) Software Engineering Environment Upgrade
P
(2) Software Test Environment Upgrade
E Q
M c.
(1) Operator
(2) Maintenance
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2
26 27 28 29 30 31 32 33 34 35 36
SOFTWARE CHANGE REQUEST (SCR), Continuation Sheet, Figure 7
TITLE OF CHANGE
SCR NUMBER and REV:
PARAGRAPH# BLOCK/LINE NO. BLOCK TITLE AND SUPPLEMENTARY INFORMATION
Figure 7 Page 8 of 8 Pages
23. APPROVAL/DISAPPROVAL
Figure 1 Page 2 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 2
SCR NUMBER & REV:
SOFTWARE CHANGE REQUEST (SCR), Figure 3
SCR NUMBER & REV:
SCR NUMBER and REV:
SOFTWARE CHANGE REQUEST (SCR), Figure 6
SCR NUMBER and REV:
SCR NUMBER and REV:
Title: CALIBRATION CERTIFICATE
Number: DI-QCIC-80798B Approval Date: 20050328 AMSC Number: F7554 Limitation:
DTIC Applicable: GIDEP Applicable:
Preparing Activity: AFMETCAL DET 1/MLE Applicable Forms: None Use, Relationships:
This Data Item Description (DID) contains the format and content requirements for calibration reports or certificates accompanying calibrations performed on DoD test, measurement, and diagnostic equipment.
This DID is applicable to contracts requiring calibration of test equipment prior to delivery. This DID is consistent with ISO 17025 requirements for calibration reports or certificate.
This DID supersedes DI-QCIC-80798A.
Requirements:
1. Format. Contractor format is acceptable.
2. Content. The calibration certificate or report shall include:
a. title (e.g., calibration report or calibration certificate);
b. the name and address of the laboratory, and the location where the calibrations were carried out, if different from the address of the laboratory;
c. unique identification of the test report or calibration certificate (such as the serial number), and on each page an identification in order to ensure that the page is recognized as a part of the test report or calibration certificate, and a clear identification of the end of the test report or calibration certificate;
d. the name and address of the client or customer;
e. identification of the method used;
f. a description of, the condition of, and unambiguous identification of the item(s) tested or calibrated;
g. the date of receipt of the test or calibration item(s) where this is critical to the validity and application of the results, and the date(s) of performance of the test or calibration;
Downloaded from http://www.everyspec.com
DI-QCIC-80798B
h. reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results;
i. the test or calibration results with, where appropriate, the units of measurement;
j. the name(s), function(s) and signature(s) or equivalent identification of person(s) authorizing the test report or calibration certificate;
k. where relevant, a statement to the effect that the results relate only to the items tested or calibrated;
l. the conditions (e.g. environmental) under which the calibrations were made that have an influence on the measurement results;
m. the uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof;
n. evidence that the measurements are traceable.
End of DI-QCIC-80798B
Downloaded from http://www.everyspec.com
Source: http://assist.dla.mil -- Downloaded: 2019-06-10T17:16Z
Source: http://assist.dla.mil -- Downloaded: 2019-06-10T17:16Z
Title: COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND ASSOCIATED
SUPPLEMENTAL DATA
Number: DI-TMSS-80527C Approval Date: 20110812 AMSC Number: 9207 Limitation: No DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: TM
Applicable Forms: None
Use/relationship: Commercial Off-the-Shelf Manuals may be used as is or with supplementation to support COTS equipment used by DOD. This DID is used to:
a. Acquire sample COTS manuals for evaluation.
b. Acquire COTS manuals which have been evaluated and found to be acceptable.
c. Acquire associated supplemental data, if required.
This DID contains format, content, and intended use information for the data deliverable(s) resulting from the work described in MIL-PRF-32216.
This DID supersedes DI-TMSS-80527B, dated 17 Oct 2006.
Requirements:
1. Content. The manual shall contain all technical information on the assembly, installation, operation, parts, and maintenance of commercial equipment.
2. Evaluation. The manual shall be evaluated using the criteria found in MIL-PRF-32216.
3. Supplementation. The manual may be supplemented with additional data to comply with contract. Supplemental data shall be prepared in accordance with MIL-PRF-32216.
4. Format. The basic manual shall be in the contractor's format. Supplemental data shall be in the format specified by the contracting activity.
5. Digital files. Interactive Electronic Technical Manuals (IETMs) or PDFs are preferred for electronic COTS manuals.
6. PDF Files. PDF files shall be searchable, capable of having links added, and have fonts embedded.
7. IETMs. IETMs shall meet the general style and format and user interface requirements in MIL-PRF-87268 or MIL-STD-40051-1 (Army only) or MIL-STD-3031 (Army only).
8. Paper manuals. If paper manuals are acquired, the data shall be clearly legible and on paper of sufficient quality for long term use.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD A TDP________ TM _______ OTHER QCIC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Pulsed RF Calibration Source N64267-22-D-XXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A001 CALIBRATION CERTIFICATION Calibration Report
II
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-QCIC-80798B
(See Block 16)
SOW Paragraph: 5.1.2
NAWCAD BL31400 TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASGEN
(See Block 16) (See Block 16)
A b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
a. ADDRESSEE Final
A N/A N/A Draft Reg. Repro
16. REMARKS Patrick Brannick 1 1 Block 4/5: DI-QCIC-80798B and SOW paragraph 5.1.2 shall be used as guidance and are provided for reference. Information items in DI-QCIC-80798B that are not relevant to the procured unit do not need to be included in format. Actual calibration data should be contained in the calibration report related to the certificate.
Block 8: Calibration Report (CDRL A001 subtitle) requires government approval.
The contractor shall provide a preliminary draft of the Calibration Report with data to the Government for review, comment, and approval of the format no later than (NLT) 60 calendar days prior to initial operating capability (IOC) for each system.
IOC shall be defined as the delivery date of the initial order of system(s).
Government will provide the contractor with approval/disapproval of format including comments within 15 days of receipt of preliminary draft. Contractor shall provide a government approved final version with incorporated comments NLT 30 days prior to IOC for first system.
Block 10: Frequency of Calibration Report shall be generated for each system installed.
Block 12: Date of first submission shall be no later than (NLT) 60 calendar days prior to initial operating capability (IOC) of the first system procured.
Block 13: Date of subsequent submissions: N/A
Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and copies shall be provided in accordance with (IAW) CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.
Block 16: This CDRL refers only to the format of the Calibration Report printed by the calibration standards, it is not intended that the contractor run actual US Navy workload for calibration.
NAWCAD BL31400
Corry Barnhouse 1 1 0
NAWCAD AA14200
Heather M. Loprano
NAWCAD BL31400 1 1 0
Alexander Dymek
NAWCAD AA14200 1 1 0
Copies with each unit delivered
0 1 0
15. TOTAL 4 5 0
G. PREPARED BY
H. DATE I. APPROVED BY J. DATE
P. Brannick, NAWCAD BL31400 04/22/2021 K. Bergland, NSWCCOR, MS35 CDM 06/21/2021 DD Form 1423-1 JUN 90 Previous editions are obsolete. Page 1 of 2 Pages
DD FORM 1423 (CDRL) Supplemental
BLOCK 14 ENTRY COMPLETE ADDRESS
Patrick Brannick, patrick.brannick@navy.mil Metrology and Calibration Branch
NAWCAD BL31400
JB MDL
Highway 547, Building 120-3, Rm. 269 Lakehurst, NJ 08733
Corry Barnhouse, corry.barnhouse@navy.mil Metrology Engineering Product Support Branch
NAWCAD METCAL AA14200
Bldg 1403 22113 Fortin Circle, Unit 7 Patuxent River, MD 20670
Heather M. Loprano, heather.loprano@navy.mil Metrology and Calibration Branch
NAWCAD BL31400
JB MDL
Highway 547, Building 120-3, Rm. 269 Lakehurst, NJ 08733
Alexander Dymek, alex.dymek@navy.mil Metrology Engineering Product Support Branch
NAWCAD METCAL AA14200
Bldg 1403 mailto:patrick.brannick@navy.mil mailto:corry.barnhouse@navy.mil mailto:heather.loprano@navy.mil
Page 2 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
TBD E TDP________ TM __ ____ OTHER CQIC
A002 Inspection and Test Plan Instrument Calibration Procedure
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-QCIC-81110
SOW Paragraph 5.1.3
XX C
(See Block 16) (See Block 16) (See Block 16)
b. COPIES
Draft Reg. Rep ro
16. REMARKS Patrick Brannick 1 1 0 Block 4/5: DI-QCIC-81110 and SOW Paragraph 5.1.3 shall be used as guidance and are provided for reference.
Block 8: Instrument Calibration Procedure (CDRL A002 subtitle) for each system requires government approval. Contractor shall provide a preliminary draft to the government for review, comment, and approval no later than (NLT) 90 calendar days prior to initial operating capability (IOC). IOC shall be defined as the delivery date of the initial order of system(s). Government will provide the contractor with approval/disapproval of content and/or format including comments within 15 days of receipt of preliminary draft. Contractor shall provide a government approved final version with incorporated comments NLT 30 days prior to IOC of each system.
Block 9: DISTRIBUTION STATEMENT C. DISTRIBUTION AUTHORIZED TO
U. S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS TO PROTECT
PUBLICATIONS REQUIRED FOR OFFICIAL USE OR FOR ADMINISTRATIVE
OR OPERATIONAL PURPOSES ONLY. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO MEASUREMENT SCIENCE
DIRECTORATE, NAVAL SURFACE WARFARE CENTER, CORONA
DIVISION, P.O. BOX 5000, CORONA.
Block 10/11/12/13: Submissions shall be provided with each System delivered as specified in the delivery schedule of the contract.
Block 14: Submission in contractor format is acceptable. Electronic format is desired and acceptable if in MS-Excel or MS Word. Electronic submission of data shall also be on CD-ROM. Quantity and copies shall be provided IAW CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.
NAWCAD AA14200
Heather M. Loprano
NAWCAD BL31400 1 1 0
Alexander Dymek
NAWCAD AA14200 1 1 0
P. Brannick NAWCAD BL31400 4/22/2021 K. Bergland, NSWCCOR, MS35 CDM 06/21/2021
1077/183
BLOCK 14 ENTRY COMPLETE ADDRESS
Patrick Brannick, patrick.brannick@navy.mil Metrology and Calibration
NAWCAD BL31400JB MDL
NAWCAD AA14200NAVAIR
Bldg 1403
Metrology and Calibration
NAWCAD BL31400
JB MDL
Highway 547, Building 120-3, Rm. 269 Lakehurst, NJ 08733
Alexander Dymek, alex.dymek@navy.mil Metrology Engineering Product Support Branch
NAWCAD METCAL AA14200
Bldg 1403
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
TBD A TDP________ TM __ ____ OTHER ILSS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Proposed Spare Parts List Repairable Parts List
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ILSS-80134A
SOW Paragraph 5.1.4 (See Block 16)
ASGEN
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
16. REMARKS Patrick Brannick
1 1 0
Block 4/5: DI-ILSS-80134A and SOW Paragraph 5.1.4 shall be used as guidance and are provided for reference. Information items in DI-ILSS-80134A that are not relevant to the procured unit do not need to be included in format.
Block 8: Repairable Parts List (CDRL A005 subtitle) requires government approval.
Contractor shall provide a preliminary draft to the Government for review, comment, and approval no later than (NLT) 60 calendar days prior to initial operating capability (IOC) for each system. Government will provide the contractor with approval/disapproval of content and/or format including comments within 15 days of receipt of preliminary draft. Contractor shall provide a government approved final version with incorporated comments NLT 30 days prior to IOC. IOC shall be considered the delivery date for the first system(s) ordered by the government.
Block 9: DISTRIBUTION STATEMENT C. DISTRIBUTION AUTHORIZED TO
U. S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS TO PROTECT
PUBLICATIONS REQUIRED FOR OFFICIAL USE OR FOR ADMINISTRATIVE
OR OPERATIONAL PURPOSES ONLY. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO MEASUREMENT SCIENCE
DIRECTORATE, NAVAL SURFACE WARFARE CENTER, CORONA
DIVISION, P.O. BOX 5000, CORONA.
Block 10/11/12: Final Repairable Parts List(s) submissions shall be provided with each new system delivered.
Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and copies shall be provided IAW CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.
NAWCAD AA14200
Heather M. Loprano
NAWCAD BL31400 1 1 0
Alexander Dymek
NAWCAD AA14200 1 1 0
P. Brannick NAVAIRLKE 41L4 21 DEC 2020 K. Bergland, NSWCCOR, MS35 CDM 06/21/2021
BLOCK 14 ENTRY COMPLETE ADDRESS
Patrick Brannick, patrick.brannick@navy.mil Metrology and Calibration
NAWCAD BL31400
JB MDL
NAWCAD METCAL AA14200
Bldg 1403
NAWCAD BL31400
JB MDL
Alexander Dymek, alex.dymek@navy.mil
NAWCAD METCAL AA14200
Bldg 1403
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
TBD A TDP________ TM __ ____ OTHER MISC
Pulsed RF Calibration Source N64267-21-R-XXXX TBD
A004 Syllabus Training Course Syllabus
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
SOW Paragraph 5.1.5 (See Block 16)
ONE/R
8. APP CODE 11. AS OF DATE
13. DATE OF SUBSEQUENT
N/A
N/A
16. REMARKS Patrick Brannick
1 1 0
Block 4/5: DI-MISC-81459A and SOW Paragraph 5.1.5 shall be used as guidance and are provided for reference. Information items in DI-MISC-81459A that are not relevant to the procured unit do not need to be included in format.
Block 8: Training Course Syllabus (CDRL A006 subtitle) requires government approval. Contractor shall provide a preliminary draft to the Government for review, comment, and approval no later than (NLT) 60 calendar days prior to date of scheduled training class. Government will provide the contractor with approval/disapproval of content and/or format including comments within 15 days of receipt of preliminary draft. Contractor shall provide a government approved final version with incorporated comments NLT 30 days prior to training class(s).
Block 9: DISTRIBUTION STATEMENT C. DISTRIBUTION AUTHORIZED TO
U. S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS TO PROTECT
PUBLICATIONS REQUIRED FOR OFFICIAL USE OR FOR ADMINISTRATIVE
OR OPERATIONAL PURPOSES ONLY. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO MEASUREMENT SCIENCE
DIRECTORATE, NAVAL SURFACE WARFARE CENTER, CORONA
DIVISION, P.O. BOX 5000, CORONA.
Block 12: Final submission of Training Course Syllabus shall be provided 30 days prior to training class and Qty. (10) copies provided to training class attendees on site(s).
Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and
NAWCAD AA14200
Heather M. Loprano 1 1 0
NAWCAD BL31400
Alexander Dymek 1 1 0
NAWCAD AA14200
Copies at training site(s) 0 10 0
15. TOTAL 3 14 0
P. Brannick NAVAIRLKE 41L4 21 DEC 2020 K. Bergland, NSWCCOR, MS35 CDM 06/21/2021
BLOCK 14 ENTRY COMPLETE ADDRESS
Patrick Brannick, patrick.brannick@navy.mil Metrology and Calibration
NAWCAD BL31400
JB MDL
NAWCAD METCAL AA14200
Bldg 1403
NAWCAD BL31400
JB MDL
Alexander Dymek, alex.dymek@navy.mil
NAWCAD METCAL AA14200
Bldg 1403
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A005 Software Version Description (SVD) Software/Firmware Version Description
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81442A
SOW Paragraph 5.1.6
a. ADDRESSEE
Block 4/5: DI-IPSC-81442A shall be used as guidance and is provided for reference.
SOW Paragraph 5.1.6 is mandatory to this requirement.
Block 8: Prior notification and government approval of all Software/Firmware Version Description(s) (CDRL A005 subtitle) for each system is required by the government. Contractor shall provide a Software/Firmware Version Description to the government for review, comment, and approval no later than (NLT) 15 calendar days prior to installation of software and/or firmware revisions to any system.
Government comments with or without approval will be provided to the contractor within 15 days of receipt of Software/Firmware Version Description providing information explained in DI-IPSC-81442A.
Block 9: DISTRIBUTION STATEMENT C. DISTRIBUTION AUTHORIZED TO
U. S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS TO PROTECT
PUBLICATIONS REQUIRED FOR OFFICIAL USE OR FOR ADMINISTRATIVE
OR OPERATIONAL PURPOSES ONLY. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO MEASUREMENT SCIENCE
DIRECTORATE, NAVAL SURFACE WARFARE CENTER, CORONA
DIVISION, P.O. BOX 5000, CORONA.
Block 10/11/12/13: Submission(s) of Software/Firmware Version Description (s) apply to new systems and shall be provided to the government prior to each software/firmware change to the initial operating capability (IOC) of each system.
IOC of a system is defined as its delivery date.
Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and
NAWCAD AA14200
Heather M. Loprano
NAWCAD BL31400 1 1 0
Alexander Dymek
NAWCAD AA14200 1 1 0
P. Brannick NAWCAD BL13400 21 DEC 2020 K. Bergland, NSWCCOR, MS35 CDM 06/21/2021
BLOCK 14 ENTRY COMPLETE ADDRESS
Patrick Brannick, patrick.brannick@navy.mil Metrology and Calibration Branch
NAWCAD BL31400
JB MDL
NAWCAD METCAL AA14200
Bldg 1403
NAWCAD BL31400
JB MDL
Highway 547, Building 120-3, Rm. 269 Lakehurst, NJ 08733
Alexander Dymek, alex.dymek@navy.mil Metrology Engineering Product Support Branch
NAWCAD METCAL AA14200
Bldg 1403
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
Pulsed RF Calibration Source N64267-22-D -XXXX TBD
A006 Software/Firmware Change Request Software/Firmware Change Request
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
SOW Paragraph 5.1.7
a. ADDRESSEE
Block 4/5: DI-MISC-81807 shall be used as guidance and is provided for reference.
SOW Paragraph 5.1.7 is mandatory to this requirement.
Block 8: Prior notification and government approval of all Software/Firmware Change Request(s) (CDRL A006 subtitle) for each system is required by the government. Contractor shall provide a Software/Firmware Change Request to the government for review, comment, and approval no later than (NLT) 15 calendar days prior to installation of software and/or firmware revisions to any system. Government comments with or without approval will be provided to the contractor within 15 days of receipt of Software/Firmware Change Request providing information explained in
DI-MISC-81807.
Block 9: DISTRIBUTION STATEMENT C. DISTRIBUTION AUTHORIZED TO
U. S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS TO PROTECT
PUBLICATIONS REQUIRED FOR OFFICIAL USE OR FOR ADMINISTRATIVE
OR OPERATIONAL PURPOSES ONLY. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO MEASUREMENT SCIENCE
DIRECTORATE, NAVAL SURFACE WARFARE CENTER, CORONA
DIVISION, P.O. BOX 5000, CORONA.
Block 10/11/12/13: Submission(s) of Software/Firmware Change Request(s) apply to both new and upgraded systems and shall be provided to the government prior to each software/firmware change to the initial operating capability (IOC) of each system. Upgraded systems are defined as systems bought under the contract that this CDRL is attached to at an earlier date whether still under warranty or not.
Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and
NAWCAD AA14200
Heather M. Loprano
NAWCAD BL31400 1 1 0
Alexander Dymek
NAWCAD AA14200 1 1 0
15. TOTAL 4 4 0
P. Brannick NAWCAD BL31400 21 DEC 2020 K. Bergland, NSWCCOR, MS35 CDM 06/21/2021
BLOCK 14 ENTRY COMPLETE ADDRESS
Patrick Brannick, patrick.brannick@navy.mil Metrology and Calibration Branch
NAWCAD BL31400
JB MDL
NAWCAD METCAL AA14200
Bldg 1403
NAWCAD BL31400
JB MDL
Highway 547, Building 120-3, Rm. 269 Lakehurst, NJ 08733
Alexander Dymek, alex.dymek@navy.mil Metrology Engineering Product Support Branch
NAWCAD METCAL AA14200
Bldg 1403
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
TBD T TDP________ TM TMSS OTHER _________
T001 Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data
Operator/Service Manual
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-TMSS-80527C
SOW Paragraph 5.1.1
N/A (See Block 16)
Block 4/5: DI-TMSS-80527C shall be used as guidance and is provided for reference. SOW paragraph 5.1.1 is mandatory to this requirement.
Block 8: Operator/Service Manual(s) (CDRL T001 subtitle) requires government approval. Contractor shall provide an Illustrated Parts Breakdown (IPB) within the manual(s). Contractor shall provide a preliminary draft to the government for review, comment, and approval no later than (NLT) 30 calendar days prior to acceptance testing. Government will provide the contractor with comments NLT 15 calendar days of receipt of preliminary draft. Contractor shall provide a government approved final version with incorporated comments NLT 30 days prior to initial operating capability (IOC) of each system to addressees in accordance with (IAW) CDRL T001 distribution (Block 14a).
Block 9: DISTRIBUTION STATEMENT C. DISTRIBUTION AUTHORIZED TO
U. S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS TO PROTECT
PUBLICATIONS REQUIRED FOR OFFICIAL USE OR FOR ADMINISTRATIVE
OR OPERATIONAL PURPOSES ONLY. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO MEASUREMENT SCIENCE
DIRECTORATE, NAVAL SURFACE WARFARE CENTER, CORONA
DIVISION, P.O. BOX 5000, CORONA.
Block 10/12/13: Submissions of Operator/Service Manual(s) shall be provided with each new system being delivered.
Block 14: Submission in contractor format is acceptable. Electronic format is desired and acceptable if in MS-Excel or MS Word. Electronic submission of data shall also be on CD-ROM and/or DvD media. Qty. (1) Operator/Service Manual shall be shipped with each Calibration Standard installed. Quantity and copies shall be provided IAW CDRL T001 distribution (Block 14a). Addressee's POC information provided on CDRL supplemental page 2.
Block 16: The US government shall have limited technical data rights for all technical manuals and documents furnished with the procured commercial items, for the purpose of Government use only in duplicating or posting technical documentation to limited access web sites for use by US Government Personnel and Contractors engaged in maintenance, calibration or related logistics activities associated with the procured commercial items in accordance with DFARS 252.227-7015 Technical Data--Commercial Items.
NAWCAD AA14200
Heather M. Loprano
NAWCAD BL31400 1 1 0
Alexander Dymek
NAWCAD AA14200 1 1 0
P. Brannick NAWCAD BL31400 04/22/2021
K. Bergland, NSWCCOR, MS35 CDM 06/21/2021
BLOCK 14 ENTRY COMPLETE ADDRESS
Patrick Brannick, patrick.brannick@navy.mil Metrology and Calibration Branch
NAWCAD BL31400
JB MDL
NAWCAD METCAL AA14200
Bldg 1403
NAWCAD BL31400
JB MDL
Highway 547, Building 120-3, Rm. 269 Lakehurst, NJ 08733
Alexander Dymek, alex.dymek@navy.mil Metrology Engineering Product Support Branch
NAWCAD METCAL AA14200
Bldg 1403
CONTRACT DATA REQUIREMENTS LIST
Form Approved
File details come from the government source that posted it. Updated .