PRS(TE_1)-Elevator_Maintenance - DRAFT.pdf
PDF 686 KB Posted
- Attached to
- Fort Leonard Wood Elevator Maintenance
- Solicitation number
- PANMCC-25-P-0000023288
About this file
This document is a Performance Requirements Summary (PRS) for an elevator maintenance contract at Fort Leonard Wood. The PRS details specific performance standards, acceptable quality levels (AQLs), and surveillance methods for various elevator maintenance services, including preventative maintenance, service calls, and state inspections. Key performance requirements include:
- Preventative Maintenance: 95% AQL for completing manufacturer-recommended tasks on schedule and logging service details
- Service Calls: 95% AQL for responding within allowable time and reporting to operations management
- State Inspections: 100% inspection for annual testing, certification, and performance verification, with immediate scheduling of any identified deficiencies
- Surveillance methods include random sampling, full inspections, and customer complaints
- Contractors must re-perform work at no additional cost if performance is deemed unacceptable
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TE_2-Elevator_Locations_and_Data - DRAFT.pdf | ||
| PWS-Elevator_Maintenance DRAFT.pdf | ||
| SCA Wage Determination 15-5093.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TE 1 – PRS
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
1. PURPOSE: This exhibit explains the requirements and standards for performance of service necessary for acceptable contract performance. It describes the quality assurance methods the Government will use to evaluate the Contractor’s performance in meeting the contract requirements and describes the responsibility of the Contractor when a standard for performance is determined to be in noncompliance with contract requirements. The Performance Requirements Summary Table in this Technical Exhibit details the following information:
1.1 Column 1 – Required service under provision of contract.
1.2 Column 2 – Standard for performance of required service.
1.3 Column 3 – The acceptable quality level (AQL) for performance of required service. The AQL is the maximum percent defective (or the number of defects per hundred units) that, for purposes of sampling inspection can be considered satisfactory.
1.4 Column 4 – The inspection method and frequency that required services will be evaluated by the Government.
2. BASIS FOR GOVERNMENT’S QUALITY ASSURANCE PROCEDURES: The primary quality assurance procedures that will be used by the Government to inspect and evaluate a Contractor’s performance will be random sampling, 100% inspection and customer complaints.
3. DETERMINATION OF CONTRACTOR’S PERFORMANCE
3.1 If the number of defects for a specific service is equal to or greater than the AQL maximum allowable degree of deviation, the service shall be determined unacceptable.
3.2 When performance in any specific service is determined unacceptable and clearly, the fault of the Contractor, the Contractor shall re-perform the work at no additional cost to the Government.
DRAFT
TE 1 – PRS
PERFORMANCE REQUIREMENTS SUMMARY TABLE
Required Service PWS Reference / Standard AQL Surveillance
Preventative Maintenance
1.14 and 5.2:
All manufacturer’s recommended tasks accomplished as scheduled; Recorded on the elevator log sheet; Reported to the
OMD on the day of service
95% Random Sampling
Inspections and Customer Complaints
Government Requested Service
Calls
1.14 and 5.3:
Responded within allowable time;
Recorded on the elevator log sheet;
Reported to the OMD on the day of service
95% of total service calls per month
Random Sampling Inspections and Customer
Complaints
Government Requested Service
Calls – Service Calls with same complaint for same elevator
5.3.2:
More than 4 service calls within one year for same elevator with same complaint 100% Random Sampling
Inspections
State Inspection, Testing and
Certification / Performance
Verification Testing
1.14 and 5.5:
Inspections, testing and certification accomplished annually; Results reported within 14 calendar days of completion
100% 100% Inspections
State Inspection, Testing and
Certification / Performance
Verification Testing Results
5.5:
Number of deficiencies covered under this contract are limited; Deficiencies scheduled for repair immediately
100% 100% Inspections
DRAFT