Technical Exhibit #2 – Performance Requirements Summary (PRS) The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance thresholds provided below describe the minimum acceptable levels of service required for each requirement.
Performance
Objective
Performance
Standard
Performance
Threshold
Method of
Surveillance
Incentive/Disincentive
Para. 1.4 PWS
Hours of
System
Availability and
Technical
Support
-Fax system shall be operational 365 days yearly 12 hours daily between
0630AM–0630PM
CST
-Technical support shall be available
365 days yearly 12 hours daily between 630AM-
0630 PM CST
-Communication system -
95%compliance.
Technical support
98% compliance.
Random or
Scheduled
- Positive Contractor Performance
Assessment System Reporting.
- Negative Contractor Performance
Assessment System Reporting
- No award of option years.
Para. 1.5 PWS
Performance
Quality
Contractor shall supply copies of any changes to the
Quality Control
Plan (QCP) to the
COR and KO within 5 working days of the change.
100% compliance
Random
-Positive Contractor Performance
Para. 3 PWS
Technical
Requirements
The contractor’s fax system shall support the maximum required storage capacity of 10GB per account/mailbox
-95% compliance
Random
Para. 4 PWS
Functional
Requirements:
*File Formats
*Seamless
Send Process
The contractor’s system shall support the requirement for multiple file formats and seamless send process.
- 98% compliance
Random
Para. 5 PWS
Privacy of
Protected
Health
Information
Privacy of
Protected Health
Information shall be accomplished.
- 100%
Compliance
Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this
PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.
PRS Description of contents:
a. PRS #: indicates the numbering sequence within the PRS table.
b. Performance Objective: PWS paragraph number(s) specifying each required task(s) and brief summary of required task(s) to be monitored.
c. Performance Standard: appropriate performance standard, usually described in terms of quality and timeliness, so that a distinction can be made between satisfactory and unsatisfactory performance.
d. Actual Quality Level (AQL): This column lists the maximum allowable degree of deviation from perfect performance of each requirement (If applicable, state the sampling method utilized (i.e. ANSI/ASQ Z1.4)) before the Government considers contractor performance unsatisfactory. An AQL does not say the contractor may knowingly offer defective service to the
Government, but recognizes defective performance sometimes happens unintentionally.
e. Workload Indicator(s)/Lot size: This column indicates what will be directly utilized to obtain the lot size and validate the performance objective is achieved.
f. Method of Surveillance: method(s) utilized to objectively perform surveillance of requirement.
g. Consequence of failure to achieve the AQL