About this file

This Request for Proposal (RFP #27-PPW-006) is issued by the Town of Los Gatos, California, seeking professional consulting services to conduct a comprehensive operational assessment of the Public Works Engineering Team. The Town requires a detailed evaluation of organizational effectiveness, staffing levels, business processes, service delivery practices, policies, procedures, and resource allocation across the Engineering Team, which currently consists of a Town Engineer, three senior engineers, two associate engineers, one senior construction manager, one senior inspector, one permit technician, one senior transportation planner, and various part-time staff, consultants, and interns. The assessment shall identify opportunities to improve efficiency, effectiveness, customer service, project delivery, and organizational resiliency. Electronic proposals must be submitted through the Town's bidding portal by Tuesday, December 8, 2026, at 1:00 PM. No pre-proposal conference or site tour will be held. The resulting agreement will be for a one-year term beginning January 2027 with no renewal options.

The proposal evaluation consists of two phases: Phase I (Pass/Fail responsiveness determination) and Phase II (points-based scoring on cover letter, project approach and scope of services, lump sum fee, firm qualifications and expertise, and project team experience, totaling 100 points). Proposers must demonstrate government performance auditing experience, municipal government auditing experience, and experience assessing and evaluating municipal engineering operations and staffing. The Town will negotiate with the highest-ranked proposer, proceeding to subsequent ranked proposers if necessary. Payment shall be made on a lump sum basis not-to-exceed the amount proposed by the selected consultant, including all direct costs and overhead. Proposers must obtain and maintain comprehensive insurance coverage as specified in the sample agreement, provide proof of a Town of Los Gatos Business Tax Certificate, submit a completed W-9 form, and comply with all nondiscrimination and equal employment opportunity conditions. Questions must be submitted by 2:00 PM on December 1, 2026, through the bidding portal.

View the file

Other files

File Type Posted
Agreement_For_Services_SAMPLE.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

FOR

PUBLIC WORKS ENGINEERING ORGANIZATIONAL

ASSESSMENT

27-PPW-006

Proposal Opening

Tuesday, December 8, 2026, 1:00 pm

ISSUE DATE: November 16, 2026

Request For Proposal #27-PPW-006 Title: Public Works Engineering Organizational Assessment

PUBLIC WORKS ENGINEERING ORGANIZATIONAL ASSESSMENT

TABLE OF CONTENTS

1. Scope of Work

2. Instructions to Proposers

3. Required Information

4. Evaluation, Selection and Award Process

5. Evaluation Criteria

6. Agreement & Payment

7. General Terms & Conditions

8. Attachments

9. Vendor Questionnaire

Attachments:

A - Sample Agreement

1. Scope of Work

1.1. Introduction

The Town seeks professional consulting services to conduct a comprehensive operational assessment of the Public

Works Engineering Team. The purpose of the assessment is to evaluate organizational effectiveness, staffing levels, business processes, service delivery practices, policies, procedures, and resource allocation. The assessment shall identify opportunities to improve efficiency, effectiveness, customer service, project delivery, and organizational resiliency while ensuring the Town can successfully meet current and future service demands.

The following is a general scope of work for Consultant's consideration. This may not represent all tasks that are required but is intended to provide the Town's basic expectations. Consultants are asked to provide a Scope of Services and associated Fee Proposal as part of their response to this RFP.

1.2. Project Initiation

Conduct a project kickoff meeting with Town leadership and Parks and Public Works leadership

Review project goals, schedule, deliverables, communication protocols, and stakeholder engagement approach.

Prepare a detailed project work plan outlining methodology, milestones, information requests, and schedule for meetings with Town staff.

1.3. Organizational and Service Delivery Assessment

Evaluate the structure, functions, and responsibilities of the Public Works Engineering Team, including:

• Capital Improvement Program (CIP) project planning, management and delivery.

• Construction management and inspection.

• Development review and permit processing.

• Traffic engineering and transportation functions.

• Utility coordination.

• Regulatory compliance activities.

• Public inquiries and customer service functions.

• Interdepartmental coordination.

• Consultant management and contract administration.

The assessment should identify:

• Organizational strengths and challenges.

• Areas of duplicated effort or service gaps.

• Role clarity and accountability.

• Alignment of organizational structure with current responsibilities.

• Opportunities for improved coordination and communication.

1.4. Business Process Evaluation

Document and assess key engineering workflows and business processes, including:

• CIP planning and project delivery processes.

• Development review workflows.

• Encroachment permit processes.

• Plan review and approval procedures.

• Traffic studies and engineering requests.

• Procurement and consultant management.

• Project tracking and reporting.

• Inspection process and documentation.

• Public communication procedures.

• Coordination with other Town departments and external agencies.

The evaluation will allow the consultant to:

• Prepare process maps for major workflows.

• Identify bottlenecks, inefficiencies, redundancies, and risks.

• Evaluate use of technology and data systems.

• Identify opportunities for process automation and standardization.

• Benchmark practices against comparable municipalities.

1.5. Staffing and Workload Analysis

Evaluate staffing adequacy and workload distribution across the Engineering Team.

The analysis shall include:

• Inventory of existing positions and responsibilities.

• Review of workload metrics and service demand indicators.

• Assessment of current and anticipated project workload.

• Evaluation of supervisory spans of control.

• Assessment of employee utilization and workload balancing.

• Evaluation of succession planning risks and organizational resiliency.

• Identification of specialized skill requirements.

• Assessment of consultant versus in-house resource utilization.

In performing this assessment the Consultant might consider:

• Current service demands.

• CIP program size and complexity.

• Development activity levels.

• Future growth and infrastructure investment needs.

• Regulatory requirements.

• Resident service expectations.

• Engineering staffing levels of comparable California municipalities

1.6. Review of Policies and Procedures

The Consultant shall review existing policies, procedures, performance measures, and management practices affecting

Engineering Team operations.

The review shall include:

• Operating procedures and standards.

• Development review policies.

• Project management practices.

• Performance monitoring and reporting practices.

• Customer service standards.

• Consultant management procedures.

• Documentation and recordkeeping practices.

• Risk management practices.

The Consultant shall identify opportunities to:

• Clarify policies and responsibilities.

• Improve consistency and accountability.

• Establish measurable service standards.

• Enhance performance monitoring and reporting.

1.7. Interviews and Meetings

The Consultant should provide outreach and engagement to the following groups as part of the evaluation.

• Town Manager

• Town Attorney

• Public Works Engineering and Administrative Staff

• Community Development Department staff.

1.8. Organization and Operational Recommendations

Based on results of the prior tasks develop recommendations to optimize Engineering Team operations to address:

Organizational Structure.

Staffing Plan including recommended staffing levels, position classifications and competencies, and short, medium and long term staffing needs.

Operational Improvements such as

• Process streamlining.

• Technology improvements.

• Project management enhancements.

• Performance management framework.

• Customer service improvements.

• Training and professional development needs.

The product of this work should include an implementation roadmap that prioritizes the recommendations. The recommendations should include immediate, short, medium and long-term actions. The actions should be ranked and prioritized based on cost and impact, and identify key performance indicators and responsible parties.

1.9. Final Report and Presentation

Provide a final comprehensive report documenting existing conditions, analyses and assessments performed, recommendations and the implementation roadmap. Assume preparation for and attendance at two meetings at two in person meetings: one with the Town Manager, the second with Town Council.

2. Instructions to Proposers

2.1. Proposal documents

The Project Documents, including this RFP are available via the Town’s bidding site at https://procurement.opengov.com/portal/losgatosca. The Town is not responsible for the completeness of Project

Documents located through another service.

2.2. Submission of Bid Proposals

The Town will accept electronic proposals only, in response to this RFP submitted on or before Tuesday, December 8, 2026 at 1:00 pm through the bidding portal: https://procurement.opengov.com/portal/losgatosca which time the proposals will be opened electronically.

2.3. Pre-Proposal Conference and Site Tour

There will be no pre-proposal conference or site tour for this Request for Proposals.

2.4. Examination of Proposal Documents

The submission of a proposal shall be deemed a representation and certification by the Proposer that they:

A. Have carefully read and fully understand the information that was provided by the Town to serve as the basis for submission of this proposal.

B. Have the capability to successfully undertake and complete the responsibilities and obligations of the proposal being submitted.

C. Represent that all information contained in the proposal is true and correct.

D. Did not, in any way, collude, conspire to agree, directly or indirectly, with any person, firm, corporation or other

Proposer in regard to the amount, terms or conditions of this proposal.

E. Acknowledge that the Town has the right to make any inquiry it deems appropriate to substantiate or supplement information supplied by Proposer, and Proposer hereby grants the Town permission to make these inquiries, and to provide any and all related documentation in a timely manner.

2.5. Modification of Proposal

No request for modification of the proposal shall be considered after its submission on grounds that Proposer was not fully informed of any fact or condition.

2.6. Questions

Any questions by the Proposer regarding this RFP or the project must be submitted through bidding portal https://procurement.opengov.com/portal/losgatosca and received by the Town no later than 2:00 pm on Tuesday, December 1, 2026

The Town shall not be responsible for nor be bound by any oral instructions, interpretations, or explanations issued by the Town or its representatives.

Responses from the Town to questions by any Proposer will be communicated via addendum to all recipients of this

RFP. Questions received after the date and time stated above will not be accepted and will be returned to sender/s without response.

2.7. Addenda

https://procurement.opengov.com/portal/losgatosca https://procurement.opengov.com/portal/losgatosca.at

Any addenda issued by Town shall be in writing, shall be posted to the town's bidding website https://procurement.opengov.com/portal/losgatosca, shall become a part of this RFP, and shall be acknowledged and responded to by Proposer.

2.8. Withdrawal of Proposal

A Proposer may withdraw its proposal at any time before the expiration of the time for submission of proposals as provided in the RFP by delivering a written request for withdrawal signed by, or on behalf of, the Proposer.

3. Required Information

3.1. INFORMATION REQUIRED TO BE SUBMITTED WITH THE PROPOSAL

These guidelines govern the format and content of the Proposal. The intent of the RFP is to encourage responses that clearly communicate the Proposer’s understanding of the Town’s requirements and the Proposer’s ability to meet those requirements.

The Proposal should include the following information:

• Vendor Questionnaire per Section 9 of this Request for Proposals

• Cover letter describing how the Proposer can meet the needs of the Town and stating all deviations or exceptions to the Town's standard agreement, if any.

• Project Approach / Scope of Services.

• Lump Sum Fee for the Scope of Services provided by the Consultant

• Hourly rates for staff assigned to the Project,

• Relevant experience and expertise of the firm.

• Identification of the project team, including the main project contact.

• Resumes for the project team identifying relevant experience.

• Other relevant information to assist the Town in its selection.

3.2. REQUIRED QUALIFICATIONS

Government Performance Auditing Experience

Municipal Government Auditing Experience

Experience Assessing and Evaluating Municipal Engineering Operations and Staffing

4. Evaluation, Selection and Award Process

4.1. Evaluation, Selection and Award Process

RFP responses will be evaluated and ranked according to the evaluation criteria identified below by an evaluation committee composed of Town staff. The evaluation committee will open and review the Proposals in confidence.

After the initial proposal evaluation, the Town may determine that additional information is needed to establish the final ranking of proposers. The semi-finalists may be contacted and asked to:

• Conduct a scenario-based demonstration of the equipment or service;

• Revise the submitted proposal for the purpose of obtaining best and final offers; and/or

• Provide additional information to assist the Town in determining the best value proposer.

The Evaluation Committee will use all information collected to rank the ability of each Proposer to best meet the requirements of the Town.

Proposals will be evaluated in two phases:

• Phase I based on Responsiveness (Pass/Fail)

• Phase II based on completeness, of proposal, qualifications of the Firm and Team, Expertise, experience and

References (points) as per the Scoring Scale set forth in the evaluation criteria. Evaluation and scoring of

Proposals will be based on how likely the Proposal content meets or exceeds performance requirements for this

RFP. Each criterion has an assigned number of possible points and is divided into multiple sub-criteria. The sub-criteria are not equally weighted. The Proposal Narrative must respond to each sub-criterion, unless otherwise indicated.

The total maximum score for the evaluation of Proposals is one hundred points (100)

The proposals will be evaluated using the following interpretation guidelines:

Interpretation Guidelines for Ranking Criteria

Scoring

Scale % of

Possible

Points

Interpretation Explanation for Percentage Points

0% Not

Responsive

Response does not include or fails to address the requirements being scored. The omission(s), flaw(s), or defect(s) are significant and unacceptable.

10-30% Minimally

Responsive

Response minimally addresses the requirements being scored. The omission(s), flaw(s), or defect(s) are significant and unacceptable.

40-60% Inadequate Response addresses the requirements being scored, but there are one or more omissions, flaws, or defects or the requirements are addressed in such a limited way that it results in a low degree of confidence in the proposed solution.

70% Adequate Response adequately addresses the requirements being scored. Any omission(s), flaw(s), or defect(s) are inconsequential and acceptable.

75% Between

Adequate and

Good

Response better than adequately addresses the requirements being scored. Any omission(s), flaw(s), or defect(s) are inconsequential and acceptable.

80% Good Response fully addresses the requirements being scored with a good degree of confidence in the Proposer’s response or proposed solution. No identified omission(s), flaw(s), or defect(s). Any identified weaknesses are minimal, inconsequential, and acceptable.

85% Between Good and Excellent

Response fully addresses the requirements being scored with a better than good degree of confidence in the Proposer’s response or proposed solution. No identified omission(s), flaw(s), or defect(s). Any identified weaknesses are minimal, inconsequential, and acceptable.

90% Excellent Response fully addresses the requirements being scored with a high degree of confidence in the Proposer’s response or proposed solution. Proposer offers one or more enhancing features, methods or approaches exceeding basic expectations.

95% Between

Excellent and

Exceptional

Response fully addresses the requirements being scored with a better than excellent degree of confidence in the Proposer’s response or proposed solution.

Proposer offers one or more enhancing features, methods or approaches exceeding basic expectations.

100% Exceptional All requirements are addressed with the highest degree of confidence in the

Proposer’s response or proposed solution. The response exceeds the requirements in providing multiple enhancing features, a creative approach, or an exceptional solution.

4.2. NEGOTIATIONS

Upon the Town’s final ranking of Proposals, the Proposers shall be prepared to enter into the Agreement. The Town will first begin negotiations with the top-ranked Proposer(s). If the Town and the top-ranked Proposer(s) do not reach an agreement, then the Town may negotiate with the next highest-ranked Proposer. This process will continue until the

Town reaches an agreement with a Proposer(s) or terminates the procurement. The Town may begin negotiating with the next highest-ranked Proposer whenever the Town determines that doing so is in its best interest, and the Town may negotiate with more than one Proposer at the same time.

The failure of the highest-ranked Proposer to comply with any of the requirements of this section shall constitute grounds for the Town to negotiate the Agreement with the next top-ranked Proposer. Upon completion of successful negotiations, the Town will notify all Proposers of the outcome and staff's proposed recommendation for Award.

5. Evaluation Criteria

Phase 1

No. Evaluation Criteria Scoring Method Weight (Points)

1. Responsiveness

When determining Responsiveness of the Proposal, the Town may consider any of the following items:

• Proposal received on time and completed per instructions.

• Proposal contains required contents, forms and signatures submitted in accordance with RFP instructions.

• Proposal is compliant with specifications and industry standards.

• Possession of industry standard licensing and/or certifications.

• Financial capacity of the

Proposer.

• Experience or past performance of the Proposer.

• Use of Subcontractors /

Subconsultants.

• Past, Present and Pending

Legal Actions.

• Exceptions with Town's standard terms and conditions.

• Anticipated adherence with

Project delivery schedule.

• Ability to respond to Town’s inquiries for Proposal clarification.

If the Evaluation Committee determines, at its sole discretion, that

Pass / Fail 1 (100% of Total) the Proposer passes Phase 1, the

Evaluation Committee shall advance the Proposal to Phase 2.

Phase 2 - Proposal Evaluation Criteria

No. Evaluation Criteria Scoring Method Weight (Points)

1. Cover letter Points Based 10 (10% of Total)

2. Project Approach and Scope of

Services

Points Based 25 (25% of Total)

3. Lump Sum Fee Points Based 15 (15% of Total)

4. Firm Qualifications, Expertise, and

Experience

Points Based 25 (25% of Total)

5. Experience of Project Team Points Based 25 (25% of Total)

6. Agreement & Payment

6.1. Agreement Type and Payment Method

It is anticipated that the Agreement resulting from this RFP, if awarded, will be an Agreement for Services as shown in the Sample Agreement under Attachments. The method of payment to the successful Proposer shall be for services provided based on established rates for services with a maximum “not to exceed” fee as set by the Proposer in the

Proposal or as negotiated between the Proposer and the Town as being the maximum cost to perform all work. This figure shall include direct costs and overhead, such as, but not limited to, materials, delivery, transportation, communications, and any subcontracted items of work.

Proposers shall be prepared to accept the terms and conditions of the Agreement, including Insurance Requirements. If a Proposer desires to take exception to the Agreement, Proposer shall provide the following information in the Cover

Letter of their submittal package:

• Clearly identify each proposed change to the Agreement, including all relevant Attachments.

• Furnish the reasons for each proposed change, as well as specific recommendations for alternative language.

The above factors will be taken into account in evaluating Proposals. Proposals that take exceptions to the proposed

Agreement may be determined by the Town, at its sole discretion, to be unacceptable and no longer considered for award.

6.2. Term of Agreement

The term of this Agreement is for One (1) year period beginning January 2027, with no option to renew the Agreement.

6.3. Agreement Implementation

Upon award notification and prior to final Agreement approval, the successful proposer will be required to submit:

• Proof of insurance compliance documentation as specified herein

• Documentation of all credentials necessary to legally perform the Project specified

• A completed W9 form and, if applicable, non-resident withholding exemption form, if not already on file with the Town

• Proof of a current Town of Los Gatos Business Tax Certificate

The finalized Agreement will be in the form included as Sample Agreement under Attachments herein, and shall include the RFP documents, the Proposer’s response, including Cost Proposal, and any negotiated modifications agreed to by the parties.

7. General Terms & Conditions

7.1. RIGHTS OF THE TOWN OF LOS GATOS

This RFP does not commit the Town to enter into an Agreement, nor does it obligate the Town to pay for any costs incurred in preparation and submission of Proposals or in anticipation of an Agreement. The Town reserves the right to:

• Make the selection based on its sole discretion;

• Reject any and all Proposals;

• Issue subsequent Requests for Proposals;

• Postpone opening Proposals for its own convenience;

• Remedy errors in the Request for Proposals process;

• Approve or disapprove the use of particular subconsultants;

• Negotiate with any, all, or none of the Proposers regarding project scope;

• Accept other than the highest ranked Proposal;

• Waive informalities and irregularities in the Proposals; and/or

• Enter into an agreement with another Proposer in the event the originally selected Proposer defaults or fails to execute an agreement with the Town.

An Agreement shall not be binding or valid with the Town unless and until it is executed by authorized representatives of the Town and of the Proposer.

7.2. INSURANCE REQUIREMENTS

The selected Proposer(s), at Proposer’s sole cost and expense and for the full term of the agreement or any extension thereof, shall obtain and maintain, at a minimum, all of the insurance requirements outlined in the sample Agreement attached in this RFP.

All policies, endorsements, certificates, and/or binders shall be subject to the approval of the Town of Los Gatos as to form and content. These requirements are subject to amendment or waiver, if so approved in writing by the Town of Los

Gatos. The selected Proposer agrees to provide the Town with a copy of said policies, certificates, and/or endorsement upon award of Agreement.

7.3. PUBLIC NATURE OF PROPOSAL MATERIAL

Responses to this RFP become the exclusive property of the Town of Los Gatos. At such time as the Town awards an

Agreement, all Proposals received in response to this RFP become a matter of public record and shall be regarded as public records, with the exception of those elements in each Proposal which are defined by the Proposer as business or trade secrets and plainly marked as “Confidential,” “Trade Secret,” or “Proprietary.” The Town shall not in any way be liable or responsible for the disclosure of any such Proposal or portions thereof, if they are not plainly marked as

“Confidential,” “Trade Secret,” or “Proprietary,” or if disclosure, in the Town’s sole discretion, is required under the

California Public Records Act as addressed below. Any Proposal which contains language purporting to render all or significant portions of the Proposal “Confidential,” “Trade Secret,” or “Proprietary” shall be regarded as non-responsive.

Although the California Public Records Act recognizes that certain confidential trade secret information may be protected from disclosure, the Town of Los Gatos may determine, in its sole discretion that the information that a

Proposer submits is not a trade secret. If a request is made for information marked “Confidential,” “Trade Secret,” or

“Proprietary,” the Town will endeavor to provide the Proposer who submitted the information with reasonable notice to allow the Proposer to seek protection from disclosure by a court of competent jurisdiction, at the Proposer's sole expense.

7.4. COLLUSION

By submitting a Proposal, each Proposer represents and warrants that its Proposal is genuine and made in the interest of or on behalf of any person not named therein; that the Proposer has not directly induced or solicited any other person to submit a sham Proposal or any other person to refrain from submitting a Proposal; and that the Proposer has not in any manner sought collusion to secure any improper advantage over any other person submitting a Proposal.

7.5. CONFLICT OF INTEREST

Respondents to this RFP do so with the understanding that Contractors to the Town owe their professional responsibility solely to the Town. Proposers shall not have or obtain any holding or interest within the Town of Los Gatos. Proposers shall have no business holdings or agreements with any individual member of the staff or management of the Town or its representatives nor shall they enter into any such holdings or agreements. In addition, Proposers must warrant that as of the time of entering a contract they do not have and shall not acquire any direct or indirect interest adverse to those of the Town with regard to the services that are the subject of this RFP. Proposers shall immediately disassociate themselves from such an interest should they discover they exist and shall, at the Town's sole discretion, divest itself of such interest. Proposers shall not knowingly and shall take reasonable steps to ensure that they do not employ a person having such an interest in the performance of an agreement contemplated by this RFP. If after employment of a person, Proposers discover they have employed a person with a direct or indirect interest that would conflict with its performance of such agreement, Proposers must promptly notify Town of this employment relationship, and shall, at the Town's sole discretion, sever any such employment relationship.

7.6. DISQUALIFICATION

Factors, such as, but not limited to, any of the following, may disqualify a Proposal without further consideration:

• Evidence of collusion, directly or indirectly, among Proposers in regard to the amount, terms or conditions of this Proposal;

• Any attempt to improperly influence any member of the evaluation team;

• Existence of any lawsuit, unresolved contractual claim or dispute between Proposer and the Town;

• Evidence of incorrect information submitted as part of the Proposal;

• Evidence of Proposer’s inability to successfully complete the responsibilities and obligations of the Proposal; and

• Proposer’s default under any previous agreement with the Town.

7.7. NON-CONFORMING PROPOSAL

A Proposal shall be prepared and submitted in accordance with the provisions of the RFP instructions and specifications.

Any alteration, omission, addition, variance, or limitation of, from, or to a Proposal may be sufficient grounds for non-acceptance of the Proposal, at the sole discretion of the Town.

7.8. GRATUITIES

No person shall offer, give, or agree to give any Town employee any gratuity, discount, or offer of employment in connection with the award of Agreement by the Town. No Town employee shall solicit, demand, accept, or agree to accept from any other person a gratuity, discount, or offer of employment in connection with a Town Agreement.

7.9. FIRMS OR PERSONS NOT ELIGIBLE TO SUBMIT A PROPOSAL

To avoid any conflict of interest or perception of a conflict of interest, Proposer(s) selected to provide contractual services under this RFP will be subject to the following requirements:

• The Proposer or other entity who works on the procurement will be precluded from submitting Proposals as a prime Contractor or Subcontractor.

• The Proposer or any other entity who participated in the procurement shall not have a financial, ownership or other interest in any potential Proposer.

• Any Contractor or other entity who works on the grant application will be precluded from submitting a Proposal as a prime Contractor or Subcontractor.

7.10. NON-DISCRIMINATION / NON-PREFERENTIAL TREATMENT

The Town of Los Gatos hereby notifies all Proposers that it will affirmatively ensure that the contract entered into pursuant to this advertisement will be awarded to the highest evaluated responsible Proposer without discrimination on the grounds of race, color, national origin, sex, religion, age, or disability.

During the performance of this Agreement, the Contractor and its subcontractors shall not unlawfully discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, physical handicap, medical condition, marital status, age (over 40) or sex. The Contractor and subcontractors shall ensure that the evaluation and treatment of their employees and applicants for employment are free of such discrimination. The

Contractor and subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code, Section 12990 et seq.) and the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, Section 7285.0 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing

Government Code, Section 12990, set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations are incorporated into this contract by reference and made a part hereof as if set forth in full. The Contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.

The Contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the contract.

In the event the Town, as a result of supervising the Contractor's performance under the Agreement or after investigating a complaint by a third party, finds that the Contractor is or has been in violation of its agreement to comply with these Equal Employment Opportunity Conditions, notice of such violations shall be filed with the Town

Representative and given to the Contractor by depositing same in the United States mail, postage prepaid, addressed to the last known business address of the Contractor, with return receipt requested. Not later than 15 calendar days after the filing of said notice with the Town, a hearing shall be held by the Town Council for the purpose of ascertaining whether the charges contained in the notice are true, and, if true, whether the Contractor has failed to make a reasonable and substantial effort to comply with these Equal Employment Opportunity Conditions. Notice of the time and place of said hearing shall be given the Contractor not less than 5 days prior thereto in the same manner as the notice of violations is given. During said hearing, the Town Council shall receive and consider any evidence offered by the Town Representative, the Contractor, and any third party. At the conclusion of said hearing, the Town Council shall determine the matter and its determination shall be final.

If after the hearing described above, the Town Council determines that the Contractor has failed to comply with these

Equal Employment Opportunity Conditions and has failed to make a reasonable and substantial effort to comply with said conditions, the Contractor shall be deemed in material breach of the Contract. It is understood that the Town will have suffered damage by virtue of said breach; and it being impractical and unfeasible to determine the amount of actual damage, it is agreed that the Contractor shall pay the Town, as fixed and liquidated damages, and not as a penalty, the sum of $100.00 for each calendar day during which the Contractor is found to have been in noncompliance.

Such monies may be recovered from the Contractor and its Surety. The Town may deduct any such damages from monies due the Contractor.

A finding by the Town Council that the Contractor has failed to comply with these Equal Employment Opportunity

Conditions and has failed to make a reasonable and substantial effort to so comply, or a finding of willful violation of the nondiscrimination provisions of the State of California Fair Employment Practices Act, or similar provisions of Federal law or Executive Order, in the performance of work on the project shall be deemed a basis for determining the

Contractor to be not a "Responsible Proposer" as to future contracts for which the Contractor may submit bids. A finding of willful violation of the nondiscrimination provisions of the State of California Fair Employment Practices Act shall be deemed to have occurred upon receipt by the Owner of written notice from the California Fair Employment Practices

Commission that it has investigated and determined that the Contractor has violated said Fair Employment Practices Act and has issued an order under Government Code §12970, or obtained judgment and order of enforcement under

Government Code §12973.

7.11. ADHERENCE TO ALL LOCAL, STATE, AND FEDERAL LAWS

The Proposer shall adhere to all applicable federal, state, and local laws, ordinances, statutes, rules and regulations, and rulings or directives of any agencies having jurisdiction relevant in any way to the Proposer’s scope of work.

9. Vendor Questionnaire

1. Formation date of company*

Please enter Month and Year.

*Response required

2. Number of years providing the specified services*

*Response required

3. Please list names and titles of all officers and directors. If an individual or partnership, please list names and addresses of all partners, indicating whether they are general or limited partners.*

*Response required

4. Indicate whether Proposer has ever failed to complete any Agreement awarded to it. If so, note when, where, and why. Attach additional sheets, if necessary. *

*Response required

5. Indicate whether Proposer has been or is the subject of a bankruptcy or insolvency proceeding or subject to assignment for the benefit of creditors. *

*Response required

6. Required Documents*

Please upload the documents requested in Section 3.1 of the Request for Proposals. Please include all documents in one

PDF in the order in which they were requested.

*Response required

7. List of Subcontractors*

Please download the below documents, complete, and upload.

• SUBCONTRACTORS.pdf

*Response required

8. References*

Please download the below documents, complete, and upload.

• REFERENCES.pdf

*Response required

9. Affirmations and Certification*

RESERVATION

It is understood that the Town reserves the right to reject this Proposal, but that this Proposal shall not be withdrawn for a period of 45 days from the date prescribed for its opening.

DISCLOSURE

The undersigned declares that this Proposal is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization or corporation; that the Proposal is genuine and not collusive or sham;

that the undersigned has not directly or indirectly induced or solicited any other Proposer to put in a false or sham

Proposal and has not directly or indirectly colluded or agreed with any Proposer or anyone else to put in a sham

Proposal or to refrain from bidding; that the undersigned has not directly or indirectly sought by agreement, communication or conference with anyone to fix his/her Proposal price or the Proposal price of any other Proposer, or https://government-project.s3.us-west-2.amazonaws.com/97988/ae558a97-7b62-41df-9506-8d000846d192_SUBCONTRACTORS.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OTD2W6WH%2F20261116%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261116T220335Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEA4aCXVzLXdlc3QtMiJHMEUCIQDxKcP71GNfpSlVk59bWYaBe%2FGKG5aQYbn8vMWqQ%2FQyYAIgdGfhjAoe9tgNCfjk1ZAVlNNQSxX9Ivs5ThXLzgeX%2BlgqlQUI1%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDF%2Bdy3HSJkSGK%2B5s2SrpBFj4AiTuAFwPU8aHWS5xO3YTfJ7qikfhsRyOOpQ2f7d%2FTfHzKGoSDhjQow31pIv%2FPGWktOUuf414FnwbWBYUAX%2B3XF5c%2BZSEJK7NbcisMaFoe1Qcrj36AI1AMVQkBNga%2BBLztyKotgGz3YkkSfchOcUANn5LrlVSp5Ku5QsmQv1cPIg%2FCSoBy4lCpLCxSwVx004c0HD%2BluNk6R7TAReuJfdIjVhX5Y4OWHmChRf80eql0siUQmGLu%2Fy%2FD3tspI6sJ48%2B25YweEYF2Dnrwt%2BtgPTH6e6%2B93DpptwlYLMRW4ljb6LTwizUkhGodne54CX4HzgClDXVU9Z5RuhZw8CVszTw8N1p4guWJyO6%2FF1RCRwwEXSSVmrp8Xhe7dsC5EGR17NNI8oCsuyIVkryMbdQZiLTilMBIFsMrv9t9kyCXqIMc6wkzy0H5M1lxqqpcduCXNzUy%2FgtC80Wx9BhXjPnWSpKDECVWu6phHkrTy8YWu%2F0yVKun7CSYtYwjH20yXzh84le%2FF%2FY0KiT%2B3EB8r5Um4cLK%2FdN19Bdey4myYTpKgQiK6FEsPwIh3F13s5Ng%2BsQUYQ2ZshOMBYQ05lFdQh0bbJtF%2B2e%2FcnZTDrX0e33LRs7DzB%2F4FUsZscHEYScGSG6OcDLNnbWDFqNw2Np9F67SIhJ5DeZhG1JYn9iFidvSWg1Ei9xo%2ByCRhdb8rffGSXtmWUaaIqWxPJRVoDzi4qlHBa%2BBnuC1%2FCbHr11tRhbvpHf80rQmo7YKbnovnR6h8w%2BnDhJikq8hiCzJz2MzYPQG3zwk00NxLNYy6YpllIpjzuym9D39bfvcacVMJL77dcGOpkB1PZ%2F5cy%2BGnFqjg0lRGyATVeI8MmhPy9MS%2F1z2xD5CMzZHWY82vpI6X%2BwjQmoAKuVz4lUQlaaMLDr0LUjd0A%2BOf9d24h4COAkrhrYMGRbLajMwcywl0fsn5RoSqBkJsbJzaXWmOkpEJzGUN5ZTe3LgYWXoZZVzKydqFZPxSS5eMKFQD7AvCvSf0M5Gx0RPNpLqH%2FTisEbOgcU&X-Amz-Signature=90f16de9713410257bc3398599d94e07bf10f3eccd35e06f1a064697f743c2bf&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22SUBCONTRACTORS.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/97988/8d7c662d-b8b7-4e7e-8b58-b6e26742161b_REFERENCES.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OTD2W6WH%2F20261116%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261116T220335Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEA4aCXVzLXdlc3QtMiJHMEUCIQDxKcP71GNfpSlVk59bWYaBe%2FGKG5aQYbn8vMWqQ%2FQyYAIgdGfhjAoe9tgNCfjk1ZAVlNNQSxX9Ivs5ThXLzgeX%2BlgqlQUI1%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDF%2Bdy3HSJkSGK%2B5s2SrpBFj4AiTuAFwPU8aHWS5xO3YTfJ7qikfhsRyOOpQ2f7d%2FTfHzKGoSDhjQow31pIv%2FPGWktOUuf414FnwbWBYUAX%2B3XF5c%2BZSEJK7NbcisMaFoe1Qcrj36AI1AMVQkBNga%2BBLztyKotgGz3YkkSfchOcUANn5LrlVSp5Ku5QsmQv1cPIg%2FCSoBy4lCpLCxSwVx004c0HD%2BluNk6R7TAReuJfdIjVhX5Y4OWHmChRf80eql0siUQmGLu%2Fy%2FD3tspI6sJ48%2B25YweEYF2Dnrwt%2BtgPTH6e6%2B93DpptwlYLMRW4ljb6LTwizUkhGodne54CX4HzgClDXVU9Z5RuhZw8CVszTw8N1p4guWJyO6%2FF1RCRwwEXSSVmrp8Xhe7dsC5EGR17NNI8oCsuyIVkryMbdQZiLTilMBIFsMrv9t9kyCXqIMc6wkzy0H5M1lxqqpcduCXNzUy%2FgtC80Wx9BhXjPnWSpKDECVWu6phHkrTy8YWu%2F0yVKun7CSYtYwjH20yXzh84le%2FF%2FY0KiT%2B3EB8r5Um4cLK%2FdN19Bdey4myYTpKgQiK6FEsPwIh3F13s5Ng%2BsQUYQ2ZshOMBYQ05lFdQh0bbJtF%2B2e%2FcnZTDrX0e33LRs7DzB%2F4FUsZscHEYScGSG6OcDLNnbWDFqNw2Np9F67SIhJ5DeZhG1JYn9iFidvSWg1Ei9xo%2ByCRhdb8rffGSXtmWUaaIqWxPJRVoDzi4qlHBa%2BBnuC1%2FCbHr11tRhbvpHf80rQmo7YKbnovnR6h8w%2BnDhJikq8hiCzJz2MzYPQG3zwk00NxLNYy6YpllIpjzuym9D39bfvcacVMJL77dcGOpkB1PZ%2F5cy%2BGnFqjg0lRGyATVeI8MmhPy9MS%2F1z2xD5CMzZHWY82vpI6X%2BwjQmoAKuVz4lUQlaaMLDr0LUjd0A%2BOf9d24h4COAkrhrYMGRbLajMwcywl0fsn5RoSqBkJsbJzaXWmOkpEJzGUN5ZTe3LgYWXoZZVzKydqFZPxSS5eMKFQD7AvCvSf0M5Gx0RPNpLqH%2FTisEbOgcU&X-Amz-Signature=84c37db3689d85de9a4d8e69e9dd0617f932e8fc725dd054c6047966dedc25b1&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22REFERENCES.pdf%22&x-id=GetObject to fix any overhead, profit or cost element of such Proposal price or of that of any other Proposer, or to secure any advantage against the Town of Los Gatos or anyone interested in the proposed Contract; that the only persons or parties interested in this Proposal as principals are those named herein; that all statements contained in this Proposal are true;

that the undersigned has not directly or indirectly, submitted his/her Proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any other persons, partnership, corporation, or association except to such person or persons as have a direct financial interest in Proposer’s general business; and that the undersigned has not accepted any Proposal from any subcontractor or vendor through any Proposal depository, the

Bylaws, Rules or Regulations of which prohibit or prevent the undersigned from considering any Proposal from any subcontractor or vendor, which is not processed through said Proposal depository, or which may prevent any subcontractor or vendor from bidding to any general contractor who does not use the facilities of or accept bids from or through such Proposal depository; and that the undersigned has not paid, and will not pay, any fee to any corporation, partnership, company, association, organization, Proposal depository, or to any member or agent thereof to effectuate a collusive or sham Proposal.

WORDS AND PHRASES

Wherever in this Proposal an amount is stated in both words and figures, in case of discrepancy between words and figures, the words shall prevail; if all or any portion of the Proposal is required to be given in unit prices and totals and a discrepancy exists between any such unit prices and totals so given, the unit prices shall prevail.

CERTIFICATION

The Proposer certifies that the Proposal Documents have been thoroughly read and understood and that, except as may be specifically noted and contained in addenda, there are no discrepancies or misunderstandings as to the meaning, purpose or intent of any provision in the Proposal Documents or as to the interpretation of the same. The undersigned hereby incorporates by reference, the same as though set out in full, all provisions of Request for Bids published by the

Town and pertaining to the work described in this Proposal.

By confirming below, the submission of a Proposal shall be deemed a representation and certification by the Proposer that they have investigated all aspects of the RFP, that they are aware of the applicable facts pertaining to the RFP process, its procedures and requirements, and they have read and understand the RFP. No request for modification of the Proposal shall be considered after its submission on the grounds that the Proposer was not fully informed as to any fact or condition.

☐ Please confirm

*Response required

1. Scope of Work
1.1. Introduction
1.2. Project Initiation
1.3. Organizational and Service Delivery Assessment
1.4. Business Process Evaluation
1.5. Staffing and Workload Analysis
1.6. Review of Policies and Procedures
1.7. Interviews and Meetings
1.8. Organization and Operational Recommendations
1.9. Final Report and Presentation
2. Instructions to Proposers
2.1. Proposal documents
2.2. Submission of Bid Proposals
2.3. Pre-Proposal Conference and Site Tour
2.4. Examination of Proposal Documents
2.5. Modification of Proposal
2.6. Questions
2.7. Addenda
2.8. Withdrawal of Proposal
3. Required Information
3.1. INFORMATION REQUIRED TO BE SUBMITTED WITH THE PROPOSAL
3.2. REQUIRED QUALIFICATIONS
4. Evaluation, Selection and Award Process
4.1. Evaluation, Selection and Award Process
4.2. NEGOTIATIONS
5. Evaluation Criteria
Phase 1
Phase 2 - Proposal Evaluation Criteria
6. Agreement & Payment
6.1. Agreement Type and Payment Method
6.2. Term of Agreement
6.3. Agreement Implementation
7. General Terms & Conditions
7.1. RIGHTS OF THE TOWN OF LOS GATOS
7.2. INSURANCE REQUIREMENTS
7.3. PUBLIC NATURE OF PROPOSAL MATERIAL
7.4. COLLUSION
7.5. CONFLICT OF INTEREST
7.6. DISQUALIFICATION
7.7. NON-CONFORMING PROPOSAL
7.8. GRATUITIES
7.9. FIRMS OR PERSONS NOT ELIGIBLE TO SUBMIT A PROPOSAL
7.10. NON-DISCRIMINATION / NON-PREFERENTIAL TREATMENT
7.11. ADHERENCE TO ALL LOCAL, STATE, AND FEDERAL LAWS
9. Vendor Questionnaire
1. Formation date of company*
2. Number of years providing the specified services*
3. Please list names and titles of all officers and directors. If an individual or partnership, please list names and addresses of all partners, indicating whether they are general or limited partners.*
4. Indicate whether Proposer has ever failed to complete any Agreement awarded to it. If so, note when, where, and why. Attach additional sheets, if necessary. *
5. Indicate whether Proposer has been or is the subject of a bankruptcy or insolvency proceeding or subject to assignment for the benefit of creditors. *
6. Required Documents*
7. List of Subcontractors*
8. References*
9. Affirmations and Certification*

File details come from the government source that posted it. Updated .