About this file

This document is a Project Statement issued by the Michigan Department of Technology, Management and Budget (DTMB) for architectural and engineering services related to roofing restorations at the East Side of the Carson City Correctional Facility in Ionia County, Michigan. The requested services encompass preliminary design, final design, construction administration, and field inspection for replacing the existing metal roofing, underlayment, flashing, and accessories on several buildings, including housing units, administration, and maintenance facilities. The new metal roofing system shall be based on the Firestone UNA-CLAD-UC-14 product used for adjacent buildings. Proposals must be submitted electronically through the SIGMA VSS system by February 29, 2024, at 2:00 PM Eastern. A mandatory pre-proposal walkthrough is scheduled for February 15, 2024, at 11:00 AM at the project site. All contractor/vendor representatives attending the walkthrough must submit a LEIN request form five business days prior.

The total cost for all requested services should be provided as the bid amount. NIGP codes include 90607, 92588, and 92533. The desired construction start is in the Spring of 2024. Questions should be emailed to the DTMB Project Director by February 22, 2024, at 2:00 PM Eastern. This project will comply with all applicable federal, state, and local regulations and standards.

View the file

Other files

File Type Posted
RFP 24057.pdf PDF
LEIN Check 24057.pdf PDF
SAMPLE Billable Rate Contract (Rev 221207).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0427 (R 10/22)

PROJECT STATEMENT

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

3111 West St. Joseph Street

Lansing, Michigan 48909

FILE NUMBER

472/24057.TYC

PROPOSAL DUE DATE

February 29, 2024, at 2:00 p.m., EASTERN

CLIENT AGENCY

Department of Corrections

PROJECT NAME AND LOCATION

East Side Roofing- Carson City Correctional Facility

PROJECT ADDRESS (if applicable) 10274 Boyer Road, Carson City, Michigan 48811

CLIENT AGENCY CONTACT

Corey Daly

TELEPHONE NUMBER

(517)927-3326

DTMB - DCD PROJECT DIRECTOR

Todd Cordill, NCARB

TELEPHONE NUMBER

(517)897-7017

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:

Thursday, February 15, 2024, 11:00 am at Building 100 (Administration), Carson City Correctional Facility.

The street address is listed above.

MANDATORY (Check box if Mandatory)

LEIN Check (Department of Corrections ONLY) All contractor / vendor representatives attending Preproposal Walk Through Meeting must submit a Vendor / Contractor LEIN Request form five business days prior to the meeting date (See the attached Vendor/Contractor LEIN Request Form). Send the LEIN Request form, filled and signed, by email to Daniel T. Smith at email address: smithD76@michigan.gov .

The email “Subject” must include (facility name, project name, date and time of Pre-Proposal Walk Through Meeting).

PROJECT DESCRIPTION/SERVICES REQUESTED

The Department of Technology, Management and Budget (DTMB) is requesting architectural and engineering services for roofing restorations at several existing housing buildings at the east side of the Carson City Correctional Facility. The subject existing buildings are as follows: Housing units A/B, C/D, E/f, G/H; East Administration; MSI building; and Maintenance. The above-mentioned buildings have existing metal roofing with exposed fasteners. The existing metal roofing, underlayment, flashing, and accessories shall be replaced. Each existing building shall also have new roof decking as needed. The existing decking shall be inspected and evaluated by the professional services contractor. The new metal roofing system and accessories shall be based on Firestone UNA-CLAD-UC-14 roofing panels (standing seam metal roofing). This system was used for re-roofing of the adjacent east side gymnasium, education, and food service buildings several years ago.

This request is for services encompassed by Phase 400 Preliminary Design, Phase 500 Final Design, Phase 600 Construction Administration/ Office, and Phase 700 Construction Administration/ Filed Inspection Services.

Please NOTE:

• Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as the bid amount.

• Firms should only submit one (1) attachment (being less than 6 MB) for proposal submission. The attachment is to be the technical and cost proposal combined.

mailto:smithD76@michigan.gov

• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response.

SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.

• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov

• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).

• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.

• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.

• Responses should not be emailed to the Project Director.

NIGP CODES

90607 92588 92533

DESIRED SCHEDULE OF WORK

Construction beginning Spring of 2024

ACCEPTING RFP QUESTIONS UNTIL:

Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Todd Cordill at cordillt1@michigan.gov address no later than 2:00 p.m., Eastern on Thursday, February 22, 2024.

REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DHHS, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.

This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov mailto:cordillt1@michigan.gov