Project Statement 24222.pdf

PDF 129 KB Posted

Attached to
751/24222. SMD; Sturgeon Pt Lighthouse - HS Report
Solicitation number
RFP-171-240000002921-1
Issued by
Alcona County, Michigan

About this file

This document is a Project Statement from the State of Michigan Department of Technology, Management and Budget (DTMB) for a Historic Structures Report for the Sturgeon Point Lighthouse Station. The Department of Natural Resources (DNR) is seeking a Professional Services Consultant (PSC) specializing in historic architecture for maritime buildings to complete the report. The report will provide an overview of the historic development of the site and recommendations to preserve, maintain, and interpret the lighthouse tower, keepers' residence, and remaining outbuildings. The RFP has a mandatory pre-proposal meeting on August 26, 2024, and proposals are due on September 12, 2024. The selected PSC is expected to begin work on October 7, 2024, and submit the completed Historic Structures Report by February 1, 2025. The PSC must have a minimum of 10 years of historic preservation experience and have completed at least 3 previous Historic Structures Reports.

The Project Statement provides details on the anticipated schedule, submission requirements, and contact information for questions. It also outlines the desired scope of work, including historical documentation, conditions assessment, and recommended treatments. The PSC must comply with all relevant federal, state, and local regulations and standards, and the project will require close coordination with the State Historic Preservation Office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0427 (R 10/22)

PROJECT STATEMENT

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

3111 West St. Joseph Street Lansing, Michigan 48909

FILE NUMBER

751/24222.SMD

PROPOSAL DUE DATE

Thursday, September 12, 2024, at 2:00 p.m., EST

CLIENT AGENCY

Department of Natural Resources

PROJECT NAME AND LOCATION

Sturgeon Point Lighthouse – Historic Structures Report

PROJECT ADDRESS (if applicable) 6071 E. Point Rd., Harrisville, MI 48740

CLIENT AGENCY CONTACT

Ronda Osga, Gaylord District Regional Field Planner

TELEPHONE NUMBER

989.619.6426

DTMB - DCD PROJECT DIRECTOR

Scott DeKorte

TELEPHONE NUMBER

616.490.6169

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:

MANDATORY Pre-Proposal Meeting 11:00 a.m., EASTERN on Monday, August 26, 2024, at the Sturgeon Point Lighthouse

MANDATORY (Check box if Mandatory)

PROJECT DESCRIPTION/SERVICES REQUESTED:

Project Details:

Sturgeon Point Lighthouse Station HSR

WIP HAR-15-010

National Register of Historic Places, Reference #84001370

Project Description:

The DNR Parks and Recreation Division is pursuing funding to complete a Historic Structures Report for the Lighthouse Station associated outbuildings and remaining historic site features. The selected Professional Services Consultant shall specialize in historic architecture for maritime buildings. The Secretary of the Interior’s Standards for Rehabilitation, Guidelines for Rehabilitating Historic Buildings, and the National Park Service Historic Lighthouse Preservation Handbook must guide materials investigation methods and proposed treatments to protect the historic integrity of the buildings.

Project Background Sturgeon Point Lighthouse is in northeastern lower Michigan five miles north of Harrisville on Lake Huron.

Built in 1869 by the U.S. Lighthouse Board. The lighthouse and keepers’ residence are constructed of brick masonry on an ashlar limestone foundation. The tower stands 70 feet, 9 inches tall and is 16 feet in diameter at its base which tapers to 10 feet at the lantern room, which can be reached by a spiral staircase on the interior. The tower has four windows, one each that face the cardinal points of a compass, provides natural light for the interior. The lantern room features a three-and-a-half-order Fresnel lens which is said to have provided a light that could be seen for up to 15 miles.

The lighthouse remained under the operation of the U.S. Lighthouse Service until 1939, when the U.S Lighthouse Service merged with the U.S. Coast Guard. In 2005, ownership was transferred from the U.S.

Coast Guard to the Michigan Department of Natural Resources under the terms of the National Historic Lighthouse Preservation Act. The property is currently comanaged by DNR and the Alcona Historical Society.

Existing Documentation:

The DNR is in possession of some historic documents including photos, aerial photos, site maps, topo maps, original drawings, etc. which will be made available to the awarded PSC firm.

Proposed Scope of Work The purpose of the Historic Structures Report is to provide an overview of the historic development of the site as well as specific recommendations to preserve, maintain and interpret the lighthouse tower, attached keepers’ residence and remaining outbuilding.

Proposed scope of work includes but is not limited to, the following:

• Historical documentation and analysis of the buildings and site.

• Building chronology.

• Identification of materials and features that are significant to the structure.

• Recommended period of Interpretation.

• Conditions assessment of all buildings and any remaining historic site features.

• Paint analysis.

• Structural analysis

• Mortar analysis.

• Building code, life safety, accessibility evaluation.

• Hazardous material assessment.

• Recommend overall treatment approach.

• Prioritization of recommended treatments and cost estimates.

Experience:

The PSC shall demonstrate appropriate historical building / restoration experience relevant to the work described within the RFP to assist the State in determining key firm experience. The PSC shall provide a certified historic architect as part of the team for the project. The project will require close coordination with the State Historic Preservation Office. PSC firm shall have ten (10+) minimum years’ experience with historic preservation. PSC firm shall have completed a minimum of three (3) HSR previously.

Approach:

The PSC’s approach to the work will be evaluated as part of the RFP. The PSC shall provide a detailed description of the process / methods / techniques to be utilized in completing the work. The PSC shall develop an overall schedule for the project.

Anticipated Schedule:

Planned dates are as follows –

1. RFP Issued – August 12, 2024

2. RPF on Site Walk-Thru – August 26, 2024 – 11:00am

3. RFP Question Deadline – September 04, 2024 – 3:00pm

4. RFP Addendum Issuance – September 06, 2024

5. RPF Due – September 12, 2024 – 2:00pm

6. RFP Reviews Completed – September 17, 2024, +/-

7. PSC Contract Execution – September 26, 2024, +/-

8. PSC Begin Work – October 07, 2024, +/-

9. PSC Kick-off Meeting (On site) - TBD

10. PSC Review Research Findings Meeting (On site) - TBD

11. PSC Review Existing Conditions Meeting (On site) - TBD

12. PSC Issuance of Completed HSR – February 01, 2025.

Please NOTE:

• Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as the bid amount.

• Firms are encouraged to combine their technical and cost proposals into one (1) attachment for proposal submission.

• Please remember that attachments can be no larger than 25mb.

• Please do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response. SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.

• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov

• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).

• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.

• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.

• Responses should not be emailed to the Project Director.

NIGP CODES

90607, 90633, and 90648

DESIRED SCHEDULE OF WORK

Refer to schedule above

ACCEPTING RFP QUESTIONS UNTIL:

Please do not submit online questions via VSS. ALL questions should be emailed to Scott DeKorte at dekortes@michigan.gov address no later than 3:00 p.m., Eastern on Wednesday, September 4, 2024.

REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.

This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov mailto:dekortes@michigan.gov

File details come from the government source that posted it. Updated .