About this file
This is a Notice of Award issued by the City of Peachtree Corners, Georgia for the PTC 23-08 LMIG Sidewalks 2024 construction project. The project involves pedestrian improvements along three roadways: SR 140/Holcomb Bridge Road, SR 141/Peachtree Industrial Boulevard, and Avalon Ridge Parkway in Peachtree Corners, Georgia. The scope of work includes construction of concrete sidewalk and curb and gutter, reconstruction of catch basins, utility adjustments and coordination, striping, guardrail installation, grading, and erosion control. Sealed bids were received by August 14, 2025 at 2:00 P.M. local time at Peachtree Corners City Hall. The City of Peachtree Corners awarded the contract to DAF Concrete, Inc., with the award issued on August 28, 2025. The successful bidder must comply with conditions precedent within 15 days of receipt of the Notice of Award, including delivery of four executed counterparts of the Agreement and required contract security and insurance documentation.
The contract price awarded to DAF Concrete, Inc. is $1,176,925.00. The project is being engineered by Keck & Wood, Inc. (Project No. 230438). The contract is funded through the Local Maintenance and Improvement Grants (LMIG) program. DAF Concrete, Inc. is located at 212 Hicks Drive, Marietta, Georgia 30060. The Owner will return one fully executed counterpart of the Agreement along with additional copies of contract documents within ten days after the bidder complies with the conditions precedent.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PTC 23_08 LMIG Sidewalks 2024 _ Advertisement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
310 Technology Parkway, Peachtree Corners, GA 30092 • 678.691.1200 • peachtreecornersga.gov
OFFICE OF PUBLIC WORKS
& ENGINEERING
Greg Ramsey, PE | Public Works Director
NOTICE OF AWARD
Date of Issuance:
Owner: City of Peachtree Corners Owner's Contract No.: PTC 23-08
Engineer: Keck & Wood, Inc. Engineer's Project No.: 230438
Project: PTC 23-08 LMIG Sidewalks 2024 Contract Name: PTC 23-08 LMIG Sidewalks
Bidder: DAF Concrete, Inc.
Bidder’s Address:
212 Hicks Drive
Marietta, GA 30060
TO BIDDER:
You are notified that Owner has accepted your Bid dated August 14, 2025 for the above Contract, and that you are the Successful Bidder and are awarded a Contract for PTC 23-08 LMIG Sidewalks 2024.
The Contract Price of your Contract is $1,176,925.00.
Four (4) unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the Contract Documents accompanies this Notice of Award, or has been transmitted or made available to Bidder electronically.
a set of the Drawings will be delivered separately from the other Contract Documents.
You must comply with the following conditions precedent within 15 days of the date of receipt of this Notice of Award:
1. Deliver to Owner four (4) counterparts of the Agreement, fully executed by Bidder.
2. Deliver with the executed Agreement(s) the Contract security and insurance documentation as specified in the Instructions to Bidders and General Conditions, Articles 2 and 6.
3. Other conditions precedent (if any): None.
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in Paragraph 2.02 of the General Conditions.
City of Peachtree Corners
Greg Ramsey, P.E.
Director of Public Works Copy: Engineer