Promaster estimate ITB 5959 District 3 ~1.pdf

PDF 50 KB Posted

Attached to
NOTICE - Mobile Unit Retrofit
Solicitation number
S-10000-00011450
Issued by
Hood River County, Oregon

About this file

This document is an estimate provided by The VanLife Collective for a custom interior design and installation project for a 2022 Promaster 159 high 2500 vehicle. The estimate includes detailed pricing for various components such as a custom interior blueprint, flooring, insulation, fans, wiring, windows, battery system, cabinetry, and running boards, totaling $45,524.16. The project scope involves designing and installing a desk, counter partition, computer monitor layout, and other customized features for the client. The estimate outlines the steps required to proceed with the project, including signing the estimate, providing a 50% deposit, and scheduling the work based on availability and lead times. The document also includes notes about potential charges for "no shows" during the project timeline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ESTIMATE

The Vanlife Collective 1537-B Osprey Dr Hood River, OR 97031 info@thevanlifecollective.com +1 (541) 224-6966 https://thevanlifecollective.com

Eduardo Sanabria Bill to

Eduardo Sanabria

Estimate details

Estimate no.: 1353 Estimate date: 04/29/2024

Vehicle Type, Height & Length: Promaster 159 high 2500 Vehicle Year: 2022

# Date Product or service Description SKU Qty Rate Amount

1. Summary Basic Interior — painted wall panels -white Battery System to maintain computers and printer Serve people through slider door Shelf to store items -- Printer -Some locking shelves -Side steps -Desk and chairs to attach to driver wall

1 $0.00 $0.00

2. Custom Blueprints CAD drawing for custom design. We want to make sure the cabinets we build are what you are looking for.

You may submit a design payment of $2000 for this portion before committing to the project. Depending on revisions, the price of the cabinets may be adjusted

Items to design -Desk -Counter Partition in slider doorway -Battery cabinet position relative to "counter partition" -Potential layout to mount computer monitors

1 $2,000.00 $2,000.00

3. Foundation Floor Std Length 1/2 in composite sublfoor Lonseal Flooring

1 $3,958.70 $3,958.70

4. Thinsulate entire van 600L Thinsulate throughout van.

Walls, ceiling, slider door and rear doors included.

Options to add on:

Thins600L_6 1 $1,804.50 $1,804.50 mailto:info@thevanlifecollective.com tel:+1 5412246966

5. Maxxfan 7500 smoke (Installed) Fan Install Package.

For the front sprinter fan only, the fan adaptor is removed

Maxxfan7500_3 1 $997.50 $997.50

6. Prewire Wall Circuit Harness 14/2 to each wall panel for localized lights and 12V sockets. Spade Connectors 120V plug x4 - Hardwired 10AWG to secondary fuse block (opposite battery side) - Deutch Connectors

Prewire_Wallpackage1 $812.00 $812.00

7. Prewire Lights Prewire 14/2 to light run. Terminates in spade connector at ceiling, integrating with ceiling assembly.

Central dimmer or switch optional

Prewire_lightrun2/2.5 1 $439.23 $439.23

8. Prewire Alternator DCDC harness

1/0 from starter battery to house battery DC-DC charger 1/0 local frame ground Split loom under chassis Anderson Connector

Prewire_Alt4 1 $885.96 $885.96

9. Prewire Shore Power Noco 15 amp plug installed in side of wall.

Priced for van with no walls

Install_ShoreNoco1 1 $201.11 $201.11

10. Large Window (Installed) For use as "Pass through counter" Install a window in van body. --Slider door awning

LargeWindow 1 $1,561.95 $1,561.95

11. Custom Battery Box (Installed) Custom battery box - fit to Promaster Wheel Well -Size: 400ah -Inverter: 2000w victron -DCDC/MPPT : Kisae 1250 (Alternator and Solar Ready) -On plugs for easy removal *Add prewiring separately

CustomJuice 1 $12,750.37 $12,750.37

12. Panel Package (Installed) Walls and Ceiling, treated for mold (backside) and painted on the front.

4x Dimmable Lights are included in the ceiling

Timber_24 1 $6,307.90 $6,307.90

13. Custom Floor to Ceiling Cabinet 42" W x 46" H x 13" D shelving with a locking door.

Add another 42" unit with no door for +$750

Custom_TallCab_30 1 $2,188.69 $2,188.69

14. Custom Cabinet Simple Desk, Drivers Side Forward, white laminate Dimensions TBA, approx 36w x 27h x 22d Locking filing cabinet fits under desk

CustomCab 1 $2,263.75 $2,263.75

15. Fiamma F80 10'6" Awning for Sprinter (Installed)

Fiamma install to factory roof rails $199 Shipping included.

Fiamma_Sprinter_6 1 $3,476.00 $3,476.00

16. Custom Floor to Ceiling Cabinet Cabinet in the slider door that acts as partition. It will partly block the doorway, Custom_TallCab_30 1 $3,972.50 $3,972.50 allowing entrance, and will have a flip up counter to block the rest of the door when needed.

On the inside -- 2 doors give access to shelving for storage.

17. Running Boards (installed) Passenger and Driver side Running boards.

High clearance Not compatible with undermount tanks.

Running_general_6 1 $1,904.00 $1,904.00

Note to customer Thank you for considering The VanLife Collective for your upcoming project. We've prepared an estimate that outlines the scope of work, labor, and products involved. If you have any questions or require further clarification, please don't hesitate to reach out to us.

To proceed with the project, please follow these steps:

1. Return a signed copy of this estimate to info@thevanlifecollective.com 2.We will send you an invoice for deposit of 50% of the cost of the project.

(For larger custom projects with separate materials and time, we ask for 100% of materials and 50% of projected labor)

3. Upon payment of the deposit, we will schedule your project with consideration to your availability and our lead times.

We understand that schedules can be dynamic. If you need to reschedule, kindly provide as much notice as possible. Please be advised that 'no shows' may incur a charge of up to 4 hours of labor.

Total $45,524.16

Accepted date Accepted by

File details come from the government source that posted it. Updated .