PROJECTDESCRIPTION Access Rd.pdf
PDF 183 KB Posted
- Attached to
- MT DAR 2021(1), Defense Access Roads FY 2021
- Solicitation number
- 69056721B000006
About this file
This document provides a project description and scope of work for roadway resurfacing and improvements along Minuteman Missile Base routes in Montana. The proposed contract involves resurfacing over 145 miles of existing roads with new aggregate and calcium chloride application, as well as isolated drainage upgrades and cattle guard repairs. The work is separated into three schedules ranging from 39 to 57 miles and is required to be completed by November 2022. The estimated value of the contract is between $4 million to $7 million. Services include construction surveying, quality control, sampling and testing, erosion control measures, dust control watering, excavation and embankment work, riprap installation, aggregate base courses, road reconditioning, stabilized aggregate surfacing, culvert installation, structural plate repairs, fence and cattle guard relocation, equipment rental, labor, topsoil and turf establishment, and temporary traffic control. The solicitation will be issued by the Federal Highway Administration Department of Transportation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT DAR 2021(1), Defense Access Roads FY 2021
The work consists of roadway reconditioning, aggregate surfacing, aggregate stabilization, drainage improvements, cattle guard and culvert replacement.
Project length: Schedule A: 39.11 miles
Schedule B: 48.94 miles Schedule C: 57.16 miles
Tentative Fixed Completion Date: November 2022 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $4 million to $7 million
Location: 25 Miles W of Great Falls, MT
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc h N am e
_A
A dd iti on al S ch
Sc h
N am e
_B iti on al
N am e
C
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes 157 Soil Erosion & Sediment Control (erosion control devices)
Fiber Roll
1,180 LNFT
Check Dam
30 EACH
Fiber Roll
1,180 LNFT
Check Dam
30 EACH
Fiber Roll
1,680 LNFT
Check Dam
30 EACH
158 Watering for Dust Control 2,761 MGAL 3,592 MGAL 4,235 MGAL
DIVISION 200 – Earthwork 204 Excavation & Embankment Unclassified Borrow
123 TON
Unclassified Borrow
123 TON
Unclassified Borrow
123 TON
O ne
S ch ed ul e Sc h N am e
_A iti on al
N am e
_B iti on al
N am e
C
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 2
48 CUYD
Class3
66 CUYD
Ditch Class2
211 LNFT
Class 2
48 CUYD
Class3
66 CUYD
Ditch Class2
211 LNFT
Class 2
48 CUYD
Class3
66 CUYD
Ditch Class2
211 LNFT
DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 620 TON 620 TON 620 TON 302 Minor Crushed Aggregate 2,295 TON 3,075 TON 3,285 TON 303 Road Reconditioning 201,220 LNFT 258,402 LNFT 301,804 LNFT 311 Stabilized Aggregate Surface Course Aggregate
94,529 TON
Calcium Chloride
1,806 TON
Aggregate
124,660 TON
Calcium Chloride
2,343 TON
Aggregate
148,331 TON
Calcium Chloride
2,765 TON
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 24 Inch Culvert
90 LNFT
72 Inch Culvert
68 LNFT
24 Inch Culvert
90 LNFT
72 Inch Culvert
68 LNFT
24 Inch Culvert
146 LNFT
72 Inch Culvert
68 LNFT
603 Structural Plate Structures (culverts & drains)
Cleaning Culvert
7 EACH
Repairing Drainage Structure
13 EACH
Cleaning Culvert
9 EACH
Repairing Drainage Structure
18 EACH
Cleaning Culvert
13 EACH
Repairing Drainage Structure
19 EACH
619 Fences, Gates, Cattle Guards & Bollard Posts
Remove and Reset Fence
475 LNFT
Remove and Reset Fence
475 LNFT
Remove and Reset Fence
475 LNFT
622 Rental Equipment (yes/no) Yes Yes Yes 623 General Labor (yes/no) Yes Yes Yes 624 Topsoil (landscaping & related items) 855 SQYD 1,080 SQYD 1,215 SQYD 625 Turf Establishment (indicate seeding or mulching separately) 855 SQYD 1,080 SQYD 1,215 SQYD 629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) 611 SQYD 611 SQYD 611 SQYD 635 Temporary Traffic Control – Flagger 2,540 HR 3,220 HR 3,580 HR
File details come from the government source that posted it. Updated .