Public Address System RFP.pdf

PDF 3 MB Posted

Attached to
PUBLIC ADDRESS SYSTEM
Solicitation number
RFP - CGRE - 240000000544
Issued by
Clare County, Michigan

About this file

This document is a Request for Proposals (RFP) issued by the Clare-Gladwin Regional Education Service District (CGRESD) for the purchase and complete installation of a public address system as part of new construction for a Career and Technical Education Building located in Clare, Michigan.

The RFP requires bidders to submit proposals by December 20, 2023 at 3:00 pm. A pre-bid meeting is scheduled for December 4, 2023 at 12:00 pm, and post-bid interviews will be held on December 22-23, 2023. CGRESD reserves the right to reject any or all proposals. The selected bidder will be required to coordinate with the construction manager, Rockford Construction, and provide a performance bond, labor bond, and material bond. Bidders must adhere to the provided project schedule.

View the file

Other files

File Type Posted
Addendum 1 write up.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clare-Gladwin RESD Request for Proposals / Public Address System 27-5116

A. Instructions Clare-Gladwin RESD is accepting proposals for the purchase and complete installation of a public address system as part of new construction for a Career and Technical Education Building located at 3200 S. Clare Ave. Clare, MI 48617. Clare-Gladwin RESD has contracted Rockford Construction to manage the construction project. The selected bidder will coordinate with Rockford Construction for scheduling, installation, and safety requirements for the project's duration, along with the owner for programming of the public address system. Bidders will contract directly with Clare-Gladwin RESD for this proposal. If a bidder plans to submit proposals for multiple bid categories, please provide a total package price.

**CGRESD reserves the right to reject any or all proposals and to make any award that it considers to be in the best interest of CGRESD.**

B. Proposal Submission and Bid Walk To be considered by CGRESD, the complete proposal must be received no later than Wednesday December 20, 2023, at 3:00 pm. Proposals should be mailed or submitted in-person to the address listed below:

Proposal Submission Clare-Gladwin RESD

Attn: Tara Mager - Proposal for PA System 4041 East Mannsiding Rd.

Clare, MI 48617

Pre-Bid Meeting December 4th, 2023 at 12:00pm

Clare-Gladwin RESD Administration Building Rooms A&B

4041 East Mannsiding Rd.

Clare, MI 48617

Post-Bid Interviews (Tentative) December 22nd & 23rd, 2023

C. Late Proposals Any proposal received by CGRESD after the time specified above may not be considered, at CGRESD's discretion. The party submitting a proposal shall bear full and total responsibility for ensuring timely receipt of that proposal.

D. Withdrawal of Proposals Proposals may be withdrawn by written notice received at any time prior to the submission deadline.

Proposals may be withdrawn in person, provided that the firm’s representative signs a receipt for the proposal prior to the submission deadline.

E. Questions Concerning this RFP Inquiries may be made to Eric Johnson at the Clare-Gladwin Regional Education Service District located at 4041 E. Mannsiding Rd., Clare, MI 48617, via telephone at (989) 386-9334, or via email at ejohnson@cgresd.net. Information about CGRESD is available during business hours (7:30 a.m. – 4:00 p.m.). Questions & answers will be updated and can be accessed at https://www.cgresd.net/o/cgresd/page/request-for-proposal

F. Economy of Preparation Proposals should be prepared simply, providing a concise description of the firm’s ability to meet the https://www.cgresd.net/o/cgresd/page/request-for-proposal requirements of this RFP.

G. Proposal Signature The proposal should be signed by the person responsible for the decision as to services and costs being offered. In the case of a joint proposal, each party should certify as to services and costs being offered by its own firm in connection with this proposal.

H. Prime Responsibilities The firm selected will be required to assume responsibility for all services described in this RFP and in the proposal, regardless of who actually provides such services and whether the selected firm utilizes separate consultants. The selected firm shall be the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from the contract.

I. Proposal Preparation Costs All costs incurred for proposal preparation presentation, or contract negotiation, are the responsibility of the firm. CGRESD shall not be responsible for, and will not pay, the cost for any information solicited or received.

J. Acceptance of Proposal Contents The contents of the proposal of the selected firm will become contractual obligations when a contract is issued, except with regard to particular contents which are rejected by CGRESD. Failure of the successful firm to abide by such obligations without the express consent of CGRESD’s Board of Education will result in cancellation of the award.

K. Proposed Project Schedule Bidders must adhere to the attached schedule provided by the Construction Manager. Please reference the attached project schedule.

L. Collusive Bidding and Relationship Disclosure.

The Proposer certifies that their Proposal is made without any previous understanding, agreement or connection with any person, firm, or company making a Proposal for the same project and is in all respects fair and without outside control, collusion, fraud, or other illegal action.

The Proposer shall submit a Familial Relationship Disclosure in substantially the form attached hereto as Attachment “B.”

The Proposer shall also submit an Iran Economic Sanctions Act Certification in substantially the form attached hereto as Attachment “C.”

M. Scope of Services It is assumed that any proposal submitted will include, but shall not necessarily be limited to, the performance of all of the activities and services identified in this RFP and as set forth in the form of Agreement attached as Attachment “A.” CGRESD will consider alternate proposals; however, the proposals must clearly indicate any activities that have been deleted and/or added from the requested scope of services.

N. Insurance Prior to beginning work, the selected firm will be required to provide a copy of insurance certificates for general and professional liability coverages. Clare-Gladwin RESD and Rockford Construction must be named as additional insured for the duration of the project.

O. Bonding The CONTRACTOR shall, at its sole expense, furnish to the OWNER security of the following types and amounts:

Bid Bond 5% Performance Bond 100% Labor Bond 100% Material Bond 100%

IP PUBLIC ADDRESS SYSTEMS

27 5116 - 1

MAGNUS CENTER NEW BUILDING

CLARE GLADWIN RESD

TDF #2022-29--01

SECTION 27 5116 - PUBLIC ADDRESS SYSTEMS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Amplifier and control equipment.

B. Input equipment.

C. Accessories.

1.02 RELATED REQUIREMENTS

A. Section 26 0526 - Grounding and Bonding for Electrical Systems.

1.03 REFERENCE STANDARDS

A. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

1.04 SYSTEM DESCRIPTION

A. Public address system for voice and music.

B. Input components:

1. Microphone.

C. Features:

1. Interface to telephone system.

2. One-way paging by zone.

3. Emergency paging override.

4. Distribution of background music.

1.05 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Shop Drawings: Indicate electrical characteristics and connection requirements. Indicate layout of equipment mounted in racks and cabinets, component interconnecting wiring, and wiring diagrams of field wiring to speakers and remote input devices.

C. Product Data: Provide data showing electrical characteristics and connection requirements for each component.

D. Test Reports: Indicate satisfactory completion of each test recommended by the manufacturer.

E. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of product.

F. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

G. Manufacturer's Field Reports: Indicate that installation is complete and system performs according to specified requirements.

H. Project Record Documents: Record actual locations of speakers, control equipment, and outlets for input/output connectors.

I. Operation Data: Include instructions for adjusting, operating, and extending the system.

J. Maintenance Data: Include repair procedures and spare parts documentation.

1.06 QUALITY ASSURANCE

A. Comply with requirements of NFPA 70 and Federal Communications Commission.

B. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section with minimum three years documented experience with service facilities within 100 miles of Project.

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=NFPA%2070 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=NFPA%2070

PUBLIC ADDRESS SYSTEMS

27 5116 - 2

TDF #2022-29--01

C. Supplier Qualifications: Authorized distributor of specified manufacturer with minimum three years documented experience.

D. Installer Qualifications: Authorized installer of specified manufacturer with service facilities within 100 miles of Project.

E. Products: Listed, classified, and labeled as suitable for the purpose intended.

F. Product Listing Organization Qualifications: An organization recognized by OSHA as a Nationally Recognized Testing Laboratory (NRTL) and acceptable to authorities having jurisdiction.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Valcom a Potter Company

2.02 AMPLIFICATION AND CONTROL EQUIPMENT

A. IP backbone general purpose paging system connected to an IP network audio gateway on a new data network supplied and installed by the structured cabling contractor.

1. Product: Valcom VE-6030 or equivalent headend by Valcom

B. IP backbone system deployment offers the benefit of using software to make changes such as volume levels, zoning, etc.

C. Access to make page announcements can be standalone phones or microphones, as well as FXO, FXS and SIP IP backbone systems.

D. System shall be capable of supporting from one to two hundred paging zones.

E. Each endpoint, including speakers and horns, simply plugs into a PoE network switch.

F. All communications and power are provided with this single PoE port which makes installation fast and simple.

G. Set-up and programming are 100% software controlled and managed.

H. Making changes is done with the click of a mouse including speaker volume levels, zoning, and all call page broadcast.

I. Access can be stand alone, phones, microphones, IP Interactive Consoles, FXO, FXS, and SIP.

J. The IP system shall have no limits on zones and can be expanded without the need to purchase new headend equipment.

K. IP system shall be capable of multi-buildings, multi-site, and multi-campus.

K. System Cabinet: Rack mounted in existing cabinet.

2.03 COMPONENTS

A. SIP-Based Paging Server.

1. 4 Zones, One-Way Analog Paging.

2. 8 Zones IP Paging

3. SIP compatible.

4. PoE (IEEE 802.3af).

5. Input for background music.

6. Feedback elimination.

7. Night Ring Tone.

8. IP Power Supply 24VDC, 300ma Part no. 324D

3. Product: Valcom VIP-204B

4. Substitutions: See Section 01 6000 - Product Requirements

B. 6 Zone, One-Way Page Control with Power.

1. One-Way All-Call.

27 5116 - 3

TDF #2022-29--01

2. Pulse and Tone Dial.

3. Background music mutes only in zone being paged.

4. Emergency page override for priority announcements.

5. Unlimited expansion capability.

6. Programable by zone.

7. Built in tones: steady tones.

8. Battery back-up input.

a. Valcom VPB-260.

9. UL, CSA, CE listed.

10. Audio Input

a. Input Impedance: 600 ohms.

b. Music source impedance: 8 to 600 ohms.

c. Music Input Level: 10dBm nominal.

11. Audio Output

a. Low level out impedance: 8 ohms.

b. Low level output level: -10dBm nominal.

c. Low level output level: 0dBm maximum.

12. Environment

1. Temperature: +32 to + 104 degrees Fahrenheit.

2. Humidity: 0-85% Non-Condensing.

13. Dimensions and weight

1. 10.9” H x 13” W x 2.7” D

2. Weight: 6.2lbs.

14. Auxiliary Relays

1. 2 Form-C make-break contacts.

2. Rated 2 amps at 30 VDC.

15. Housing and Finish

1. Gray painted aluminum alloy.

16. Product: Valcom V-2006A.

G. Microphone: Desk type low impedance microphone with push-to-talk switch.

1.Product Valcom V-400.

C. Ceiling Speakers: 8-inch (200 mm) SIP Speaker for indoor use.

1. Concurrent Sio and Multicast.

2. PoE (IEEE 802.af).

3. Paging, emergency alerts, and tones.

4. Valcom, Informacast, and Syn-Apps versions.

5. One way paging.

6. Bridge/Backbone box combo for 8-inch Ceiling Speaker: Valcom V-9916M.

7. Product: Valcom VIP-120A.

D. IP Digital Clock/Speaker.

1. 4-Digit Clock.

27 5116 - 4

TDF #2022-29--01

2. One way or talkback.

3. PoE (IEEE 802.af).

4. One Ethernet Port.

5. Output Level 103 db/1 meter.

6. Recessed Back Box: Valcom VB-R19

7. Product: Valcom VIP-432A-DF

E. IP High-Efficiency Horn with Long Line Extender

1. Concurrent Sio and Multicast.

2. PoE (IEEE 802.af).

3. Suitable for paging, broadcasting, emergency alerts and tones

4. Talkback intercom.

5. Horn is indoor/outdoor. The network interface must be mounted indoors.

6. Multiple color options.

7. High Quality audio.

8. Product: Valcom VIP148AL

F. IP PoE 12-Inch and 16 -inch Analog Clocks

1. Easy To Read analog face.

2. PoE (IEEE 802.af).

3. Facility wide time standard.

4. Utilizes NTP (Network Time Protocol) synchronization.

5. Product 12” Clock: Valcom VIP-A12A.

6. Product 16” Clock: Valcom VIP-A16A.

G. IP PoE Digital Clock

1. 4.0 Inch, 4-digits.

2. PoE (IEEE 802.af).

3. Product: Valcom VIPD640A.

2.04 WIRE AND CABLE

A. IP rated cable Cat 5e or better.

B. Provided and installed by the structured cabling contractor.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Mounting Heights: Coordinate locations of outlet boxes specified in Section 26 0533.16 to obtain mounting heights indicated.

C. Install input circuits in separate cables and raceways from output circuits.

D. Provide protection for exposed cables where subject to damage.

E. Use armored cable for outside speaker circuits.

F. Use suitable cable fittings and connectors.

G. Ground and bond equipment and circuits in accordance with Section 26 0526.

H. Clocks and PA to be controlled from single head end.

27 5116 - 5

TDF #2022-29--01

3.02 FIELD QUALITY CONTROL

A. See Section 01 4000 - Quality Requirements, for additional requirements.

B. Measure and record sound power levels at designated locations.

3.03 ADJUSTING

A. Using the software package, adjust for appropriate sound levels in each room and corridor.

B. Adjust devices and wall plates to be flush and level.

3.04 CLOSEOUT ACTIVITIES

A. See Section 01 7900 - Demonstration and Training, for additional requirements.

B. Demonstration: Demonstrate operation of system to Owner's personnel.

1. Use operation and maintenance data as reference during demonstration.

2. Briefly describe function, operation, and maintenance of each component.

C. Training: Train Owner's personnel on operation and maintenance of system.

1. Use operation and maintenance manual as training reference, supplemented with additional training materials as required.

2. Provide minimum of two hours of training.

3. Instructor: Manufacturer's training personnel.

4. Location: At project site.

3.05 MAINTENANCE

A. See Section 01 7000 - Execution Requirements - Alteration Projects, for additional requirements relating to maintenance service.

B. Provide a separate maintenance contract for specified maintenance service.

C. Provide service and maintenance of public address and music system for one year from Date of Substantial Completion.

END OF SECTION

ID Task

Mode

Task Name Duration Start Finish

1 CGRESD 595 days? Mon 2/20/23 Fri 5/30/25

2 Design 205 days Mon 2/20/23 Fri 12/1/23

13 Procurement Items 262 days Wed 2/1/23 Thu 2/1/24

16 Preconstruction/Estimating 112 days? Tue 9/5/23 Wed 2/7/24

61 Construction 347 days? Thu 2/1/24 Fri 5/30/25

62 Submittals 35 days Mon 2/12/24 Fri 3/29/24

63 Procurement 60 days Mon 4/8/24 Fri 6/28/24

64 Mobilization 5 days Mon 4/1/24 Fri 4/5/24

65 Site Work - 65 days Mon 4/1/24 Fri 6/28/24

66 SESC Installation 10 days Mon 4/1/24 Fri 4/12/24

67 Mass Grading 15 days Mon 4/8/24 Fri 4/26/24

68 Site Utilities 90 days Mon 4/15/24 Fri 8/16/24

69 Site Concrete / Asphalt Paving Base Course 40 days Mon 8/5/24 Fri 9/27/24

70 Asphalt Paving Top Course / Striping / Signage 20 days Thu 5/1/25 Wed 5/28/25

71 Seeding / Landscaping Fall 2024 30 days Mon 9/2/24 Fri 10/11/24

72 Final Seeding Landscaping Phase Spring 2025 15 days Mon 5/5/25 Fri 5/23/25

73 Building Construction 325 days? Fri 3/1/24 Thu 5/29/25

74 Building Foundations 30 days Mon 4/15/24 Fri 5/24/24

75 Classrooms/Tech Center 265 days Mon 5/6/24 Fri 5/9/25

76 CMU Walls 45 days Mon 5/6/24 Fri 7/5/24

77 Pre-Eng Building #2 45 days Mon 6/24/24 Fri 8/23/24

78 Cooler/Freezer Install 10 days Mon 7/29/24 Fri 8/9/24

79 Roofing Conference/Tech Center 40 days Mon 8/12/24 Fri 10/4/24

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Project: Design Schedule

Date: Mon 11/27/23

Task Name Duration Start Finish

80 Set Mechanical Equipment 5 days Mon 10/7/24 Fri 10/11/24

81 Interior Framing 30 days Mon 10/7/24 Fri 11/15/24

82 Exterior Glazing/Openings 15 days Mon 8/26/24 Fri 9/13/24

83 Interior MEP Rough-In 30 days Mon 10/21/24 Fri 11/29/24

84 Kitchen MEP Rough-In 20 days Mon 11/4/24 Fri 11/29/24

85 MEP Rough Inspections 10 days Mon 12/2/24 Fri 12/13/24

86 Hang/Finish Drywall 30 days Mon 12/16/24 Fri 1/24/25

87 Paint Structure and Deck 15 days Mon 1/6/25 Fri 1/24/25

88 Prime/1st Coat Drywall 20 days Mon 1/13/25 Fri 2/7/25

89 Paint CMU 30 days Mon 2/10/25 Fri 3/21/25

90 Resonance Tile in Kitchen 10 days Mon 3/24/25 Fri 4/4/25

91 Ceiling Grid 20 days Mon 3/3/25 Fri 3/28/25

92 MEP Trim Out 20 days Mon 3/17/25 Fri 4/11/25

93 Drop Pads 15 days Mon 4/7/25 Fri 4/25/25

94 Flooring 25 days Mon 3/31/25 Fri 5/2/25

95 Final Clean 5 days Mon 5/5/25 Fri 5/9/25

96 Conference Center 75 days Mon 7/8/24 Fri 10/18/24

97 CMU Walls 20 days Mon 7/8/24 Fri 8/2/24

98 Pre-Eng Conference Center 20 days Mon 7/22/24 Fri 8/16/24

99 Roofing Conference Center 20 days Mon 8/12/24 Fri 9/6/24

100 Set Mechanical Equipment 5 days Mon 9/9/24 Fri 9/13/24

101 Exterior Glazing/Openings 10 days Mon 9/9/24 Fri 9/20/24

102 MEP Rough-In 20 days Thu 8/8/24 Wed 9/4/24

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Task Name Duration Start Finish

103 Build/Hang/Finish Bulkhead 10 days Mon 8/19/24 Fri 8/30/24

104 MEP Rough Inspections 2 days Thu 9/5/24 Fri 9/6/24

105 Paint CMU 7 days Tue 8/27/24 Wed 9/4/24

106 Install Operable Wall 5 days Thu 9/5/24 Wed 9/11/24

107 Ceiling Grid 5 days Thu 9/5/24 Wed 9/11/24

108 Overhead MEP Trim Out 10 days Thu 9/5/24 Wed 9/18/24

109 Overhead MEP Inspections 2 days Thu 9/19/24 Fri 9/20/24

110 Doors/Hardware 3 days Thu 9/5/24 Mon 9/9/24

111 MEP Trim Out 5 days Tue 9/10/24 Mon 9/16/24

112 Drop Pads 5 days Mon 9/23/24 Fri 9/27/24

113 Flooring 10 days Mon 9/30/24 Fri 10/11/24

114 Final Clean 5 days Mon 10/14/24 Fri 10/18/24

115 Project Closeout 64 days Mon 4/14/25 Thu 7/10/25

116 Commissioning Kickoff 1 day Mon 4/14/25 Mon 4/14/25

117 Punchlist 30 days Mon 5/12/25 Fri 6/20/25

118 Commissioning 15 days Tue 4/15/25 Mon 5/5/25

119 Test & Balance 5 days Tue 5/6/25 Mon 5/12/25

120 Initial Inspections 5 days Mon 5/5/25 Fri 5/9/25

121 Functional Testing 5 days Mon 5/12/25 Fri 5/16/25

122 Life Safety Testing 2 days Mon 5/19/25 Tue 5/20/25

123 Life Safety Demonstration 2 days Wed 5/21/25 Thu 5/22/25

124 TCO Inspections 5 days Wed 5/21/25 Tue 5/27/25

125 C of O Inspections 2 days Wed 5/28/25 Thu 5/29/25

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Task Name Duration Start Finish

126 Turnover/Owner FFE Install 30 days Fri 5/30/25 Thu 7/10/25

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

CABLE LABEL DETAIL

SHRINK WRAP DETAIL

A 014

Cable Family Cable Number

Green

White

Black

Red

A014

Minimum 1/2" Shrink Tube

1/2" 1" over all open cable.

1-inch separation from Shrink Tube end. Standard cable orientation shown. Label must be readable from top of connector.

MIC LEVEL

LINE LEVEL +3"

VIDEO/DATA +6"

RF/CAT-TV +6"

AC/DC POWER +24"

SPEAKER LEVEL +12"

TYPICAL BACKCAN

A

TA702

A

TA701

LOCATION A LOCATION B

MANUFACTURER

MODEL NUMBER

EQUIPMENT ID NO.

NET RJ452-M

AV - AUDIO VIDEO CONTRACTOR

GC - GENERAL CONTRACTOR

DC - DATA COMMUNICATIONS CONTRACTOR

EC - ELECTRICAL CONTRACTOR

FC - FURNITURE CONTRACTOR

O - OWNER

NOTES:

1. All exposed cable strip-points must have heat-shrink tubing applied.

2. Consult project documents for specific colors if required.

3. Consult project documents for "Clear" heat-shrink requirements on cable labels.

CONDUIT SPACING GUIDELINES

NOTES:

1. All conduit spacing referenced from mic level signals.

2. All distances are minimum required spacing. Where it is not possible to maintain adequate separation, keep parallel groupings to an absolute minimum using 90 degree crossings wherever possible or necessary.

CONDUIT GENERAL NOTES FOR ELECTRICAL CONTRACTOR

- EC to provide and install all conduit, backboxes, gutter boxes, terminal cans, raceways, cable trays and access panels unless otherwise noted.

- EC to install pull lines in all conduits.

- EC shall not substitute conduit type without written permission from the consultant.

- Conduit runs are drawn for illustration only. Actual conduit paths & interim boxes to be determined by the EC.

- EC may increase the size of junction boxes, gutters & conduit as needed in the event that a conflict exists.

- EC to provide and install all high voltage (120V - 240V) cable and fixtures unless otherwise notes.

- Install applicable size pull boxes after 270 deg. of bend or if conduit run is more than 100'.

- Label all conduit for destinations such as box numbers and/or room locations.

- Deburr all rough edges to prevent cable abrasion.

- Ensure all conduits are free from debris & water.

- Ensure all in ground pull boxes and vaults are weather proof & free of debris & water.

- Ensure conduit is electrically isolated from all equipment racks & enclosures.

THE FOLLOWING ILLUSTRATION SHOWN IS USED WHEN A CONNECTION NEEDS TO BE

BROKEN AND CONTINUED WITHIN A DRAWINGS SHEET. AN INTRA/SHEET FLAG WILL BE

USED AND NUMBERED (LABELED) TO SHOW THE CONNECTION IS CONTINUED

ELSEWHERE ON THE SHEET.

DISCRETE LABELING PER INSTANCE

SOURCE/DESTINATION SHEET

RJ452-M N001

N001 RJ452-M

SOURCE

DESTINATION

WHERE DEVICE

RESIDES IN SYSTEM

WHERE DEVICE

RESIDES IN LOCATION A

N001

DISCRETE EQUIPMENT

ID NUMBER

EXAMPLE: CTRL-1

TYPICAL CONNECTION

WITH CONNECTION

TYPE SHOWN

THIS BLOCK TYPICAL FOR ALL DIAGRAMS AND DRAWINGSThe Electrical Contractor or "EC" will be responsible for the following:

*All high voltage wiring/terminations contained within this drawing set. Scope includes, but is not limited to:

PROVISION AND INSTALLATION OF:

*Conduit, gang boxes, pull boxes, and pull string required for the audio and video systems.

*All junction boxes and in-wall enclosures required for the audio communications system. Sizes of all junction boxes and enclosures will be indicated on the audio/video drawings. All junction boxes, pull boxes, and wall mounted enclosures are to be clearly labeled with permanent marker. Refer to audio/video drawings for labeling.

*AC power circuits, outlets, and interconnection of opwer to each video projector location.

*All AC power circuits, outlets, power panels and interconnection of power to the sound equipment racks.

*Wherever possible, all audio circuits shall be supplied from the same A/V electrical panel.

*The designated A/V power panel (if appropriate to the project) shall not furnish power to any other equipment.

*All outlets that service the stage (if there is a stage area) shall be supplied from the same A/V electrical panel.

*All outlets that srevice the control booth (if there is a control booth) shall be supplied from the same A/V electrical panel.

*Wherever possible, all outlets that service the ceiling mounted video projectors shall be supplied from the same A/V electrical panel.

*All high voltage wiring and terminations for projector screens and up/down switches

INSTALLATION OF:

*Installation of the following items which are provided by the A/V contractor:

(Unless specifically noted)

CONDUIT GUIDELINES:

*EMT should be used when possible.

*The EC shall provide pull boxes where appropriate.

*The EC shall provide pull lines in all conduit.

*All conduit to be sized by the EC in accordance with all applicable federal and local codes.

*All conduit paths, routing and installation methods shall be verified with architect and/or consultant prior to installation.

*Use of flex conduit is prohibited without proper approval from the AV contractor.

*The overall AV system requires extensive conduit to be furnished and installed by the EC per the specifications contained within this drawing set. If site conditions prevent conduit to be installed for any particular system(s), or if any conduit is deleted by the EC, the EC shall (at no additional cost) furnish and install all plenum wire that is to be contained within said conduit.

BLU-RAY

CD

DVD

2-WAY SPEAKER

SUBWOOFER

CEILING SPEAKER

AMPLIFIER

PROJECTOR

DISPLAY

PTZ CAMERA

TOUCHPANEL

HEADPHONES

MOBILE DEVICE

CD PLAYER

DVD PLAYER

BLU-RAY PLAYER

DOCUMENT CAMERA

DESKTOP PC

LAPTOP/GUEST PCBLUETOOTH DEVICE

WIRED MIC

AC DUPLEX OUTLET -- STANDARD POWER

AC QUAD OUTLET -- STANDARD POWER

CEILING MOUNTED BOX -- SEE SCHEDULE FOR DETAILS

CEILING SPEAKER ( FLOOR PLAN/RCP )

CEILING MOUNTED NETWORK DROP

WALL MOUNTED NETWORK DROP

FLOOR MOUNTED NETWORK DROP

WALL RACK

FREESTANDING RACK WITH DOORS

WALL MOUNTED BOX -- SEE SCHEDULE FOR DETAILS

FLOOR MOUNTED BOX -- SEE SCHEDULE FOR DETAILS

S

CAMERA ( FLOOR PLAN/RCP )

WP-1

WP-1

WP-1

W P

-1

TO JB-1BOX DESIGNATION

CONDUIT BY E.C.

(2) 1.0" EMT

2@C6

DESTINATION BOX

QTY OF CONDUIT**

CONDUIT SIZE

CONDUIT TYPE

WIRE TYPE

QUANTITY OF WIRE

NOTE:

**QUANTITY IS (1) UNLESS NOTED DIFFERENTLY

EXISTING EQUIPMENT

TO REMAIN

EXISTING EQUIPMENT

TO BE DEMOLISHED

W P

-1 W

P -1

NEW EQUIPMENT

TO BE INSTALLED

EXISTING EQUIPMENT

TO REMAIN/BE REUSED

W P

-1 W

P -1

NOTE: ALL MOUNTING HEIGHTS FOR AVL BOXES

IN THIS PROJECT MEASURED TO CENTER OF BOX

VOLUME CONTROL

(TYP.)

WALL PLATE

TOUCHPANEL

"4

The detail drawing below shows a representation of the calculated throw range for the specified projector in each room layout's reflected ceiling plan (RCP).

**NOTE: This detail is provided as a reference ONLY.

All throw distances are based off of the center of the lens to the center of the projection screen.

Due to the variance in the outer edges of the actual lens optics, it is always a best practice to place the projector as closer to the center of the throw range as possible (also referred to as the "sweet spot").

Minimum and maximum extents are shown to define the possible locations of the projector should any mechanical issues in the field make it necessary to move the projector as a last resort.

Installation teams shall always verify these calculations prior to any installation activities as a secondary process check.

Prior to installation, these items should be reviewed and confirmed:

1. The projected light path is clear from interference, and/or any obstructions.

2. The area for the projector to be installed, physically, is clear of any mechanical obstructions, or items that will hinder the placement of the projector.

Projector shown with actual X/Y lens offset

Maximum throw distance (from lens, in inches)

278" 208"

Minimum throw distance (from lens, in inches)

Projection Center-line

Projection extents (image width)

Projection Screen

TASK FURNISH INSTALL

AC POWER, CONDUIT, RACEWAYS, ELECTRICAL BACKBOXES, JUNCTION

BOXES, PULL BOXES, CABLE TRAYS, FLOOR BOXES AND OTHER CABLE

INFRASTRUCTURE

EC EC

ROUGH OR FINISHED TRIM, CASEWORK, MILLWORK, EQUIPMENT

CAVITIES, STRUCTURAL WORK, WHITE BOARDS, TACK BOARDS, OTHER

NON-ELECTRONIC DISPLAY SURFACES, OR SPECIAL CONSTRUCTION

GC GC

CEILING MOUNTED LOUDSPEAKERS AV AV

CEILING MOUNTED LOUDSPEAKER CABLE AV AV

AUDIOVISUAL CABLE AV AV

AUDIOVISUAL EQUIPMENT AND RACK AV AV

TERMINATIONS OF AUDIOVISUAL CABLE AV AV

VOICE/DATA NETWORK CABLE, CATV-CAT6 CABLE DC DC

VOICE/DATA NETWORK AND NETWORK ELECTRONICS DC DC

PRESENTER COMPUTER O O

AUDIOVISUAL EQUIPMENT WALL MOUNTS OR CEILING MOUNTS RQUIRED

TO FASTEN AUDIOVISUAL EQUIPMENT TO GC PROVIDED SUPPORT

SYSTEMS

AV AV

UNISTRUT, ANCHORS, OR OTHER MATERIALS REQUIRED TO ATTACH

AUDIOVISUAL EQUIPMENT MOUNTS TO STRUCTURE, INCLUDING FLAT

PANEL VIDEO DISPLAY BLOCKING FOR WALL MOUNTED DEVICES

GC GC

PRODUCTION CONSOLE, OTHER TECHNICAL FURNITURE GC GC

CABLE MANAGEMENT HARDWARE AT RACKS AND CONSOLES AV AV

FLOOR BOXES INCLUDING INTERNAL BRACKETS, TEMPORARY COVERS,

AND PERMANENT COVERS

EC EC

CUSTOM COVER PLATES FOR FLOOR BOXES, BACK BOXES AV AV

GENERAL DIVISION OF RESPONSIBILITIES

CABLE LABELING

FAMILY SIGNAL TYPE

A Serial

B Broadband

C Video

D DVI Video

E Digital Media

F Fiber Optic

G AES/EBU

H HDMI

I IR/S

J Optical Audio

K Control Network

L Line-Level

M Microphone

N Network

O I/O

P Power

Q Component Video

R Relay

S Speaker

T DMX

U UTP Signal

V Digital Video

W RGB Signal

X Antenna

Y Y/C S-Video

Z SDI Video

CONDUIT SEPARATION TOLERANCES

CONDUIT NOTES & COORDINATION

SYMBOL CONDUIT SIZE

1 3/4"

2 1"

3 1 1/4"

4 1 1/2"

5 2"

6 3"

7 4"

8 6"

9 8"

10 12"

11 6" CABLE

TRAY

12 12" CABLE

TRAY

13 NO CONDUIT

SYMBOL CONDUIT TYPES

EMT ELECTRICAL

METALLIC TUBING

PVC POLY-VINYL

CHLORIDE

RGD GALVANIZED RIGID

METAL

FLX FLEXIBLE

METALLIC TUBING

PLS FLEXIBLE PLASTIC

TUBING

WMT WIRE MOLD TRACK

IMC INTERMEDIATE

METAL CONDUIT

EXST EXISTING CONDUIT

SYMBOL GENERAL ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

AV AUDIO VISUAL CONTRACTOR

EC ELECTRICAL CONTRACTOR

EXS EXISTING EQUIPMENT

FBO FURNISHED BY OTHERS

FL FLUSH MOUNT

FOH FRONT OF HOUSE

GC GENERAL CONTRACTOR

LAN LOCAL AREA NETWORK

GENERAL ABBREVIATIONS

CABLE CONNECTION FLAGS

SCHEMATIC DEVICE KEY

PREFIX EQUIPMENT NAME ABBREVIATIONS

A AUDIO AMPLIFIER

ACD AUDIO CASSETTE PLAYER/RECORDER

ADA AUDIO DISTRIBUTION AMP

ADT ANTENNA DISTRIBUTION

ALS ASSISTED LISTENING SYSTEM

AMN AUDIO MONITOR

ANT ANTENNA

APA AUDIO PRE-AMP

APB AUDIO PATCHBAY

ASP ANTENNA SPLITTER

ATX AUDIO TRANSFORMER

AVR AUDIO-VIDEO RACK

CAM VIDEO CAMERA

CCU CAMERA CONTROL UNIT

CDC INTEGRATED CD & CASSETTE PLAYER/RECORDER

CDP CD PLAYER

CDR CD RECORDER

CFR CARD/MODULE FRAME

CGN VIDEO CHARACTER GENERATOR

CMB SIGNAL COMBINER

CMP AUDIO COMPRESSOR

COM PRODUCTION COMMUNICATIONS

CON DEVICE CONTROLLER

CPI COMPUTER INTERFACE

CPU COMPUTER

CS INTEGRATED CEILING LOUDSPEAKER & BACKCAN

CTL CONTROL SYSTEM

CVT VIDEO FORMAT CONVERTER

DMR DIGITAL MESSAGE REPEATER

DPB DATA PATCHBAY

DSP DIGITAL SIGNAL PROCESSOR

DSW DATA NETWORK SWITCH

DVC DIGITAL VIDEO CASSETTE PLAYER/RECORDER

DVD DIGTIAL VIDEO DIS PLAYER/RECORDER

DVS DIGTIAL VIDEO SCALER

EFX AUDIO EFFECTS PROCESSOR

EQU AUDIO EQUALIZER

ER EQUIPMENT RACK

FB FLOOR BOX

GAT AUDIO GATE

GUI GRAPHICAL USER INTERFACE

JB JUNCTION BOX

MIC WIRED MIC

MIX AUDIO MIXER

MJ MIC JUNCTION BOX

MON VIDEO MONITOR

MP MIC PLATE

MPA MIC PRE-AMP

MSP MIC SPLITTER

PCM PRODUCTION COMMUNICATIONS MASTER

EQUIPMENT NAME ABBREVIATIONS

ADDITIONAL RESPONSIBILITIES

AV SCHEMATIC SYMBOLS

SHEET LIST - TA SERIES

NUMBER NAME

TA001 AV SYMBOLS, NOTES, DIVISION OF LABOR

TA002 AV SCHEDULES

TA201 AV PLAN - FIRST FLOOR

TA211 AV RCP - FIRST FLOOR

TA301 AV SECTIONS, ELEVATIONS

TA401 AV RACKS, PLATES, DETAILS

TA402 AV TOUCHPANEL STORYBOARD - CONFERENCE CENTER

TA701 AV SCHEMATICS

TC001 TC SYMBOLS, NOTES, DETAILS

TC201 TC PLAN - FIRST FLOOR

TC211 TC RCP - FIRST FLOOR

CABLE TYPES - AV

CODE DESRIPTION BELDEN WEST PENN WINDY CITY OTHER

C6 CAT6 - 4 UNSHIELDED, TWISTED PAIR 7883A 4246 CAT6

CNT CONTROL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

F FIBER WIRE 1801B DA252401 OCC-DZ006TSLX9YP

HDMI PRETERMINATED HDMI CABLE - - - 4K60 CAPABLE

L LINE - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

M MIC - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

RF ANTENNA CABLE - - - CABLE TYPE AS REQUIRED BY DEVICE

S10 SPEAKER - 1 PAIR 10 GA SPEAKER WIRE 6T00UP 25210 10-02P

S12 SPEAKER - 1 PAIR 12 GA SPEAKER WIRE 6000UE 227 12-02

S16 SPEAKER - 1 PAIR 16 GA SPEAKER WIRE 6200UE 225 16-02

SDI VIDEO COAXIAL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

AV PLAN/RCP SYMBOLS

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA001

AV

SYMBOLS,

NOTES,

DIVISION OF

LABOR

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

WIRE PULL PLAN/RCP DETAIL

EQUIPMENT STYLE - EXISTING EQUIPMENT STYLE - NEW

MOUNTING HEIGHT DETAIL

PROJECTOR THROW RANGE DETAIL (RCP ONLY)

SYMBOL GENERAL ABBREVIATIONS

NTS NOT TO SCALE

OFE OWNER FURNISHED EQUIPMENT

RCP REFLECTED CEILING PLAN

RK RACK MOUNT

SR SURFACE MOUNT

SSH STANDARD SWITCH HEIGHT

SWL SAFE WORKING LOAD

TBD TO BE DETERMINED

UON UNLESS OTHERWISE NOTED

PREFIX EQUIPMENT NAME ABBREVIATIONS

PLS PLASMA SCREEN

PRB ACTIVE PRESS BOX

PRJ VIDEO PROJECTOR

PSU POWER SUPPLY UNIT

PTC PAN TILT CONTROLLER

PTU PAN TILT UNIT

PWR AC POWER DISTRIBUTION

RMT REMOTE CONTROL

RP RACK PANEL

RPB RACKMOUNT PATCHBAY

RX SIGNAL RECEIVER

SCR PROJECTION SCREEN

SEQ POWER SEQUENCING DEVICE

SIGN DIGITAL SIGNAGE PLAYER

SJ SPEAKER JUNCTION

SP LOUDSPEAKER ENCLOSURE

SPLT SIGNAL SPLITTER

STB STAGE BOX SUB SNAKE

SUB SUBWOOFER

TP TOUCH PANEL

TSG TEST SIGNAL GENERATOR

TVA MATV DISTRIBUTION AMP

TVC MATV COMBINER

TVD MATV DE-MODULATOR

TVM MATV MODULATOR

TVP MATV HETERDYNE PROCESSOR

TVR TELEVISION RECEIVER

TVS MATV SPLITTER

TVT MATV TAP

TX SIGNAL TRANSMITTER

VC VOLUME CONTROL

VCD VIDEO CASSETTE PLAYER/DVD COMBO

VCR VIDEO CASSETTE PLAYER/RECORDER

VDA VIDEO DISTRIBUTION AMP

VDR VIDEO DISC RECORDER

VJ VIDEO JUNCTION BOX

VP VIDEO PLATE

VPB VIDEO PATCHBAY

VSC VIDEO SCAN CONVERTER

VSG VIDEO SYNC GENERATOR

VSP VIDEO SIGNAL PROCESSOR

VSW VIDEO SWITCHER

VTX VIDEO TRANSFORMER

WFV WAVE FORM/VECTOR SCOPE MONITOR

WM WIRELESS MICROPHONE

WP WALL PLATE

WRX WIRELESS RECEIVER

WTX WIRELESS TRANSMITTER

XVR AUDIO CROSSOVER

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

IT

S

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA002

AV

SCHEDULES

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

AV BOX SCHEDULE

BOX # LOCATION TYPE MOUNTING HEIGHT MOUNTING TYPE

BOX & COVER

PROVIDED BY

CONN. PLATE

PROVIDED BY COMMENTS

JB-1 TABLES / CHAIR STORAGE 120 10x10x6 7' - 0" SURFACE EC AV

MP-1 HEALTH CLASSROOM 145 3 GANG DEEP 4' - 6" FLUSH EC AV

TP-1 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

TP-1 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

TP-2 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

TP-2 CONFERENCE CENTER 118 2 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

VC-1 HEALTH CLASSROOM 145 1 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

VC-2 HEALTH SIMULATION 144 1 GANG EXTRA DEEP 4' - 6" FLUSH EC AV

VJ-1 CONFERENCE CENTER 118 2 GANG DEEP 16' - 8" FLUSH EC AV

VJ-2 CONFERENCE CENTER 118 2 GANG DEEP 16' - 8" FLUSH EC AV

WB-1 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-2 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-3 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-4 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-5 CONFERENCE CENTER 118 WB-X3NK-GNG 1' - 6" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-6 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-7 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

WB-8 CONFERENCE CENTER 118 WB-X3NK-GNG 2' - 2" FLUSH AV AV COVER = WB-X3-CVR-xxx

AV DISPLAY SCHEDULE

LABEL LOCATION MAKE MODEL MOUNT

MON-1 CULINARY CLASSROOM 124 VIEWSONIC CDE6520-W LTM1U

MON-2 CULINARY CLASSROOM 124 VIEWSONIC CDE6520-W LTM1U

AV LOUDSPEAKER SCHEDULE

LABEL LOCATION MAKE MODEL ROTATION PITCH AZIMUTH

SP-1 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-2 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-3 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-4 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-5 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-6 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-7 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-8 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-9 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-10 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-11 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-12 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-13 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-14 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-15 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-16 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-17 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-18 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-19 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-20 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-21 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-22 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-23 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-24 CONFERENCE CENTER 118 QSC AD-C6T-LP

SP-S1 QSC NL-C4-WH

SP-S2 QSC NL-C4-WH

AV PROJECTION SCREEN CALCS

LABEL LOCATION MAKE MODEL

ASPECT

RATIO

SCREEN

HEIGHT

SCREEN

WIDTH

SCR-1 CONFERENCE CENTER 118 DALITE 35195L 16x9 90" 160"

SCR-2 CONFERENCE CENTER 118 DALITE 35195L 16x9 90" 160"

AV PROJECTOR CALCS

LABEL LOCATION MAKE MODEL

ASPECT

RATIO LENS

IMAGE

HEIGHT

IMAGE

WIDTH

THROW

DISTANCE

PRJ-1 CONFERENCE CENTER 118 EPSON EB-PU2213B 16x9 ELPLM15 92" 164" 26' - 0"

PRJ-2 CONFERENCE CENTER 118 EPSON EB-PU2213B 16x9 ELPLM15 92" 164" 26' - 0"

MOBILE CART, VOICE LIFT SCHEDULE

MODEL LOCATION

MOBILE CART & VOICE LIFT ADULT LEARNING CLASSROOM 128

MOBILE CART & VOICE LIFT CULINARY CLASSROOM 124

MOBILE CART & VOICE LIFT CRIMINAL JUSTICE CLASSROOM 133

MOBILE CART & VOICE LIFT CERT TESTING CLASSROOM 137

VOICE LIFT DIGITAL MEDIA CLASSROOM 135

MOBILE CART & VOICE LIFT EDUCATIONAL CLASSROOM 142

MOBILE CART & VOICE LIFT TRANSITIONS CLASSROOM 143

MOBILE CART & VOICE LIFT HEALTH CLASSROOM 145

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

PT

DISP

PT

DISP

PT

DISP

PT

DISP

PT

DISP

PT

DISP

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224

L E N

O V

O E

2 2

L O

G I T E C

H k

L E N

O V

O E

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224

L E N

O V

O E

2 2

L O

G I T E C

H k

L E N

O V

O E

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E22 24

LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224LENOVO E2224

LOGITECH k360

LENOVO E2224

L E N

O V

O E

2 2

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

L E N

O V

O E

L O

G I T E C

H k

L E N

O V

O E

WB-8

WB-1

WB-4

WB-5

W B

-7

W B

-2

W B

-3

W B

-6

JB-1

TP-2

TP-1

TP-2

TP-1

M P

-1

CRIM JUSTICE

WORKOUT

DIGITAL MEDIA

DIGITAL MEDIA

CLASSROOM

CRIM JUSTICE

CLASSROOM

CERT TESTING

CLASSROOM

ADULT LEARNING

CLASSROOM

CORRIDOR

HEALTH

SIMULATION

TRANSITIONS

CLASSROOM

EDUCATIONAL

CLASSROOM

HEALTH

CLASSROOM

WOMEN

MEN

STORAGE

MECH

JC

STORAGE

CORRIDOR

PRODUCTION

ROOM

SOUND ROOM

VEST

STUDENT

COMMONS

MEN

WOMEN

CULINARY

CLASSROOM

PASSAGE

CULINARY LAB

TABLES / CHAIR

STORAGE

DRY STOR

CONFERENCE

CENTER

CORRIDOR

ADMIN

RECEPTION

COPY

STORAGE

STORAGE

UNISEX

EXTRA OFFICE /

CONF

COUNSELOR

CLOSET

CONF

SPEC POP

COORD

WORK BASE

LEARN COORD

EXTRA OFFICE /

CONF

CTE COORD

DIRECTOR

PASSAGE

TO JB-1 TO JB-1

TO JB-1 TO JB-1

1.0" EMT

1@C6

1.25" EMT

4@C6

1.25" EMT

4@C61.25" EMT

4@C6

1.25" EMT

4@C6

1.0" EMT

1@C6

1.25" EMT

4@C6

1.25" EMT

4@C6

1.0" EMT

1@C6

1.25" EMT

4@C6

TA301

TA301

AVR-1

1.0" EMT

1@C6

1.25" EMT

4@C6

V C

-1 V

C -2

TO JB-1

TO JB-1

1.0" EMT

1@CNT

1.0" EMT

1@C6

1.0" EMT

1@CNT

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA201

AV PLAN -

FIRST FLOOR

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

1/8" = 1'-0"

AV PLAN - FIRST FLOOR - FULL BUILDING

CABLE TYPES - AV

CODE DESRIPTION BELDEN WEST PENN WINDY CITY OTHER

C6 CAT6 - 4 UNSHIELDED, TWISTED PAIR 7883A 4246 CAT6

CNT CONTROL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

F FIBER WIRE 1801B DA252401 OCC-DZ006TSLX9YP

HDMI PRETERMINATED HDMI CABLE - - - 4K60 CAPABLE

L LINE - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

M MIC - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

RF ANTENNA CABLE - - - CABLE TYPE AS REQUIRED BY DEVICE

S10 SPEAKER - 1 PAIR 10 GA SPEAKER WIRE 6T00UP 25210 10-02P

S12 SPEAKER - 1 PAIR 12 GA SPEAKER WIRE 6000UE 227 12-02

S16 SPEAKER - 1 PAIR 16 GA SPEAKER WIRE 6200UE 225 16-02

SDI VIDEO COAXIAL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

AV GENERAL NOTES

# NOTES

1 (1) MOBILE CART SYSTEM AND/OR (1) VOICE LIFT SYSTEM TO BE PROVIDED FOR THIS SPACE. SEE SCHEMATICS FOR DETAILS

2 EC TO PROVIDE (1) DATA JACK AND (1) 20A/120V CIRCUIT NEAR PROJECTOR AT THIS LOCATION

3 EC TO PROVIDE (2) DATA JACKS AND (3) 20A/120V CIRCUITS NEAR AVR-1

4 AV TO INSTALL MARSHALL CV605-U3 PTZ CAMERA ABOVE INSTRUCTOR'S STATION AT THIS LOCATION. HDMI WIRING TO TRAVEL

TO CEILING-MOUNTED DISPLAYS NEARBY. COORDINATE EXACT LOCATION W/ OWNER'S REP

5 EC TO PROVIDE 4 SQ. BACKBOX IN CEILING AT THIS LOCATION FOR WIRELESS MIC RECEIVER. PROVIDE 1.0" EMT CONDUIT PATH FROM 4 SQ BOX TO JB-1. AV TO INSTALL SHURE MXWAPT4=-Z10 TO CEILING AT THIS LOCATION.

6 AV TO INSTALL C2G 14626 WALL MOUNT SHELF NEXT TO AVR-1 AT AN APPROPRIATE MOUNTING HEIGHT. INSTALL SHURE MXWNCS4 CHARGING STATION ATOP SHELF AND PROVIDE WIRE PATH FROM CHARGING STATIONS TO AVR-1

7 AV TO INSTALL WOLFVISION CYNAP CORE PRO AND VISIONARY TX TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM

LOCATION TO JB-1 AS NEEDED

8 AV TO INSTALL CLOCK AUDIO C303W-D-P-UDP TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM LOCATION TO JB-1 AS

NEEDED

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

PT

DISP

PT

DISP

PT

DISP

PT

DISP

PT

DISP

VJ-1

VJ-2

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

PRJ-2

SCR-2

PRJ-1

SCR-1

TO JB-1

TO JB-1

1.0" EMT

1@C6

1.0" EMT

1@C6

1.0" EMT

1@CNT

1.0" EMT

1@CNT

MON-1 MON-2

SP-3

SP-2

SP-1

SP-15

SP-14

SP-13

SP-6

SP-5

SP-4

SP-18

SP-17

SP-16

SP-9

SP-8

SP-7

SP-21

SP-20

SP-19

SP-12

SP-11

SP-10

SP-24

SP-23

SP-22

5TO JB-1

1.0" EMT

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16

1@S161@S16

1@S16

1@S16

TO JB-1

1.0" EMT

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16

1@S16 1@S16

1@S16

1@S16

TO JB-1

1.0" EMT

1@S16

TO JB-1

1.0" EMT

1@S16

1.0" EMT

1@C6

1.0" EMT

1@C6

TO JB-1

1.0" EMT

1@C6

TO JB-1

TO JB-1

TO JB-1

SP-S1

SP-S2

1.0" EMT

1@C6

1.0" EMT

1@C6

1@C6

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA211

AV RCP -

FIRST FLOOR

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

1/8" = 1'-0"

AV RCP - FIRST FLOOR - FULL BUILDING

CABLE TYPES - AV

CODE DESRIPTION BELDEN WEST PENN WINDY CITY OTHER

C6 CAT6 - 4 UNSHIELDED, TWISTED PAIR 7883A 4246 CAT6

CNT CONTROL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

F FIBER WIRE 1801B DA252401 OCC-DZ006TSLX9YP

HDMI PRETERMINATED HDMI CABLE - - - 4K60 CAPABLE

L LINE - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

M MIC - 1 PR 22 GA W/ SHIELD 9451 454 22-1PREZ

RF ANTENNA CABLE - - - CABLE TYPE AS REQUIRED BY DEVICE

S10 SPEAKER - 1 PAIR 10 GA SPEAKER WIRE 6T00UP 25210 10-02P

S12 SPEAKER - 1 PAIR 12 GA SPEAKER WIRE 6000UE 227 12-02

S16 SPEAKER - 1 PAIR 16 GA SPEAKER WIRE 6200UE 225 16-02

SDI VIDEO COAXIAL WIRE - - - CABLE TYPE AS REQUIRED BY DEVICE

AV GENERAL NOTES

# NOTES

1 (1) MOBILE CART SYSTEM AND/OR (1) VOICE LIFT SYSTEM TO BE PROVIDED FOR THIS SPACE. SEE SCHEMATICS FOR DETAILS

2 EC TO PROVIDE (1) DATA JACK AND (1) 20A/120V CIRCUIT NEAR PROJECTOR AT THIS LOCATION

3 EC TO PROVIDE (2) DATA JACKS AND (3) 20A/120V CIRCUITS NEAR AVR-1

4 AV TO INSTALL MARSHALL CV605-U3 PTZ CAMERA ABOVE INSTRUCTOR'S STATION AT THIS LOCATION. HDMI WIRING TO TRAVEL

TO CEILING-MOUNTED DISPLAYS NEARBY. COORDINATE EXACT LOCATION W/ OWNER'S REP

5 EC TO PROVIDE 4 SQ. BACKBOX IN CEILING AT THIS LOCATION FOR WIRELESS MIC RECEIVER. PROVIDE 1.0" EMT CONDUIT PATH FROM 4 SQ BOX TO JB-1. AV TO INSTALL SHURE MXWAPT4=-Z10 TO CEILING AT THIS LOCATION.

6 AV TO INSTALL C2G 14626 WALL MOUNT SHELF NEXT TO AVR-1 AT AN APPROPRIATE MOUNTING HEIGHT. INSTALL SHURE MXWNCS4 CHARGING STATION ATOP SHELF AND PROVIDE WIRE PATH FROM CHARGING STATIONS TO AVR-1

7 AV TO INSTALL WOLFVISION CYNAP CORE PRO AND VISIONARY TX TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM

LOCATION TO JB-1 AS NEEDED

8 AV TO INSTALL CLOCK AUDIO C303W-D-P-UDP TO CEILING AT THIS LOCATION. PROVIDE WIRE PATH FROM LOCATION TO JB-1 AS

NEEDED

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

PRJ-1

SCR-1

PRJ-2

SCR-2

VJ-2

WB-5

TP-2TP-1

WB-4

VJ-1

13' - 8"

VJ-1

PRJ-1

SCR-1

WB-3WB-2

MON-1 MON-2

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA301

AV

SECTIONS,

ELEVATIONS

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

1/4" = 1'-0"

EAST SECTION 2

1/8" = 1'-0"

NORTH SECTION

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

PUSH

NEUTRIK

M

IC

/L

IN

E

IN

PUSH

NEUTRIK

M

IC

/L

IN

E

IN

A V

-1 A

V -2

AVR-1

DRAWER (UD2)2 RU MISC.

BLANK1 RU MISC.

A-01

(QSC CX-Q 8K4)

2 RU MAINS

BLANK1 RU MISC.

SW-2

(GSM4230PX)

1 RU AV NET

SW-1

(GSM4248PX)

1 RU AV NET

DSP-1

(QSC CORE NANO)

1 RU SHELF

DIGITAL SIGNAL

PROCESSOR

UPS-1

(UPX-2000R-2)

2 RU

2000VA POWER

BACKUP

BLANK2 RU MISC.

BLANK1 RU MISC.

GPIO-1

(QSC QIO-GP8x8)

1 RU SHELF POTS RX, FIRE ALARM

BLANK1 RU MISC.

WB-x (TYP. OF 8) FSR WB-X3-GNG-B

F U

T U

R E

TX-x (VISIONARY SOLUTIONS DUETE5-WP-WHITE)

IO-x (ATTEROTECH unD6IO)

AVR-1

DWR-16-22

16-SP WALL RACK

20A/120V

20A/120V x2

RACK NOTES:

1. INSTALL RACK RAILS AT APPROPRIATE DISTANCE FROM

BACK OF EQUIPMENT FOR LACER BARS.

2. ALL WIRING IN BACK OF RACKS SHOULD BE SECURED TO THE

LACER BARS.

3. WIRING TO AND FROM THE RACK SHALL BE RUN ON THE LEFT

HAND SIDE OF THE RACK AS YOU FACE THE REAR OF THE

RACK.

4. ALL POWER CONNECTIONS AND WIRING SHALL BE RUN ON

THE RIGHT HAND SIDE OF THE RACK AS YOU FACE THE REAR

OF THE RACK.

5. ALL WIRING SHALL BE CONTAINED IN PANDUIT FINGER TRAY

OR SIMILAR.

6. WIRING SHALL BE SEPARATED IN FINGER TRAY(S)

ACCORDING TO SIGNAL AND WIRE TYPE.

7. ALL WIRES TERMINATING IN THE EQUIMENT RACK MUST

HAVE A UNIQUE LABEL. SEE DRAWINGS FOR LABELING

DETAILS.

8. ALL EQUIPMENT SHALL HAVE A LABEL ON THE FRONT

INDICATING THE EQUIPMENT FUNCTION AND SCHEMATIC

DESIGNATION.

9. ALL NETWORKED DEVICES SHALL BE CLEARLY LABELED

WITH THE NETWORK IP ADDRESS.

10. ALL NETWORKED DEVICES SHALL HAVE STATIC IP

ADDRESSES. COORDINATE WITH THE SCHOOL IT

DEPARTMENT FOR RESERVATIONS.

11. PROGRAM AMPLIFIERS FOR SLEEP MODE WHEN THE SYSTEM

IS POWERED OFF.

EXTRON

SMB 112

2-GANG TABLETOP BOX

VIDEO TX

(VISIONARY SOLUTIONS DUETE-WP-H)

FRONT VIEW

SIDE VIEW

ETHERCON CONNECTOR

MOUNTED TO BACK OF BOX

CHIEF

CMA 395

PROJECTOR

AND MOUNT

MOUNTED TO APPROPRIATE

STRUCTURE

SIZE POLE

FOR FIELD

CONDITIONS

CHIEF

VCT000W

86" DISPLAY

(BY AV)

CHIEF XPA1U

MOBILE CART DISPLAY MOUNT

(BY AV)

86" DISPLAY - MOBILE CART

C E

N T

E R

O F

D

IS

P L

A Y

T O

P O

F D

IS

P

L A

Y

B O

T T

O M

O F

D

IS

P L

A Y

6' - 3"

MON-2MON-1

CHIEF LCM2X1U

CEILING MOUNTED 2x1 MENU BOARD

CEILINGTO CEILING STRUCTURE ABOVE

VARIABLE POSITION

MOUNTING BRACKETS

ELECTRICAL

JUNCTION BOX

AUDIENCE

SIDE

AUDIENCE

SIDE

ACCESS DOOR

(SUGGESTED) 3/8" THREADED ROD (NOT INCLUDED)

ATTACHED TO MOUNTING BRACKET

METHOD 1 METHOD 2

3/8" THREADED ROD

(NOT INCLUDED)

HANGER BRACKET

FINISHED CEILING

SELF-TRIMMING FLANGE

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA401

AV RACKS,

PLATES,

DETAILS

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

6" = 1'-0"

AV PLATES

3" = 1'-0"

RACK DETAILS

NOT TO SCALE

MOBILE VIDEO INPUT DETAIL - EXTRON SMB 112

NOT TO SCALE

PROJECTOR MOUNTING DETAIL - VCT000W

NOT TO SCALE

DISPLAY MOUNTING DETAIL - 86" - MOBILE CART

1" = 1'-0"

CULINARY LAB DISPLAY MOUNTING DETAIL

12" = 1'-0"

PROJECTION SCREEN DETAIL - RECESSED CEILING

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

HEMLOCK HIGH SCHOOL

PERFORMING ARTS CENTER

LOGO

SCREEN IS TAPPED

SPLASH PAGE

ON POWER DOWN

OR

AFTER 5 MIN. DELAY

SYSTEM

SHUTDOWN

1 2 3

4 5 6

7 8 9

LOGIN KEYPAD

LOGIN

LOGIN SUCCEEDS

MAIN PAGE

SOURCES

ROUTING

POWER

SOURCE MAIN VIDEO MAIN

ZONING MAIN POWER MAIN

FROM ANY PAGE

SOURCES

FROM ANY PAGE

ROUTING

FROM ANY PAGE FROM ANY PAGE

POWER

ZONING

SOURCES

ROUTING

POWER

ZONING

SOURCES

ROUTING

POWER

ZONING

SOURCES

ROUTING

POWER

ZONING

SOURCES

ROUTING

POWER

ZONING

ZONING

AUDIO INPUTS

M-1

V O

L

M E

T E

R

V O

L

M E

T E

R

V O

L

M E

T E

R

V O

L

M E

T E

R

M-2 M-3 M-4

V O

L

M E

T E

R

V O

L

M E

T E

R

M-5 M-6

V O

L

M E

T E

R

V O

L

M E

T E

R

M-7 M-8

M-15

V O

L

M E

T E

R

V O

L

M E

T E

R

M-16

V O

L

M E

T E

R

V O

L

M E

T E

R

M-9 M-10

V O

L

M E

T E

R

V O

L

M E

T E

R

M-11 M-12

V O

L

M E

T E

R

V O

L

M E

T E

R

M-13 M-14

V O

L

M E

T E

R

BT-1

V O

L

M E

T E

R

V O

L

M E

T E

R

BT-2 BT-3

V O

L

M E

T E

R

V O

L

M E

T E

R

BT-4 BT-5

V O

L

M E

T E

R

V O

L

M E

T E

R

BT-6 BT-7

V O

L

M E

T E

R

BT-8

V O

L

M E

T E

R

V O

L

M E

T E

R

WM-1 WM-2

V O

L

M E

T E

R

V O

L

M E

T E

R

WM-3 WM-4

VIDEO

ROUTING

PREVIEW

SCREEN

WB-1

INPUTS

OUTPUTS

PREVIEW

SCREEN

WB-2

PREVIEW

SCREEN

WB-3

PREVIEW

SCREEN

WB-4

PREVIEW

SCREEN

WB-5

PREVIEW

SCREEN

WB-6

PREVIEW

SCREEN

WB-7

PREVIEW

SCREEN

WB-8

PREVIEW

SCREEN

MOBILE-1

PREVIEW

SCREEN

MOBILE-2

ZONE 1 ZONE 2

ZONE 4ZONE 3

PROJECTORS

PRJ-2

SCREEN

CONTROLS

MASTER POWER BUTTON

ALL DISPLAYS

SYSTEM

SHUTDOWN

PROJECTION / SCREEN

CONTROLS

SYSTEM

PRJ-1

SCREEN

CONTROLS

HAV DESIGN.

55 E. Main Ave. Zeeland, MI 49464

616.836.1776

SHEET TITLE

Issue :

Project Number :

Designed By :

Drawn By :

Checked By :

Date Issue :

R e v is io n s

BIDS/PERMITS

CG-02

TGH

ADF

TGH

11/27/2023

TA402

AV

TOUCHPANEL

STORYBOARD

CONFERENCE

CENTER

C

LA

R E -G

LA

D

W

IN

R E S D

M A

G N

U S C

E N

TE

R

S

C la re A v e

C la re

M

I

12" = 1'-0"

AV TOUCHPANEL STORYBOARD - CONFERENCE CENTER

N o

D a te D e sc ri p ti o n

/2

/2

B

ID

S / P

E R

M

CONFERENCE IN WB-1

VISIONARY SOLUTIONS

DUETE5-WP-WHITE

TX-1

VIDEO INHDMI LAN 1 RJ452-M

LAN 2 RJ452-M

NET RJ452-M

CONFERENCE IN WB-1

RDL

D-XLR2M

MIC 1-2

MIC/LINE OUTXLR-M MIC/LINE IN PHX72

MIC/LINE IN PHX72MIC/LINE OUTXLR-M

CUSTOM

NP-1

8x8 PLATE

CONFERENCE IN WB-1

AV-1RJ452-M

AV-2RJ452-M

AV RACK ROOM AVR-1

NETGEAR

GSM4248PX

SW-1

PORT-1RJ452-M

PORT-2RJ452-M

PORT-3RJ452-M

PORT-4RJ452-M

PORT-5RJ452-M

PORT-6RJ452-M

PORT-7RJ452-M

PORT-8RJ452-M

PORT-9RJ452-M

PORT-10RJ452-M

PORT-11RJ452-M

PORT-12RJ452-M

PORT-21 RJ452-M

PORT-22 RJ452-M

PORT-23 RJ452-M

PORT-24 RJ452-M

PORT-25 RJ452-M

PORT-26 RJ452-M

PORT-27 RJ452-M

PORT-28 RJ452-M

PORT-29 RJ452-M

PORT-30 RJ452-M

PORT-31 RJ452-M

PORT-32 RJ452-M

SFP+ (3)SFP SFP+ (7) RJ452-M

SFP+ (4)SFP SFP+ (8) RJ452-M

SFP+ (1)SFP SFP+ (5) RJ452-M

SFP+ (2)SFP SFP+ (6) RJ452-M

PORT-13RJ452-M

PORT-14RJ452-M

PORT-15RJ452-M

PORT-16RJ452-M

PORT-17RJ452-M

PORT-18RJ452-M

PORT-19RJ452-M

PORT-20RJ452-M

PORT-33 RJ452-M

PORT-34 RJ452-M

PORT-35 RJ452-M

PORT-36 RJ452-M

PORT-37 RJ452-M

PORT-38 RJ452-M

PORT-39 RJ452-M

PORT-40 RJ452-M

AV…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .